Перейти к содержанию
The Consortium

Разработчикам

risk_register_template

NXS Risk Intelligence API

Open. Reading is free and needs no key.

GET /v1/gcri/registers/template EServed

All operations

Sector risk register template

A blank risk register structured on the ISO 31000 process stages (edition not re-read: unverified), seeded with candidate lines from NHS-1 for the sector and scope: candidate causes and consequences from recorded relations and candidate NIS-1 indicators. Likelihood, consequence, rating, owner and treatment are caller fields. Not an assessment. State: exists.

MCP tool: risk.register_template

Параметры

Параметры
ОпределениеInТипЧто это делает
industry необязательноqueryстрокаISIC Rev.5 section letter A to V (filters), or a 2, 3 or 4 digit division, group or class (accepted by pattern, no filter until the dimensions package merges)
jurisdiction необязательноqueryстрокаISO 3166-1 alpha-3 country code (e.g. CAN, validated by pattern), a UN M49 region code (e.g. 150) or a regime id (eu, au, asean, un). This product holds no place data, so coverage says none
hazard необязательноqueryстрокаNHS-1 hazard id, family or domain, e.g. water.flood or atmo.cyclone.tropical-cyclone Example: water
indicator необязательноqueryстрокаNIS-1 indicator id (e.g. IND.CLI.physical_acute.consecutive_dry_days): restricts hazards to those it names
domain необязательноqueryстрокаNIS-1 domain code, e.g. WAT
subsite необязательноquerystring (water-nexus, food-nexus, energy-nexus, health-nexus, biodiversity-nexus, risk-management, climate-hazards, disaster-resilience, critical-infrastructure, cities-built-environment, trade-strategic-resources, oceans-coasts, ai-autonomous-systems, cyber-digital-resilience, data-compute, quantum, space-earth-observation, biotechnology-biosecurity, advanced-industry-robotics, economic-development, human-development, future-work-skills, digital-public-infrastructure, systems-modelling)Scope the answer to one subsite manifest (its sectors, hazards and indicators)
top необязательноqueryintegerCandidate lines, 1 to 100 (default 20): a ranked shortlist, not a page

Ответы

  • 200 Records with provenance
  • 304 Not modified: the If-None-Match validator matched the current ETag (a problem, RFC 9457)
  • 400 Bad request (BAD_PAGE, BAD_KIND, BAD_ID, BAD_STATE, BAD_JSON, BAD_BODY) (a problem, RFC 9457)
  • 404 NOT_FOUND, or NOT_YET_PUBLISHED for a designed route (a problem, RFC 9457)
  • 429 RATE_LIMITED: open-tier rate limit (a problem, RFC 9457)
  • 500 INTERNAL: unhandled error (a problem, RFC 9457)