Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

Systems in depth

One section per system: its state at evidence close, its exposures and what the operational series will watch.

10 min read0 figures5 tables25 notesNR-REGIONAL-SAS-2026-BASELINE

உள்ளடக்கம்
  1. ·Edition home
  2. ·Executive summary
  3. 1South Asia’s risk travels through rivers, monsoons and shared supply
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Second deficient monsoon with unsettled river treaties
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
    1. 8.1 Member countries: the baseline regional chapter
    2. 8.2 Shared basins and grids: the baseline regional chapter
    3. 8.3 Hub list: the baseline regional chapter
    4. 8.4 Regional pathway: the baseline regional chapter
  11. AMethodology
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

8.1Member countries: the baseline regional chapter

The registry names one member edition for South Asia, India. The other seven states are read as a reference group, using the same published series, so that the member is seen in its setting. They have no edition in the registry and are never joined to the region on code alone.

1,991million

people in eight states, 2025 (ESTIMATED)1

5,234Mt CO₂e

emissions excluding land use, 2024 (ESTIMATED)3

4,985US$ billion

output of seven states, 2025 (ESTIMATED)2

Table 8.1Member system cards at baseline
MemberState at baselineசான்றுகள்நிலை
India (member)population 1,463.9 million; emissions 4,371.2 Mt; fossil 75.8% of electricity; PM2.5 at 54.1 µg/m³; 2026 monsoon at 87% of average134827அறிவிக்கப்பட்டது
Reference: Pakistanpopulation 255.2 million; renewable water 226 m³ per person; withdrawals at 326%; floods in 2025 affected at least 5.8 million; poverty at $3.00 a day 23.0%161116அறிவிக்கப்பட்டது
Reference: Bangladeshpopulation 175.7 million; fossil 97.7% of electricity; PM2.5 at 69.3 µg/m³; 18.1 million projected at IPC Phase 3 or worse14817அறிவிக்கப்பட்டது
Reference: Afghanistanpopulation 43.8 million; 13.8 million projected at IPC Phase 3 or worse; about 2.65 million returns; electricity access 87.8%1518அறிவிக்கப்பட்டது
Reference: Nepalpopulation 29.6 million; hydro 98.7% of electricity; paddy down 4.2% in 20251420அறிவிக்கப்பட்டது
Reference: Sri Lankapopulation 21.8 million; Cyclone Ditwah damaged paddy in November 2025; cereals 5.5 Mt in 2025119அறிவிக்கப்பட்டது
Reference: Bhutan and Maldivespopulations 0.80 and 0.53 million; Bhutan 70.4% forest and 51.6% protected; 49% of Maldives people below 5 m1713அறிவிக்கப்பட்டது

Couplings across members

  • CLI → WAT across the Indus and Ganges plains (India, Pakistan, Bangladesh)
  • WAT → ENE hydropower in Nepal and Bhutan and the links to India
  • CLI → FOO monsoon deficits into rice and wheat output
  • FIN ← CLI losses carried by households and budgets across borders

Evidence to bind in 2027

  • emissions on national inventory basis
  • flood loss and heat death series by state
  • condition of nature outside protected areas

8.2Shared basins and grids: the baseline regional chapter

Shared rivers, glaciers and power links carry risk across borders. This chapter names each system, the states involved and the evidence read at baseline. Rows without a source are designed empty states.

326%

Pakistan withdrawals against internal water, 20226

2river treaties

Indus 1960 and Ganges 19963940

12 Dec 2026reported expiry

Ganges Water Treaty40

Table 8.2Shared basins and seas
BasinMembers involvedசான்றுகள்நிலை
IndusIndia, Pakistan, Afghanistan; Court of Arbitration award of 31 August 2026, rejected by India2238அறிவிக்கப்பட்டது
GangesIndia, Bangladesh, Nepal; treaty reported to expire in December 202640அறிவிக்கப்பட்டது
Brahmaputra and MeghnaIndia, Bangladesh, Bhutan; no source read37NOT BOUND
Hindu Kush Himalaya glaciersall eight states in or beside the range; glaciers retreating, no figures read2137அறிவிக்கப்பட்டது
Table 8.3Shared grids and gas networks
GridMembers involvedசான்றுகள்நிலை
India, Nepal and Bhutan power linksNepal and Bhutan draw nearly all electricity from hydropower; flows and capacity not bound4NOT BOUND
India and Bangladesh power linkBangladesh draws 97.7% from fossil fuels; flows not bound424NOT BOUND
Electricity access87.8% in Afghanistan, 95.7% in Pakistan, 97.9% in Nepal in 20245அறிவிக்கப்பட்டது
Border crossing at Gyirongbadly damaged by a flash flood on 26 August 2026; casualty figures not bound25அறிவிக்கப்பட்டது

Couplings through shared systems

  • CLI → WAT → ENE low flow into hydropower and cooling water
  • WAT → FOO irrigation across the Indus plains
  • CLI → INF a glacier hazard cutting a border crossing
  • WAT → governance treaty positions into flow management

Evidence to bind in 2027

  • Indus flows and reservoir storage
  • Ganges treaty status
  • cross-border power flows
  • glacier mass change by basin

8.3Hub list: the baseline regional chapter

The hubs the series registry names for this region and for its member country. The list is read from the registry, so a change there changes this page.

பதிவேடு

Regional hubs
Bengaluru
Desks with a remit
The Global Centre for Risk and Innovation (GCRI) · the Global Risks Forum (GRF) · GRX
Registry record
NR-REGIONAL-SAS-2026-BASELINE-v1.0.0
Table 8.4Member hubs as the registry names them
HubMemberRegistry roleMember edition
BengaluruIndiaG20 · hubin preparation

What a hub does in this series

  • Hub terms of reference are not set at baseline
  • Hub contact points are not named at baseline
  • The registry names the hubs and the desks with a remit; working arrangements follow from Q1 2027

8.4Regional pathway: the baseline regional chapter

The regional pathway is the route through which the series will read South Asia as one region from 2027. This page states what exists today and what comes next. It does not describe any body that has not been constituted.

Table 8.5The regional pathway at baseline
கட்டம்What exists todayநிலைNext
Regional hubBengaluru is named in the series registryNAMEDterms set from Q1 2027
DesksGCRI, GRF and GRX hold the remit for regional editions in the registryNAMEDwork plan for Q1 2027
Evidence graphmember and regional findings share identifiersPREPAREDfirst sealed cut NQ-REG-SAS-2027-Q1
Member editionsIndia in preparationMIXEDreview through the chain before release

Open at baseline

  • Constitution of any regional council or working group
  • Hub terms of reference and contact points
  • The route from the one registry member to the seven reference-group states

Decisions that rest elsewhere

  • Water, energy and health policy rest with national authorities
  • River treaties are made and interpreted by their parties and courts; this edition cites them and decides nothing
  • Membership of any regional association is a decision of its member states and is not set by the registry

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1DATA VINTAGE AFTER CLOSE: World Bank (ed.), World Development Indicators, SP.POP.TOTL population total, Afghanistan, Bangladesh, Bhutan, India, Maldives, Nepal, Pakistan and Sri Lanka (data service, source updated 8 October 2026). World Bank, Washington. Observation year 2025. Accessed 2026-11-03.back
  2. 3World Bank (ed.), World Development Indicators, EN.GHG.ALL.MT.CE.AR5 total greenhouse gas emissions excluding LULUCF and EN.GHG.CO2.MT.CE.AR5, eight states. World Bank, Washington. Observation year 2024. Accessed 2026-11-03.back
  3. 2World Bank (ed.), World Development Indicators, NY.GDP.MKTP.CD GDP in current US dollars, NY.GDP.PCAP.CD and NY.GDP.MKTP.KD.ZG, eight states (latest value 2025; Afghanistan 2024). World Bank, Washington. Observation year 2025. Accessed 2026-11-03.back
  4. 4World Bank (ed.), World Development Indicators, EG.ELC.FOSL.ZS, EG.ELC.HYRO.ZS, EG.ELC.COAL.ZS, EG.ELC.RNEW.ZS and EG.FEC.RNEW.ZS, electricity and energy shares, eight states (latest value by state: 2021 to 2024). World Bank, Washington. Observation year 2024. Accessed 2026-11-03.back
  5. 8World Bank (ed.), World Development Indicators, EN.ATM.PM25.MC.M3 mean annual PM2.5 exposure (2023) and SH.STA.AIRP.P5 mortality rate attributed to household and ambient air pollution (2019), eight states. World Bank, Washington. Observation year 2023. Accessed 2026-11-03.back
  6. 27S. Valadbaygi (ed.), India Baseline Edition 2026 (draft pack read for findings CLI-002 and CLI-003: 2026 monsoon at 87% of the long period average; the weather-service statements it cites were read by that edition, not by this one). GCRI for the Nexus Consortium, Toronto, 2026. Observation year 2026. Accessed 2026-11-03.back
  7. 6World Bank (ed.), World Development Indicators, ER.H2O.INTR.PC renewable internal freshwater resources per person and ER.H2O.FWTL.ZS annual freshwater withdrawals as a share of internal resources, eight states. World Bank, Washington. Observation year 2022. Accessed 2026-11-03.back
  8. 11World Bank (ed.), World Development Indicators, SN.ITK.DEFC.ZS prevalence of undernourishment and SI.POV.DDAY poverty headcount at $3.00 a day (2021 PPP), eight states (no value for Bhutan and Maldives undernourishment; poverty years 2019 to 2024). World Bank, Washington. Observation year 2024. Accessed 2026-11-03.back
  9. 16Food and Agriculture Organization (ed.), GIEWS Country Brief: Pakistan (reference date 6 February 2026; cereal output about 53 Mt in 2025; floods affected at least 5.8 million people; about 10 million at IPC Phase 3 or worse April to July 2025). FAO, Rome. Observation year 2025. Accessed 2026-11-03.back
  10. 17Food and Agriculture Organization (ed.), GIEWS Country Brief: Bangladesh (reference date 4 September 2026; 2026 paddy forecast 61.9 Mt; 18.1 million projected at IPC Phase 3 or worse September to December 2026). FAO, Rome. Observation year 2026. Accessed 2026-11-03.back
  11. 5World Bank (ed.), World Development Indicators, EG.ELC.ACCS.ZS access to electricity, eight states. World Bank, Washington. Observation year 2024. Accessed 2026-11-03.back
  12. 18Food and Agriculture Organization (ed.), GIEWS Country Brief: Afghanistan (reference date 15 September 2026; 13.8 million projected at IPC Phase 3 or worse; about 2.65 million returns by late July 2026). FAO, Rome. Observation year 2026. Accessed 2026-11-03.back
  13. 20Food and Agriculture Organization (ed.), GIEWS Country Brief: Nepal (reference date 18 August 2026; cereals 11.1 Mt and paddy 5.7 Mt in 2025, paddy down 4.2%). FAO, Rome. Observation year 2025. Accessed 2026-11-03.back
  14. 19Food and Agriculture Organization (ed.), GIEWS Country Brief: Sri Lanka (reference date 31 August 2026; cereals 5.5 Mt in 2025; Cyclone Ditwah damage to paddy, November 2025). FAO, Rome. Observation year 2025. Accessed 2026-11-03.back
  15. 7World Bank (ed.), World Development Indicators, AG.LND.FRST.ZS forest area, ER.LND.PTLD.ZS terrestrial protected areas and AG.LND.AGRI.ZS agricultural land, eight states (forest and agricultural land 2024; protected areas 2025). World Bank, Washington. Observation year 2025. Accessed 2026-11-03.back
  16. 13World Bank (ed.), World Development Indicators, VC.IDP.NWDS new internal displacement associated with disasters (2023) and EN.POP.EL5M.ZS population in low elevation coastal zones below 5 m (2015), eight states. World Bank, Washington. Observation year 2023. Accessed 2026-11-03.back
  17. 22T. Gamble-Eddington, Court of Arbitration Finds that the Indus Water Treaty Remains in Force (International Law in Brief, 21 September 2026; award and order of 31 August 2026, PCA Case No. 2023-01). American Society of International Law, Washington. Observation year 2026. Accessed 2026-11-03.back
  18. 40Government of the Republic of India and Government of the People’s Republic of Bangladesh (parties), Treaty on sharing of the Ganga/Ganges waters at Farakka, done at New Delhi, 12 December 1996 (text read; Article XII: in force for thirty years from signature and renewable by mutual consent; that no renewal was signed and talks had not begun by 4 August 2026 is from K. Padmanabhan, ThePrint, 4 August 2026). Joint Rivers Commission, Dhaka and New Delhi. Observation year 2026. Accessed 2026-11-05.back
  19. 43National Disaster Management Authority, Pakistan (ed.), Situation reports (page opened; the Monsoon 2025 tab lists no reports, so no season toll was read and none is used in the findings). NDMA, Islamabad. Observation year 2025. Accessed 2026-11-05.back
  20. 39Government of India, Government of Pakistan and International Bank for Reconstruction and Development (parties), The Indus Waters Treaty 1960 (with annexes), signed at Karachi, 19 September 1960; United Nations Treaty Series, vol. 419, No. 6032. United Nations, New York, 1962. Observation year 1960. Accessed 2026-11-05.back
  21. 38Permanent Court of Arbitration (ed.), The Indus Waters Western Rivers Arbitration (Islamic Republic of Pakistan v. Republic of India), PCA Case No. 2023-01: press release on the Award on the Status of the Indus Waters Treaty in Respect of India’s Decision on Abeyance and the Order on Interim Measures concerning the Ratle Hydro-Electric Plant (31 August 2026; the treaty remains fully in force; concreting of the Ratle dam wall and power intake limited until 90 days after the Neutral Expert’s final decision, expected in July 2027). PCA, The Hague. Observation year 2026. Accessed 2026-11-05.back
  22. 37P. Wester, A. Mishra, A. Mukherji and A. B. Shrestha (eds.), The Hindu Kush Himalaya Assessment: Mountains, Climate Change, Sustainability and People. Springer, Cham, 2019 (bibliographic record opened in Crossref; volume not read; no figure drawn from it). Observation year 2019. Accessed 2026-11-03.back
  23. 21World Meteorological Organization (ed.), State of the Climate in Asia 2025 (series page opened, published 17 June 2026; the page states no South Asia figures). WMO, Geneva. Observation year 2025. Accessed 2026-11-03.back
  24. 24Ember (ed.), Bangladesh electricity country page (fossil 98%, solar and wind 1.5% in 2025; the year was stated in the headline only; read through a page summary). Ember, London. Observation year 2025. Accessed 2026-11-03.back
  25. 25S. J. Cook, The August 2026 Rasuwa disaster (blog post, 10 September 2026; ice-rock avalanche, initial volume about 100 million cubic metres; no precise casualty figure). Royal Scottish Geographical Society, Perth. Observation year 2026. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Print

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF113 pages972 KBTagged, with bookmarks

      SHA-256 89b8246dff4bc9dead8b095bf3e8be2463fbba37f32a0e0c884836124aa97e1e

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF123 pages990 KBTagged, with bookmarks

      SHA-256 2a36ebcee6c03a394769b1f55a244149989043f431c6c15f24e0da7c20ff483e

  • Web edition

  • Data bundle

    • Indicators, CSV

      20 indicators with unit, year, status and source

      NR-REGIONAL-SAS-2026-BASELINE-indicators.csv1 KB

      SHA-256 c0bb6afc3ff01b05ebd6dbd566c9125f87f57df1c1dc4e01485659aeadb385dc

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-REGIONAL-SAS-2026-BASELINE-indicators.json3 KB

      SHA-256 45487fdf00901bfa27864428350d19ff545810c990da37ba7c347c1456db6a52

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-REGIONAL-SAS-2026-BASELINE-findings.csv3 KB

      SHA-256 374f092e5a2c7de23f9fb6d7b0c875e62c609874703037d784411d8e1ca0899e

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-REGIONAL-SAS-2026-BASELINE.bib1 KB

      SHA-256 92cb3c8618224e844dc22c52e83850779ab7da3452768f248244bdcbc57a1527

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-REGIONAL-SAS-2026-BASELINE.ris1 KB

      SHA-256 d8373545721ad35ae6a9e8352bed5aad8e5b1f73329ce8b02dc663efb6683fe8

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-REGIONAL-SAS-2026-BASELINE.cff1 KB

      SHA-256 b4b5cd02ea3c9620522be25c9c70d9b3378ce2e8116f25a0f3fdd4defae28644

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 8: Systems in depth. In South Asia Regional Systems Risk and Resilience Report 2026: Baseline Edition, The State of South Asia’s Interdependent Systems. (Baseline Edition 2026, Report No. NR-REGIONAL-SAS-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

அறிக்கைகள்பங்களி

Send evidence or a correction on South Asia.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the GCRI Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems Evidence deskRegional Systems
Contribution form · reports.contribution.gcri

தனிப்பட்ட தரவு, உணர்திறன் வாய்ந்த உள்கட்டமைப்பு விவரங்கள் அல்லது பகிர உங்களுக்கு உரிமை இல்லாத எதையும் ஒருபோதும் அனுப்ப வேண்டாம். ஒரு பங்களிப்பு பயன்படுத்தப்படும் முன் மதிப்பாய்வு செய்யப்படுகிறது; அதை அனுப்புவது எந்த ஆசிரியர் உரிமையையோ பதிப்பு உரிமையையோ வழங்காது, நிதியுதவி ஒருபோதும் ஒரு கண்டுபிடிப்பை விலைக்கு வாங்காது.

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace