Skip to content

GCRI · Foundry

Güvenlik açısından kritik yazılım mühendisliği

Software and safety-critical systems engineering applies rigorous practice where a software fault could reach a decision with real consequences. In this field it means fail-closed defaults, verified builds, known components, tested recovery, and an assurance case that states what has and has not been shown.

01Sicil

Safety-critical software engineering on the record.

Yöntem kaydıSTEM yöntemi
  1. YöntemYazılım ve güvenlik açısından kritik sistemleri mühendisliği
  2. Applied inFoundry
  3. Canonical pageSTEM Commons
02Başvuru

What software and safety-critical systems engineering does here.

Software and safety-critical systems engineering develops software whose failure could cause harm, loss of life or major disruption. It applies rigorous processes to control-system, medical, aviation and infrastructure software. In data and compute and methods and modelling, safety-critical software practice limits the chance that a software fault cascades through physical infrastructure. It informs assurance requirements for automated control in interconnected systems. The canonical description is on the STEM Commons.

Fail-closed policy gates

Sonuç doğurabilecek her talep; kimlik, yetki, amaç ve veri sınıfı bakımından değerlendirilir. Açık bir karar bulunmadığında geçit talebi reddeder ve ret kaydedilir.

Build provenance and bills of materials

Releases are built by a controlled pipeline that signs provenance attestations and produces a software bill of materials, so a deployed artefact can be traced to its source and components.

Assurance cases

Claims about a system, such as tenant isolation or kill-switch effectiveness, are argued from evidence in a structured case, with gaps and residual risks stated rather than assumed away.

03Yöntemler ve kanıt

Güvenlik açısından kritik yazılım mühendisliğinin nasıl modellendiği, ölçüldüğü ve sınandığı.

Model, varsayımları, verileri ve belirsizliği, bir bilim insanının veya mühendisin kontrol edeceği biçimde. Yapılar yayımlanmış yöntemleri izler. Çizilen değerler bulgu değil, açıklayıcıdır.

Model, denklemler ve varsayımlar

The model structure used for safety-critical software engineering, the assumptions it makes and how each is tested.

i öğesinin riskiRi = f(Hi, Ei, Vi, Ci)tehlike, maruziyet, kırılganlık ve başa çıkma kapasitesi
Beklenen yıllık kayıpEAL = ∑k pk · Lkover events k with annual probability pk
Bağlı sistemlerxt+1 = A xt + B ut + εtA carries the couplings, u the shock, ε the error
VarsayımNeden yapıldığıNasıl sınanır
Bir olay içinde tehlike ve maruziyet bağımsızdırKayıp integralini çözülebilir tutarOrtak kayıtlara uydurulmuş bir kopula ile karşılaştırın
Bağlantılar çalışma noktası yakınında doğrusaldırŞokların A üzerinden yayılmasına izin verirDoğrusal aralığın ötesine itin ve karşılaştırın
Kırılganlık eğrileri yerler arasında aktarılabilirYerel eğriler nadiren mevcutturMevcut olduğunda gözlemlenen kayıplarla doğrulayın
Girdiler
kaynağı belgelenmiş, sürümlü veri setleri
Çıktılar
dağılımlar, asla tek sayılar değil
Kod
model kartı ve testlerle birlikte yayımlanır
Yeniden üretim
aynı veri, kod, ortam ve tohum değeri
Standart risk ve durum uzayı formülasyonları; listelenen varsayımlar yöntemin tipik varsayımlarıdır, inceleme için belirtilmiştir, sonuç değildir.
FAIR guiding principles · GO FAIR and FORCE11W3C PROV · World Wide Web ConsortiumGuidance on consistent treatment of uncertainties · IPCCCEOS Analysis Ready Data · Committee on Earth Observation Satellites
04Veri

Yöntemin tükettikleri.

Bu platformda yazılım ve güvenlik açısından kritik sistemleri mühendisliğinde kullanılan veri kümeleri ve kayıtlar; her birinin rolü ve değerlerinin taşıdığı etiketle birlikte. Kaynaklar kaynak sicilinde.

VeriRolEtiket
Source repositories and review recordsChange history and approvalGÖZLENEN
Test coverage and mutation resultsVerification depthGÖZLENEN
Yazılım malzeme listeleriComponent inventoryGÖZLENEN
Vulnerability advisoriesExposure of componentsBİLDİRİLMİŞ
Incident and fault logsArıza analiziGÖZLENEN
05Süreç

Sürecin nasıl işlediği.

Process explorer · Process

Safety-critical software engineering: Risk management process

8 adım5 aşama

Süreç

Safety-critical software engineering: Risk management process

ISO 31000:2018, kapsam, bağlam ve kriterlerden değerlendirme ve işlemeye, oradan da izleme, gözden geçirme ve raporlamaya uzanan döngüsel bir risk yönetimi süreci ortaya koyar.

  1. 01 Çerçeveleme

    1. 01Scope, context and criteriaDataset · Project ownerThe frame for the process: the scope, the external and internal context, and the risk criteria. Later steps are read against this frame.
  2. 02 Risk değerlendirmesi

    1. 04Risk identificationStep · Project ownerThe first part of risk assessment. Risk is usually expressed by risk sources, potential events, their consequences and likelihood.
    2. 05Risk analysisModel · Project ownerThe second part of risk assessment. It considers consequences and likelihood of the identified risks, with guidelines, not a formula.
    3. 06Risk değerlendirmeAdım · Proje sahibiRisk değerlendirmesinin son bölümü. Analiz sonuçları, nerede daha fazla eylem gerektiğini görmek için risk kriterleriyle karşılaştırılır.
  3. 03 Tedavi

    1. 07Risk işlemeAdım · Proje sahibiİşleme seçenekleri belirlenir, ardından planlar hazırlanır ve uygulanır. Kalan risk belgelenir ve izleme ile gözden geçirmeye aktarılır.
  4. 04 Süreç boyunca

    1. 02İletişim ve danışmaAdım · Proje sahibiPaydaşlarla iletişim ve danışma kendi başına bir süreç unsurudur. Standart onu sırayla değil, diğerlerinin yanında gösterir.
    2. 03İzleme ve gözden geçirmeAdım · Proje sahibiİzleme ve gözden geçirme her aşamada yapılır. Yeni deneyim, bilgi ve analiz unsurları, eylemleri ve kontrolleri revize edebilir.
  5. 05 Kaydedin ve raporlayın

    1. 08Recording and reportingRecord · Project ownerThe process and its outcomes are documented and reported. The standard does not name who receives the report in the clauses read.

Dış bir standardın veya yöntemin, kamuya açık kaynaklarından çıkarılmış özeti. Çerçevenin ne söylediğini tanımlar, herhangi bir uygulamanın kaydı değildir. Nexus'un veya herhangi bir ortağın bir adımı gerçekleştirdiğini, belgelendirdiğini veya onayladığını göstermez. Bir geçit yöntemin bir adımıdır, asla bir Nexus onayı değildir.

06Doğrulama

Sonuçlar nasıl kontrol edilir.

Yazılım; incelemeler, tanımlı kapsam ölçütlerine göre testler ve gerekçelendirilen yerlerde biçimsel ispatlar yoluyla doğrulanır. Bağımsız değerlendirme, güvenlik gerekçesini inceler.

Kontrol edinNasıl yapıldığı
Deny-by-default testsRequests without an explicit policy decision are tested to confirm they fail closed
Provenance verificationDeployed artefacts are checked against signed attestations before they run
Hata enjeksiyonuDependencies are failed deliberately to test recovery and isolation
Independent assessmentThe assurance case is reviewed by an assessor outside the development team

Belirsiz ortamlarla etkileşen karmaşık yazılımlar eksiksiz biçimde test edilemez. Güncellemeler ve üçüncü taraf bileşenler yeni arıza yolları ortaya çıkarır.

08Sorumlu yönetim

Yöntemi kimin sürdürdüğü.

Siber Güvenlik ve Dijital Dayanıklılık , yazılım ve güvenlik açısından kritik sistemleri mühendisliğinin sorumlu yönetimini üstlenir ve bunun platformlar genelinde nasıl uygulandığını inceler.

10Sorular

Sorular ve yanıtlar.

Bu alanda yazılım ve güvenlik açısından kritik sistemler mühendisliğinin sınırları nelerdir?
Belirsiz ortamlarla etkileşen karmaşık yazılımlar eksiksiz biçimde test edilemez. Güncellemeler ve üçüncü taraf bileşenler yeni arıza yolları ortaya çıkarır.
Sonuçlar nasıl kontrol edilir?
Yazılım; incelemeler, tanımlı kapsam ölçütlerine göre testler ve gerekçelendirilen yerlerde biçimsel ispatlar yoluyla doğrulanır. Bağımsız değerlendirme, güvenlik gerekçesini inceler.
Bu sayfadaki değerler gerçek mi?
The data names, roles and checks are real descriptions of practice. The canvas shows a design of the method’s use, not a run; no result is reported here.
Bu yöntem başka nerede uygulanıyor?
Toplumları ayakta tutan Kanonik yöntem sayfası onu uygulayan tüm platformları listeler.
RaporlarKatkıda bulunun

Bu sayfadan kanıt katkısında bulunun.

Reports, Konsorsiyumun üç ayda bir yayımlanan yayınıdır. Bu konu hakkında bildikleriniz bir sonraki sayıda kanıt, vaka veya düzeltme olabilir; size atfedilir ve kendi çalışmanızsa CC BY 4.0 kapsamında yayımlanır.

GCRIFoundryFoundry Build and Readiness
Foundry

Bir yöntem, bir veri seti ya da bir soru getirin.

Bilgi ve başvurular bugün açıktır. Bir başvuru bir referans numarası alır ve bir sonraki adımı belirtir; başvurular, ödemeler, işlem kapasitesi tahsisleri ve kayıtlar yalnızca ekipleri, koşulları ve inceleme kapasiteleri mevcut olduğunda açılır.

The Global Centre for Risk and Innovation (GCRI Canada) is a Canadian not-for-profit organisation, not a registered charity, with its registered office in Ontario.