The Global Centre for Risk and Innovation (GCRI)
The public technical tools of Biodiversity Nexus: what can be learned from them, the data behind them and their limits.
Data and technical methods · Workspace WS-75
| Land cover change composite | v5.5 | Open | DERIVED |
| Species occurrence records | v1.8 | Open | OBSERVED |
| Protected and conserved areas layer | v3.8 | Open | OFFICIAL |
| Ecosystem condition model | v5.4 | Open | MODELLED |
share used vs alert level
Biodiversity Nexus · PipelinePipeline, in outline: domain structure with placeholder names and illustrative values, not a record.
Biodiversity Nexus tools are the public technical views the platform releases on biodiversity and nature: maps and model descriptions, each with its time and space reference, sources, licence and uncertainty. Analysis runs in Nexus Foundry for authorized projects, and data that is not released is not available through these pages.
Fig.A programme from scoping to the owner's decision. Design, not a record.
Urban demand centres and the hubs that anchor digital and data infrastructure, shown for Indonesia as an example geography for this subject.
Analysis runs in Nexus Foundry for authorized projects. Public pages show released views only, each with its time and space reference and its rights.
Each term as this page uses it. Where a standard-setting body defines the term, the wording follows that body.
| Term | Definition |
|---|---|
| Public-safe release | A recorded decision on the detail at which a layer may be published without exposing sensitive sites or people. |
| Coordinate reference system | The definition that ties coordinates to locations on Earth, catalogued with EPSG codes. |
| Model card | A short document describing a model's intended use, training data, performance and limits. |
The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.
The current service level is R0: information and enquiries. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.