Skip to content

GCRI · Foundry

مهندسی نرم‌افزار حیاتی از نظر ایمنی

Software and safety-critical systems engineering applies rigorous practice where a software fault could reach a decision with real consequences. In this field it means fail-closed defaults, verified builds, known components, tested recovery, and an assurance case that states what has and has not been shown.

01ثبت‌خانه

Safety-critical software engineering on the record.

سابقهٔ روشروش STEM
  1. MethodSoftware and safety-critical systems engineering
  2. به‌کاررفته در⁨Foundry⁩
  3. داده5 ورودی
  4. Canonical pageSTEM Commons
02درخواست

مهندسی نرم‌افزار و سامانه‌های حیاتی از نظر ایمنی در این حوزه چه نقشی دارد.

Software and safety-critical systems engineering develops software whose failure could cause harm, loss of life or major disruption. It applies rigorous processes to control-system, medical, aviation and infrastructure software. In data and compute and methods and modelling, safety-critical software practice limits the chance that a software fault cascades through physical infrastructure. It informs assurance requirements for automated control in interconnected systems. The canonical description is on the STEM Commons.

Fail-closed policy gates

هر درخواست پیامدار بر پایهٔ هویت، مأموریت، هدف و رده داده ارزیابی می‌شود؛ هرگاه تصمیم صریحی وجود نداشته باشد، دروازه رد می‌کند و این رد ثبت می‌شود.

Build provenance and bills of materials

Releases are built by a controlled pipeline that signs provenance attestations and produces a software bill of materials, so a deployed artefact can be traced to its source and components.

Assurance cases

Claims about a system, such as tenant isolation or kill-switch effectiveness, are argued from evidence in a structured case, with gaps and residual risks stated rather than assumed away.

03روش‌ها و شواهد

چگونگی مدل‌سازی، اندازه‌گیری و آزمون مهندسی نرم‌افزارهای ایمنی‌بحرانی.

مدل، مفروضات، داده‌ها و عدم قطعیت آن، به شکلی که دانشمند یا مهندس بررسی می‌کند. ساختارها از روش‌های منتشرشده پیروی می‌کنند. مقادیر ترسیم‌شده تبیینی‌اند، نه یافته.

مدل، معادلات و مفروضات

The model structure used for safety-critical software engineering, the assumptions it makes and how each is tested.

ریسک عنصر iRi = f(Hi, Ei, Vi, Ci)مخاطره، مواجهه، آسیب‌پذیری و ظرفیت مقابله
زیان سالانهٔ مورد انتظارEAL = ∑k pk · Lkover events k with annual probability pk
سامانه‌های جفت‌شدهxt+1 = A xt + B ut + εtA carries the couplings, u the shock, ε the error
فرضچرا ساخته می‌شودچگونه آزموده می‌شود
مخاطره و مواجهه در یک رویداد مستقل‌اندانتگرال زیان را تحت‌کنترل نگه می‌داردمقایسه با برازش مفصل بر سوابق مشترک
جفت‌شدگی‌ها نزدیک نقطهٔ کار خطی‌انداجازه می‌دهد شوک‌ها از طریق A منتشر شوندفراتر از دامنهٔ خطی آشفته کنید و مقایسه کنید
منحنی‌های آسیب‌پذیری میان مکان‌ها منتقل می‌شوندمنحنی‌های محلی به‌ندرت در دسترس‌انداعتبارسنجی در برابر زیان‌های مشاهده‌شده در جاهایی که وجود دارند
ورودی‌ها
مجموعه‌داده‌های نسخه‌دار با خاستگاه
خروجی‌ها
توزیع‌ها، هرگز تک‌رقم‌ها
کد
منتشرشده با کارت مدل و آزمون‌ها
بازتولید
همان داده، کد، محیط و بذر
فرمول‌بندی‌های استاندارد ریسک و فضای حالت؛ مفروضات فهرست‌شده نمونهٔ روش‌اند، برای داوری بیان شده‌اند و نتیجه نیستند.
FAIR guiding principles · GO FAIR and FORCE11W3C PROV · World Wide Web ConsortiumGuidance on consistent treatment of uncertainties · IPCCCEOS Analysis Ready Data · Committee on Earth Observation Satellites
04داده

آنچه روش مصرف می‌کند.

Datasets and records used by software and safety-critical systems engineering on this platform, with the role each plays and the label its values carry. Sources are listed in the source register.

دادهنقشبرچسب
مخازن منبع و سوابق بازبینیتاریخچهٔ تغییرات و تأییدمشاهده‌شده
پوشش آزمون و نتایج آزمون جهشVerification depthمشاهده‌شده
صورت‌حساب مواد نرم‌افزاریComponent inventoryمشاهده‌شده
Vulnerability advisoriesمواجههٔ اجزاگزارش‌شده
گزارش‌های رخداد و خطاتحلیل خرابیمشاهده‌شده
05فرایند

نحوهٔ اجرای فرایند.

Process explorer · Process

Safety-critical software engineering: Risk management process

8 گام5 مرحله

فرایند

Safety-critical software engineering: Risk management process

ISO 31000:2018 فرایندی تکرارشونده برای مدیریت ریسک ارائه می‌کند، از دامنه، بافت و معیارها تا ارزیابی و مواجهه با ریسک و سپس پایش، بازنگری و گزارش‌دهی.

  1. 01 چارچوب‌بندی

    1. 01دامنه، زمینه و معیارهامجموعه‌داده · مالک پروژهچارچوب فرایند: دامنهٔ کار، بافت بیرونی و درونی، و معیارهای ریسک. گام‌های بعدی در قیاس با این چارچوب خوانده می‌شوند.
  2. 02 ارزیابی ریسک

    1. 04Risk identificationStep · Project ownerThe first part of risk assessment. Risk is usually expressed by risk sources, potential events, their consequences and likelihood.
    2. 05Risk analysisModel · Project ownerThe second part of risk assessment. It considers consequences and likelihood of the identified risks, with guidelines, not a formula.
    3. 06Risk evaluationStep · Project ownerThe last part of risk assessment. Results of the analysis are compared with the risk criteria to see where more action is needed.
  3. 03 تیمار

    1. 07Risk treatmentStep · Project ownerTreatment options are selected, then plans are prepared and implemented. Residual risk is documented and goes to monitoring and review.
  4. 04 در سراسر فرایند

    1. 02Communication and consultationStep · Project ownerCommunication and consultation with stakeholders is its own process element. The standard draws it alongside the others, not in sequence.
    2. 03Monitoring and reviewStep · Project ownerMonitoring and review take place at every stage. New experience, knowledge and analysis can revise elements, actions and controls.
  5. 05 ثبت و گزارش

    1. 08Recording and reportingRecord · Project ownerThe process and its outcomes are documented and reported. The standard does not name who receives the report in the clauses read.

طرح کلی یک استاندارد یا روش بیرونی، برگرفته از منابع عمومی آن. این متن آنچه چارچوب می‌گوید را شرح می‌دهد و سابقهٔ هیچ اجرایی نیست. نشان نمی‌دهد که Nexus یا هیچ شریکی گامی را انجام می‌دهد، گواهی می‌کند یا تأیید می‌کند. دروازه گامی از روش است و هرگز تأیید Nexus نیست.

06اعتبارسنجی

نتایج چگونه بررسی می‌شوند.

نرم‌افزار از طریق بازبینی‌ها، آزمون بر پایهٔ معیارهای پوشش تعریف‌شده و در صورت توجیه، اثبات‌های صوری راستی‌آزمایی می‌شود. ارزیابی مستقل پروندهٔ ایمنی را بررسی می‌کند.

بررسیچگونه انجام می‌شود
Deny-by-default testsRequests without an explicit policy decision are tested to confirm they fail closed
Provenance verificationDeployed artefacts are checked against signed attestations before they run
تزریق خطاDependencies are failed deliberately to test recovery and isolation
Independent assessmentThe assurance case is reviewed by an assessor outside the development team

نرم‌افزار پیچیده‌ای که با محیط‌های نامطمئن تعامل دارد، نمی‌تواند به‌طور کامل آزمایش شود. به‌روزرسانی‌ها و مؤلفه‌های شخص ثالث مسیرهای تازهٔ خرابی پدید می‌آورند.

08تولیت

چه کسی روش را نگهداری می‌کند.

امنیت سایبری و تاب‌آوری دیجیتال متولی مهندسی نرم‌افزار و سامانه‌ها حیاتی برای ایمنی در کنسرسیوم است و چگونگی کاربست آن را در سکوها بررسی می‌کند.

10پرسش‌ها

پرسش و پاسخ.

محدودیت‌های مهندسی نرم‌افزار و سامانه‌های حیاتی از نظر ایمنی در این حوزه چیست؟
نرم‌افزار پیچیده‌ای که با محیط‌های نامطمئن تعامل دارد، نمی‌تواند به‌طور کامل آزمایش شود. به‌روزرسانی‌ها و مؤلفه‌های شخص ثالث مسیرهای تازهٔ خرابی پدید می‌آورند.
نتایج چگونه بررسی می‌شوند؟
نرم‌افزار از طریق بازبینی‌ها، آزمون بر پایهٔ معیارهای پوشش تعریف‌شده و در صورت توجیه، اثبات‌های صوری راستی‌آزمایی می‌شود. ارزیابی مستقل پروندهٔ ایمنی را بررسی می‌کند.
آیا مقادیر این صفحه واقعی‌اند؟
The data names, roles and checks are real descriptions of practice. The canvas shows a design of the method’s use, not a run; no result is reported here.
این روش در کجاهای دیگر به کار می‌رود؟
رصدخانهٔ صفحهٔ مرجع روش هر سکویی را که آن را به کار می‌گیرد فهرست می‌کند.
گزارش‌هامشارکت

شواهد را از همین صفحه ارسال کنید.

Reports نشریهٔ فصلی کنسرسیوم است. آنچه دربارهٔ این موضوع می‌دانید می‌تواند در ویراست بعدی به شواهد، یک مورد یا یک اصلاح تبدیل شود، به نام شما ثبت شود و در صورتی که کار خود شما باشد تحت CC BY 4.0 منتشر شود.

GCRI⁨Foundry⁩ساخت و آمادگی Foundry
⁨Foundry⁩

یک روش، یک مجموعه‌داده یا یک پرسش بیاورید.

اطلاعات و درخواست‌ها امروز باز است. هر درخواست یک شمارهٔ پیگیری می‌گیرد و گام بعدی را مشخص می‌کند؛ درخواست‌های عضویت، پرداخت‌ها، تخصیص رایانش و ثبت‌نام‌ها تنها زمانی باز می‌شوند که تیم، شرایط و ظرفیت داوری آن‌ها فراهم باشد.

The Global Centre for Risk and Innovation (GCRI Canada) is a Canadian not-for-profit organisation, not a registered charity, with its registered office in Ontario.