Skip to content

GCRI · Digital Public Infrastructure

Reviewed models and scenarios

Model descriptions for Digital Public Infrastructure are published here once reviewed, with their assumptions, evidence and validation. They describe models; they are not live simulations.

02What is shown

Released, referenced and rights-cleared.

  • Time and space reference for every view.
  • Sources and licence.
  • Uncertainty and known limits.
  • Version and date of release.
03Model classes

The kinds of model DPI work relies on.

Model classOpen examplesQuestion it answersValidation
Exclusion analysisSurvey-based estimationWho is left outField studies
Service continuity modelsDependency modelsOutage effectsIncident records
04Process

How the process runs.

Process explorer · Process

Reviewed models and scenarios: Hazard, exposure, vulnerability

10 steps4 stages

Process

Reviewed models and scenarios: Hazard, exposure, vulnerability

In IPCC AR6 Working Group II, climate risk results from interactions between hazards and a system's exposure and vulnerability, and responses can add risk.

  1. 01 Drivers

    1. 01HazardDataset · DPI operatorThe potential occurrence of a natural or human-induced physical event or trend that may harm people, property, services or ecosystems.
    2. 02ExposureDataset · DPI operatorThe presence of people, livelihoods, species, ecosystems, infrastructure or assets in places and settings that could be adversely affected.
    3. 03SensitivityDataset · DPI operatorThe degree to which a system or species is affected, either adversely or beneficially, by climate variability or change.
    4. 04Capacity to cope and adaptDataset · DPI operatorThe ability of systems, institutions, humans and other organisms to adjust to damage, take opportunities or respond to consequences.
  2. 02 Assessment

    1. 05Risk from responsesComponent · DPI operatorRisks from climate responses arise when responses miss their objectives, or from trade-offs or negative side effects.
    2. 06VulnerabilityComponent · DPI operatorThe propensity or predisposition to be adversely affected. It includes sensitivity to harm and lack of capacity to cope and adapt.
    3. 07RiskModel · Digital Public InfrastructureRisk results from dynamic interactions between hazards and the system's exposure and vulnerability. Each may be uncertain and change.
  3. 03 Response

    1. 08Risk management and responseStep · DPI operatorRisk management is plans, actions, strategies or policies that reduce the likelihood or size of adverse consequences.
    2. 09Residual riskRecord · DPI operatorThe climate impact risk that remains after adaptation and mitigation efforts. Adaptation can redistribute risk between areas and groups.
  4. 04 Decision

    1. 10Decision by the responsible partyDecision · DPI operatorThe framing names no single decision maker. Decisions on responses rest with the responsible party under its own rules.

Outline of an external standard or method, from its public sources. It describes what the framework says, not a record of any run. It does not show that Nexus or any partner performs, certifies or approves a step. A gate is a step of the method, never a Nexus approval.

05Status

Releases appear as they are reviewed.

Analysis runs in Foundry; reviewed releases are listed here.

07Questions

Questions and answers.

Can I request a map or model?
Write to Contact with what you need and why.
ReportsContribute

Contribute evidence from this page.

Reports is the Consortium's quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

GCRIDigital Public InfrastructureStrategic SystemsExponential Technology
Digital Public Infrastructure

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.