Methodology
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
Contents
- ·Edition home
- ·Executive summary
- 1Money meets risk
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5A loss year that meets tight public budgets
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- A.1 Methods
- A.2 Model card, Resilience Investment Model v0
- A.3 The baseline evidence cut
- A.4 Evidence age and coverage
- A.5 Evidence cards, two anchor sources
- A.6 Publication acceptance record
- A.7 Status words
- A.8 How the edition is made, released and corrected
- A.9 Glossary and abbreviations
- A.10 Technical annex
- BData appendix
- CReferences and record
- ·Complete edition, for print
A.1Methods
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | Result |
|---|---|---|---|
| (1) | Insured share of overall disaster losses, 2025 | 108 ÷ 224 | ≈ 48% |
| (2) | Share of loss and damage fund pledges received | 397.74 ÷ 790.24 | ≈ 50% |
| (3) | 2025 cat bond issuance relative to year-end outstanding (not a growth rate) | 25.6 ÷ 61.3 | ≈ 42% |
| (4) | Average commitment per resilience facility arrangement | 10.3 ÷ 27 | ≈ 0.38 SDR billion |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| Label | Rule |
|---|---|
| Reported | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Estimated | Nexus analytical value with stated method |
| Scenario | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, Resilience Investment Model v0
- Model ID
- MDL-SR14-INVESTMENT · v0.1
- Purpose
- represent resilience investment as a connected system and the mechanisms by which money, losses and cover move between energy, infrastructure, adaptation and recovery
- Family
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- Method
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- Validation
- none yet, first validation against federation evidence in 2027
- Uncertainty
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for asset-, site- or country-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-STRATEGIC-INVESTMENT-GLOBAL-2026-B0
- Type
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 44 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 resilience investment annual cut
Lineage
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | 2027 global annual |
|---|---|---|
| Sources | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | Resilience Investment Model v0 specification | model runs with receipts |
| Findings | twelve baseline findings | findings re-bound to federation evidence |
| Review | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | Observed | Released | Cadence | Next release |
|---|---|---|---|---|
| Energy investment | 2026 estimate | May 2026 | annual | 2027 |
| US asset condition | 2025 | Mar 2025 | four-yearly | 2029 |
| Disaster losses | 2025 | Jan to Mar 2026 | annual | 2027 |
| Cat bond market | 2025 | early 2026 | quarterly | next quarterly report |
| Climate finance landscape | 2023 | Jun 2025 | biennial | 2027 |
| Climate finance decision | 2024 | Nov 2024 | one-off | none scheduled |
| Loss and damage fund | Sep 2025 | Nov 2025 | per meeting | next Board report |
| IMF resilience facility | to Feb 2026 | Mar 2026 | annual | 2027 |
| US grant round | 2026 | Sep 2026 | per round | selection results |
| National plans | 2023 to 2026 | 2025 to 2026 | per plan | not scheduled |
| System | Coverage | Thinnest dimension |
|---|---|---|
| Energy | GOOD | grid and storage detail |
| Infrastructure | PARTIAL | condition outside the US |
| Disaster losses | GOOD | comparability of series |
| Risk transfer | PARTIAL | public cover data |
| Climate finance | PARTIAL | private adaptation finance |
| Recovery funds | THIN | payment speed |
| National portfolios | THIN | common basis |
| Multilateral lending | PARTIAL | country-level use |
| Field | Source that would fill it | Blocker |
|---|---|---|
| Resilience share of national investment on a common basis | national budget offices and statistics offices | not published on a common basis; no consolidated series |
| Split between upkeep and new build in national portfolios | national infrastructure plans | not retrieved; plans use different categories |
| Grid investment detail from the full IEA World Energy Investment 2026 report | IEA World Energy Investment 202636 | the report page returned an access error; only the launch presentation was read |
| Adaptation finance needs and gap from the UNEP Adaptation Gap Report 2025 | UNEP Adaptation Gap Report 202535 | the report page returned an access error; figures seen only in search summaries |
| Disaster cost and return figures from the UNDRR GAR 2025 itself | UNDRR GAR 202523 | the report pages returned access errors |
| Swiss Re Institute sigma 1/2026 text and protection gap | Swiss Re Institute sigma 1/202625 | the sigma page returned an access error; figures come from a trade report |
| Ten-year funding total of the UK infrastructure strategy | UK Infrastructure: A 10 Year Strategy1428 | the publication page read gives no total; the parliamentary statement returned an access error |
| Size and term of the German special fund from the Finance Ministry page | Federal Ministry of Finance29 | the page returned a service error; split and term come from a law-firm note |
| Japan five-year plan details from the Cabinet Secretariat | Cabinet Secretariat plan documents17 | only a press report gave the total; the plan page read states a review cycle but no amount |
| Australian Disaster Ready Fund audit results | Australian National Audit Office30 | the audit page returned a service error |
| Private adaptation finance by country | Climate Policy Initiative full report6 | the full report exceeded the size the fetch tool accepts; the landing page gives no private figure |
| Envelope of the EU competitiveness fund | European Commission proposal2031 | sources differ; the Commission page returned an error |
A.5Evidence cards, two anchor sources
Issued by the International Energy Agency. Annual. Role: binds ENE-001. Coverage: global. The 11-page launch presentation was read; the full report was not opened.
EVD-SR14-001
IEA World Energy Investment 2026 launch presentation1
Issued by the UN climate process. Per Board meeting. Role: binds CLI-008. Resources as at 23 September 2025.
EVD-SR14-002
Report of the Board of the Fund for responding to Loss and Damage8
| Dimension | EVD-SR14-001 | EVD-SR14-002 |
|---|---|---|
| Completeness | slides only; sector detail partly in charts | status of resources stated in full |
| Timeliness | about 5 months into the year | about 7 weeks after the reporting date |
| Revision | estimates for 2026 will be revised | figures change at each Board meeting |
| Method transparency | method sits in the full report, not opened | trustee reporting stated |
| External validation | agency review | trustee and Board review |
Evidence cards to follow in 2027
- IEA36: grid and storage tables in the full report
- UNEP35: need and gap tables
- UNDRR23: investment and return chapters
- Swiss Re Institute25: protection gap section
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Group | Area | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- Maps
- plates in Q2 2027
- Waivers
- none
A.7Status words
| Status | What it means |
|---|---|
| Observed | Measured directly and published by the source. |
| Reported | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| Estimated | A Nexus estimate from cited evidence, with its method in Annex A. |
| Modelled | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Scenario | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Step | What happens | Source |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Term | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Coupling | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| ASCE | American Society of Civil Engineers |
| CPI | Climate Policy Initiative |
| EIB | European Investment Bank |
| GAO | US Government Accountability Office |
| GAR | Global Assessment Report on Disaster Risk Reduction |
| IEA | International Energy Agency |
| IMF | International Monetary Fund |
| NCQG | new collective quantified goal on climate finance |
| RSF | Resilience and Sustainability Facility |
| SDR | special drawing right |
| UNDRR | United Nations Office for Disaster Risk Reduction |
| UNEP | United Nations Environment Programme |
A.10Technical annex
| Item | Annex | Contents | Status |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-SR14-PRT-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Regional notes | regional investment cards | WITH REGIONAL EDITIONS |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: adaptation finance
- Construct
- finance tracked as supporting adaptation to climate change, from public and private sources
- Unit
- USD billion a year
- Method
- bottom-up tracking of public, private and multilateral flows
- Source
- Climate Policy Initiative landscape6
- Uncertainty
- the tracker calls its figure likely an underestimate
- Known limits
- tracking gaps, domestic flows and private flows differ by region
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 36UNVERIFIED, not opened: IEA (ed.), World Energy Investment 2026 full report (grid investment near USD 550 billion in 2026, from press summaries); the report page returned an access error. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: UNEP (ed.), Adaptation Gap Report 2025: Running on Empty, taken from search-result summaries (needs USD 310 to 365 billion a year by 2035; international public adaptation finance USD 26 billion in 2023; 59% as debt); the report pages returned access errors. United Nations Environment Programme, Nairobi. Observation year 2025. Accessed 2026-11-03.back
- 23UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays, taken from search-result summaries; the report pages returned access errors; no figure used in the findings. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-03.back
- 25UNVERIFIED, not opened: Swiss Re Institute, sigma 1/2026, Natural catastrophes in 2025, taken from a trade report and search-result summaries; the sigma page returned an access error. Swiss Re Institute, Zurich. Observation year 2025. Accessed 2026-11-03.back
- 14HM Treasury and NISTA (eds.), UK Infrastructure: A 10 Year Strategy (publication page; published 19 June 2025; no funding total on the page). UK Government, London. Observation year 2025. Accessed 2026-11-03.back
- 28UNVERIFIED, not opened: UK Parliament, written statement HCWS717 on the 10 Year Infrastructure Strategy, June 2025, taken from search-result summaries; the page returned an access error; no figure used. UK Parliament, London. Observation year 2025. Accessed 2026-11-03.back
- 29UNVERIFIED, not opened: German Federal Ministry of Finance, Special fund infrastructure and climate neutrality (EUR 500 billion total, from a search summary); the page returned a service error. Bundesministerium der Finanzen, Berlin. Observation year 2025. Accessed 2026-11-03.back
- 17Cabinet Secretariat of Japan (ed.), Fundamental Plan for National Resilience (English page; the plan is reviewed about every five years; no five-year amount on the page read). Cabinet Secretariat, Tokyo. Observation year 2023. Accessed 2026-11-03.back
- 30UNVERIFIED, not opened: Australian National Audit Office, Award of funding under the Disaster Ready Fund, audit report, taken from search-result summaries; the page returned a service error. Australian National Audit Office, Canberra. Observation year 2025. Accessed 2026-11-03.back
- 6Climate Policy Initiative (ed.), Global Landscape of Climate Finance 2025 (publication page, 23 June 2025; global climate finance USD 1.9 trillion in 2023; adaptation finance USD 65 billion, likely an underestimate; international flows to emerging and developing economies USD 196 billion, 78% public). Climate Policy Initiative, London. Observation year 2023. Accessed 2026-11-03.back
- 20European Parliament (ed.), European Competitiveness Fund, legislative observatory summary (proposed envelope EUR 234.3 billion for 2028 to 2034; multiannual financial framework described as a EUR 2 trillion budget). European Parliament, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 31UNVERIFIED, not opened: trade-press reports of the European Competitiveness Fund envelope (figures between EUR 409 billion and EUR 451 billion), taken from search-result summaries; the figures conflict with the Parliament summary [20]. Observation year 2025. Accessed 2026-11-03.back
- 1IEA (ed.), World Energy Investment 2026, launch presentation (11 pages, Paris, 28 May 2026; global energy investment USD 3.4 trillion in 2026 estimate against USD 2.6 trillion in 2015; electricity supply and infrastructure USD 1.6 trillion). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-03.back
- 8UNFCCC (ed.), Report of the Board of the Fund for responding to Loss and Damage, addendum FCCC/CP/2025/10/Add.1, 10 November 2025 (pledges USD 790.24 million and amount received USD 397.74 million at 23 September 2025; 27 contributors). United Nations Framework Convention on Climate Change, Bonn. Observation year 2025. Accessed 2026-11-03.back
