Trigger verification
Historical forecasts are compared with observed events to estimate how often a proposed trigger would have hit, missed or falsely activated.
GCRI · Disaster Resilience and Recovery
Forecasting supplies the lead time that early warning and anticipatory action depend on. In this field the emphasis is on how forecasts become triggers and warnings, and on verifying them against what happened so that action thresholds rest on demonstrated skill.
Forecasting and time-series analysis predict future values of variables from past observations and explanatory information. They support early warning and planning across hazards, markets and health. In disaster and crisis and climate and hazards, forecasts trigger early action and anticipatory finance before shocks materialise. Probabilistic forecasts allow decisions to account for uncertainty across connected systems. The canonical description is on the STEM Commons.
Historical forecasts are compared with observed events to estimate how often a proposed trigger would have hit, missed or falsely activated.
The lead time at which flood forecasts reach usable skill is estimated for each river reach, setting how early action can begin.
Seasonal rainfall outlooks are evaluated for the regions and seasons where they show skill, and used only there to trigger preparedness.
Flood water, rain, population density and true-colour imagery over the Philippines, from NASA GIBS. Each layer carries its own date.
The interactive map needs JavaScript; the layer list and sources are below.
Layers 4
Hazards now, for this page
Keyboard, with the map focused
Hold Ctrl or ⌘ and scroll to zoom
Latest available
NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © OpenStreetMap contributors (ODbL) · Natural Earth
Loading the latest NASA imagery.
Drag to move. Ctrl or ⌘ and scroll, pinch or the buttons to zoom; hover for the values under the pointer; reset returns to the region.
Hazards now, framed on the Philippines.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.
Layers and dates
Datasets and records used by forecasting and time-series analysis on this platform, with the role each plays and the label its values carry. Sources are listed in the source register.
| Data | Role | Label |
|---|---|---|
| GloFAS forecasts and reforecasts | Flood trigger design | FORECAST |
| Seasonal forecast archives | Drought trigger design | FORECAST |
| Observed event records | Verification | OBSERVED |
| Impact databases | Linking hazard to impact | REPORTED |
The screen a team would use to follow this method: its measures, states and decisions. Names are examples and values are illustrative.
Disaster resilience · Forecasting for early action · Run R-6827
held-out period
| T+2 | 0.11 | 0.14 | 0.31 | Skilful |
| T+4 | 0.25 | 0.23 | 0.10 | Skilful |
| T+6 | 0.21 | 0.14 | 0.21 | Skilful |
| T+8 | 0.38 | 0.22 | 0.26 | Marginal |
Forecasts are evaluated out of sample with proper scoring rules and reliability diagrams. Rolling-origin evaluation tests performance over time.
| Check | How it is done |
|---|---|
| Hindcast verification | Triggers are tested on past forecasts before use |
| Contingency table scores | Hit rate, false alarm ratio and related scores are reported |
| Impact link check | Thresholds are checked against recorded impacts, not hazard values alone |
Structural breaks and regime changes undermine models trained on the past. Forecast skill typically declines rapidly with lead time.
Assembled from the Nexus Standards area profile Early warning and anticipatory action: the hazards it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Choose the components, pick an initiating hazard and step through the cascade. The Map view places the run on an example geography with open data. Every coupling weight is a stated assumption you can change. A teaching model, not a forecast, an assessment or a certification. To model a place of your own choosing, open the full System Builder.
Hazards
Systems and couplings
Controls
NS-0 Constitution and principlesNS-3 Risk record UNIs (grammar, legacy crosswalk, allocation authority)NS-9 Contextual UNIs (deployments, instances, programme instances)NS-10 Policies and clauses (machine-readable obligations: definition, binding, evaluation and enforcement)NS-11 Verification and monitoring (evidence, attestations, zero-trust conformance observation)NRS-C7 Early warning, triggers and anticipatory actionNRS-S9 System profile: NXS-AAP (Anticipatory action and triggers)NRS-H117 Hazard family: Social cohesion and atrocity risk (NHS-1 soc.cohesion)NRS-H83 Hazard family: Health system capacity failure (NHS-1 health.system)NRS-H98 Hazard family: Agentic AI acting at scale (NHS-1 tech.ai-agentic)NRS-H22 Hazard family: Solar-terrestrial storms (NHS-1 space.solar-storm)Observation
Example geography
The model, its assumptions, its data and its uncertainty, in the form a scientist or engineer would check. Structures follow published methods. The values drawn are illustrative, not findings.
How far the outlook for forecasting for early action could spread, shown as ranges rather than a single line.
Climate and Hazards stewards forecasting and time-series analysis for the Consortium and reviews how it is applied across platforms.
Process explorer · Process
9 steps·3 stages·1 gate
Process
The WMO flood forecasting manual and Early Warnings for All describe the chain from forecast to action, across EW4All's four pillars.
Neutral outline of a published external standard or method, from its issuing body. Not a record of operation. Nexus does not perform, certify or approve any step shown. A gate or decision belongs to the party the source names.
Reports is the Consortium's quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.
Never send personal data, sensitive infrastructure detail or anything you have no right to share. A contribution is reviewed before use; sending it confers no authorship or editorial rights, and sponsorship never buys a finding.
Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.
Maps, data and figures on this site are shown for context and general information. They are not advice, forecasts or warnings; the limits of the information are set out in the Disclaimers and Data Notices.
This site uses only strictly necessary cookies to work and to remember your privacy choices. Nothing loads from other companies, and we never sell or share your personal information.
This site uses only strictly necessary cookies to work and to remember your privacy choices. Nothing loads from other companies, and we never sell or share your personal information. We run no advertising. You can review your choices at any time through Privacy choices at the foot of every page.