从需求到验证的可追溯性
Every requirement is linked to the analysis, inspection, demonstration or test that will verify it, so a readiness claim can be traced to evidence rather than to confidence.
GCRI · Labs
Systems engineering gives testbeds and innovation programmes their structure: requirements traced to tests, interfaces managed, readiness assessed at gates. It is the discipline behind technology readiness levels, and it keeps a prototype’s evidence tied to the system and the environment in which it will be used.
Systems engineering is an interdisciplinary approach to designing and managing complex systems over their life cycle. It focuses on requirements, interfaces and interactions so that the whole performs as intended. In research and evidence, methods and modelling and innovation, systems engineering exposes interfaces where failures propagate between components and organisations. It supports designing interconnected infrastructure with explicit dependency management. The canonical description is on the STEM Commons.
Every requirement is linked to the analysis, inspection, demonstration or test that will verify it, so a readiness claim can be traced to evidence rather than to confidence.
Independent panels review evidence at each gate against stated technology and integration readiness criteria, and record what must be shown before the next stage is funded.
Hardware, software and organisational interfaces are tested together under the conditions of the intended operating environment, because integration problems rarely appear in component tests.
团队遵循该方法时会使用的界面:其指标、状态与决策。名称为示例,数值仅作示意。
Labs · Systems engineering for testbeds · Run R-6631
节点:资产 · 边:依赖关系
| N3 | 0.42 | 4 | Critical |
| N4 | 0.13 | 5 | 正常 |
| N5 | 0.31 | 8 | 正常 |
| N6 | 0.13 | 4 | 正常 |
模型、其假设、数据和不确定性,以科学家或工程师会核查的形式呈现。结构遵循已发表的方法。所取数值仅为示意,不是研究发现。
The model structure used for systems engineering for testbeds, the assumptions it makes and how each is tested.
Ri = f(Hi, Ei, Vi, Ci)危害、风险暴露、脆弱性和应对能力EAL = ∑k pk · Lkover events k with annual probability pkxt+1 = A xt + B ut + εtA carries the couplings, u the shock, ε the error| 假设 | 为何制作 | 如何检验 |
|---|---|---|
| 在一次事件中,危害与暴露相互独立 | 使损失积分保持可计算 | 与基于联合记录拟合的 copula 进行比较 |
| 耦合在工作点附近是线性的 | 让冲击通过 A 传播 | 在线性范围之外施加扰动并比较 |
| 脆弱性曲线可以在不同地点之间迁移使用 | 很少有本地曲线可用 | 在有观测损失的地方据此进行验证 |
每项要求均可追溯至通过分析、检查、演示或测试获得的验证证据。独立评审在生命周期关口核查完整性。
| 核查 | 如何开展 |
|---|---|
| 可追溯性审计 | 抽取一部分要求,追溯至验证证据并反向核对 |
| 独立关卡评审 | Reviewers outside the project team assess the readiness evidence |
| Configuration control | Every result is tied to a recorded version of hardware, software and procedure |
开放系统或社会技术系统中的涌现行为可能无法被需求所涵盖。僵化的流程可能减缓对变化的适应。
Process explorer · Process
8 个步骤·4 个阶段
流程
最初的危害可能引发后续的风险和事件;本图示描绘了跨能源、水、信息通信技术、卫生和交通等 系统 的一条级联链。
依据公开来源对外部标准或方法所作的概要。它说明该框架的内容,不是任何一次运行的记录。它不表明 Nexus 或任何合作伙伴执行、认证或批准某一步骤。关口是方法中的一个步骤,绝不是 Nexus 的批准。所列依赖项仅为示例,须由针对该地的依赖关系调查确定。
Reports 是联合体的季刊。您对该主题的了解可以成为下一期中的证据、案例或更正,署名归您,并在属于您本人作品时以 CC BY 4.0 发布。
切勿发送个人数据、敏感基础设施细节或您无权分享的任何内容。贡献在使用前会经过审查;发送贡献不赋予署名权或编辑权,赞助也绝不能换取研究结论。
本网站上的地图、数据和图表仅作为背景和一般信息展示。它们不是建议、预测或预警;信息的局限见免责声明和数据说明。