Skip to content

GCRI · اقلیم و مخاطره‌ها

روش‌های داده و فنی

The public technical tools of Climate and Hazards: the models and data behind them, how to reproduce a view and the uncertainty it carries.

01فضای کار

The workspace for data and technical methods.

Build workspace

Climate and hazards · Data and technical methods · Run R-0324 · Example interface, not a record

Run in progressGCRI · Climate and Hazards

Runs

same inputs, versioned

R-8008Climate and atmosphericv3.10.76در حال اجرا
R-3128Earth and geophysicalv9.30.49Failed test
R-5157پیش‌بینیv6.60.80Passed
R-6078Extreme value theoryv8.30.85Failed test

کارت مدل

روش
علوم اقلیم و جو
ورودی‌ها
Reanalysis, Downscaled projections ensemble
اعتبارسنجی
held-out period, skill reported
برچسب
مدل‌سازی‌شده

Run log

  1. 00:00:43اطلاعاتIngest reanalysis
  2. 00:04:12اطلاعاتSchema and licence checks passed
  3. 00:07:40هشدارGap filled by interpolation, flagged
  4. 00:15:03انجام‌شدهCalibration complete
  5. 00:21:55دروازهIndependent test queued
Build workspace.رابط تصویری؛ داده‌های زنده نیست.

Climate and Hazards · Build workspace. Build workspace: example names and illustrative values, not a record.

02ابزارها

What is published here.

نقشه‌ها

نقشه‌های منتشرشده

Open the released maps

مدل‌ها

Reviewed models and scenarios

Open the reviewed models

Scenarios

Sector scenarios

Open the sector scenarios

03Fitness for purpose

What every hazard tool should state about itself.

Hazard tools serve planners, engineers and climate service providers. A specialist checks the observational baseline, the ensemble and scenario, and the downscaling and bias correction before using any layer. Tools draw on climate science, extreme value statistics and spatial statistics, and support the climate projections and compound hazards topics.

  • Scenario and period behind each projection.
  • Whether a product is observed, reanalysis or modelled.
  • Bias correction and downscaling used.
04فرایند

نحوهٔ اجرای فرایند.

Process explorer · Process

Data and technical methods: Build, sign and accept

10 steps4 مرحله2 دروازه

فرایند

Data and technical methods: Build, sign and accept

An admitted mission becomes a cycle project; the build is pinned, verified and signed, and the Global Risks Forum (GRF) records acceptance for exercise, not permission to deploy.

  1. 01 Request and sources

    1. 01Admitted mission becomes a cycle projectسابقه · جهان to FoundryAn admitted mission becomes a cycle project with a decision case.
    2. 02Qualify data sources and resourcesStep · the Global Centre for Risk and Innovation (GCRI)GCRI qualifies data sources and resource offers and builds the scenario models. An offer is not an allocation.
  2. 02 Build and verify

    1. 03Source snapshotسابقه · NXS-FAC (blueprints, builds and signing)The snapshot pins the commit, dependencies and generator versions.
    2. 04Build contractRecord · NXS-FAC (blueprints, builds and signing)The build contract declares the artefact kind, environment and reproducibility envelope.
    3. 05Integrate and buildModel · GCRIGCRI integrates software and data, signs builds, and tests security and interoperability.
    4. 06Verification suiteGate · NXS-FAC (blueprints, builds and signing)Required and advisory checks stay separate. Reproducibility needs pinned inputs, declared nondeterminism and independent rebuilds.
  3. 03 Sign and admit

    1. 07Sign the exact artefactStep · NXS-FAC (blueprints, builds and signing)NXS-FAC builds, attests and requests a signature via a scoped signer identity. It holds no key material.
    2. 08Package admissionگام · NXS-NXQ (software, models and capability lifecycle)NXS-NXQ receives the signed package and keeps admission evidence that binds the task, data class, evaluation suite and expiration.
  4. 04 Accept

    1. 09گزارش ساخت هستهسابقه · GCRIThe Core Build Report is the go or no-go record. Universe assembles the Core and holds the decision for the exercise.
    2. 10⁨G3⁩ · ساخت برای تمرین پذیرفته شددروازه · The Global Risks ForumGRF records whether the build is accepted for exercise. A signed build or release candidate is not permission to deploy to production.

سال برنامه · NXS-FAC · UniverseDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The record order follows the Builds and Releases room lists of NXS-FAC.

05Build environment

Working with the tools.

Analysis runs in ⁨Foundry⁩ for authorised projects. Public pages show released views only, each with its time and space reference and its rights.

06منابع

Where this page’s references lead.

نهادها و اسنادی که این صفحه بر پایهٔ آن‌ها خوانده می‌شود. وضعیت و ویراست‌ها تغییر می‌کنند؛ هر پیوند به نهاد صادرکننده می‌رود.

07صفحه‌ها

Pages in Data and technical methods.

08پرسش‌ها

پرسش و پاسخ.

Can I use the data?
Each released view states its licence and terms. Data that is not released is not available through these pages.
گزارش‌هامشارکت

شواهد را از همین صفحه ارسال کنید.

گزارش‌ها is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

GCRIاقلیم و مخاطراتریسک و تاب‌آوری سامانه‌های جهانیسیگنال رصدخانهسناریو و آزمون تنش
اقلیم و مخاطرات

یک روش، یک مجموعه‌داده یا یک پرسش بیاورید.

اطلاعات و درخواست‌ها امروز باز است. هر درخواست یک شمارهٔ پیگیری می‌گیرد و گام بعدی را مشخص می‌کند؛ درخواست‌های عضویت، پرداخت‌ها، تخصیص رایانش و ثبت‌نام‌ها تنها زمانی باز می‌شوند که تیم، شرایط و ظرفیت داوری آن‌ها فراهم باشد.