- Reports
- Baseline Edition 2026
- Complete edition
Strategic Systems Report 2026: Critical Minerals and Strategic Materials
Strategic Systems
Critical Minerals and Strategic Materials 2026
Imprint
- Editor
- Saeed Valadbaygi, Chief Steward and Managing Editor, the Global Centre for Risk and Innovation (GCRI)
- Publisher of record
- The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium, Toronto
- Report number
- NR-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE
- Evidence close
- 30 September 2026, cut DC-STRATEGIC-MINERALS-GLOBAL-2026-B0
- Status
- Draft under stewardship review; not yet released
- DOI and UNI
- Issued at deposit
- Licence
- CC BY 4.0 for Nexus-authored text, tables and figures; third-party material keeps its own licence
- Cite as
- Valadbaygi, S. (Ed.). (2026). Strategic Systems Report 2026: Critical Minerals and Strategic Materials (Baseline Edition 2026, Report No. NR-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI). https://therisk.global/nexus-reports/editions/sr-04/
Contents
- Critical Minerals and Strategic Materials 2026
- Executive summary
Executive summary
The edition on a few pages: the abstract, the key messages, the headline finding and what each steward reads in it.
S.1Abstract
Critical minerals are the small-volume inputs that large industries depend on: lithium, cobalt, graphite, rare earths, gallium, germanium and copper. The 2025 and 2026 evidence shows supply concentration turning into disruption. Excluding rare earths, the average share of the top refining country rose to 72% in 2025, up from 70% in 20232. China produced 270,000 tonnes of the 390,000 tonnes of rare earths mined worldwide in 2025, and 99% of primary low-purity gallium1. In April 2025 China placed licence controls on seven heavy rare earths and announced an October 2025 expansion; the status of that expansion at the close is not bound5. The DRC replaced a cobalt export ban with quotas of up to 96,600 tonnes a year for 2026 and 2027, and cobalt metal approached USD 58,000 a tonne in the first quarter of 202612. The IEA estimates that full rare earth controls would put USD 6.5 trillion a year of downstream production outside China at risk2. Investment fell 9% in 2025, while public finance commitments in advanced economies reached about USD 65 billion2. Responses include the G7 roadmap of October 2025, a US price floor of USD 110 a kilogram for NdPr oxide and the EU 2030 benchmarks192011. This baseline reads these events as mechanisms, not as a list. It places no country or company in a league table, attributes no motive and recommends no policy.
S.2Key messages
Six readings that frame the critical minerals baseline, and the eight questions this edition answers, each with its status and source.
Yes: the top refiner averaged 72% excluding rare earths in 2025.2
Is mineral supply concentrated?Reported
Yes: China placed licence controls on seven heavy rare earths in April 2025. The status of the October 2025 expansion at the close is not bound.5
Are export controls real?Reported
Yes: the DRC caps cobalt exports, and Zimbabwe and Mozambique limited raw exports.29
Do producers also restrict supply?Reported
About USD 6.5 trillion a year of downstream output in the rare earth case.2
What is at stake economically?Reported
Slowly: rare earth refining concentration eased modestly, and refining lags mining.2
Is diversification under way?Reported
The G7, the EU, the United States and Australia use stockpiles, price floors and benchmarks.2112022
Who is acting?Reported
Little so far: the United States recycled USD 18 billion of critical minerals in 2025.1
What does recycling add?Reported
A lapse of Chinese controls that overlaps the cobalt quota and thin stockpiles. SCN-SR04-MAG-01
What will 2027 test first?Expert input
S.3Headline finding
ReportedEQL 4NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-MIN-004
The DRC replaced a February 2025 cobalt export ban with quotas of up to 96,600 tonnes a year for 2026 and 2027, including 9,600 tonnes for strategic reserves, and cobalt metal approached USD 58,000 a tonne in the first quarter of 2026.
| Item | Bar, scaled to the largest value | Value |
|---|---|---|
| DRC mine output, 2025 (estimate) | 230,000 | |
| DRC export cap a year, 2026 and 2027 | 96,600 | |
| of which strategic reserves | 9,600 |
Source: USGS1. Output and exports are different measures; the cap covers exports of contained cobalt.
A producer that holds about two thirds of mined supply can move the market by decision. The quota also reserves 9,600 tonnes for state use and lets the regulator move unused quota to that reserve, which adds discretion for buyers210. Refined stocks stayed high, so prices of intermediates and refined metal diverged2.
S.4At a glance
S.5What each steward reads in it
GCRI · KEY T
Technical Truth
The evidence supports reading critical minerals as one dependent network.
GRF · KEY M
Public Meaning
For most people mineral risk arrives as a late car, a dearer battery or a delayed device.
GRA · KEY F
Capital Meaning
Readiness implications only. A disruption puts very large downstream output at risk, public finance has grown fast, and refining projects outside the dominant supplier cost more.
NEXUS
Synthesis
Mineral risk is well described event by event and thinly measured as a system.
S.6What this edition is, and is not
What this edition is
A baseline: the 2026 state of the world’s critical minerals and strategic materials and the couplings through which it carries risk into other systems. It synthesises published evidence and ranks no country, company or asset.
What it is not
Not a mineral-security ranking, a trade-policy position, an investment recommendation or an assessment of any producer, company or government. Mining, trade and stockpile decisions rest with owners, regulators and competent authorities.
What comes next
National, regional and sector evidence feeds the 2027 critical minerals edition through the federation. Each edition reports what changed against this baseline: observations, source revisions, method changes, scenario updates and corrections.
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 2IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 1U.S. Geological Survey (ed.), Mineral Commodity Summaries 2026 (version 1.3, May 2026; manuscript dated 6 February 2026). U.S. Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
- 5Pillsbury Winthrop Shaw Pittman (eds.), China Suspends Export Controls on Certain Critical Minerals and Related Items (client alert; announcements 55 to 58, 61 and 62 suspended from 7 November 2025 to 10 November 2026; Article 2 of Announcement 46 suspended to 27 November 2026; Announcement 18 of 4 April 2025 remains in force). Pillsbury, Washington. Observation year 2025. Accessed 2026-11-03.back
- 19G7, Roadmap to Promote Standards-based Markets for Critical Minerals, 31 October 2025 (read on the Natural Resources Canada news page). Observation year 2025. Accessed 2026-11-03.back
- 20MP Materials, MP Materials Announces Transformational Public-Private Partnership with the Department of Defense to Accelerate U.S. Rare Earth Magnet Independence, press release of 10 July 2025 (USD 400 million preferred equity; USD 110 per kilogram NdPr price floor for ten years; USD 150 million loan). MP Materials, Las Vegas. Observation year 2025. Accessed 2026-11-03.back
- 11European Commission, Critical Raw Materials Act (web page; 2030 benchmarks of 10% extraction, 40% processing, 25% recycling and a 65% single third-country cap, as shares of annual EU consumption). Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs, Brussels. Observation year 2024. Accessed 2026-11-03.back
- 9Fastmarkets (ed.), Cobalt export quotas: DRC sets limits to rebalance global supply (ARECOMS announcement of 21 September 2025; 18,125 tonnes to the end of 2025; 87,000 tonnes base plus a 9,600 tonne strategic quota for 2026; effective 16 October 2025). Fastmarkets, London. Observation year 2025. Accessed 2026-11-03.back
- 22CMC Markets (ed.), Unpacking the US-Australia Critical Minerals Framework (market commentary on the framework signed 20 and 21 October 2025; at least USD 1 billion from each country in six months; pipeline of up to USD 8.5 billion). Observation year 2025. Accessed 2026-11-03.back
- 10Shanghai Metals Market (ed.), Congo creates strategic cobalt reserve to influence supply and prices, regulator says (news report of 16 April 2026; reserve run by ARECOMS; 10% of national export volumes, 9,600 tonnes in 2026). Observation year 2026. Accessed 2026-11-03.back
Small volumes, large dependence
Part I describes systems and their couplings. It ranks no country or operator and assesses no authority.
1.1The questions this part answers
Key questions
- Where is critical minerals risk concentrated?
- Which couplings carry critical minerals shocks into other systems?
- Which critical minerals capabilities hold under compound stress?
- What must 2027 evidence measure first?
In this part
- Narrative
- Headline finding
- Lead figure
- Five mechanism chapters
- Twelve-domain reading
- Sector screens
- Dependency matrix
- Risk objects
- Capability ladder
- Scenario
- Three lenses
- Portfolio
1.2The argument
Critical minerals are usually reported by commodity: lithium, cobalt, graphite, rare earths. The 2025 and 2026 evidence reads them as one dependent network. A few countries refine most of the supply, trade controls and quotas can move prices within months, and small volumes underpin very large downstream output21.
The causes repeat. China placed licence controls on seven heavy rare earths in April 20255. The DRC capped cobalt exports from October 20259. Zimbabwe and Mozambique limited raw exports of lithium and graphite2. Prices followed: cobalt rose by around 130% and strategic minor minerals more than doubled2.
Diversification is slow. Refining and magnet capacity lag mining outside the dominant supplier, and refining projects there face capital costs 20% to over 150% higher2. In rare earths, diversified refining capacity equals about two thirds of expected mined supply by 2035, but planned magnet capacity only one third2.
The edition therefore asks the same four questions of every event: what was the common cause, how did it spread, what was shared, and what threshold was crossed. It attributes no motive and places no producer in a league table.
For each mineral one country holds most of the output. The shares come from different measures, so the bars compare reach, not risk, and refining shares are higher still for several minerals12.
| Item | Bar, scaled to the largest value | Value |
|---|---|---|
| China, primary low-purity gallium | 99 | |
| China, natural graphite | 82 | |
| DRC, mined cobalt | 73 | |
| China, rare earth mine output | 69 |
Source: as cited in the note to this figure. Year 2025.
Figure ID FIG-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-01-003
1.3Twenty couplings between five systems
The critical minerals-centred matrix types the twenty couplings between the five core systems, read for their critical minerals content. Strengths are Nexus estimates (ESTIMATED) from the cited evidence and analogue events; they set the graph that 2027 evidence will test.
Each line is one coupling from one system to another, drawn by the strength the edition assigns. Strengths are Nexus estimates from the cited evidence and analogue events.
- Strong
- Moderate
- Weak
Source: this edition’s coupling matrix (Table 1.1); status Estimated.
| From, to | WAT | ENE | FOO | HLT | BIO |
|---|---|---|---|---|---|
| WAT Water | · | WEAK hydro · cooling | WEAK irrigation | WEAK safe supply | MODERATE mine water · tailings |
| ENE Energy | MODERATE pumping · treatment · acid | · | MODERATE sulphur · acid · fertiliser | WEAK power | MODERATE mining footprint |
| FOO Food | WEAK withdrawals | WEAK bioenergy | · | WEAK nutrition | WEAK land conversion |
| HLT Health | WEAK workforce | WEAK workforce | WEAK labour | · | WEAK residues |
| BIO Biodiversity | WEAK catchments | WEAK hydrology | WEAK pollination | WEAK zoonoses | · |
| Strength: strong, moderate or weak; a Nexus estimate (status Estimated) from cited evidence and analogue events. The scale is defined in Annex A. | |||||
Transmission paths
- 01
TRD → MIN → FIN
A licence on heavy rare earths halts magnet supply and cuts vehicle output.
- 02
MIN → FIN
A producer quota lifts cobalt prices by around 130%.
- 03
INF → MIN → DAT
Weak smelter fees threaten by-product recovery of gallium and germanium.
Reported 2026 fees2
- 04
ENE → MIN → FOO
A Gulf shutdown curbs sulphur and acid used in processing and fertiliser.
Reported 20262
- 05
MIN → BIO
Mine expansion triggers offsite deforestation.
Reported Africa 2001 to 202027
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 2IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 1U.S. Geological Survey (ed.), Mineral Commodity Summaries 2026 (version 1.3, May 2026; manuscript dated 6 February 2026). U.S. Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
- 5Pillsbury Winthrop Shaw Pittman (eds.), China Suspends Export Controls on Certain Critical Minerals and Related Items (client alert; announcements 55 to 58, 61 and 62 suspended from 7 November 2025 to 10 November 2026; Article 2 of Announcement 46 suspended to 27 November 2026; Announcement 18 of 4 April 2025 remains in force). Pillsbury, Washington. Observation year 2025. Accessed 2026-11-03.back
- 9Fastmarkets (ed.), Cobalt export quotas: DRC sets limits to rebalance global supply (ARECOMS announcement of 21 September 2025; 18,125 tonnes to the end of 2025; 87,000 tonnes base plus a 9,600 tonne strategic quota for 2026; effective 16 October 2025). Fastmarkets, London. Observation year 2025. Accessed 2026-11-03.back
- 27Morton, O., Bousfield, C.G., Dégny Valé, P. et al., Mining triggers extensive additional deforestation in sub-Saharan Africa, Nature, 2026 (16,627 mines, 2001 to 2020). Observation year 2020. Accessed 2026-11-03.back
Key findings
Twelve findings carry the critical minerals baseline. They are grouped by coupling and never ranked. Each resolves to its source or, where Nexus analysis is involved, to its stated method.
2.1Headline finding
ReportedEQL 4NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-MIN-004
The DRC replaced a February 2025 cobalt export ban with quotas of up to 96,600 tonnes a year for 2026 and 2027, including 9,600 tonnes for strategic reserves, and cobalt metal approached USD 58,000 a tonne in the first quarter of 2026.
| Item | Bar, scaled to the largest value | Value |
|---|---|---|
| DRC mine output, 2025 (estimate) | 230,000 | |
| DRC export cap a year, 2026 and 2027 | 96,600 | |
| of which strategic reserves | 9,600 |
Source: USGS1. Output and exports are different measures; the cap covers exports of contained cobalt.
Implication
A producer that holds about two thirds of mined supply can move the market by decision. The quota also reserves 9,600 tonnes for state use and lets the regulator move unused quota to that reserve, which adds discretion for buyers210. Refined stocks stayed high, so prices of intermediates and refined metal diverged2.
What would move it
The allocation framework beyond 2027, use of the strategic reserve and Indonesian cobalt output would each move this finding.
2.2Minerals
ReportedEQL 4NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-MIN-001
Excluding rare earths, the average share of the top refining country rose to 72% in 2025, up from 70% in 2023, according to the IEA Global Critical Minerals Outlook 2026.2
ReportedEQL 4NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-MIN-002
World rare earth mine output was an estimated 390,000 tonnes in 2025, of which China produced 270,000 tonnes; the United States relies on imports for more than two thirds of the rare earth compounds and metals it consumes.1
ReportedEQL 4NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-MIN-004
The DRC replaced a February 2025 cobalt export ban with quotas of up to 96,600 tonnes a year for 2026 and 2027, including 9,600 tonnes for strategic reserves, and cobalt metal approached USD 58,000 a tonne in the first quarter of 2026.129
ReportedEQL 3NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-MIN-005
China accounted for 99% of world primary low-purity gallium production in 2025, and European gallium prices were about five times Chinese domestic prices in 2026.12
ReportedEQL 3NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-MIN-010
A July 2025 agreement between the US Department of Defense and MP Materials includes USD 400 million of preferred equity and a ten-year price floor of USD 110 a kilogram for NdPr oxide, and MP produced 2,599 tonnes of NdPr oxide in 2025, up 101%.2021
2.3Trade
ReportedEQL 4NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-TRD-003
China placed licence controls on seven heavy rare earths in April 2025 and announced an October 2025 expansion, and the number of Chinese tariff codes under export control has tripled since 2023. The status of the expansion at the close is not bound.25
2.4Finance
ReportedEQL 3NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-FIN-006
The IEA estimates that fully implemented rare earth export controls would put USD 6.5 trillion a year of downstream production outside China at risk, and a full disruption of battery-grade graphite trade over USD 300 billion a year.2
ReportedEQL 3NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-FIN-007
Critical mineral investment fell 9% in 2025, and public finance commitments in advanced economies reached about USD 65 billion, over four times the 2023 level, with a gap between commitments and disbursements.2
2.5Infrastructure
ReportedEQL 3NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-INF-008
The benchmark copper smelter fee was settled at USD 0 a tonne in 2026, China’s share of global copper smelting capacity rose from about 15% in 2005 to 50% in 2025, and many strategic minor minerals are recovered as by-products of base metal smelting.2
2.6POL
ReportedEQL 3NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-POL-009
In June 2026 G7 leaders set a target to reduce dependency on a single non-G7 supplier of rare earths and permanent magnets to below 60% by 2030, and the G7 roadmap of October 2025 sets minimum criteria for standards-based markets.219
ReportedEQL 4NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-POL-011
The EU Critical Raw Materials Act sets 2030 benchmarks of 10% of consumption from extraction, 40% from processing, 25% from recycling and no more than 65% from one third country, and the Commission adopted the RESourceEU action plan on 3 December 2025.1113
2.7Systemic
Expert inputEQL 2NRF-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-SYS-012
The leading compound pathway for 2027 testing is the October 2025 Chinese control expansion taking effect in a way that overlaps the DRC cobalt quota and thin stockpiles. § scenario
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1U.S. Geological Survey (ed.), Mineral Commodity Summaries 2026 (version 1.3, May 2026; manuscript dated 6 February 2026). U.S. Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
- 2IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 10Shanghai Metals Market (ed.), Congo creates strategic cobalt reserve to influence supply and prices, regulator says (news report of 16 April 2026; reserve run by ARECOMS; 10% of national export volumes, 9,600 tonnes in 2026). Observation year 2026. Accessed 2026-11-03.back
- 9Fastmarkets (ed.), Cobalt export quotas: DRC sets limits to rebalance global supply (ARECOMS announcement of 21 September 2025; 18,125 tonnes to the end of 2025; 87,000 tonnes base plus a 9,600 tonne strategic quota for 2026; effective 16 October 2025). Fastmarkets, London. Observation year 2025. Accessed 2026-11-03.back
- 20MP Materials, MP Materials Announces Transformational Public-Private Partnership with the Department of Defense to Accelerate U.S. Rare Earth Magnet Independence, press release of 10 July 2025 (USD 400 million preferred equity; USD 110 per kilogram NdPr price floor for ten years; USD 150 million loan). MP Materials, Las Vegas. Observation year 2025. Accessed 2026-11-03.back
- 21MP Materials, MP Materials Reports Fourth Quarter and Full Year 2025 Results, 26 February 2026 (REO in concentrate 50,692 tonnes; NdPr oxide 2,599 tonnes; first NdFeB magnets on commercial equipment in the fourth quarter of 2025; company-reported figures). MP Materials, Las Vegas. Observation year 2025. Accessed 2026-11-03.back
- 5Pillsbury Winthrop Shaw Pittman (eds.), China Suspends Export Controls on Certain Critical Minerals and Related Items (client alert; announcements 55 to 58, 61 and 62 suspended from 7 November 2025 to 10 November 2026; Article 2 of Announcement 46 suspended to 27 November 2026; Announcement 18 of 4 April 2025 remains in force). Pillsbury, Washington. Observation year 2025. Accessed 2026-11-03.back
- 19G7, Roadmap to Promote Standards-based Markets for Critical Minerals, 31 October 2025 (read on the Natural Resources Canada news page). Observation year 2025. Accessed 2026-11-03.back
- 11European Commission, Critical Raw Materials Act (web page; 2030 benchmarks of 10% extraction, 40% processing, 25% recycling and a 65% single third-country cap, as shares of annual EU consumption). Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs, Brussels. Observation year 2024. Accessed 2026-11-03.back
- 13European Commission and the EU Circular Economy Stakeholder Platform, European Commission adopts RESourceEU Action Plan (platform post of 10 December 2025; plan adopted 3 December 2025). Observation year 2025. Accessed 2026-11-03.back
Systems and sectors at baseline
3.1Where each system stood at evidence close
MIN · Refining
Top refiner average share, excluding rare earths
72%up from 70% in 2023.
Reported2025IEA2
TRD · Controls
Chinese tariff codes under export control, against 2023
3xstatus of the October 2025 expansion at the close is not bound.
Reported2025IEA2
MIN · Cobalt
DRC export cap a year, 2026 and 2027
96,600tonnesless than half of 2024 production.
FIN · Value at risk
Downstream output outside China at risk, rare earths
6.5USD trillionabout 7% of combined GDP; modelled.
Reported2026IEA2
MIN · Rare earths
World mine output
390,000tonnesChina 270,000 tonnes.
Reported2025USGS1
SYS · Cross-system
Public finance commitments, advanced economies
65USD billionover four times 2023; disbursement lags.
Reported2025IEA2
3.2Domain posture
Each of the twelve coupled domains is read through critical minerals, in words, not scored. The coupling column names the dependency that carries critical minerals risk into each domain.
| Domain | Posture at baseline | Coupling | Status |
|---|---|---|---|
| WAT | Sulphuric acid and water underpin mineral processing; evidence not consolidated here. | WAT → MIN | Inferred EQL 2 |
| ENE | The 2026 Gulf conflict curtailed aluminium and sulphur supply; energy minerals drive demand. | ENE ↔ MIN | Reported EQL 3 |
| FOO | Sulphuric acid links mineral processing and fertiliser; China curbed acid exports in May 2026. | MIN ↔ FOO | Reported EQL 3 |
| HLT | Imaging and device minerals such as gadolinium; not consolidated here. | MIN → HLT | Inferred EQL 2 |
| BIO | Mining triggered 187,000 hectares of direct deforestation and about 34 offsite hectares per direct hectare in Africa27. | MIN → BIO | Reported EQL 4 |
| CLI | Lithium demand rose by nearly 30% in 2024, led by vehicles and storage3. | CLI → MIN | Reported EQL 3 |
| INF | Smelters are strategic midstream infrastructure; the benchmark copper fee was USD 0 a tonne in 2026. | INF ↔ MIN | Reported EQL 3 |
| FIN | Investment fell 9% in 2025; public finance commitments reached about USD 65 billion. | FIN → MIN | Reported EQL 3 |
| DAT | Gallium and germanium underpin chips and optics; data-centre servers are a growing exposure. | MIN → DAT | Reported EQL 3 |
| AIC | Semiconductors, robotics and AI raise demand for gallium, germanium and indium. | AIC → MIN | Inferred EQL 2 |
| MIN | The core system: a 72% top-refiner average and 270,000 tonnes of Chinese rare earth output. | the core system | Reported EQL 4 |
| TRD | Chinese tariff codes under export control tripled since 2023; heavy rare earth licences placed in April 2025. | TRD ↔ MIN | Reported EQL 4 |
3.3Sector screens
All sixteen sectors are screened for their dependence on critical minerals, on the same grammar as every national edition. The evidence column describes coverage of the baseline evidence, not the performance of the sector.
| Code | Sector | Baseline evidence | Exposure to watch | Evidence coverage |
|---|---|---|---|---|
| GS-00 | Cross-system | one mineral shock reaches magnets, batteries and chips2 | control lapse with cobalt quota | PARTIAL |
| GS-01 | Water | water and acid in processing | acid supply shock | THIN |
| GS-02 | Energy | lithium, graphite and copper demand from storage and grids2 | storage and grid build-out | GOOD |
| GS-03 | Food and agrifood | acid and sulphur link to fertiliser2 | acid export curbs | THIN |
| GS-04 | Health | imaging and device minerals | specialty material gaps | THIN |
| GS-05 | Finance and economy | USD 6.5 trillion of downstream output at risk in one case2 | price shock | PARTIAL |
| GS-06 | Development | producer revenue and export policies2 | export restrictions | PARTIAL |
| GS-07 | Climate | demand for clean-energy minerals3 | demand outpacing supply | PARTIAL |
| GS-08 | Disaster | Gulf conflict curtailed aluminium and sulphur2 | regional shutdown | THIN |
| GS-09 | Infrastructure | projected copper supply gap of 25% in 20352 | copper shortfall | GOOD |
| GS-10 | Cities | urban demand for batteries and cables | thin evidence here | THIN |
| GS-11 | Biodiversity | mining deforestation in Africa27 | mine expansion | PARTIAL |
| GS-12 | Earth observation | the Earth MRI programme remaps US resources1 | data access | THIN |
| GS-13 | Cyber and digital | chips and optics depend on gallium and germanium1 | single-supplier gaps | PARTIAL |
| GS-14 | Policy | stockpiles, price floors and benchmarks21119 | implementation gaps | GOOD |
| GS-15 | Science | cascade and trade-network models published232425 | data at operating scale | PARTIAL |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 2IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 1U.S. Geological Survey (ed.), Mineral Commodity Summaries 2026 (version 1.3, May 2026; manuscript dated 6 February 2026). U.S. Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
- 27Morton, O., Bousfield, C.G., Dégny Valé, P. et al., Mining triggers extensive additional deforestation in sub-Saharan Africa, Nature, 2026 (16,627 mines, 2001 to 2020). Observation year 2020. Accessed 2026-11-03.back
- 3IEA (ed.), Global Critical Minerals Outlook 2025. International Energy Agency, Paris, 2025. Observation year 2024. Accessed 2026-11-03.back
- 11European Commission, Critical Raw Materials Act (web page; 2030 benchmarks of 10% extraction, 40% processing, 25% recycling and a 65% single third-country cap, as shares of annual EU consumption). Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs, Brussels. Observation year 2024. Accessed 2026-11-03.back
- 19G7, Roadmap to Promote Standards-based Markets for Critical Minerals, 31 October 2025 (read on the Natural Resources Canada news page). Observation year 2025. Accessed 2026-11-03.back
- 23Ouyang, X., Liu, L., Liu, Q. et al., Systemic risks and cascading dynamics in the global cobalt supply chain, Environmental Science and Ecotechnology, 2026 (trade-linked flows, 1998 to 2019). Observation year 2019. Accessed 2026-11-03.back
- 24Liu, X., Huang, H., An, F. et al., Resilience assessment of lithium ion battery supply chains under critical mineral shortages, iScience, 2026 (multi-tier network of nine battery manufacturers). Observation year 2026. Accessed 2026-11-03.back
- 25Han, Y., Wang, P., Liao, Z. et al., Exploring the divergence of rare earth trade networks with a global simulation model, iScience, 2025. Observation year 2025. Accessed 2026-11-03.back
Risks and capability
Four global risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence; loss metrics are added only where they can be modelled.
4.1Risk objects
Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.
ReportedEQL 4RSK-SR04-TRD-001
Export controls on rare earths and magnets take effect
- Driver
- the status of the October 2025 expansion at the close is not bound5; post-close, context only: a suspension reported to end on 10 November 20267
- Exposure
- vehicle, electronics, defence and data-centre makers outside China2
- Vulnerability
- refining and magnet capacity lag mining outside the dominant supplier2
- Capacity
- licences; stockpiles; new magnet production in Texas21
- Cascade
- TRD → MIN → FIN
- Horizon
- 1 year
ReportedEQL 4RSK-SR04-MIN-002
Cobalt quota squeeze
InferredEQL 3RSK-SR04-INF-003
Smelter stress and loss of by-product recovery
InferredEQL 3RSK-SR04-POL-004
Slow diversification against concentrated refining
4.2Capability ladder
Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence at the global level, from a policy listing to performance in real events.
| Function | Rung | Level | Strongest public evidence at baseline |
|---|---|---|---|
| Prevention and mitigation | EXISTS | due diligence and responsible-mining standards widespread; uptake uneven3335 | |
| Monitoring and observation | ADEQUATE | agency statistics and outlooks published every year12 | |
| Early warning | LISTED | no common cross-mineral warning; an IEA programme exists48 | |
| Preparedness and planning | EXISTS | national critical mineral lists and an IEA programme161748 | |
| Redundancy and reserves | EXISTS | US, Australian and DRC reserves announced; use not yet tested2 | |
| Response | LISTED | an oil stock release in March 2026 is the analogue; no mineral release found2 | |
| Continuity of critical services | LISTED | offtake and price-floor arrangements; not consolidated20 | |
| Recovery | LISTED | restart time after a shock not consolidated | |
| Adaptation | EXISTS | substitution and circularity studies published2829 | |
| Social protection | LISTED | support for mining communities not consolidated | |
| Finance and insurance | EXISTS | public finance, price floors and loans22022 | |
| Institutional coordination | EXISTS | G7, IEA and bilateral frameworks181922 | |
| Technical infrastructure | EXISTS | refineries and magnet plants being built; gaps outside China221 | |
| Workforce | LISTED | skills and equipment constraints noted2 | |
| Research capacity | ADEQUATE | cascade and trade-network models published232425 | |
| A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline. | |||
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 5Pillsbury Winthrop Shaw Pittman (eds.), China Suspends Export Controls on Certain Critical Minerals and Related Items (client alert; announcements 55 to 58, 61 and 62 suspended from 7 November 2025 to 10 November 2026; Article 2 of Announcement 46 suspended to 27 November 2026; Announcement 18 of 4 April 2025 remains in force). Pillsbury, Washington. Observation year 2025. Accessed 2026-11-03.back
- 7POST-CLOSE, context only: Law-firm briefing, BIS Suspends Affiliates Rule, China Pauses Rare Earth Export Controls (BIS final rule of 10 November 2025; China suspension from 7 November 2025 to 10 November 2026), read on the Legal 500 intelligence page. Observation year 2025. Accessed 2026-11-03.back
- 2IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 21MP Materials, MP Materials Reports Fourth Quarter and Full Year 2025 Results, 26 February 2026 (REO in concentrate 50,692 tonnes; NdPr oxide 2,599 tonnes; first NdFeB magnets on commercial equipment in the fourth quarter of 2025; company-reported figures). MP Materials, Las Vegas. Observation year 2025. Accessed 2026-11-03.back
- 1U.S. Geological Survey (ed.), Mineral Commodity Summaries 2026 (version 1.3, May 2026; manuscript dated 6 February 2026). U.S. Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
- 9Fastmarkets (ed.), Cobalt export quotas: DRC sets limits to rebalance global supply (ARECOMS announcement of 21 September 2025; 18,125 tonnes to the end of 2025; 87,000 tonnes base plus a 9,600 tonne strategic quota for 2026; effective 16 October 2025). Fastmarkets, London. Observation year 2025. Accessed 2026-11-03.back
- 20MP Materials, MP Materials Announces Transformational Public-Private Partnership with the Department of Defense to Accelerate U.S. Rare Earth Magnet Independence, press release of 10 July 2025 (USD 400 million preferred equity; USD 110 per kilogram NdPr price floor for ten years; USD 150 million loan). MP Materials, Las Vegas. Observation year 2025. Accessed 2026-11-03.back
- 33UNVERIFIED, not opened: OECD, OECD Due Diligence Guidance for Responsible Supply Chains of Minerals from Conflict-Affected and High-Risk Areas, third edition. OECD Publishing, Paris, 2016, cited from memory; the request returned an access error. Observation year 2016. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: Initiative for Responsible Mining Assurance, IRMA Standard for Responsible Mining, version 1.0, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03.back
- 48UNVERIFIED, not opened: IEA, Critical Minerals Security Programme, described in the Outlook 2025 and 2026 texts; the programme page was not opened. Observation year 2025. Accessed 2026-11-03.back
- 16U.S. Department of the Interior, Interior Department releases final 2025 List of Critical Minerals (7 November 2025; 60 minerals; ten additions). Observation year 2025. Accessed 2026-11-03.back
- 17Congressional Research Service, U.S. Geological Survey’s Critical Minerals List, In Focus IF13145, 7 January 2026. Observation year 2025. Accessed 2026-11-03.back
- 28Yuan, X., Song, Q., Liu, Y. et al., Role of anthropogenic mineral circularity in addressing dual challenges of resource supply and waste management in global photovoltaic development, Nature Communications, 2025. Observation year 2025. Accessed 2026-11-03.back
- 29Teixeira, C., Gabbett, C., Synnatschke, K., Coleman, J.N. et al., A self-reliance framework for identifying strategic advanced materials, Nature Communications, 2026. Observation year 2026. Accessed 2026-11-03.back
- 22CMC Markets (ed.), Unpacking the US-Australia Critical Minerals Framework (market commentary on the framework signed 20 and 21 October 2025; at least USD 1 billion from each country in six months; pipeline of up to USD 8.5 billion). Observation year 2025. Accessed 2026-11-03.back
- 18G7 Leaders, G7 Critical Minerals Action Plan, Kananaskis, 17 June 2025 (read in an archive copy of the text). Observation year 2025. Accessed 2026-11-03.back
- 19G7, Roadmap to Promote Standards-based Markets for Critical Minerals, 31 October 2025 (read on the Natural Resources Canada news page). Observation year 2025. Accessed 2026-11-03.back
- 23Ouyang, X., Liu, L., Liu, Q. et al., Systemic risks and cascading dynamics in the global cobalt supply chain, Environmental Science and Ecotechnology, 2026 (trade-linked flows, 1998 to 2019). Observation year 2019. Accessed 2026-11-03.back
- 24Liu, X., Huang, H., An, F. et al., Resilience assessment of lithium ion battery supply chains under critical mineral shortages, iScience, 2026 (multi-tier network of nine battery manufacturers). Observation year 2026. Accessed 2026-11-03.back
- 25Han, Y., Wang, P., Liao, Z. et al., Exploring the divergence of rare earth trade networks with a global simulation model, iScience, 2025. Observation year 2025. Accessed 2026-11-03.back
Export-control expansion that overlaps a cobalt quota squeeze
A conditional statement under stated assumptions, never a prediction.
5.1Assumptions
Scenario SCN-SR04-MAG-01: what is assumed, and what is held constant.
- Baseline
- the 2026 reference state in this edition
- Drivers
- the October 2025 Chinese expansion takes effect while the DRC quota holds and stockpiles are thin; post-close, context only: a suspension reported to end on 10 November 20267
- Analogues
- April 2025 rare earth controls; DRC cobalt quota, 202559
- Interventions
- none modelled: the specification describes the unmitigated case
- Run state
- narrative specification; quantified run scheduled for 2027
5.2The cascade, step by step
- 1
TRD → MIN
licence requirements extend to foreign-made products that contain Chinese rare earths
2025
- 2
MIN → INF
magnet exports fall and plants outside China wait for licences
2025
- 3
MIN → FIN
prices diverge between Chinese and other markets
2026
- 4
MIN → FIN
cobalt supply stays capped while battery demand grows
2025 · 2026
- 5
FIN → MIN
buyers draw on stocks and reserves; the net cost of stockpiling is modest against the impact
2026
- 6
MIN → DAT
chip and device makers face gallium and germanium gaps
2025
5.3The scenario as a table of steps
How the shock in scenario SCN-SR04-MAG-01 would travel through Critical Minerals and Strategic Materials’s coupled systems, step by step, under the assumptions the edition states.
| Step | What happens | Source |
|---|---|---|
| 01 Trade to minerals | Licence requirements extend to foreign-made products that contain Chinese rare earths. Analogue or source: 2025. | Edition SR-04, scenario SCN-SR04-MAG-01, step 1 |
| 02 Minerals to infrastructure | Magnet exports fall and plants outside China wait for licences. Analogue or source: 2025. | Edition SR-04, scenario SCN-SR04-MAG-01, step 2 |
| 03 Minerals to finance | Prices diverge between Chinese and other markets. Analogue or source: 2026. | Edition SR-04, scenario SCN-SR04-MAG-01, step 3 |
| 04 Minerals to finance | Cobalt supply stays capped while battery demand grows. Analogue or source: 2025 · 2026. | Edition SR-04, scenario SCN-SR04-MAG-01, step 4 |
| 05 Finance to minerals | Buyers draw on stocks and reserves; the net cost of stockpiling is modest against the impact. Analogue or source: 2026. | Edition SR-04, scenario SCN-SR04-MAG-01, step 5 |
| 06 Minerals to dat | Chip and device makers face gallium and germanium gaps. Analogue or source: 2025. | Edition SR-04, scenario SCN-SR04-MAG-01, step 6 |
A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Critical Minerals and Strategic Materials 2026, scenario SCN-SR04-MAG-01 (2026); Critical Minerals and Strategic Materials 2026, references (NR-CIT-1) (2026).
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 7POST-CLOSE, context only: Law-firm briefing, BIS Suspends Affiliates Rule, China Pauses Rare Earth Export Controls (BIS final rule of 10 November 2025; China suspension from 7 November 2025 to 10 November 2026), read on the Legal 500 intelligence page. Observation year 2025. Accessed 2026-11-03.back
- 5Pillsbury Winthrop Shaw Pittman (eds.), China Suspends Export Controls on Certain Critical Minerals and Related Items (client alert; announcements 55 to 58, 61 and 62 suspended from 7 November 2025 to 10 November 2026; Article 2 of Announcement 46 suspended to 27 November 2026; Announcement 18 of 4 April 2025 remains in force). Pillsbury, Washington. Observation year 2025. Accessed 2026-11-03.back
- 9Fastmarkets (ed.), Cobalt export quotas: DRC sets limits to rebalance global supply (ARECOMS announcement of 21 September 2025; 18,125 tonnes to the end of 2025; 87,000 tonnes base plus a 9,600 tonne strategic quota for 2026; effective 16 October 2025). Fastmarkets, London. Observation year 2025. Accessed 2026-11-03.back
Readings from the other desks
The global baseline is read through each steward’s lens, then once as a whole. Each lens is a projection of reviewed findings, not a separate argument. The other desks’ own editions of this subject are listed first, as cross-references, not copies.
6.1The other desks’ editions of this subject
Federation: each desk writes its own edition for the subjects in its remit. Until a desk releases, its edition shows its frame and the reading this edition printed for it.
| Desk | Edition | State | Identifier |
|---|---|---|---|
| GCRI Systems Evidence | No edition of this subject at this desk in the 2026 Baseline cycle | Not in this cycle | |
| GRF Public Deliberation | Outside this desk’s remit | Not in remit | |
| GRA Capital Readiness | No edition of this subject at this desk in the 2026 Baseline cycle | Not in this cycle | |
| Standards Progress | Outside this desk’s remit | Not in remit | |
| Academy Capability | Outside this desk’s remit | Not in remit | |
| Index Measurement | Outside this desk’s remit | Not in remit |
6.2Three lenses
One edition, read by each steward. The lens of this site comes first.
GCRI · KEY T
Technical Truth
The evidence supports reading critical minerals as one dependent network. Concentration is rising in refining, controls and quotas have turned concentration into disruption, and diversification is slow because refining and magnet capacity lag mining. Evidence is strongest for production shares and prices and weakest for stocks, secondary supply and end-use flows.
MIN-001 · TRD-003 · MIN-004 · SYS-012
GRF · KEY M
Public Meaning
For most people mineral risk arrives as a late car, a dearer battery or a delayed device. The baseline asks that public debate treat minerals as shared and interdependent, and keep recycling, stockpiles and standards in view, not only mines.
MIN-004 · TRD-003
GRA · KEY F
Capital Meaning
Readiness implications only. A disruption puts very large downstream output at risk, public finance has grown fast, and refining projects outside the dominant supplier cost more2. These show where finance-readiness evidence will matter. Nothing here is advice, a rating or an approval.
FIN-006 · FIN-007
NEXUS
Synthesis
Mineral risk is well described event by event and thinly measured as a system. The 2027 programme should bind stock data, test the control and quota compound, and map recovery thresholds before the next large shock.
SYS-012 · M-01 · M-03
6.3Standards, Academy and steward contributions
How the Nexus Standards drafts, the Risk Academy and the three stewards feed each quarterly edition for critical minerals. The standards are a preparatory working draft (2026) and are cited as drafts, never as adopted standards.
| Quarter | Edition | Question | Boundary |
|---|---|---|---|
| Q1 | State and Agenda | What matters this year, and what is the starting position? | observed baseline stays distinct from planned work |
| Q2 | Evidence and Build | What new evidence and capability exist? | a configured capability is not a validated result |
| Q3 | Stress Test and Readiness | What do scenarios and tests show? | simulated loss or performance is not observed impact |
| Q4 | Annual Synthesis and Renewal | What changed in the year, and what renews? | release follows review, not event publicity deadlines |
| Steward or body | Role | Contribution route |
|---|---|---|
| GCRI Canada | Lead Institution and Consortium Secretariat; publisher of record; technical truth (key T) | science and practice communities · GCRI gateway |
| The Global Risks Forum (GRF) | leadership, dialogue and the Universe programme; public meaning (key M) | policy, Universe and national adoption · GRF gateway |
| The Global Risks Alliance (GRA) | finance, insurance and development readiness; capital meaning (key F) | finance and insurance · GRA gateway |
| Nexus Standards | preparatory drafts on vocabulary, hazards, indicators and methods | Standards site · working groups HAZ, IND, MTH, FIN, AI |
| Risk Academy | learning pathways tied to the agenda questions | Academy gateway · learning by review |
| Reports strategic desks | mineral chapter inputs: GCRI evidence and GRA readiness | strategic editorial board |
Standards drafts used in this edition
- Risk vocabulary NRS-C1 (424 terms) for terms in the glossary
- Hazard atlas NHS-1 1.1.0 (905 hazards in 120 families) for risk objects
- Seven risk classes: global, catastrophic, existential, emerging, planetary, exponential, frontier-tech
Standards calendar to watch
- Founding calls from 20 October 2026; working groups meet from 5 November 2026
- Inaugural Global Standards Council session, 12 January 2027
- Quarterly reviews in March, June, September and December, aligned with each edition
6.4GCRI reading: the model card
GCRI’s reading of this edition is its model card: what the national model is, what it computes and where it stops. It is printed in full in Annex A, with the methods it belongs to. Annex A, methodology
6.5Global Risks Forum reading: editorial essays
Four signed essays by the Reports editorial team set out the positions this edition takes. They are interpretation, labelled as such; the evidence they draw on is in the findings register.
Magnets need rare earths, batteries need cobalt and graphite, chips need gallium, and all of them need smelters and refiners. Treating each mineral alone understates how one decision becomes a shock in many industries. This edition reads the network.
EDITORIAL ESSAY · 01
Minerals are one network
Mining is concentrated for some minerals, but refining is more so. The top refiner averaged 72% excluding rare earths in 2025, and refining capacity outside it lags mining plans. Earlier data show the same pattern in 2022 and in 2024.
EDITORIAL ESSAY · 02
Concentration is a refining problem
The G7 roadmap ties market access to labour, anti-corruption and environmental criteria. Evidence on uranium in cobalt exports and on deforestation around mines shows why oversight gaps matter.
EDITORIAL ESSAY · 03
Standards are part of supply security
Recycling is small today. Models show that secondary supply can rise sharply in some technologies, but over decades and with surpluses in only a few metals.
EDITORIAL ESSAY · 04
Recycling is a long game
6.6Global Risks Alliance reading: 2027 critical minerals readiness pack
The registers that open the 2027 global cycle. At baseline each is initialised from this edition.
| Item | Register | State at baseline | First 2027 entry |
|---|---|---|---|
| E1 | Global risk state delta | baseline set by this edition | changes against the baseline |
| E2 | WEFH+B state delta | five global system readings set | indicator updates and freshness |
| E3 | Agenda and Portfolio movement | eight agenda items · 6 proposed objects | admission decisions |
| E4 | Federation delivery register | national chapters in preparation | national chapters |
| E5 | Consortium capability register | national consortia forming | first contributions |
| E6 | Leadership questions and challenges | none yet | first challenge log |
| E7 | Foundry technical state | national environments prepared | first federation cut |
| E8 | Publication candidates | twelve findings carried forward | PUBLISH · HOLD dispositions |
| E9 | Universe readiness | one candidate mission | admission and role spine |
| E10 | Correction register | none | first federation-wide cycle |
Publication dispositions
- Publish
- Hold
- Needs evidence
- Restricted
- Superseded
6.7Nexus Standards reading: standards and regulatory watch
Instruments and published guidance that shape the systems in this edition, by status on the retrieval date. The edition assesses no one’s compliance.
- IN FORCE
- ISSUED
- PUBLISHED · GUIDANCE
- PUBLISHED · VOLUNTARY
| Instrument | Body | Scope | Status | Relevance |
|---|---|---|---|---|
| Critical Raw Materials Act30 | European Union | EU | IN FORCE | benchmarks and strategic projects |
| Batteries Regulation31 | European Union | EU | IN FORCE | recycled content and due diligence |
| Conflict minerals regulation32 | European Union | EU | IN FORCE | tin, tantalum, tungsten, gold |
| OECD Due Diligence Guidance33 | OECD | global | PUBLISHED · GUIDANCE | responsible supply chains |
| EITI Standard 202334 | EITI | global | PUBLISHED · VOLUNTARY | revenue transparency |
| IRMA Standard35 | IRMA | global | PUBLISHED · VOLUNTARY | responsible mining |
| Global Industry Standard on Tailings Management36 | ICMM, UNEP and PRI | global | PUBLISHED · VOLUNTARY | tailings |
| ISO 31000 risk management37 | ISO | global | PUBLISHED · VOLUNTARY | risk process |
| Roadmap for standards-based markets19 | G7 | G7 | PUBLISHED · GUIDANCE | minimum criteria |
| Executive Order 1424114 | United States | US | ISSUED 2025 | permitting and finance |
| Executive Order 1428515 | United States | US | ISSUED 2025 | seabed minerals |
Changed since 2024
6.8Risk Academy reading: literature and evidence review, science and assessments
The review behind this edition covers critical minerals assessments, peer-reviewed science and the institutional reports that bind its findings. Systematic reviews for each agenda item begin in 2027.
Review protocol
- Question
- What does the published evidence establish about the world’s critical minerals and strategic materials and its couplings?
- Sources searched
- agency statistics; market outlooks; policy texts; peer-reviewed supply-chain literature
- Window
- releases available at evidence close, 30 September 2026
- Selection
- sources that bind or contextualise a finding in this edition
- Next step
- systematic reviews for agenda items 01 to 05 in 2027
| Reference | Type | Year | Role | Used for |
|---|---|---|---|---|
| Ouyang et al.23 | journal article | 2026 | supports | cobalt cascades |
| Liu et al.24 | journal article | 2026 | supports | battery chain recovery |
| Han et al.25 | journal article | 2025 | supports | rare earth trade networks |
| Manzuk and Philippe26 | journal article | 2026 | supports | uranium in cobalt exports |
| Morton et al.27 | journal article | 2026 | supports | mining deforestation |
| Yuan et al.28 | journal article | 2025 | context | secondary supply |
| Teixeira et al.29 | journal article | 2026 | framework | self-reliance index |
| Sovacool et al.40 | journal article | 2020 | framework | sustainable minerals |
| Graedel et al.41 | journal article | 2015 | framework | criticality |
| Gulley, Nassar and Xun42 | journal article | 2018 | context | competition for resources |
| Reference | Issuer | Year | Role | Used for |
|---|---|---|---|---|
| Outlook 20262 | IEA | 2026 | supports | markets and policy |
| Outlook 20253 | IEA | 2025 | supports | concentration trend |
| Critical materials4 | IRENA | 2023 | context | mining and refining shares |
| Panel report38 | United Nations | 2024 | context | principles |
| Minerals for Climate Action39 | World Bank | 2020 | context | mineral intensity |
| Critical Materials Assessment43 | US Department of Energy | 2023 | context | criticality assessment |
| Reference | Issuer | Year | Role | Used for |
|---|---|---|---|---|
| Mineral Commodity Summaries 20261 | USGS | 2026 | supports | production and reliance |
| Final 2025 List16 | US Department of the Interior | 2025 | supports | critical minerals list |
| Critical Minerals List17 | Congressional Research Service | 2026 | context | list method |
| Professional Paper 180247 | USGS | 2017 | context | criticality framing |
| Critical raw materials12 | European Commission | 2023 | context | EU list |
| Reference | Issuer | Year | Role | Used for |
|---|---|---|---|---|
| Critical Raw Materials Act11 | European Commission | 2024 | supports | benchmarks |
| RESourceEU13 | European Commission | 2025 | supports | action plan |
| Critical Minerals Action Plan18 | G7 | 2025 | supports | cooperation |
| Roadmap19 | G7 | 2025 | supports | standards-based markets |
| Partnership release20 | MP Materials | 2025 | supports | price floor and equity |
| Results release21 | MP Materials | 2026 | context | company-reported output |
| US-Australia framework22 | market commentary | 2025 | context | bilateral financing |
Where the evidence agrees
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 2IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 30UNVERIFIED, not opened: Regulation (EU) 2024/1252 establishing a framework for ensuring a secure and sustainable supply of critical raw materials (Critical Raw Materials Act), Official Journal of the European Union, 2024, cited from memory; the EUR-Lex request returned no text. Observation year 2024. Accessed 2026-11-03.back
- 31UNVERIFIED, not opened: Regulation (EU) 2023/1542 concerning batteries and waste batteries, Official Journal of the European Union, 2023, cited from memory. Observation year 2023. Accessed 2026-11-03.back
- 32UNVERIFIED, not opened: Regulation (EU) 2017/821 laying down supply chain due diligence obligations for importers of tin, tantalum and tungsten, their ores, and gold from conflict-affected and high-risk areas, Official Journal of the European Union, 2017, cited from memory. Observation year 2017. Accessed 2026-11-03.back
- 33UNVERIFIED, not opened: OECD, OECD Due Diligence Guidance for Responsible Supply Chains of Minerals from Conflict-Affected and High-Risk Areas, third edition. OECD Publishing, Paris, 2016, cited from memory; the request returned an access error. Observation year 2016. Accessed 2026-11-03.back
- 34UNVERIFIED, not opened: Extractive Industries Transparency Initiative, The EITI Standard 2023, Oslo, cited from memory; the page returned not found. Observation year 2023. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: Initiative for Responsible Mining Assurance, IRMA Standard for Responsible Mining, version 1.0, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03.back
- 36UNVERIFIED, not opened: ICMM, UNEP and PRI, Global Industry Standard on Tailings Management, August 2020, cited from memory. Observation year 2020. Accessed 2026-11-03.back
- 37UNVERIFIED, not opened: ISO 31000:2018, Risk management: guidelines. International Organization for Standardization, Geneva. Observation year 2018. Accessed 2026-11-03.back
- 19G7, Roadmap to Promote Standards-based Markets for Critical Minerals, 31 October 2025 (read on the Natural Resources Canada news page). Observation year 2025. Accessed 2026-11-03.back
- 14The White House, Executive Order 14241, Immediate Measures to Increase American Mineral Production, 20 March 2025. Observation year 2025. Accessed 2026-11-03.back
- 15The White House, Executive Order 14285, Unleashing America’s Offshore Critical Minerals and Resources, 24 April 2025. Observation year 2025. Accessed 2026-11-03.back
- 13European Commission and the EU Circular Economy Stakeholder Platform, European Commission adopts RESourceEU Action Plan (platform post of 10 December 2025; plan adopted 3 December 2025). Observation year 2025. Accessed 2026-11-03.back
- 16U.S. Department of the Interior, Interior Department releases final 2025 List of Critical Minerals (7 November 2025; 60 minerals; ten additions). Observation year 2025. Accessed 2026-11-03.back
- 7POST-CLOSE, context only: Law-firm briefing, BIS Suspends Affiliates Rule, China Pauses Rare Earth Export Controls (BIS final rule of 10 November 2025; China suspension from 7 November 2025 to 10 November 2026), read on the Legal 500 intelligence page. Observation year 2025. Accessed 2026-11-03.back
- 11European Commission, Critical Raw Materials Act (web page; 2030 benchmarks of 10% extraction, 40% processing, 25% recycling and a 65% single third-country cap, as shares of annual EU consumption). Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs, Brussels. Observation year 2024. Accessed 2026-11-03.back
- 44UNVERIFIED, not opened: International Seabed Authority, Council and Assembly sessions in Kingston, March and July 2026, on the draft exploitation regulations (Mining Code), taken from search-result summaries and a research-institute blog; no official statement was found. Observation year 2026. Accessed 2026-11-03.back
- 23Ouyang, X., Liu, L., Liu, Q. et al., Systemic risks and cascading dynamics in the global cobalt supply chain, Environmental Science and Ecotechnology, 2026 (trade-linked flows, 1998 to 2019). Observation year 2019. Accessed 2026-11-03.back
- 24Liu, X., Huang, H., An, F. et al., Resilience assessment of lithium ion battery supply chains under critical mineral shortages, iScience, 2026 (multi-tier network of nine battery manufacturers). Observation year 2026. Accessed 2026-11-03.back
- 25Han, Y., Wang, P., Liao, Z. et al., Exploring the divergence of rare earth trade networks with a global simulation model, iScience, 2025. Observation year 2025. Accessed 2026-11-03.back
- 26Manzuk, R.A. and Philippe, S., Uranium in cobalt-hydroxide exports from the Democratic Republic of the Congo, Nature Communications, 2026 (mine-level trade records, 2000 to 2024). Observation year 2024. Accessed 2026-11-03.back
- 27Morton, O., Bousfield, C.G., Dégny Valé, P. et al., Mining triggers extensive additional deforestation in sub-Saharan Africa, Nature, 2026 (16,627 mines, 2001 to 2020). Observation year 2020. Accessed 2026-11-03.back
- 28Yuan, X., Song, Q., Liu, Y. et al., Role of anthropogenic mineral circularity in addressing dual challenges of resource supply and waste management in global photovoltaic development, Nature Communications, 2025. Observation year 2025. Accessed 2026-11-03.back
- 29Teixeira, C., Gabbett, C., Synnatschke, K., Coleman, J.N. et al., A self-reliance framework for identifying strategic advanced materials, Nature Communications, 2026. Observation year 2026. Accessed 2026-11-03.back
- 40UNVERIFIED, not opened: Sovacool, B.K. et al., Sustainable minerals and metals for a low-carbon future, Science 367, 30 to 33, 2020, cited from memory. Observation year 2020. Accessed 2026-11-03.back
- 41UNVERIFIED, not opened: Graedel, T.E. et al., Criticality of metals and metalloids, Proceedings of the National Academy of Sciences 112(14), 4257 to 4262, 2015, cited from memory. Observation year 2015. Accessed 2026-11-03.back
- 42UNVERIFIED, not opened: Gulley, A.L., Nassar, N.T. and Xun, S., China, the United States, and competition for resources that enable emerging technologies, Proceedings of the National Academy of Sciences 115(16), 4111 to 4115, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03.back
- 3IEA (ed.), Global Critical Minerals Outlook 2025. International Energy Agency, Paris, 2025. Observation year 2024. Accessed 2026-11-03.back
- 4IRENA (ed.), Geopolitics of the Energy Transition: Critical Materials. International Renewable Energy Agency, Abu Dhabi, 2023. Observation year 2022. Accessed 2026-11-03.back
- 38UNVERIFIED, not opened: United Nations Secretary-General’s Panel on Critical Energy Transition Minerals, Resourcing the Energy Transition: Principles to Guide Critical Energy Transition Minerals towards Equity and Justice, September 2024, cited from memory; the request returned not found. Observation year 2024. Accessed 2026-11-03.back
- 39UNVERIFIED, not opened: Hund, K., La Porta, D., Fabregas, T.P., Laing, T. and Drexhage, J., Minerals for Climate Action: The Mineral Intensity of the Clean Energy Transition. World Bank, Washington, 2020, cited from memory; the request returned not found. Observation year 2020. Accessed 2026-11-03.back
- 43UNVERIFIED, not opened: U.S. Department of Energy, Critical Materials Assessment 2023. Washington, July 2023, cited from memory. Observation year 2023. Accessed 2026-11-03.back
- 1U.S. Geological Survey (ed.), Mineral Commodity Summaries 2026 (version 1.3, May 2026; manuscript dated 6 February 2026). U.S. Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
- 17Congressional Research Service, U.S. Geological Survey’s Critical Minerals List, In Focus IF13145, 7 January 2026. Observation year 2025. Accessed 2026-11-03.back
- 47UNVERIFIED, not opened: Schulz, K.J., DeYoung, J.H., Seal, R.R. and Bradley, D.C. (eds.), Critical Mineral Resources of the United States: Economic and Environmental Geology and Prospects for Future Supply, USGS Professional Paper 1802, 2017, cited from memory; named in the foreword of the 2026 Mineral Commodity Summaries. Observation year 2017. Accessed 2026-11-03.back
- 12European Commission, Critical raw materials (web page; 2023 list of 34 critical raw materials with copper and nickel listed as strategic; earlier lists 2011 to 2020). Brussels. Observation year 2023. Accessed 2026-11-03.back
- 18G7 Leaders, G7 Critical Minerals Action Plan, Kananaskis, 17 June 2025 (read in an archive copy of the text). Observation year 2025. Accessed 2026-11-03.back
- 20MP Materials, MP Materials Announces Transformational Public-Private Partnership with the Department of Defense to Accelerate U.S. Rare Earth Magnet Independence, press release of 10 July 2025 (USD 400 million preferred equity; USD 110 per kilogram NdPr price floor for ten years; USD 150 million loan). MP Materials, Las Vegas. Observation year 2025. Accessed 2026-11-03.back
- 21MP Materials, MP Materials Reports Fourth Quarter and Full Year 2025 Results, 26 February 2026 (REO in concentrate 50,692 tonnes; NdPr oxide 2,599 tonnes; first NdFeB magnets on commercial equipment in the fourth quarter of 2025; company-reported figures). MP Materials, Las Vegas. Observation year 2025. Accessed 2026-11-03.back
- 22CMC Markets (ed.), Unpacking the US-Australia Critical Minerals Framework (market commentary on the framework signed 20 and 21 October 2025; at least USD 1 billion from each country in six months; pipeline of up to USD 8.5 billion). Observation year 2025. Accessed 2026-11-03.back
- 5Pillsbury Winthrop Shaw Pittman (eds.), China Suspends Export Controls on Certain Critical Minerals and Related Items (client alert; announcements 55 to 58, 61 and 62 suspended from 7 November 2025 to 10 November 2026; Article 2 of Announcement 46 suspended to 27 November 2026; Announcement 18 of 4 April 2025 remains in force). Pillsbury, Washington. Observation year 2025. Accessed 2026-11-03.back
The 2027 agenda
Eight bounded questions open the 2027 critical minerals agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 critical minerals edition.
7.1Questions for the operational series
- M-01
How would the October 2025 Chinese control expansion taking effect, overlapping the DRC cobalt quota, travel through magnets, batteries and defence supply at the same time?
INI-SR04-MAG-01 · magnet and battery materials shock; first output: dependency analysis for six regions.
- M-02
Which minerals are single points of failure across the most end uses?
INI-SR04-SPF-02 · single points of failure; first output: mineral dependency register.
- M-03
How large are stockpiles and reserves, and how fast could they be drawn?
INI-SR04-STK-03 · stockpiles and reserves; first output: stockpile table.
- M-04
Where are refining and smelting capacity outside the dominant supplier thinnest?
INI-SR04-REF-04 · refining and smelting capacity; first output: capacity map.
- M-05
How do by-product minerals depend on base metal smelters?
INI-SR04-BYP-05 · by-product dependence; first output: by-product flow table.
- M-06
Which producers and consumers publish stock and flow data on a comparable basis?
To be admitted in 2027; first output: coverage note.
- M-07
How do mining footprints and safeguards change under faster supply growth?
To be admitted in 2027; first output: scoping note.
- M-08
Which mineral security capabilities have been tested in real shocks, and which are only planned?
Mineral security capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for the 2027 minerals portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-SR04-MAG-01 | Magnet and battery materials shock | Initiative | M-01 | PROPOSED |
| INI-SR04-SPF-02 | Single points of failure | Initiative | M-02 | PROPOSED |
| INI-SR04-STK-03 | Stockpiles and reserves | Initiative | M-03 | PROPOSED |
| INI-SR04-REF-04 | Refining and smelting capacity | Initiative | M-04 | PROPOSED |
| INI-SR04-BYP-05 | By-product dependence | Initiative | M-05 | PROPOSED |
| MSN-SR04-2027-01 | Magnet and battery materials Universe mission | Mission | M-01 | Candidate |
7.3The pathway
The critical minerals edition reads national mineral chapters, sector editions and the global edition through one governed evidence graph. At baseline the federation is designed and its first editions are drafted. This page states what exists today and what comes next.
- 01
National mineral chapters
mineral reading in each national edition
IN PREPARATION · national baselines
- 02
Sector editions
energy, infrastructure, digital, finance
PLANNED · sector Baseline Editions
- 03
Critical minerals system model
the global mineral system of systems
v0 SPECIFIED · v1 with federation evidence
- 04
Strategic links
SR-03 supply chains · SR-13 strategic technology infrastructure · SR-14 resilience investment
PLANNED · strategic baselines
- 05
Universe
annual proving environment
CANDIDATE MISSION · mandate in 2027
- 06
Critical Minerals Report
this series
BASELINE DRAFT · 2027 annual edition
- 07
Evidence and correction
one graph, many projections
OPEN · first correction cycle in 2027
7.4Universe 2027: evidence pack for the critical minerals candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | 2027 critical minerals annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-SR04-2027-01 · Magnet and battery materials Universe mission
- Role spine
- Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| MIN-001 · refining concentration | INI-SR04-REF-04 | refining and smelting capacity | PUBLIC |
| MIN-002 · rare earth output | INI-SR04-SPF-02 | single points of failure | PUBLIC |
| TRD-003 · export controls | INI-SR04-MAG-01 | magnet and battery materials shock | PUBLIC |
| MIN-004 · cobalt quota | INI-SR04-STK-03 | stockpiles and reserves | PUBLIC |
| MIN-005 · gallium | INI-SR04-BYP-05 | by-product dependence | PUBLIC |
| FIN-006 · value at risk | sector editions · key F review | impact table | PUBLIC |
| INF-008 · smelters | INI-SR04-BYP-05 | by-product dependence | PUBLIC |
| SYS-012 · compound pathway | MSN-SR04-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the federation | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| Mineral Commodity Summaries | USGS | annual | MIN-002 |
| Global Critical Minerals Outlook | IEA | annual | MIN-001 |
| Export control announcements | Ministry of Commerce and customs | per event | TRD-003 |
| Cobalt quota decisions | ARECOMS | per event | MIN-004 |
| Critical minerals list | USGS and Interior | per update | POL-009 |
| Company production reports | MP Materials | quarterly | MIN-010 |
| Strategic projects and action plans | European Commission | per round | POL-011 |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- annual publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-SR04-001 | Licence controls on heavy rare earths, 20255 | CORROBORATED | TRD · MIN | risk object RSK-SR04-TRD-001 |
| SIG-SR04-002 | DRC cobalt quota, 20259 | CORROBORATED | MIN · FIN | risk object RSK-SR04-MIN-002 |
| SIG-SR04-003 | Smelter fee collapse, 20262 | PARTIAL | INF · MIN | research question M-04 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 5Pillsbury Winthrop Shaw Pittman (eds.), China Suspends Export Controls on Certain Critical Minerals and Related Items (client alert; announcements 55 to 58, 61 and 62 suspended from 7 November 2025 to 10 November 2026; Article 2 of Announcement 46 suspended to 27 November 2026; Announcement 18 of 4 April 2025 remains in force). Pillsbury, Washington. Observation year 2025. Accessed 2026-11-03.back
- 9Fastmarkets (ed.), Cobalt export quotas: DRC sets limits to rebalance global supply (ARECOMS announcement of 21 September 2025; 18,125 tonnes to the end of 2025; 87,000 tonnes base plus a 9,600 tonne strategic quota for 2026; effective 16 October 2025). Fastmarkets, London. Observation year 2025. Accessed 2026-11-03.back
- 2IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
Systems in depth
One section per system: its state at evidence close, its exposures and what the operational series will watch.
8.1Common causes
One cause can strike many minerals at once: an export control, a producer quota, a conflict or a price slump. The shared cause matters more than the mineral.
Chinese tariff codes under export control, against 20232
| Instance | Mechanism in action | Evidence | Status |
|---|---|---|---|
| Export controls | China licenses seven heavy rare earths; the status of the October 2025 expansion is not bound | 5 | Reported |
| Producer quotas | the DRC caps cobalt exports | 19 | Reported |
| Raw export limits | Zimbabwe for lithium and Mozambique for graphite | 2 | Reported |
| Price slump | low cobalt prices led the DRC to ban and then cap exports | 19 | Reported |
Pathways in this mechanism
- TRD → MIN controls
- MIN → FIN quotas
- ENE → MIN conflict
Evidence to bind in 2027
- common cause tagging of supply events
- frequency of overlapping controls and quotas
Related editions
- GLB Global Systems
- SR-03 Global Supply Chains, Trade and Chokepoints
- SR-13 Strategic Technology Infrastructure and Sovereign Readiness
- SR-14 Global Resilience Investment and National Portfolios
- GS-02 Energy
- GS-13 Cyber and Digital Systems
8.2Domino effects
A shortage in one mineral removes an input from the next stage. A magnet licence delay reaches vehicle plants; an acid shortage reaches processing and fertiliser.
| Instance | Mechanism in action | Evidence | Status |
|---|---|---|---|
| Magnets to vehicles | export volumes fell sharply in April and May 2025 and some automakers cut output | 2 | Reported |
| Acid to processing | sulphur disruption raised acid costs; China halted acid exports from May 2026 | 2 | Reported |
| Smelters to by-products | weak fees threaten gallium and germanium recovery | 2 | Inferred |
| Minerals to chips | the gallium export ban to the United States was lifted for one year in November 2025 | 1 | Reported |
Pathways in this mechanism
- TRD → MIN → FIN
- ENE → MIN → FOO
- INF → MIN → DAT
Evidence to bind in 2027
- timing of output loss in downstream plants
- stock cover by plant
Related editions
- GLB Global Systems
- SR-03 Global Supply Chains, Trade and Chokepoints
- SR-13 Strategic Technology Infrastructure and Sovereign Readiness
- SR-14 Global Resilience Investment and National Portfolios
- GS-02 Energy
- GS-13 Cyber and Digital Systems
8.3Inter-systemic feedbacks
Mineral supply responds to what it enables. Demand from batteries and chips lifts prices, prices draw investment, and investment cycles shape the next shortage.
| Instance | Mechanism in action | Evidence | Status |
|---|---|---|---|
| Price to investment | weak prices in 2024 and early 2025 were followed by lower investment in 2025 | 23 | Reported |
| Demand to prices | lithium prices more than doubled on storage demand and tight supply | 2 | Reported |
| Policy to price | the DRC quota lifted cobalt prices by around 130% | 2 | Reported |
| Cascade amplification | cobalt risk concentrates at refining and manufacturing bridges | 23 | Reported |
Pathways in this mechanism
- FIN → MIN
- CLI → MIN
- MIN → FIN
Evidence to bind in 2027
- investment lags by stage
- price transmission to end users
Related editions
- GLB Global Systems
- SR-03 Global Supply Chains, Trade and Chokepoints
- SR-13 Strategic Technology Infrastructure and Sovereign Readiness
- SR-14 Global Resilience Investment and National Portfolios
- GS-02 Energy
- GS-13 Cyber and Digital Systems
8.4Shared vulnerabilities
Different minerals share the same weak points: one refining country, by-product recovery at base metal smelters, thin stockpiles and slow magnet capacity.
| Instance | Mechanism in action | Evidence | Status |
|---|---|---|---|
| One refining country | the top refiner averaged 72% excluding rare earths | 2 | Reported |
| By-product recovery | gallium, germanium and indium come from base metal processing | 2 | Reported |
| Magnet capacity | planned magnet output in diversified regions is about one third of expected mined supply | 2 | Reported |
| Stock cover | stockpiles are an emergency buffer; holdings are not consolidated | 2 | Inferred |
Pathways in this mechanism
- MIN → INF
- INF → MIN
- FIN → MIN
Evidence to bind in 2027
- stock holdings by country
- capacity utilisation outside China
Related editions
- GLB Global Systems
- SR-03 Global Supply Chains, Trade and Chokepoints
- SR-13 Strategic Technology Infrastructure and Sovereign Readiness
- SR-14 Global Resilience Investment and National Portfolios
- GS-02 Energy
- GS-13 Cyber and Digital Systems
8.5Thresholds and tipping
A mineral system can absorb stress until a threshold is crossed. Licence regimes, quotas, refined stocks and recovery capacity are such thresholds.
avalanche network density against the physical cobalt chain23
| Instance | Mechanism in action | Evidence | Status |
|---|---|---|---|
| Licence thresholds | the October 2025 expansion would extend control to foreign-made products | 5 | Reported |
| Quota thresholds | the DRC can move unused quota to its reserve and has no allocation framework beyond 2027 | 210 | Reported |
| Cascade thresholds | shocks can produce abrupt nonlinear failures | 23 | Reported |
| Recovery capacity | reallocation across tiers drives most recovery in battery chains | 24 | Reported |
Pathways in this mechanism
- TRD → MIN threshold
- MIN → MIN cascade thresholds
- FIN → MIN recovery finance
Evidence to bind in 2027
- cascade thresholds at operating scale
- stock thresholds by mineral
Related editions
- GLB Global Systems
- SR-03 Global Supply Chains, Trade and Chokepoints
- SR-13 Strategic Technology Infrastructure and Sovereign Readiness
- SR-14 Global Resilience Investment and National Portfolios
- GS-02 Energy
- GS-13 Cyber and Digital Systems
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 2IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 5Pillsbury Winthrop Shaw Pittman (eds.), China Suspends Export Controls on Certain Critical Minerals and Related Items (client alert; announcements 55 to 58, 61 and 62 suspended from 7 November 2025 to 10 November 2026; Article 2 of Announcement 46 suspended to 27 November 2026; Announcement 18 of 4 April 2025 remains in force). Pillsbury, Washington. Observation year 2025. Accessed 2026-11-03.back
- 1U.S. Geological Survey (ed.), Mineral Commodity Summaries 2026 (version 1.3, May 2026; manuscript dated 6 February 2026). U.S. Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
- 9Fastmarkets (ed.), Cobalt export quotas: DRC sets limits to rebalance global supply (ARECOMS announcement of 21 September 2025; 18,125 tonnes to the end of 2025; 87,000 tonnes base plus a 9,600 tonne strategic quota for 2026; effective 16 October 2025). Fastmarkets, London. Observation year 2025. Accessed 2026-11-03.back
- 7POST-CLOSE, context only: Law-firm briefing, BIS Suspends Affiliates Rule, China Pauses Rare Earth Export Controls (BIS final rule of 10 November 2025; China suspension from 7 November 2025 to 10 November 2026), read on the Legal 500 intelligence page. Observation year 2025. Accessed 2026-11-03.back
- 3IEA (ed.), Global Critical Minerals Outlook 2025. International Energy Agency, Paris, 2025. Observation year 2024. Accessed 2026-11-03.back
- 23Ouyang, X., Liu, L., Liu, Q. et al., Systemic risks and cascading dynamics in the global cobalt supply chain, Environmental Science and Ecotechnology, 2026 (trade-linked flows, 1998 to 2019). Observation year 2019. Accessed 2026-11-03.back
- 24Liu, X., Huang, H., An, F. et al., Resilience assessment of lithium ion battery supply chains under critical mineral shortages, iScience, 2026 (multi-tier network of nine battery manufacturers). Observation year 2026. Accessed 2026-11-03.back
- 10Shanghai Metals Market (ed.), Congo creates strategic cobalt reserve to influence supply and prices, regulator says (news report of 16 April 2026; reserve run by ARECOMS; 10% of national export volumes, 9,600 tonnes in 2026). Observation year 2026. Accessed 2026-11-03.back
Methodology
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
A.1Methods
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | Result |
|---|---|---|---|
| (1) | China share of rare earth mine output, 2025 | 270,000 ÷ 390,000 | ≈ 69% |
| (2) | DRC export cap against DRC mine output in 2024 | 96,600 ÷ 226,000 | ≈ 43% |
| (3) | US critical minerals that are fully import reliant | 13 ÷ 60 | ≈ 22% |
| (4) | DRC and Indonesia combined share of cobalt mine output, 2025 | (230,000 + 44,000) ÷ 310,000 | ≈ 88% |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| Label | Rule |
|---|---|
| Reported | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Estimated | Nexus analytical value with stated method |
| Scenario | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, Critical Minerals System Model v0
- Model ID
- MDL-SR04-MINERALS · v0.1
- Purpose
- represent critical minerals as a dependent network and the mechanisms by which supply shocks spread between mining, refining, components and end uses
- Family
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- Method
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- Validation
- none yet, first validation against federation evidence in 2027
- Uncertainty
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for asset-, site- or country-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-STRATEGIC-MINERALS-GLOBAL-2026-B0
- Type
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 48 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 critical minerals annual cut
Lineage
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | 2027 global annual |
|---|---|---|
| Sources | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | Critical Minerals System Model v0 specification | model runs with receipts |
| Findings | twelve baseline findings | findings re-bound to federation evidence |
| Review | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | Observed | Released | Cadence | Next release |
|---|---|---|---|---|
| US mineral statistics | 2025 | Feb 2026 · v1.3 May 2026 | annual | 2027 |
| Market outlook | 2025 | 2026 · revised Jul 2026 | annual | 2027 |
| Mining and refining shares (older) | 2022 | Jul 2023 | one-off | none found |
| Chinese export controls | 2025 to 2026 | Apr 2025 to Nov 2025 | per event | status at close not bound |
| DRC cobalt quota | 2025 to 2026 | Sep 2025 · Apr 2026 | per event | allocation beyond 2027 |
| US critical minerals list | 2025 | Nov 2025 | periodic | not fixed |
| EU benchmarks | 2024 | 2024 | one-off | list update |
| G7 roadmap | 2025 | Oct 2025 | one-off | G7 follow-up |
| MP Materials output | 2025 | Feb 2026 | quarterly | next results |
| Cascade and trade models | 1998 to 2019 · 2025 | 2025 · 2026 | ad hoc | none scheduled |
| System | Coverage | Thinnest dimension |
|---|---|---|
| Rare earths | GOOD | magnet stocks |
| Cobalt | GOOD | quota use |
| Lithium | PARTIAL | 2026 stocks |
| Graphite | PARTIAL | anode capacity |
| Gallium and germanium | PARTIAL | by-product flows |
| Copper | PARTIAL | smelter capacity outside China |
| Recycling | THIN | secondary supply |
| Stockpiles | THIN | holdings by country |
| Field | Source that would fill it | Blocker |
|---|---|---|
| Stockpile holdings by country and mineral | national stockpile agencies | not published on a common basis |
| Full text of the G7 declaration of June 2026 | G7 presidency | only the IEA summary was read2 |
| Chinese announcement texts and numbering for the 2025 suspension | Ministry of Commerce notices46 | official texts not retrieved; sources disagree on the numbering of the joint suspension |
| ARECOMS decision text and quota allocation by company | ARECOMS9 | decision not retrieved; sources differ on how the 96,600 tonnes is split |
| Status of the October 2025 Chinese expansion at the close | Ministry of Commerce | not bound by baseline evidence; one law-firm page carries a teaser on a truce extension to 10 January 2027 that was not verified |
| Refining and smelting capacity outside China by mineral | IEA project data and company reports | only summary shares were read |
| Recycled supply by mineral | national statistics and industry | no comparable global series found |
| Defence and aerospace end-use volumes by mineral | defence ministries and industry | not published |
| Full text of Regulation (EU) 2024/1252 | EUR-Lex30 | request returned no text; benchmarks read on the Commission page11 |
| Text of the US and Australia framework of October 2025 | governments of the United States and Australia22 | read through a market commentary only |
| Price series for strategic minor minerals | price reporting agencies | subscription data |
| Status of the Mining Code for deep-sea minerals | International Seabed Authority44 | only search summaries of the 2026 sessions |
| Capability rungs beyond reserves and finance | operators, regulators, ministries | not reviewed |
A.5Evidence cards, two anchor sources
Issued by the International Energy Agency. Annual. Role: binds MIN-001, TRD-003 and FIN-006. Coverage: global. The revised version of July 2026 was read as extracted text; figure tables were read selectively.
EVD-SR04-001
IEA Global Critical Minerals Outlook 20262
Issued by the US Geological Survey. Annual. Role: binds MIN-002, MIN-004 and MIN-005. Coverage: global production and US trade. Version 1.3 of May 2026; the chapters on cobalt, gallium, graphite, lithium and rare earths were read.
EVD-SR04-002
USGS Mineral Commodity Summaries 20261
| Dimension | EVD-SR04-001 | EVD-SR04-002 |
|---|---|---|
| Completeness | estimates for several producers | selected minerals and policy; some figures modelled |
| Timeliness | first release in early 2026 | revised version of July 2026 |
| Revision | versions 1.1 to 1.3 in 2026 | revised and corrected in 2026 |
| Method transparency | sources and estimation notes stated | notes stated; projections modelled |
| External validation | federal science agency | intergovernmental agency |
Evidence cards to follow in 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Group | Area | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- Maps
- plates in Q2 2027
- Waivers
- none
A.7Status words
| Status | What it means |
|---|---|
| Observed | Measured directly and published by the source. |
| Reported | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| Estimated | A Nexus estimate from cited evidence, with its method in Annex A. |
| Modelled | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Scenario | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Step | What happens | Source |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Term | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Coupling | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| ARECOMS | Regulatory and Control Authority for Strategic Mineral Substances |
| CRMA | Critical Raw Materials Act |
| DRC | Democratic Republic of the Congo |
| EITI | Extractive Industries Transparency Initiative |
| IEA | International Energy Agency |
| IRENA | International Renewable Energy Agency |
| ISA | International Seabed Authority |
| NdFeB | neodymium-iron-boron |
| NdPr | neodymium-praseodymium |
| REO | rare earth oxide |
| USGS | United States Geological Survey |
| LMIC | low- and middle-income countries |
A.10Technical annex
| Item | Annex | Contents | Status |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-SR04-MAG-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Regional notes | regional mineral cards | WITH REGIONAL EDITIONS |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: top refiner share
- Construct
- the share of refined output held by the largest refining country for a mineral
- Unit
- percent
- Method
- average across minerals excluding rare earths, as published by the IEA
- Source
- IEA Outlook 20262
- Uncertainty
- depends on mineral coverage and on the refined product definition
- Known limits
- does not record stocks, capacity utilisation or trade controls
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 2IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 46UNVERIFIED, not opened: Ministry of Commerce of the People’s Republic of China, export control announcements of 2025 (Announcements 18, 61 and 62 and the joint suspension, numbered 70 in some summaries), taken from secondary summaries; the official texts were not retrieved and sources disagree on the numbering. Observation year 2025. Accessed 2026-11-03.back
- 9Fastmarkets (ed.), Cobalt export quotas: DRC sets limits to rebalance global supply (ARECOMS announcement of 21 September 2025; 18,125 tonnes to the end of 2025; 87,000 tonnes base plus a 9,600 tonne strategic quota for 2026; effective 16 October 2025). Fastmarkets, London. Observation year 2025. Accessed 2026-11-03.back
- 30UNVERIFIED, not opened: Regulation (EU) 2024/1252 establishing a framework for ensuring a secure and sustainable supply of critical raw materials (Critical Raw Materials Act), Official Journal of the European Union, 2024, cited from memory; the EUR-Lex request returned no text. Observation year 2024. Accessed 2026-11-03.back
- 11European Commission, Critical Raw Materials Act (web page; 2030 benchmarks of 10% extraction, 40% processing, 25% recycling and a 65% single third-country cap, as shares of annual EU consumption). Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs, Brussels. Observation year 2024. Accessed 2026-11-03.back
- 22CMC Markets (ed.), Unpacking the US-Australia Critical Minerals Framework (market commentary on the framework signed 20 and 21 October 2025; at least USD 1 billion from each country in six months; pipeline of up to USD 8.5 billion). Observation year 2025. Accessed 2026-11-03.back
- 44UNVERIFIED, not opened: International Seabed Authority, Council and Assembly sessions in Kingston, March and July 2026, on the draft exploitation regulations (Mining Code), taken from search-result summaries and a research-institute blog; no official statement was found. Observation year 2026. Accessed 2026-11-03.back
- 1U.S. Geological Survey (ed.), Mineral Commodity Summaries 2026 (version 1.3, May 2026; manuscript dated 6 February 2026). U.S. Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
Data appendix
The indicator set with its sources, the source registers, the licences of every kind of material and the formats of the edition.
B.1The indicator set
| Indicator | Value | Unit | Year | State | Source |
|---|---|---|---|---|---|
| Top refiner share, average excluding rare earths | 72 | % | 2025 | Reported | 2 |
| Top refiner share, same measure | 70 | % | 2023 | Reported | 2 |
| World rare earth mine output | 390,000 | tonnes REO | 2025 | Reported | 1 |
| China rare earth mine output | 270,000 | tonnes REO | 2025 | Reported | 1 |
| China share of primary low-purity gallium | 99 | % | 2025 | Reported | 1 |
| World mined cobalt | 310,000 | tonnes | 2025 | Reported | 1 |
| DRC share of mined cobalt | 73 | % | 2025 | Reported | 1 |
| DRC export cap, cobalt content | 96,600 | tonnes a year | 2026 to 2027 | Reported | 1 |
| Cobalt metal price, near peak | ≈ 58,000 | USD per tonne | Q1 2026 | Reported | 2 |
| Downstream output at risk, rare earth controls | 6.5 | USD trillion a year | 2026 | Estimated | 2 |
| Change in critical mineral investment | −9 | % | 2025 | Reported | 2 |
| Public finance commitments, advanced economies | ≈ 65 | USD billion | 2025 | Reported | 2 |
| US critical minerals that are fully import reliant | 13 of 60 | minerals | 2025 | Reported | 1 |
| US value of recycled critical minerals | 18 | USD billion | 2025 | Reported | 1 |
| NdPr oxide price floor in the US agreement | 110 | USD per kg | 2025 | Reported | 20 |
B.2Global source register
The governed source set behind this edition. Each source keeps its authority, coverage, cadence and role; categories describe origin, not truth.
Domains bound by the register
- MIN
- TRD
- FIN
- INF
- ENE
- DAT
- CLI
- BIO
- AIC
- FOO
| Source | Category | Coverage | Period | Cadence | Role |
|---|---|---|---|---|---|
| USGS Mineral Commodity Summaries1 | national agency | global and US | 2025 | annual | production and import reliance |
| IEA Outlook 20262 | intergovernmental agency | global | 2025 to 2026 | annual | markets and policy |
| IEA Outlook 20253 | intergovernmental agency | global | 2024 to 2025 | annual | concentration trend |
| IRENA critical materials4 | intergovernmental agency | global | 2022 | one-off | mining and refining shares |
| Export-control briefings567 | legal and advisory notes | China and US | 2025 to 2026 | per event | control scope and dates |
| DRC quota reporting910 | trade press | DRC | 2025 to 2026 | per event | quota volumes |
| European Commission pages111213 | EU institution | EU | 2023 to 2025 | periodic | benchmarks and plans |
| US executive orders1415 | government | US | 2025 | per event | permitting and seabed |
| G7 texts1819 | intergovernmental group | G7 | 2025 | per event | roadmap |
| MP Materials releases2021 | company | US | 2025 to 2026 | quarterly | rare earth output |
B.3Regional reading, ten regional clusters
Map plates follow with the regional Baseline Editions, when boundary sources and public-safe resolutions are bound. This page gives the regional reading in table form and ranks no region.
| Region | Principal hazards | Systems most exposed | Baseline evidence |
|---|---|---|---|
| North America | refining and magnet build-out; import reliance | magnets, batteries, defence | USGS1; company release21 |
| South America | lithium, copper and graphite supply; export policy | batteries, grids | IEA2 |
| Europe | benchmarks, strategic projects, recycling | magnets, batteries | Commission pages1113 |
| Eurasia | sanctions and conflict effects not consolidated here | titanium, nickel, palladium | regional statistics (not bound) |
| Middle East and North Africa | sulphur and aluminium exposure to the 2026 conflict | aluminium, acid | IEA2 |
| Africa | cobalt, copper, graphite and lithium producers; export policy | batteries, grids | USGS1; IEA2 |
| South Asia | national mission and processing build-out | batteries, magnets | national mission45 |
| East Asia | refining, magnet and cell manufacturing hubs | magnets, batteries, chips | IEA2 |
| ASEAN | nickel and cobalt by-product growth in Indonesia | batteries, steel | USGS1; IEA2 |
| Oceania-Pacific | lithium, rare earth and gallium projects; a strategic reserve | magnets, chips | framework commentary22 |
B.4Regional card: Democratic Republic of the Congo cobalt
- region
- cobalt
- export quota
- strategic reserve
- Systems in view
- batteries, superalloys, chemicals
- Defining events
- export ban in February 2025 and quotas from October 202529
- Couplings
- MIN → FIN; MIN → TRD
- Capability evidence
- a quota system and a strategic reserve set up in April 202610
- Gaps
- quota use by company; stock levels
- Agenda items
- M-01 · M-03
Exports of contained cobalt are capped at up to 96,600 tonnes a year for 2026 and 2027, including 9,600 tonnes for strategic reserves [1].
QUOTA
Annual cap
The regulator set up a strategic reserve in April 2026 and can buy, hold and sell [10].
RESERVE
State reserve
Indonesia produced an estimated 44,000 tonnes in 2025, about 14% of world mine output [1].
SUPPLY
Alternative supply
B.5How countries appear in the global edition
Countries enter the critical minerals edition through the mineral chapters of their own national editions, on one card grammar. They are read against peer distributions and thresholds, never placed in a league table.
| Card field | What it shows | Source |
|---|---|---|
| WEFH+B state | each core system against peer distribution bands | national edition |
| Couplings | the national dependency matrix | national edition |
| Risk objects | the national risk portfolio | national edition |
| Capability rungs | the national capability ladder | national edition |
| Evidence age | oldest and newest source dates | national source register |
Editions in the 2026 Baseline programme
countries and unions
clusters
flagship and sector
technology reports
How to read a country card
- Each system is shown against the distribution of its peers, with thresholds where they exist
- Couplings and risk objects come from the country’s own national edition
- Capability rungs record evidence, not a judgement of institutions
- Evidence age is printed, so older national data are visible as such
| Wave | Countries and unions | State |
|---|---|---|
| W0 | Canada | ISSUED |
| W1 | United States, United Kingdom, France, Germany, Italy, Japan, European Union, Switzerland | PLANNED |
| W2 | Mexico, Brazil, Argentina, Türkiye, Russian Federation, Saudi Arabia, United Arab Emirates, South Africa, Senegal, Kenya, African Union, India, China, Republic of Korea, Indonesia, Singapore, Australia | PLANNED |
B.6Licences
| Material | Licence |
|---|---|
| Text | CC BY 4.0 |
| Data | on the licence of each source; Nexus tables CC BY 4.0 |
| Figures | Nexus figures CC BY 4.0; third-party as credited |
| Maps | boundary source and licence printed on each plate |
| Metadata | CC0 1.0, as Zenodo publishes it |
| Third-party data, figures and text | The source’s own licence, credited where it is used; never relicensed |
| Nexus-authored text, tables and figures: CC BY 4.0 (SPDX CC-BY-4.0). Map plates print their boundary source and licence. | |
B.7Formats and provenance
| Format | Kind | State | What it is | Identifier |
|---|---|---|---|---|
| Web edition | HTML | On this site | Draft in stewardship review; every value resolves to its source. | NR-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-v1.0.0 |
| Print edition | At release | A4 portrait · screen, print and archival PDF, signed with the web edition at release. | NR-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-v1.0.0 | |
| Indicator data | CSV · JSON | On this site | 15 indicators with unit, year, status and source; the machine-readable copy ships with the evidence bundle at release. | NR-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE data release v1 |
| Figures | SVG · PNG | On this site | 4 on the web edition: headline figure, figure 1.3, coupling instrument, capability ladder. | FIG-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-* |
| Slides | Not recorded | No slide deck is recorded for this edition. | ||
| Evidence brief | HTML · PDF | Not recorded | No evidence brief is recorded for this edition. | |
| Dataset with DOI | DataCite | At release | Concept and version DOI are minted at deposit; none is recorded yet. |
Provenance
- Edition pack
- The edition’s content pack (JSON), from which the print and web editions are built
- Evidence cut
- DC-STRATEGIC-MINERALS-GLOBAL-2026-B0, closed 30 September 2026
- Reproducibility
- sourced values cited; analytical values reproducible from stated parameters
- Self-check
- 14 of 23 at evidence close; a fail on any item blocks release
- Review
- five passes scheduled before release (in Annex C)
- Publisher of record
- GCRI for the Nexus Consortium
- Corrections
- Registry correction pathway; upheld corrections are published as notices with a new version
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 2IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 1U.S. Geological Survey (ed.), Mineral Commodity Summaries 2026 (version 1.3, May 2026; manuscript dated 6 February 2026). U.S. Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
- 20MP Materials, MP Materials Announces Transformational Public-Private Partnership with the Department of Defense to Accelerate U.S. Rare Earth Magnet Independence, press release of 10 July 2025 (USD 400 million preferred equity; USD 110 per kilogram NdPr price floor for ten years; USD 150 million loan). MP Materials, Las Vegas. Observation year 2025. Accessed 2026-11-03.back
- 3IEA (ed.), Global Critical Minerals Outlook 2025. International Energy Agency, Paris, 2025. Observation year 2024. Accessed 2026-11-03.back
- 4IRENA (ed.), Geopolitics of the Energy Transition: Critical Materials. International Renewable Energy Agency, Abu Dhabi, 2023. Observation year 2022. Accessed 2026-11-03.back
- 5Pillsbury Winthrop Shaw Pittman (eds.), China Suspends Export Controls on Certain Critical Minerals and Related Items (client alert; announcements 55 to 58, 61 and 62 suspended from 7 November 2025 to 10 November 2026; Article 2 of Announcement 46 suspended to 27 November 2026; Announcement 18 of 4 April 2025 remains in force). Pillsbury, Washington. Observation year 2025. Accessed 2026-11-03.back
- 6China Briefing (ed.), How Will China’s Rare Earth Export Controls Impact Industries and Businesses? (April 2025 controls on seven rare earths; October 2025 additions and extraterritorial rules; 45-day licence period). Dezan Shira and Associates. Observation year 2025. Accessed 2026-11-03.back
- 7POST-CLOSE, context only: Law-firm briefing, BIS Suspends Affiliates Rule, China Pauses Rare Earth Export Controls (BIS final rule of 10 November 2025; China suspension from 7 November 2025 to 10 November 2026), read on the Legal 500 intelligence page. Observation year 2025. Accessed 2026-11-03.back
- 9Fastmarkets (ed.), Cobalt export quotas: DRC sets limits to rebalance global supply (ARECOMS announcement of 21 September 2025; 18,125 tonnes to the end of 2025; 87,000 tonnes base plus a 9,600 tonne strategic quota for 2026; effective 16 October 2025). Fastmarkets, London. Observation year 2025. Accessed 2026-11-03.back
- 10Shanghai Metals Market (ed.), Congo creates strategic cobalt reserve to influence supply and prices, regulator says (news report of 16 April 2026; reserve run by ARECOMS; 10% of national export volumes, 9,600 tonnes in 2026). Observation year 2026. Accessed 2026-11-03.back
- 11European Commission, Critical Raw Materials Act (web page; 2030 benchmarks of 10% extraction, 40% processing, 25% recycling and a 65% single third-country cap, as shares of annual EU consumption). Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs, Brussels. Observation year 2024. Accessed 2026-11-03.back
- 12European Commission, Critical raw materials (web page; 2023 list of 34 critical raw materials with copper and nickel listed as strategic; earlier lists 2011 to 2020). Brussels. Observation year 2023. Accessed 2026-11-03.back
- 13European Commission and the EU Circular Economy Stakeholder Platform, European Commission adopts RESourceEU Action Plan (platform post of 10 December 2025; plan adopted 3 December 2025). Observation year 2025. Accessed 2026-11-03.back
- 14The White House, Executive Order 14241, Immediate Measures to Increase American Mineral Production, 20 March 2025. Observation year 2025. Accessed 2026-11-03.back
- 15The White House, Executive Order 14285, Unleashing America’s Offshore Critical Minerals and Resources, 24 April 2025. Observation year 2025. Accessed 2026-11-03.back
- 18G7 Leaders, G7 Critical Minerals Action Plan, Kananaskis, 17 June 2025 (read in an archive copy of the text). Observation year 2025. Accessed 2026-11-03.back
- 19G7, Roadmap to Promote Standards-based Markets for Critical Minerals, 31 October 2025 (read on the Natural Resources Canada news page). Observation year 2025. Accessed 2026-11-03.back
- 21MP Materials, MP Materials Reports Fourth Quarter and Full Year 2025 Results, 26 February 2026 (REO in concentrate 50,692 tonnes; NdPr oxide 2,599 tonnes; first NdFeB magnets on commercial equipment in the fourth quarter of 2025; company-reported figures). MP Materials, Las Vegas. Observation year 2025. Accessed 2026-11-03.back
- 45UNVERIFIED, not opened: Government of India, National Critical Mineral Mission, cleared by the Union Cabinet on 29 January 2025 (outlay of INR 16,300 crore over seven years), taken from search-result summaries; the press release was not opened. Observation year 2025. Accessed 2026-11-03.back
- 22CMC Markets (ed.), Unpacking the US-Australia Critical Minerals Framework (market commentary on the framework signed 20 and 21 October 2025; at least USD 1 billion from each country in six months; pipeline of up to USD 8.5 billion). Observation year 2025. Accessed 2026-11-03.back
References and record
Every source the edition rests on, the publication record, the corrections log and the open record.
C.148 sources
NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).
- 1U.S. Geological Survey (ed.), Mineral Commodity Summaries 2026 (version 1.3, May 2026; manuscript dated 6 February 2026). U.S. Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 2IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 3IEA (ed.), Global Critical Minerals Outlook 2025. International Energy Agency, Paris, 2025. Observation year 2024. Accessed 2026-11-03. Cited in chapter 3, chapter 6, chapter 8
- 4IRENA (ed.), Geopolitics of the Energy Transition: Critical Materials. International Renewable Energy Agency, Abu Dhabi, 2023. Observation year 2022. Accessed 2026-11-03. Cited in chapter 6
- 5Pillsbury Winthrop Shaw Pittman (eds.), China Suspends Export Controls on Certain Critical Minerals and Related Items (client alert; announcements 55 to 58, 61 and 62 suspended from 7 November 2025 to 10 November 2026; Article 2 of Announcement 46 suspended to 27 November 2026; Announcement 18 of 4 April 2025 remains in force). Pillsbury, Washington. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
- 6China Briefing (ed.), How Will China’s Rare Earth Export Controls Impact Industries and Businesses? (April 2025 controls on seven rare earths; October 2025 additions and extraterritorial rules; 45-day licence period). Dezan Shira and Associates. Observation year 2025. Accessed 2026-11-03.
- 7POST-CLOSE, context only: Law-firm briefing, BIS Suspends Affiliates Rule, China Pauses Rare Earth Export Controls (BIS final rule of 10 November 2025; China suspension from 7 November 2025 to 10 November 2026), read on the Legal 500 intelligence page. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 5, chapter 6, chapter 8
- 8POST-CLOSE, context only: Gonzalez, A., China rare earth export pause nears expiry amid persistent supply concentration, Mining Technology, 27 April 2026 (expiry on 10 November 2026; April 2025 controls remain; 2025 output shares). Observation year 2026. Accessed 2026-11-03.
- 9Fastmarkets (ed.), Cobalt export quotas: DRC sets limits to rebalance global supply (ARECOMS announcement of 21 September 2025; 18,125 tonnes to the end of 2025; 87,000 tonnes base plus a 9,600 tonne strategic quota for 2026; effective 16 October 2025). Fastmarkets, London. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 4, chapter 5, chapter 7, chapter 8
- 10Shanghai Metals Market (ed.), Congo creates strategic cobalt reserve to influence supply and prices, regulator says (news report of 16 April 2026; reserve run by ARECOMS; 10% of national export volumes, 9,600 tonnes in 2026). Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 8
- 11European Commission, Critical Raw Materials Act (web page; 2030 benchmarks of 10% extraction, 40% processing, 25% recycling and a 65% single third-country cap, as shares of annual EU consumption). Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs, Brussels. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 3, chapter 6
- 12European Commission, Critical raw materials (web page; 2023 list of 34 critical raw materials with copper and nickel listed as strategic; earlier lists 2011 to 2020). Brussels. Observation year 2023. Accessed 2026-11-03. Cited in chapter 6
- 13European Commission and the EU Circular Economy Stakeholder Platform, European Commission adopts RESourceEU Action Plan (platform post of 10 December 2025; plan adopted 3 December 2025). Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6
- 14The White House, Executive Order 14241, Immediate Measures to Increase American Mineral Production, 20 March 2025. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
- 15The White House, Executive Order 14285, Unleashing America’s Offshore Critical Minerals and Resources, 24 April 2025. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
- 16U.S. Department of the Interior, Interior Department releases final 2025 List of Critical Minerals (7 November 2025; 60 minerals; ten additions). Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 17Congressional Research Service, U.S. Geological Survey’s Critical Minerals List, In Focus IF13145, 7 January 2026. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 18G7 Leaders, G7 Critical Minerals Action Plan, Kananaskis, 17 June 2025 (read in an archive copy of the text). Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 19G7, Roadmap to Promote Standards-based Markets for Critical Minerals, 31 October 2025 (read on the Natural Resources Canada news page). Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6
- 20MP Materials, MP Materials Announces Transformational Public-Private Partnership with the Department of Defense to Accelerate U.S. Rare Earth Magnet Independence, press release of 10 July 2025 (USD 400 million preferred equity; USD 110 per kilogram NdPr price floor for ten years; USD 150 million loan). MP Materials, Las Vegas. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 4, chapter 6
- 21MP Materials, MP Materials Reports Fourth Quarter and Full Year 2025 Results, 26 February 2026 (REO in concentrate 50,692 tonnes; NdPr oxide 2,599 tonnes; first NdFeB magnets on commercial equipment in the fourth quarter of 2025; company-reported figures). MP Materials, Las Vegas. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 4, chapter 6
- 22CMC Markets (ed.), Unpacking the US-Australia Critical Minerals Framework (market commentary on the framework signed 20 and 21 October 2025; at least USD 1 billion from each country in six months; pipeline of up to USD 8.5 billion). Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 4, chapter 6
- 23Ouyang, X., Liu, L., Liu, Q. et al., Systemic risks and cascading dynamics in the global cobalt supply chain, Environmental Science and Ecotechnology, 2026 (trade-linked flows, 1998 to 2019). Observation year 2019. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 24Liu, X., Huang, H., An, F. et al., Resilience assessment of lithium ion battery supply chains under critical mineral shortages, iScience, 2026 (multi-tier network of nine battery manufacturers). Observation year 2026. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 25Han, Y., Wang, P., Liao, Z. et al., Exploring the divergence of rare earth trade networks with a global simulation model, iScience, 2025. Observation year 2025. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6
- 26Manzuk, R.A. and Philippe, S., Uranium in cobalt-hydroxide exports from the Democratic Republic of the Congo, Nature Communications, 2026 (mine-level trade records, 2000 to 2024). Observation year 2024. Accessed 2026-11-03. Cited in chapter 6
- 27Morton, O., Bousfield, C.G., Dégny Valé, P. et al., Mining triggers extensive additional deforestation in sub-Saharan Africa, Nature, 2026 (16,627 mines, 2001 to 2020). Observation year 2020. Accessed 2026-11-03. Cited in chapter 1, chapter 3, chapter 6
- 28Yuan, X., Song, Q., Liu, Y. et al., Role of anthropogenic mineral circularity in addressing dual challenges of resource supply and waste management in global photovoltaic development, Nature Communications, 2025. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 29Teixeira, C., Gabbett, C., Synnatschke, K., Coleman, J.N. et al., A self-reliance framework for identifying strategic advanced materials, Nature Communications, 2026. Observation year 2026. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 30UNVERIFIED, not opened: Regulation (EU) 2024/1252 establishing a framework for ensuring a secure and sustainable supply of critical raw materials (Critical Raw Materials Act), Official Journal of the European Union, 2024, cited from memory; the EUR-Lex request returned no text. Observation year 2024. Accessed 2026-11-03. Cited in chapter 6
- 31UNVERIFIED, not opened: Regulation (EU) 2023/1542 concerning batteries and waste batteries, Official Journal of the European Union, 2023, cited from memory. Observation year 2023. Accessed 2026-11-03. Cited in chapter 6
- 32UNVERIFIED, not opened: Regulation (EU) 2017/821 laying down supply chain due diligence obligations for importers of tin, tantalum and tungsten, their ores, and gold from conflict-affected and high-risk areas, Official Journal of the European Union, 2017, cited from memory. Observation year 2017. Accessed 2026-11-03. Cited in chapter 6
- 33UNVERIFIED, not opened: OECD, OECD Due Diligence Guidance for Responsible Supply Chains of Minerals from Conflict-Affected and High-Risk Areas, third edition. OECD Publishing, Paris, 2016, cited from memory; the request returned an access error. Observation year 2016. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 34UNVERIFIED, not opened: Extractive Industries Transparency Initiative, The EITI Standard 2023, Oslo, cited from memory; the page returned not found. Observation year 2023. Accessed 2026-11-03. Cited in chapter 6
- 35UNVERIFIED, not opened: Initiative for Responsible Mining Assurance, IRMA Standard for Responsible Mining, version 1.0, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 36UNVERIFIED, not opened: ICMM, UNEP and PRI, Global Industry Standard on Tailings Management, August 2020, cited from memory. Observation year 2020. Accessed 2026-11-03. Cited in chapter 6
- 37UNVERIFIED, not opened: ISO 31000:2018, Risk management: guidelines. International Organization for Standardization, Geneva. Observation year 2018. Accessed 2026-11-03. Cited in chapter 6
- 38UNVERIFIED, not opened: United Nations Secretary-General’s Panel on Critical Energy Transition Minerals, Resourcing the Energy Transition: Principles to Guide Critical Energy Transition Minerals towards Equity and Justice, September 2024, cited from memory; the request returned not found. Observation year 2024. Accessed 2026-11-03. Cited in chapter 6
- 39UNVERIFIED, not opened: Hund, K., La Porta, D., Fabregas, T.P., Laing, T. and Drexhage, J., Minerals for Climate Action: The Mineral Intensity of the Clean Energy Transition. World Bank, Washington, 2020, cited from memory; the request returned not found. Observation year 2020. Accessed 2026-11-03. Cited in chapter 6
- 40UNVERIFIED, not opened: Sovacool, B.K. et al., Sustainable minerals and metals for a low-carbon future, Science 367, 30 to 33, 2020, cited from memory. Observation year 2020. Accessed 2026-11-03. Cited in chapter 6
- 41UNVERIFIED, not opened: Graedel, T.E. et al., Criticality of metals and metalloids, Proceedings of the National Academy of Sciences 112(14), 4257 to 4262, 2015, cited from memory. Observation year 2015. Accessed 2026-11-03. Cited in chapter 6
- 42UNVERIFIED, not opened: Gulley, A.L., Nassar, N.T. and Xun, S., China, the United States, and competition for resources that enable emerging technologies, Proceedings of the National Academy of Sciences 115(16), 4111 to 4115, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03. Cited in chapter 6
- 43UNVERIFIED, not opened: U.S. Department of Energy, Critical Materials Assessment 2023. Washington, July 2023, cited from memory. Observation year 2023. Accessed 2026-11-03. Cited in chapter 6
- 44UNVERIFIED, not opened: International Seabed Authority, Council and Assembly sessions in Kingston, March and July 2026, on the draft exploitation regulations (Mining Code), taken from search-result summaries and a research-institute blog; no official statement was found. Observation year 2026. Accessed 2026-11-03. Cited in chapter 6
- 45UNVERIFIED, not opened: Government of India, National Critical Mineral Mission, cleared by the Union Cabinet on 29 January 2025 (outlay of INR 16,300 crore over seven years), taken from search-result summaries; the press release was not opened. Observation year 2025. Accessed 2026-11-03.
- 46UNVERIFIED, not opened: Ministry of Commerce of the People’s Republic of China, export control announcements of 2025 (Announcements 18, 61 and 62 and the joint suspension, numbered 70 in some summaries), taken from secondary summaries; the official texts were not retrieved and sources disagree on the numbering. Observation year 2025. Accessed 2026-11-03.
- 47UNVERIFIED, not opened: Schulz, K.J., DeYoung, J.H., Seal, R.R. and Bradley, D.C. (eds.), Critical Mineral Resources of the United States: Economic and Environmental Geology and Prospects for Future Supply, USGS Professional Paper 1802, 2017, cited from memory; named in the foreword of the 2026 Mineral Commodity Summaries. Observation year 2017. Accessed 2026-11-03. Cited in chapter 6
- 48UNVERIFIED, not opened: IEA, Critical Minerals Security Programme, described in the Outlook 2025 and 2026 texts; the programme page was not opened. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4
C.2Publication record
Publication
- Title
- Strategic Systems Report 2026: Critical Minerals and Strategic Materials, Baseline Edition
- Series
- Reports · Strategic Systems Series SR-04
- Edition
- Baseline Edition 2026 · inaugural annual
- Version
- v1.0.0 · draft for stewardship review
- Publication ID
- NR-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-v1.0.0
- Evidence close
- 30 September 2026
- Publication date
- October 2026
- DOI
- concept and version DOI at deposit
Publisher
- Publisher of record
- The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
- Place
- Toronto
- Editor
- Saeed Valadbaygi, Chief Steward and Managing Editor
- Stewards
- GCRI · technical truth · GRF · public meaning · GRA · capital meaning
- Licence
- text CC BY 4.0; data on the terms of each source
- Copyright
- © 2026 GCRI · Nexus Consortium
- Language
- English (en-GB) source edition
- Correspondence
- Registry correction pathway · editorial office
Colophon
- Format
- A4 portrait · screen, print and archival PDF
- Typefaces
- Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
- Design standard
- Reports Foundational Edition, Volume I, Part VII
- Accessibility
- tagged PDF and HTML targets; text alternatives for every figure
- Production
- Reports editorial team, GCRI
Release path for this version
| Step | What happens | When |
|---|---|---|
| Draft | editorial self-check complete at evidence close | October 2026 |
| Steward review | five passes on the exact draft (keys T · M · F · N) | Q4 2026 |
| Approval | publication authority approves the exact digest | before release |
| Deposit | concept and version DOI minted; registry pointer set | at release |
| Succession | the 2027 critical minerals edition reports changes against this baseline | 2027 |
- Current version
- v1.0.0 draft, stewardship review
- Previous edition
- none, first edition of the series
- Next edition
- NR-STRATEGIC-MINERALS-GLOBAL-2027-v1.0.0
- Latest version
- resolve the concept DOI or the registry record
- Correction route
- Registry correction pathway
- Notice types
- erratum · addendum · supersession · withdrawal
C.3Corrections log
0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.
| Edition | Version | Date | State | Change | Notice |
|---|---|---|---|---|---|
| SR-04 | NR-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-v1.0.0 | October 2026 | Draft | Baseline Edition 2026, inaugural annual edition, | None |
Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.
C.4Open record
This edition’s open record
- Publication ID
- NR-STRATEGIC-MINERALS-GLOBAL-2026-BASELINE-v1.0.0
- Desk identifier and series alias
- NR-STR-SR-04-2026-BL
- Collection
- None
- DOI
- Concept and version DOI at deposit, on Zenodo with DataCite metadata
- Versions
- Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
- Bundle
- RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
- Licence
- CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0
Credit and identity
- ORCID
- Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
- ROR
- Your organisation by its ROR identifier, never by a typed name alone
- CRediT
- Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
- Account
- None needed to contribute; never a password
Find and follow
Search the open indexes for Critical Minerals and Strategic Materials; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.
Mirrors and harvest
The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.
{
"metadata": {
"resource_type": {
"id": "dataset"
},
"title": "Evidence on Critical Minerals and Strategic Materials for Nexus Reports",
"publication_date": "YYYY-MM-DD",
"creators": [
{
"person_or_org": {
"type": "personal",
"family_name": "Your family name",
"given_name": "Your given name",
"identifiers": [
{
"scheme": "orcid",
"identifier": "0000-0000-0000-0000"
}
]
},
"affiliations": [
{
"id": "ROR identifier of your organisation"
}
]
}
],
"description": "What it is, where its record is kept and how it bears on Strategic Systems Report 2026: Critical Minerals and Strategic Materials.",
"rights": [
{
"id": "cc-by-4.0"
}
],
"subjects": [
{
"subject": "Nexus Reports"
},
{
"subject": "Critical Minerals and Strategic Materials"
},
{
"subject": "Strategic Systems Report · SR-04"
}
],
"related_identifiers": [
{
"identifier": "https://therisk.global/nexus-reports/editions/sr-04/",
"scheme": "url",
"relation_type": {
"id": "issupplementto"
},
"resource_type": {
"id": "publication-report"
}
}
],
"version": "1.0.0"
},
"custom_fields": {},
"access": {
"record": "public",
"files": "public"
},
"files": {
"enabled": true
},
"parent": {
"communities": {
"default": "nexusreports"
}
}
}C.5Where this edition sits among the six pillars
Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.
- F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
- F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
- F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
- Applied in editions Standards Nexus Standards: applied in editions.
- SR-04 edition Reports Critical Minerals and Strategic Materials 2026, published in every format with its sources, citation and corrections.
- F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
- F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
- Taught in the open Academy Risk Academy: taught in the open.
What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; SR-04 is a drafted Baseline Edition, so these handoffs run from its first operational quarter.
| Handoff | Between | What crosses, and when |
|---|---|---|
| F03 | Foundry to Reports | Sealed observations and indicator series behind a profile (closeout). |
| F04 | Universe to Reports | After-action and scenario findings for chapters 10 and 13 (after action review). |
| F05 | Foundry to Reports | National Portfolio movement for chapter 11 (after action review). |
| Ring | Nexus Standards to Reports | Nexus Standards: applied in editions. |
| F06 | Reports to Nexus Standards | Method and correction findings as change proposals (correction). |
| F12 | Reports to Universe | Q4 synthesis informs the next-year mandate (renewal). |
| Ring | Reports to Risk Academy | Risk Academy: taught in the open. |
