डेवलपर
risk_register_template
NXS Risk Intelligence API
GET /v1/gcri/registers/template EServed
Sector risk register template
A blank risk register structured on the ISO 31000 process stages (edition not re-read: unverified), seeded with candidate lines from NHS-1 for the sector and scope: candidate causes and consequences from recorded relations and candidate NIS-1 indicators. Likelihood, consequence, rating, owner and treatment are caller fields. Not an assessment. State: exists.
MCP tool: risk.register_template
प्राचल
| नाम | In | प्रकार | यह क्या करता है |
|---|---|---|---|
industry वैकल्पिक | query | string | ISIC Rev.5 section letter A to V (filters), or a 2, 3 or 4 digit division, group or class (accepted by pattern, no filter until the dimensions package merges) |
jurisdiction वैकल्पिक | query | string | ISO 3166-1 alpha-3 country code (e.g. CAN, validated by pattern), a UN M49 region code (e.g. 150) or a regime id (eu, au, asean, un). This product holds no place data, so coverage says none |
hazard वैकल्पिक | query | string | NHS-1 hazard id, family or domain, e.g. water.flood or atmo.cyclone.tropical-cyclone Example: water |
indicator वैकल्पिक | query | string | NIS-1 indicator id (e.g. IND.CLI.physical_acute.consecutive_dry_days): restricts hazards to those it names |
domain वैकल्पिक | query | string | NIS-1 domain code, e.g. WAT |
subsite वैकल्पिक | query | string (water-nexus, food-nexus, energy-nexus, health-nexus, biodiversity-nexus, risk-management, climate-hazards, disaster-resilience, critical-infrastructure, cities-built-environment, trade-strategic-resources, oceans-coasts, ai-autonomous-systems, cyber-digital-resilience, data-compute, quantum, space-earth-observation, biotechnology-biosecurity, advanced-industry-robotics, economic-development, human-development, future-work-skills, digital-public-infrastructure, systems-modelling) | Scope the answer to one subsite manifest (its sectors, hazards and indicators) |
top वैकल्पिक | query | integer | Candidate lines, 1 to 100 (default 20): a ranked shortlist, not a page |
प्रतिक्रियाएँ
- 200 Records with provenance
- 304 Not modified: the If-None-Match validator matched the current ETag (a problem, RFC 9457)
- 400 Bad request (BAD_PAGE, BAD_KIND, BAD_ID, BAD_STATE, BAD_JSON, BAD_BODY) (a problem, RFC 9457)
- 404 NOT_FOUND, or NOT_YET_PUBLISHED for a designed route (a problem, RFC 9457)
- 429 RATE_LIMITED: open-tier rate limit (a problem, RFC 9457)
- 500 INTERNAL: unhandled error (a problem, RFC 9457)