Exponential Technology Report 2026: HPC and Advanced Computing

Edition home

Choose A4 or Letter in the print dialog; running heads and page numbers are added in print. This is a review copy: the signed PDF with its DOI is issued at release.

ReportsXT-07

Exponential Technology

HPC and Advanced Computing 2026

Baseline Edition 2026NR-XTECH-HPC-GLOBAL-2026-BASELINEGCRI for the Nexus Consortium

Imprint

Editor
Saeed Valadbaygi, Chief Steward and Managing Editor, the Global Centre for Risk and Innovation (GCRI)
Publisher of record
The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium, Toronto
Report number
NR-XTECH-HPC-GLOBAL-2026-BASELINE
Evidence close
30 September 2026, cut DC-XTECH-HPC-GLOBAL-2026-B0
Status
Draft under stewardship review; not yet released
DOI and UNI
Issued at deposit
Licence
CC BY 4.0 for Nexus-authored text, tables and figures; third-party material keeps its own licence
Cite as
Valadbaygi, S. (Ed.). (2026). Exponential Technology Report 2026: HPC and Advanced Computing (Baseline Edition 2026, Report No. NR-XTECH-HPC-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI). https://therisk.global/nexus-reports/editions/xt-07/

Contents

  1. ·

    Executive summary

  2. 1

    Chapter 1. HPC is power, cooling and policy before it is speed

  3. 2

    Chapter 2. Key findings

  4. 3

    Chapter 3. Systems and sectors at baseline

  5. 4

    Chapter 4. Risks and capability

  6. 5

    Chapter 5. Power and siting limits meet fast-growing demand

  7. 6

    Chapter 6. Readings from the other desks

  8. 7

    Chapter 7. The 2027 agenda

  9. 8

    Chapter 8. Systems in depth

  10. A

    Annex A. Methodology

  11. B

    Annex B. Data appendix

  12. C

    Annex C. References and record

Executive summary

The edition on a few pages: the abstract, the key messages, the headline finding and what each steward reads in it.

6 min read1 figure0 tables11 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

S.1Abstract

High-performance computing matters to the Nexus programme as physical infrastructure. Large systems are built from millions of cores and accelerators that draw tens of megawatts, need liquid cooling and depend on chips, funding and export rules. The June 2026 TOP500 list placed a new Chinese system, LineShine, first with 2.198 exaflops on the Linpack benchmark and about 42.2 megawatts of power14. Five systems now sit at or above one exaflop1. The combined performance of the list rose from 14.99 to 18.73 exaflops in six months, and 276 of 500 systems use accelerators5. Efficiency leaders are small systems: the Green500 leader reached 73.282 gigaflops per watt at 46 kilowatts35. Data centres, the wider class that holds these machines, used 176 terawatt-hours in the United States in 2023, 4.4% of national electricity, and a DOE news item reports a 2028 range of 6.7% to 12%12. The US Department of Commerce extended a compliance timeline for advanced computing chips to the end of 2026 and issued guidance in May 202613. EuroHPC reports a budget of at least EUR 8.2 billion for 2021 to 2027 and lists 19 AI Factories1011. The US Exascale Computing Project spent USD 1.8 billion from 2016 to 202417. Water use, supply of accelerators and memory, and workforce are not bound in this edition. This baseline sets out what the evidence supports and where it is thin. It forecasts no system and ranks no country or vendor.

S.2Key messages

Six readings that frame the HPC baseline, and the eight questions this edition answers, each with its status and source.

  1. LineShine, with 2.198 exaflops on Linpack.14

    Which system leads the June 2026 list?Reported

  2. Five at or above one exaflop; JUPITER is listed at exactly 1.000.14

    How many systems reach an exaflop?Reported

  3. From 15.8 to 42.2 megawatts for the five largest.1

    How much power do the largest systems draw?Reported

  4. A 46 kilowatt system at 73.282 gigaflops per watt.35

    Who leads on efficiency?Reported

  5. US data centres used 4.4% of electricity in 2023.12

    How large is the wider data centre load?Reported

  6. BIS extended a timeline to the end of 2026 and issued guidance in May 2026.13

    What do export rules do now?Reported

  7. EuroHPC lists a budget of at least EUR 8.2 billion for 2021 to 2027.11

    What does Europe fund?Reported

  8. Power and siting limits against fast-growing demand. SCN-XT07-PWR-01

    What will 2027 test first?Expert input

S.3Headline finding

ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-001

LineShine, a CPU-only system at the National Supercomputing Center in Shenzhen, entered the June 2026 TOP500 list at first place with 2.198 exaflops on Linpack.

Figure S.1Linpack results of the five largest systems, June 2026 (exaflops)
ItemBar, scaled to the largest valueValue
LineShine · China2.198
El Capitan · United States1.809
Frontier · United States1.353
Aurora · United States1.012
JUPITER Booster · Germany1.000

Source: TOP500 list, June 20261. Bars show the Rmax values the list gives.

The list now holds five systems at or above one exaflop, on three continents. LineShine draws about 42.2 megawatts for 52.07 gigaflops per watt, and the page lists it as CPU-only4. China had not submitted systems for some years, according to search summaries, so earlier lists did not show all capacity30. Linpack is one benchmark, and LineShine leads HPCG while El Capitan leads the mixed-precision table5.

S.4At a glance

2.198exaflops

LineShine Linpack result4

18.73exaflops

combined list performance5

42.2MW

LineShine power1

73.282GFlops per watt

Green500 leader3

4.4%

US data centre electricity share, 202312

2030target

FugakuNEXT operation, a plan14

S.5What each steward reads in it

GCRI · KEY T

Technical Truth

The evidence supports reading HPC as physical infrastructure.

GRF · KEY M

Public Meaning

For most people the HPC story arrives as a headline about a faster machine or a data centre.

GRA · KEY F

Capital Meaning

Readiness implications only. Public programmes carry the largest systems, and policy sets access to chips.

NEXUS

Synthesis

HPC is well described by lists and thinly measured as a system.

S.6What this edition is, and is not

What this edition is

A baseline: the 2026 state of HPC and advanced computing as infrastructure and the couplings through which it carries risk into other systems. It synthesises published evidence and ranks no country, company or asset.

What it is not

Not a forecast of any machine or programme, a technology order of nations or vendors, an endorsement of any vendor or an assessment of any programme. Export controls, funding and standards are decisions of competent authorities.

What comes next

National, regional and sector evidence feeds the 2027 HPC edition through the federation. Each edition reports what changed against this baseline: observations, source revisions, method changes, scenario updates and corrections.

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  2. 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  3. 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  4. 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  5. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  6. 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
  7. 10EuroHPC Joint Undertaking (ed.), AI Factories (programme page; 19 AI Factories and 13 antennas stated; the page lists 18 sites and 15 antennas). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  8. 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  9. 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
  10. 30UNVERIFIED, not opened: HPCwire (ed.), Surprise: Chinese LineShine takes number 1 on TOP500 (23 June 2026), and press coverage that China had stopped submitting to the list in 2023, taken from search-result summaries; the HPCwire page returned an access error. Observation year 2026. Accessed 2026-11-03.back
  11. 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back

HPC is power, cooling and policy before it is speed

Part I describes systems and their couplings. It ranks no country or operator and assesses no authority.

5 min read2 figures1 table10 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

1.1The questions this part answers

Key questions

  • Where is HPC risk concentrated?
  • Which couplings carry HPC shocks into other systems?
  • Which HPC capabilities hold under compound stress?
  • What must 2027 evidence measure first?

In this part

  • Narrative
  • Headline finding
  • Lead figure
  • Five footprint and governance chapters
  • Twelve-domain reading
  • Sector screens
  • Dependency matrix
  • Risk objects
  • Capability ladder
  • Scenario
  • Three lenses
  • Portfolio

1.2The argument

High-performance computing is usually discussed as a speed race. The 2026 evidence reads it as infrastructure: millions of cores and accelerators that draw tens of megawatts, sit in purpose-built halls and depend on chips, funding and export rules1913.

The system evidence is strong. LineShine reached 2.198 exaflops on Linpack at about 42.2 megawatts, and four other systems reached one exaflop or more14. The combined list rose to 18.73 exaflops, and 276 of 500 systems use accelerators5. Lists show submitted systems only.

Efficiency and demand tell a different story. The Green500 leader is a 46 kilowatt system at 73.282 gigaflops per watt, and El Capitan reached 60.9435. Outside the lists, US data centres used 4.4% of national electricity in 2023 and a 2028 range of 6.7% to 12% is reported12.

The policy base is moving. BIS extended a timeline to the end of 2026 and issued guidance in May 202613. EuroHPC reports a budget of at least EUR 8.2 billion for 2021 to 202711. Cooling water, chip supply and workforce are the least measured parts.

Figure 1.1How large are mixed-precision benchmark results on the June 2026 list? HPL-MxP, exaflops

Mixed-precision results are several times larger than Linpack results for the same machines. El Capitan reached 16.7 exaflops against 1.809 on Linpack. The two benchmarks measure different work, and the table is not a measure of useful output45.

ItemBar, scaled to the largest valueValue
El Capitan16.7
Aurora11.6
Frontier11.4
LineShine7.92
JUPITER Booster7.92

Source: as cited in the note to this figure. Year 2026.

Figure ID FIG-XTECH-HPC-GLOBAL-2026-BASELINE-01-003

16.7exaflops

El Capitan HPL-MxP5

1.809exaflops

El Capitan Linpack1

22.00petaflops

LineShine HPCG5

17.41petaflops

El Capitan HPCG5

1.3Twenty couplings between five systems

The HPC-centred matrix types the twenty couplings between the five core systems, read for their HPC content. Strengths are Nexus estimates (ESTIMATED) from the cited evidence and analogue events; they set the graph that 2027 evidence will test.

Figure 1.2Couplings between the five systems

Each line is one coupling from one system to another, drawn by the strength the edition assigns. Strengths are Nexus estimates from the cited evidence and analogue events.

  • Strong
  • Moderate
  • Weak

Source: this edition’s coupling matrix (Table 1.1); status Estimated.

Table 1.1Coupling matrix: from the row system to the column system
From, toWATENEFOOHLTBIO
WAT Water·WEAK
facility cooling
WEAK
no documented link
WEAK
no documented link
WEAK
no documented link
ENE EnergyWEAK
cooling load, not bound
·WEAK
no documented link
WEAK
no documented link
WEAK
no documented link
FOO FoodWEAK
no documented link
WEAK
no documented link
·WEAK
no documented link
WEAK
no documented link
HLT HealthWEAK
no documented link
WEAK
no documented link
WEAK
no documented link
·WEAK
no documented link
BIO BiodiversityWEAK
no documented link
WEAK
no documented link
WEAK
no documented link
WEAK
no documented link
·
Strength: strong, moderate or weak; a Nexus estimate (status Estimated) from cited evidence and analogue events. The scale is defined in Annex A.

Transmission paths

  1. 01

    ENE → INF

    Facility power and cooling limit siting and scale.

    Reported power of the five largest systems1

  2. 02

    TRD → INF

    Licence rules shape access to advanced computing items.

    Reported BIS timeline and guidance13

  3. 03

    FIN → INF

    Public programmes fund systems and software.

    Reported ECP and EuroHPC budgets1711

  4. 04

    INF → ENE

    Accelerated systems add load to data centres.

    Inferred 276 accelerated systems5; US share12

  5. 05

    GOV → ENE

    Reporting rules make facility energy visible.

    Inferred EU delegated regulation34

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  2. 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
  3. 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
  4. 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  5. 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  6. 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  7. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  8. 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  9. 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
  10. 34UNVERIFIED, not opened: European Commission, Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (500 kW threshold, annual reporting by 15 May), taken from law firm summaries; EUR-Lex returned no content. Observation year 2024. Accessed 2026-11-03.back

Key findings

Twelve findings carry the HPC baseline. They are grouped by coupling and never ranked. Each resolves to its source or, where Nexus analysis is involved, to its stated method.

6 min read1 figure0 tables18 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

2.1Headline finding

ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-001

LineShine, a CPU-only system at the National Supercomputing Center in Shenzhen, entered the June 2026 TOP500 list at first place with 2.198 exaflops on Linpack.

Figure 2.1Linpack results of the five largest systems, June 2026 (exaflops)
ItemBar, scaled to the largest valueValue
LineShine · China2.198
El Capitan · United States1.809
Frontier · United States1.353
Aurora · United States1.012
JUPITER Booster · Germany1.000

Source: TOP500 list, June 20261. Bars show the Rmax values the list gives.

Implication

The list now holds five systems at or above one exaflop, on three continents. LineShine draws about 42.2 megawatts for 52.07 gigaflops per watt, and the page lists it as CPU-only4. China had not submitted systems for some years, according to search summaries, so earlier lists did not show all capacity30. Linpack is one benchmark, and LineShine leads HPCG while El Capitan leads the mixed-precision table5.

What would move it

The November 2026 list, independent descriptions of LineShine and further submissions would each move this finding.

2.2Infrastructure

  1. ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-001

    LineShine, a new system at the National Supercomputing Center in Shenzhen, entered the June 2026 TOP500 list at first place with 2.198 exaflops on Linpack, 13,789,440 cores and about 42.2 megawatts of power.1430

  2. ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-002

    The combined performance of the June 2026 TOP500 list is 18.73 exaflops, up from 14.99 six months before, and 276 of 500 systems use accelerators, up from 255.5

  3. ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-003

    Benchmarks give different readings: El Capitan leads the mixed-precision HPL-MxP table at 16.7 exaflops, and LineShine leads HPCG at 22.00 petaflops.45

  4. ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-009

    JUPITER, inaugurated on 5 September 2025, uses about 24,000 NVIDIA GH200 superchips, warm-water cooling with heat reuse, and reached exactly 1.000 exaflops on Linpack.912

2.3Energy

  1. ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-ENE-004

    The Green500 leader, KAIROS, reached 73.282 gigaflops per watt at 46 kilowatts, against 60.94 for El Capitan and 52.07 for LineShine.345

  2. ReportedEQL 2NRF-XTECH-HPC-GLOBAL-2026-BASELINE-ENE-005

    The IEA is reported to estimate that data centres used about 415 terawatt-hours in 2024 and could use about 945 terawatt-hours in 2030, in press and search summaries.28

  3. ReportedEQL 3NRF-XTECH-HPC-GLOBAL-2026-BASELINE-ENE-006

    US data centres used 176 terawatt-hours in 2023, 4.4% of national electricity, and a DOE news item gives a 2028 range of 6.7% to 12%.1229

2.4Governance

  1. ReportedEQL 3NRF-XTECH-HPC-GLOBAL-2026-BASELINE-GOV-007

    BIS extended its authorised designer timeline for advanced computing chips to 31 December 2026 on 7 April 2026 and issued guidance in May 2026 on licences for entities headquartered in Country Group D:5 or Macau.1333

  2. ReportedEQL 3NRF-XTECH-HPC-GLOBAL-2026-BASELINE-GOV-008

    EuroHPC reports a budget of at least EUR 8.2 billion for 2021 to 2027 and lists 19 AI Factories and 13 antennas, though the page names 18 sites and 15 antennas.1011

  3. ReportedEQL 3NRF-XTECH-HPC-GLOBAL-2026-BASELINE-GOV-011

    RIKEN, Fujitsu and NVIDIA plan FugakuNEXT for around 2030, with more than 5 times the hardware performance of Fugaku and up to 100 times the application performance in about the same 40 megawatts.1441

2.5Finance

  1. ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-FIN-010

    The US Exascale Computing Project cost USD 1.8 billion from 2016 to 2024, and the CHIPS and Science Act gave USD 50 billion to Commerce for semiconductor programmes.1743

2.6Systemic

  1. Expert inputEQL 2NRF-XTECH-HPC-GLOBAL-2026-BASELINE-SYS-012

    The leading compound pathway for 2027 testing is power and siting limits on large systems meeting fast-growing demand, while export controls and unlisted systems make capacity hard to see. § scenario

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  2. 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  3. 30UNVERIFIED, not opened: HPCwire (ed.), Surprise: Chinese LineShine takes number 1 on TOP500 (23 June 2026), and press coverage that China had stopped submitting to the list in 2023, taken from search-result summaries; the HPCwire page returned an access error. Observation year 2026. Accessed 2026-11-03.back
  4. 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  5. 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
  6. 2TOP500 (ed.), TOP500 list, November 2025, 66th edition (list page; top systems, Rmax, Rpeak, power). TOP500 project, Hamburg. Observation year 2025. Accessed 2026-11-03.back
  7. 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  8. 28UNVERIFIED, not opened: IEA (ed.), Energy and AI (2025; about 415 TWh for data centres in 2024, about 945 TWh in 2030), taken from press and search-result summaries; the IEA pages returned an access error. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  9. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  10. 29UNVERIFIED, not opened: Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, December 2024; figures taken from a DOE news item [12]; the report pages returned an access error. Observation year 2023. Accessed 2026-11-03.back
  11. 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
  12. 33UNVERIFIED, not opened: US Department of Commerce Bureau of Industry and Security, Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use (Federal Register, 25 October 2023), not retrieved; the page redirected. Observation year 2023. Accessed 2026-11-03.back
  13. 10EuroHPC Joint Undertaking (ed.), AI Factories (programme page; 19 AI Factories and 13 antennas stated; the page lists 18 sites and 15 antennas). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  14. 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  15. 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
  16. 41UNVERIFIED, not opened: DatacenterDynamics and The Next Platform (eds.), reports on FugakuNEXT (development budget above 110 billion yen, FP64 peak goal above 2.6 exaflops), taken from search-result summaries. Observation year 2025. Accessed 2026-11-03.back
  17. 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
  18. 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03.back

Systems and sectors at baseline

5 min read0 figures2 tables12 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

3.1Where each system stood at evidence close

INF · Systems

LineShine Linpack result, new first place

2.198exaflops

CPU-only; about 42.2 MW.

Reported2026TOP5004

INF · Systems

Combined performance of the TOP500 list

18.73exaflops

up from 14.99 six months before.

Reported2026TOP5005

ENE · Efficiency

Green500 leader, KAIROS

73.282GFlops per watt

3.05 petaflops at 46 kW.

Reported2026Green50035

ENE · Energy

US data centre electricity use

176TWh

4.4% of US electricity.

Reported2023DOE12

FIN · Finance

Exascale Computing Project budget

1.8USD billion

from 2016 to 2024.

Reported2024ECP17

GOV · Policy

EuroHPC budget, 2021 to 2027

8.2EUR billion

at least; page gives the amended figure.

Reported2026EuroHPC11

3.2Domain posture

Each of the twelve coupled domains is read through HPC, in words, not scored. The coupling column names the dependency that carries HPC risk into each domain.

Table 3.1Each domain read in words, not scored
DomainPosture at baselineCouplingStatus
WATCooling-water use of large facilities is not bound in this edition.ENE → WATExpert input EQL 1
ENEThe five largest systems draw 15.8 to 42.2 megawatts; US data centres used 4.4% of electricity in 2023.ENE ↔ INFReported EQL 4
FOONo documented coupling at baseline; weather and crop applications are not evidenced here.none documentedExpert input EQL 1
HLTNo documented coupling at baseline; drug discovery and genomics workloads are not evidenced here.none documentedExpert input EQL 1
BIONo documented coupling at baseline.none documentedExpert input EQL 1
CLIElectricity and cooling demand matter for emissions; the footprint of large systems is not bound.INF → CLIExpert input EQL 1
INFThe core system: five systems at or above one exaflop; list performance 18.73 exaflops.the core systemReported EQL 4
FINUSD 1.8 billion for the US exascale project; USD 50 billion for CHIPS programmes; EUR 8.2 billion for EuroHPC.FIN → INFReported EQL 4
DATLarge systems hold sensitive scientific data; no figure is bound.INF ↔ DATExpert input EQL 1
AICAccelerators are in 276 of 500 listed systems; the AI and scientific demand split is not bound.INF ↔ AICReported EQL 3
MINNo supply figure for chips, memory or minerals is bound for HPC.MIN → INFExpert input EQL 1
TRDUS licence rules and guidance shape access to advanced computing items.INF ↔ TRDReported EQL 3

3.3Sector screens

All sixteen sectors are screened for their dependence on HPC, on the same grammar as every national edition. The evidence column describes coverage of the baseline evidence, not the performance of the sector.

Table 3.2Sectors: baseline evidence and the exposure to watch
CodeSectorBaseline evidenceExposure to watchEvidence coverage
GS-00Cross-systemHPC couples to energy, chips and policypower and siting limitsTHIN
GS-01Watercooling-water use not boundfacility sitingTHIN
GS-02Energyfive largest systems draw 15.8 to 42.2 MW1load from large facilitiesPARTIAL
GS-03Foodno documented couplingnone documentedTHIN
GS-04Healthno documented couplingnone documentedTHIN
GS-05Financepublic programmes of USD 1.8 billion and EUR 8.2 billion1711dependence on a few programmesPARTIAL
GS-06Developmentaccess to compute and skillswidening gapsTHIN
GS-07Climatefootprint at scale not boundelectricity demandTHIN
GS-08Disasterno documented couplingnone documentedTHIN
GS-09Infrastructurewarm-water cooling and heat reuse at JUPITER9single-site dependenceTHIN
GS-10Citiesheat reuse into a campus network9none documentedTHIN
GS-11Biodiversityno documented couplingnone documentedTHIN
GS-12Earth observationweather and climate workloads not evidenced herenone documentedTHIN
GS-13Cyber and digitalsecurity of large systems not boundaccess control and export rulesTHIN
GS-14PolicyBIS notices, EuroHPC and UK plan131123fragmented rulesPARTIAL
GS-15Sciencepublic lists and standards forums11516common benchmarksGOOD

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  2. 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  3. 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  4. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  5. 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
  6. 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  7. 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  8. 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
  9. 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
  10. 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
  11. 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03.back
  12. 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03.back

Risks and capability

Four HPC risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence.

5 min read0 figures1 table18 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

4.1Risk objects

Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.

  1. InferredEQL 3RSK-XT07-ENE-001

    Power and siting limits for large systems

    Driver
    tens of megawatts per system and growing data centre load112
    Exposure
    grid connections; host regions; research sites
    Vulnerability
    single-site dependence; long lead times for power
    Capacity
    efficient designs and heat reuse39
    Cascade
    ENE → INF
    Horizon
    1 to 5 years
  2. InferredEQL 3RSK-XT07-GOV-002

    Fragmented controls and hidden capacity

    Driver
    licence rules and guidance; systems that do not submit to lists1330
    Exposure
    research collaboration; supply chains
    Vulnerability
    uneven access to chips and skills
    Capacity
    public lists, standards forums and national plans1151623
    Cascade
    GOV → INF, FIN
    Horizon
    1 to 5 years
  3. Expert inputEQL 2RSK-XT07-INF-003

    Benchmarks read alone

    Driver
    different benchmarks give different leaders45
    Exposure
    planning and public debate
    Vulnerability
    single-number comparisons
    Capacity
    benchmark tables read together5
    Cascade
    INF → FIN
    Horizon
    1 to 5 years
  4. InferredEQL 2RSK-XT07-FIN-004

    Dependence on a few public programmes

    Driver
    large public budgets for a few systems171143
    Exposure
    national laboratories; software teams
    Vulnerability
    programme end dates; budget cycles
    Capacity
    continuing funding lines and software stacks17
    Cascade
    FIN → INF
    Horizon
    5 to 10 years

4.2Capability ladder

Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence for HPC at the global level.

Table 4.1Capabilities on the ladder of evidence: listed, exists, demonstrated, tested
FunctionRungLevelStrongest public evidence at baseline
Prevention and mitigationLISTEDno common facility energy and water series found
Monitoring and observationEXISTSpublic lists of systems and efficiency13
Early warningLISTEDno consolidated watch on power and siting limits
Preparedness and planningEXISTSnational plans and roadmaps142326
Redundancy and reservesLISTEDspare capacity across sites is not documented
ResponseLISTEDno tested response to a long outage of a large system
Continuity of critical servicesLISTEDcontinuity plans of large systems not bound
RecoveryLISTEDnot applicable at baseline; no event to recover from
AdaptationEXISTSwarm-water cooling and heat reuse at one system9
Social protectionLISTEDnot applicable at baseline
Finance and insuranceEXISTSpublic programme funding171143
Institutional coordinationEXISTSEuroHPC, DOE programmes and standards forums11261516
Technical infrastructureEXISTSexascale systems on three continents1
WorkforceLISTEDskills gaps not bound; no figure used
Research capacityADEQUATEpublic systems, lists and shared-access programmes12122
A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline.

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  2. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  3. 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  4. 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
  5. 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
  6. 30UNVERIFIED, not opened: HPCwire (ed.), Surprise: Chinese LineShine takes number 1 on TOP500 (23 June 2026), and press coverage that China had stopped submitting to the list in 2023, taken from search-result summaries; the HPCwire page returned an access error. Observation year 2026. Accessed 2026-11-03.back
  7. 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03.back
  8. 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03.back
  9. 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
  10. 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  11. 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  12. 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
  13. 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  14. 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03.back
  15. 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
  16. 26POST-CLOSE, context only: US Department of Energy (ed.), Genesis Mission (programme page; goal of 100,000 science and technology professionals over a decade; announcements dated August to October 2026; no systems named). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
  17. 21Swiss National Supercomputing Centre (ed.), Alps (system page; 2,688 Grace-Hopper nodes; 434.9 petaflops; inaugurated September 2024). CSCS, Lugano. Observation year 2024. Accessed 2026-11-03.back
  18. 22National Artificial Intelligence Research Resource Pilot (ed.), NAIRR pilot site (more than 950 projects; 14 federal agencies; 26 non-governmental partners; Operations Center award of 1 September 2026). US National Science Foundation, Alexandria. Observation year 2026. Accessed 2026-11-03.back

Power and siting limits meet fast-growing demand

A conditional statement under stated assumptions, never a prediction.

2 min read0 figures0 tables1 noteNR-XTECH-HPC-GLOBAL-2026-BASELINE

5.1Assumptions

Scenario SCN-XT07-PWR-01: what is assumed, and what is held constant.

Baseline
the 2026 reference state in this edition
Drivers
demand for large systems and data centres grows while grid connections and cooling capacity grow more slowly
Analogues
the 2023 US share of 4.4% and the 2028 range of 6.7% to 12%12
Interventions
none modelled: the specification describes the unmitigated case
Run state
narrative specification; quantified run scheduled for 2027

5.2The cascade, step by step

  1. 1

    ENE → INF

    new systems of 15 to 40 megawatts compete for grid connections

    2026

  2. 2

    INF → ENE

    accelerated systems raise facility load

    2026

  3. 3

    GOV → ENE

    reporting rules make load visible to regulators

    2026

  4. 4

    TRD → INF

    licence rules shape where new hardware can go

    2026

  5. 5

    FIN → INF

    public programmes favour sites with power and cooling

    2024

  6. 6

    INF → CLI

    electricity demand adds to emissions where grids are carbon-intensive

    2026

5.3The scenario as a table of steps

How the shock in scenario SCN-XT07-PWR-01 would travel through HPC and Advanced Computing’s coupled systems, step by step, under the assumptions the edition states.

StepWhat happensSource
01 Energy to infrastructureNew systems of 15 to 40 megawatts compete for grid connections. Analogue or source: 2026.Edition XT-07, scenario SCN-XT07-PWR-01, step 1
02 Infrastructure to energyAccelerated systems raise facility load. Analogue or source: 2026.Edition XT-07, scenario SCN-XT07-PWR-01, step 2
03 Governance to energyReporting rules make load visible to regulators. Analogue or source: 2026.Edition XT-07, scenario SCN-XT07-PWR-01, step 3
04 Trade to infrastructureLicence rules shape where new hardware can go. Analogue or source: 2026.Edition XT-07, scenario SCN-XT07-PWR-01, step 4
05 Finance to infrastructurePublic programmes favour sites with power and cooling. Analogue or source: 2024.Edition XT-07, scenario SCN-XT07-PWR-01, step 5
06 Infrastructure to climateElectricity demand adds to emissions where grids are carbon-intensive. Analogue or source: 2026.Edition XT-07, scenario SCN-XT07-PWR-01, step 6

A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: HPC and Advanced Computing 2026, scenario SCN-XT07-PWR-01 (2026); HPC and Advanced Computing 2026, references (NR-CIT-1) (2026).

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back

Readings from the other desks

The HPC baseline is read through each steward’s lens, then once as a whole. Each lens is a projection of reviewed findings, not a separate argument. The other desks’ own editions of this subject are listed first, as cross-references, not copies.

15 min read0 figures8 tables35 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

6.1The other desks’ editions of this subject

Federation: each desk writes its own edition for the subjects in its remit. Until a desk releases, its edition shows its frame and the reading this edition printed for it.

DeskEditionStateIdentifier
GCRI Systems EvidenceNo edition of this subject at this desk in the 2026 Baseline cycleNot in this cycle
GRF Public DeliberationOutside this desk’s remitNot in remit
GRA Capital ReadinessOutside this desk’s remitNot in remit
Standards ProgressNo edition of this subject at this desk in the 2026 Baseline cycleNot in this cycle
Academy CapabilityNo edition of this subject at this desk in the 2026 Baseline cycleNot in this cycle
Index MeasurementOutside this desk’s remitNot in remit

6.2Three lenses

One edition, read by each steward. The lens of this site comes first.

GCRI · KEY T

Technical Truth

The evidence supports reading HPC as physical infrastructure. Systems are large and efficient designs exist, while facility energy and water, chip supply and workforce are thinly measured. Evidence is strongest for public lists and weakest for supply and skills.

INF-001 · ENE-004 · ENE-006 · SYS-012

GRF · KEY M

Public Meaning

For most people the HPC story arrives as a headline about a faster machine or a data centre. The baseline asks that public debate separate list entries from useful work, and keep power and water in view.

INF-001 · ENE-004 · ENE-006

GRA · KEY F

Capital Meaning

Readiness implications only. Public programmes carry the largest systems, and policy sets access to chips1713. These show where finance-readiness evidence will matter. Nothing here is advice, a rating or an approval.

FIN-010 · GOV-007

NEXUS

Synthesis

HPC is well described by lists and thinly measured as a system. The 2027 programme should bind facility energy and water, publish a comparable footprint and test the power and siting pathway.

SYS-012 · H-01 · H-02

6.3Standards, Academy and steward contributions

How the Nexus Standards drafts, the Risk Academy and the three stewards feed each quarterly edition for HPC. The standards are a preparatory working draft (2026) and are cited as drafts, never as adopted standards.

Table 6.1The quarterly rhythm every edition follows
QuarterEditionQuestionBoundary
Q1State and AgendaWhat matters this year, and what is the starting position?observed baseline stays distinct from planned work
Q2Evidence and BuildWhat new evidence and capability exist?a configured capability is not a validated result
Q3Stress Test and ReadinessWhat do scenarios and tests show?simulated loss or performance is not observed impact
Q4Annual Synthesis and RenewalWhat changed in the year, and what renews?release follows review, not event publicity deadlines
Table 6.2Who contributes what each quarter
Steward or bodyRoleContribution route
GCRI CanadaLead Institution and Consortium Secretariat; publisher of record; technical truth (key T)science and practice communities · GCRI gateway
The Global Risks Forum (GRF)leadership, dialogue and the Universe programme; public meaning (key M)policy, Universe and national adoption · GRF gateway
The Global Risks Alliance (GRA)finance, insurance and development readiness; capital meaning (key F)finance and insurance · GRA gateway
Nexus Standardspreparatory drafts on vocabulary, hazards, indicators and methodsStandards site · working groups HAZ, IND, MTH, FIN, AI
Risk Academylearning pathways tied to the agenda questionsAcademy gateway · learning by review
Nexus Standards and Academytechnology chapter inputs: GCRI evidence, NXS standards, RA capabilitytechnology editorial board

Standards drafts used in this edition

  • Risk vocabulary NRS-C1 (424 terms) for terms in the glossary
  • Hazard atlas NHS-1 1.1.0 (905 hazards in 120 families) for risk objects
  • Seven risk classes: global, catastrophic, existential, emerging, planetary, exponential, frontier-tech

Standards calendar to watch

  • Founding calls from 20 October 2026; working groups meet from 5 November 2026
  • Inaugural Global Standards Council session, 12 January 2027
  • Quarterly reviews in March, June, September and December, aligned with each edition

6.4GCRI reading: the model card

GCRI’s reading of this edition is its model card: what the national model is, what it computes and where it stops. It is printed in full in Annex A, with the methods it belongs to. Annex A, methodology

6.5Global Risks Forum reading: editorial essays

Four signed essays by the Reports editorial team set out the positions this edition takes. They are interpretation, labelled as such; the evidence they draw on is in the findings register.

A list entry shows a benchmark result. The power, cooling, chips and rules behind it are less visible. Reading HPC as infrastructure brings them into view without judging any system.

EDITORIAL ESSAY · 01

Speed is the visible part

Linpack, HPCG and mixed-precision tables lead to different systems. Reading them together avoids single-number claims.

EDITORIAL ESSAY · 02

Different benchmarks, different leaders

Small systems lead on efficiency, while the load of data centres grows. Both facts hold and neither settles the footprint of large systems.

EDITORIAL ESSAY · 03

Efficiency and demand move apart

Licence rules, reporting schemes and national plans are being set while facility energy and water remain unmeasured on a common basis.

EDITORIAL ESSAY · 04

Rules arrive before measurements

6.6Global Risks Alliance reading: 2027 HPC readiness pack

The registers that open the 2027 global cycle. At baseline each is initialised from this edition.

Table 6.32027 HPC readiness pack
ItemRegisterState at baselineFirst 2027 entry
E1HPC risk state deltabaseline set by this editionchanges against the baseline
E2WEFH+B state deltafive global system readings setindicator updates and freshness
E3Agenda and Portfolio movementeight agenda items · 6 proposed objectsadmission decisions
E4Federation delivery registernational chapters in preparationnational chapters
E5Consortium capability registernational consortia formingfirst contributions
E6Leadership questions and challengesnone yetfirst challenge log
E7Foundry technical statenational environments preparedfirst federation cut
E8Publication candidatestwelve findings carried forwardPUBLISH · HOLD dispositions
E9Universe readinessone candidate missionadmission and role spine
E10Correction registernonefirst federation-wide cycle

Publication dispositions

  • Publish
  • Hold
  • Needs evidence
  • Restricted
  • Superseded

6.7Nexus Standards reading: standards and regulatory watch

Instruments and published guidance that shape the systems in this edition, by status on the retrieval date. The edition assesses no one’s compliance.

  • IN FORCE
  • PUBLISHED
  • DRAFT
  • PUBLISHED · VOLUNTARY
Table 6.4Standards and regulatory watch
InstrumentBodyScopeStatusRelevance
MPI 5.016MPI ForumglobalPUBLISHED 2025message passing
OpenMP 6.015OpenMP Architecture Review BoardglobalPUBLISHED 2024shared-memory parallelism
OpenMP technical report 1515OpenMP Architecture Review BoardglobalDRAFT 2026public comment draft of 6.1
Delegated Regulation (EU) 2024/136434European CommissionEUIN FORCEdata centre reporting scheme
EU data centre rating scheme35European CommissionEUDRAFT 2026preparatory working draft (2026)
ISO/IEC 30134-236ISO and IECglobalPUBLISHED · VOLUNTARYpower usage effectiveness
BIS advanced computing due diligence rule1333US Department of CommerceUSPUBLISHED 2025licence and designer timeline
EU Chips Act, Regulation (EU) 2023/178125European UnionEUIN FORCEsemiconductor policy
EuroHPC Council Regulations 2024/1732 and 2026/15011Council of the EUEUIN FORCEjoint undertaking budget
TOP500 and Green500 list rules13TOP500 projectglobalPUBLISHED · VOLUNTARYlist submission

Changed since 2024

  • BIS extended the authorised designer timeline to 31 December 2026 on 7 April 202613
  • The Commission proposed a data centre rating scheme in September 2026, in draft35
  • The MPI Forum voted MPI 5.0 through on 5 June 202516

To watch in 2027

  • The EU data centre rating scheme, subject to scrutiny35
  • OpenMP 6.1 after public comment15
  • Further BIS guidance on advanced computing items13

6.8Risk Academy reading: literature and evidence review, science and assessments

The review behind this edition covers HPC assessments, peer-reviewed science and the institutional reports that bind its findings. Systematic reviews for each agenda item begin in 2027.

Review protocol

Question
What does the published evidence establish about HPC and advanced computing as infrastructure and its couplings?
Sources searched
peer-reviewed journals and preprints; benchmark lists; standards forums and agencies; programme and funding pages
Window
releases available at evidence close, 30 September 2026
Selection
sources that bind or contextualise a finding in this edition
Next step
systematic reviews for agenda items 01 to 05 in 2027
Table 6.5Peer-reviewed science and preprints
ReferenceTypeYearRoleUsed for
Patterson et al.18preprint2021supportsfootprint of model training
Luccioni, Viguier and Ligozat20preprint2022supportslife-cycle footprint of one model
Luccioni, Jernite and Strubell19conference paper2024supportscost of inference
Koomey et al.38journal article2011contextefficiency trends
Shalf39journal article2020contextlimits of scaling
Dennard et al.40journal article1974frameworkscaling rules
Dongarra, Luszczek and Petitet37journal article2003frameworkLinpack benchmark
Table 6.6Benchmark and list sources
ReferenceIssuerYearRoleUsed for
TOP500 list, June 20261TOP500 project2026supportssystem results
TOP500 list, November 20252TOP500 project2025contextearlier list
Green500 list, June 20263TOP500 project2026supportsefficiency
TOP500 release, June 20264TOP500 project2026supportsLineShine, HPCG, HPL-MxP
TOP500 highlights5TOP500 project2026supportslist totals
TOP500 news page6TOP500 project2026contextlist dates
Table 6.7Standards, policy and strategies
ReferenceIssuerYearRoleUsed for
BIS notices13US Department of Commerce2026supportsexport rules
EuroHPC pages1011EuroHPC Joint Undertaking2026supportsprogramme and budget
UK action plan23UK Government2025supportscompute plan
EU Chips Act page25European Commission2026supportschips policy
DOE Genesis pages2627US Department of Energy2026contextnational platform
Table 6.8Programmes, funding and field overviews
ReferenceIssuerYearRoleUsed for
Exascale Computing Project17DOE programme2024supportsprogramme cost
CHIPS and Science Act43US Congress2022supportschips funding
DOE news item12US Department of Energy2024supportsdata centre energy
IEA Energy and AI28IEA2025contextdemand estimate
RIKEN FugakuNEXT page14RIKEN2025contextnational plan
CSCS Alps page21CSCS2024contextsystem description
NAIRR pilot page22NSF and partners2026contextshared access

Where the evidence agrees

  • Five systems reach or pass one exaflop on Linpack14
  • Efficiency leaders are small systems today35
  • Facility energy and water are not yet reported on a common basis1234

Where it is unsettled

  • How large the footprint of the largest systems and their facilities is112
  • How capacity outside public lists compares with listed capacity30
  • How benchmark results map to useful scientific output4537

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
  2. 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
  3. 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03.back
  4. 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03.back
  5. 34UNVERIFIED, not opened: European Commission, Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (500 kW threshold, annual reporting by 15 May), taken from law firm summaries; EUR-Lex returned no content. Observation year 2024. Accessed 2026-11-03.back
  6. 35UNVERIFIED, not opened: POST-CLOSE, context only: Noerr (ed.), note of October 2026 on the proposal of 21 September 2026 for a delegated regulation on an EU data centre rating scheme with grades A to G from 2027, taken from search-result summaries; preparatory working draft (2026). Observation year 2026. Accessed 2026-11-03.back
  7. 36UNVERIFIED, not opened: ISO and IEC (eds.), ISO/IEC 30134-2 Information technology, Data centres key performance indicators, Part 2: Power usage effectiveness, cited from memory. International Organization for Standardization, Geneva. Observation year 2016. Accessed 2026-11-03.back
  8. 33UNVERIFIED, not opened: US Department of Commerce Bureau of Industry and Security, Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use (Federal Register, 25 October 2023), not retrieved; the page redirected. Observation year 2023. Accessed 2026-11-03.back
  9. 25European Commission (ed.), European Chips Act (policy page; Regulation (EU) 2023/1781 in force 21 September 2023; 19 State aid decisions over EUR 33 billion; Chips Act 2.0 proposed June 2026). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2026. Accessed 2026-11-03.back
  10. 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  11. 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  12. 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  13. 18Patterson, D. et al., Carbon Emissions and Large Neural Network Training, arXiv:2104.10350, submitted 21 April 2021 (abstract page). arXiv, Ithaca. Observation year 2021. Accessed 2026-11-03.back
  14. 20Luccioni, A.S., Viguier, S. and Ligozat, A.-L., Estimating the Carbon Footprint of BLOOM, a 176B Parameter Language Model, arXiv:2211.02001, submitted 3 November 2022 (abstract page; about 24.7 tonnes CO2eq dynamic, about 50.5 tonnes life cycle). arXiv, Ithaca. Observation year 2022. Accessed 2026-11-03.back
  15. 19Luccioni, A.S., Jernite, Y. and Strubell, E., Power Hungry Processing: Watts Driving the Cost of AI Deployment?, ACM FAccT 2024, arXiv preprint of November 2023 (abstract page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
  16. 38UNVERIFIED, not opened: Koomey, J.G. et al., Implications of historical trends in the electrical efficiency of computing, IEEE Annals of the History of Computing 33(3), 46 to 54, 2011, cited from memory. Observation year 2011. Accessed 2026-11-03.back
  17. 39UNVERIFIED, not opened: Shalf, J., The future of computing beyond Moore’s Law, Philosophical Transactions of the Royal Society A 378, 20190061, 2020, cited from memory. Observation year 2020. Accessed 2026-11-03.back
  18. 40UNVERIFIED, not opened: Dennard, R.H. et al., Design of ion-implanted MOSFET’s with very small physical dimensions, IEEE Journal of Solid-State Circuits 9(5), 256 to 268, 1974, cited from memory. Observation year 1974. Accessed 2026-11-03.back
  19. 37UNVERIFIED, not opened: Dongarra, J.J., Luszczek, P. and Petitet, A., The LINPACK Benchmark: past, present and future, Concurrency and Computation: Practice and Experience 15, 803 to 820, 2003, cited from memory. Observation year 2003. Accessed 2026-11-03.back
  20. 2TOP500 (ed.), TOP500 list, November 2025, 66th edition (list page; top systems, Rmax, Rpeak, power). TOP500 project, Hamburg. Observation year 2025. Accessed 2026-11-03.back
  21. 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  22. 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  23. 6POST-CLOSE, context only: TOP500 (ed.), TOP500 news index (headlines and dates of the lists of November 2024, June 2025, November 2025 and June 2026; no November 2026 list at page read). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  24. 10EuroHPC Joint Undertaking (ed.), AI Factories (programme page; 19 AI Factories and 13 antennas stated; the page lists 18 sites and 15 antennas). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  25. 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
  26. 26POST-CLOSE, context only: US Department of Energy (ed.), Genesis Mission (programme page; goal of 100,000 science and technology professionals over a decade; announcements dated August to October 2026; no systems named). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
  27. 27Oak Ridge National Laboratory (ed.), The Genesis Mission (page; Lux and Discovery listed with one-line descriptions only). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
  28. 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03.back
  29. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  30. 28UNVERIFIED, not opened: IEA (ed.), Energy and AI (2025; about 415 TWh for data centres in 2024, about 945 TWh in 2030), taken from press and search-result summaries; the IEA pages returned an access error. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  31. 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
  32. 21Swiss National Supercomputing Centre (ed.), Alps (system page; 2,688 Grace-Hopper nodes; 434.9 petaflops; inaugurated September 2024). CSCS, Lugano. Observation year 2024. Accessed 2026-11-03.back
  33. 22National Artificial Intelligence Research Resource Pilot (ed.), NAIRR pilot site (more than 950 projects; 14 federal agencies; 26 non-governmental partners; Operations Center award of 1 September 2026). US National Science Foundation, Alexandria. Observation year 2026. Accessed 2026-11-03.back
  34. 30UNVERIFIED, not opened: HPCwire (ed.), Surprise: Chinese LineShine takes number 1 on TOP500 (23 June 2026), and press coverage that China had stopped submitting to the list in 2023, taken from search-result summaries; the HPCwire page returned an access error. Observation year 2026. Accessed 2026-11-03.back
  35. 24POST-CLOSE, context only: Post-close, context only: NIST (ed.), CHIPS for America (programme page; USD 50 billion; USD 11 billion research and USD 39 billion incentives; awards of September and October 2026 listed). National Institute of Standards and Technology, Gaithersburg. Observation year 2026. Accessed 2026-11-03.back

The 2027 agenda

Eight bounded questions open the 2027 HPC agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 HPC edition.

5 min read0 figures6 tables3 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

7.1Questions for the operational series

  1. H-01

    What do the largest systems and the facilities around them draw in power and cooling water, and how does that compare with efficiency leaders?

    INI-XT07-PWR-01 · power and cooling footprint; first output: footprint table by system.

  2. H-02

    How much of the demand on data centres comes from scientific systems, and how much from commercial AI workloads?

    INI-XT07-DEM-02 · demand split; first output: demand note.

  3. H-03

    Which chips, memory and fabrication steps are single points of failure for large systems?

    INI-XT07-SUP-03 · accelerator and memory supply; first output: dependence map.

  4. H-04

    How can capacity be seen when systems do not submit to public lists?

    INI-XT07-VIS-04 · visible and unlisted capacity; first output: visibility table.

  5. H-05

    How can benchmark results be read together, given that Linpack, HPCG and mixed-precision tables differ?

    INI-XT07-BMK-05 · benchmarks read together; first output: benchmark table.

  6. H-06

    Which national and regional rules set data centre reporting, and how do they differ?

    To be admitted in 2027; first output: rule overlay.

  7. H-07

    What workforce exists for operating, programming and securing large systems?

    To be admitted in 2027; first output: scoping note.

  8. H-08

    Which readiness capabilities have been tested in real shortages or outages, and which are only planned?

    Readiness capability register; first output: rung evidence for 15 functions.

7.2Portfolio proposed for the Q1 2027 alignment

Five initiatives and one Universe mission candidate are proposed for the 2027 HPC portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.

Table 7.1Objects proposed for the first operational quarter
IDObjectKindQuestionState
INI-XT07-PWR-01Power and cooling footprintInitiativeH-01PROPOSED
INI-XT07-DEM-02Demand splitInitiativeH-02PROPOSED
INI-XT07-SUP-03Accelerator and memory supplyInitiativeH-03PROPOSED
INI-XT07-VIS-04Visible and unlisted capacityInitiativeH-04PROPOSED
INI-XT07-BMK-05Benchmarks read togetherInitiativeH-05PROPOSED
MSN-XT07-2027-01Power and siting Universe missionMissionH-01Candidate

7.3The pathway

The HPC edition reads national readiness chapters, the coupled sector reports on energy, minerals and cybersecurity, and the global edition through one governed evidence graph. At baseline the federation is designed; the global energy and lifeline editions are drafted. This page states what exists today and what comes next.

  1. 01

    National readiness chapters

    computing and facility readiness in each national edition

    IN PREPARATION · national baselines

  2. 02

    Sector couplings

    GS-02 energy · XT-06 semiconductors and AI compute · SR-04 minerals

    GS-02 DRAFTED · sector baselines

  3. 03

    Technology system model

    systems, power, cooling, chips, funding, governance

    v0 SPECIFIED · v1 with federation evidence

  4. 04

    Strategic links

    SR-02 lifeline systems · SR-13 strategic technology

    PLANNED · strategic baselines

  5. 05

    Universe

    annual proving environment

    CANDIDATE MISSION · mandate in 2027

  6. 06

    XT-07 report

    this series

    BASELINE DRAFT · 2027 annual edition

  7. 07

    Evidence and correction

    one graph, many projections

    OPEN · first correction cycle in 2027

7.4Universe 2027: evidence pack for the HPC candidate mission

  1. 01

    Mandate

  2. 02

    Core Build · 1 month

  3. 03

    Action · 1 week

  4. 04

    Evidence seal

  5. 05

    Portfolio correction

  6. 06

    Next mandate

Table 7.2Universe 2027: evidence pack for the HPC candidate mission
ItemRecordStateTiming
F1Annual mandate recordPLANNEDafter the Q2 2027 alignment
F2Core Build recordPLANNEDone month before the exercise
F3Exercise evidencePLANNEDduring the Action week
F4Decision packetsPLANNEDexercise state only
F5Proof receiptsPLANNEDscoped to each recorded check
F6After-action reportPLANNEDwithin one quarter
F7Upgrade docketPLANNEDrouted to the Portfolio
F8Portfolio renewalPLANNED2027 global annual edition
F9Public synthesisPLANNEDpublic-safe extracts only

Mission

ID
MSN-XT07-2027-01 · Power and siting Universe mission
Role spine
Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
Receiving actors
to be identified with the mandate

7.5Handoffs and routing

Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.

Table 7.3Handoffs and routing
FindingRouted toPurposeClass
INF-001 · list entryINI-XT07-VIS-04visible and unlisted capacityPUBLIC
INF-003 · benchmarksINI-XT07-BMK-05benchmarks read togetherPUBLIC
ENE-004 · efficiencyINI-XT07-PWR-01power and cooling footprintPUBLIC
ENE-006 · data centre energyINI-XT07-DEM-02demand splitPUBLIC
GOV-007 · export rulesregional consortiarule overlayPUBLIC
GOV-008 · EuroHPCregional consortiarule overlayPUBLIC
FIN-010 · public fundingINI-XT07-SUP-03 · key F reviewaccelerator and memory supplyPUBLIC
SYS-012 · compound pathwayMSN-XT07-2027-01Universe candidateCONSORTIUM
Table 7.4Routing rules by publication class
ClassWhere it goesWho can see it
PUBLICthe published edition and its evidence bundleanyone
CONSORTIUMgoverned rooms of the federationconsortium members under agreement
CONTROLLEDneed-to-know channelsnamed competent actors only

7.6Feeds and signal register

Table 7.5Feeds watched from 2027
FeedProducerLatencyFeeds into
TOP500 and Green500 listsTOP500 projecttwice a yearINF-001
TOP500 highlights and release pagesTOP500 projecttwice a yearINF-002
Green500 listTOP500 projecttwice a yearENE-004
BIS notices and guidanceUS Department of Commerceper releaseGOV-007
EuroHPC pages and regulationsEuroHPC Joint Undertakingper releaseGOV-008
DOE data centre report and newsUS Department of Energyper releaseENE-006
National roadmaps and plansagencies and institutesper eventGOV-011

Escalation routes

  • none · keep monitoring
  • research question
  • project
  • risk object
  • annual publication
  • signal report
Table 7.6Signals at baseline
IDSignalCorroborationSystemsRoute
SIG-XT07-001LineShine at first place on the June 2026 list4PARTIALINF · TRDresearch question H-04
SIG-XT07-002US data centre share of 4.4% in 2023 and a 2028 range12CORROBORATEDENEinitiative H-01
SIG-XT07-003Advanced computing timeline extended to end of 202613PARTIALTRD · INFresearch question H-04

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  2. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  3. 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back

Systems in depth

One section per system: its state at evidence close, its exposures and what the operational series will watch.

9 min read0 figures5 tables25 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

8.1Systems and compute platforms

Large systems are listed twice a year. Evidence is strongest where a public list exists, and weakest for systems that do not submit.

2.198exaflops

LineShine Linpack result4

18.73exaflops

combined list performance5

276of 500

systems with accelerators5

Table 8.1State at baseline
ComponentStateEvidenceStatus
Exascale systemsfive systems at or above 1 exaflop on Linpack; JUPITER at exactly 1.000; the Frontier page gives 1.6 exaflops peak147Reported
Accelerated systems276 of 500, up from 255; AMD in 38.4% and Intel in 53.2% of systems5Reported
Mixed-precision tablesEl Capitan 16.7 exaflops on HPL-MxP; LineShine 22.00 petaflops on HPCG5Reported
Planned DOE systemsLux and Discovery are named at Oak Ridge; specifications not read82731Expert input

Couplings

  • INF ↔ ENE facility power
  • INF ↔ FIN programme funding
  • INF ↔ TRD licence rules

Evidence to bind in 2027

  • systems that do not submit to lists
  • specifications of planned systems

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • XT-01 Artificial Intelligence and Agentic Systems
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-08 Cloud, Edge and Distributed Computing
  • XT-02 Quantum Technologies

8.2Power, cooling and data centres

The five largest systems draw tens of megawatts. Efficiency leaders are small systems, and the wider data centre load is growing.

42.2MW

LineShine power1

73.282GFlops per watt

Green500 leader3

4.4%

US data centre electricity share, 202312

Table 8.2State at baseline
ComponentStateEvidenceStatus
Power of large systems15.8 to 42.2 megawatts for the five largest1Reported
Efficiencyleader 73.282; El Capitan 60.94; LineShine 52.07 gigaflops per watt345Reported
Data centre energyUS 176 terawatt-hours in 2023; 2028 range of 6.7% to 12% of US electricity12Reported
Cooling waternot bound for large facilities9Expert input

Couplings

  • ENE ↔ INF facility power
  • WAT → INF cooling water
  • INF → CLI emissions

Evidence to bind in 2027

  • cooling-water use
  • facility energy on a common basis

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • XT-01 Artificial Intelligence and Agentic Systems
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-08 Cloud, Edge and Distributed Computing
  • XT-02 Quantum Technologies

8.3Chips, memory and fabrication

Large systems depend on chips and memory made in a few places. Policy pages show large public programmes, and supply figures are not bound.

50USD billion

CHIPS and Science Act funding to Commerce, Public Law 117-16743

33EUR billion

public and private investment in EU first-of-a-kind facilities, over25

2023year

EU Chips Act in force on 21 September25

Table 8.3State at baseline
ComponentStateEvidenceStatus
US chips programmesUSD 11 billion for research and USD 39 billion for incentives43Reported
EU chips programmes19 State aid decisions for first-of-a-kind facilities; Chips Act 2.0 proposed in June 202625Reported
Accelerator and memory supplyno volumes or concentration figures bound4325Expert input
Materialsno HPC-specific figure bound25Expert input

Couplings

  • MIN → INF materials
  • TRD → INF licence rules
  • FIN → INF fabrication

Evidence to bind in 2027

  • accelerator and memory supply
  • fabrication capacity by country

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • XT-01 Artificial Intelligence and Agentic Systems
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-08 Cloud, Edge and Distributed Computing
  • XT-02 Quantum Technologies

8.4Economy, investment and workforce

Public programmes carry the largest systems. Workforce figures are the thin part of the evidence.

1.8USD billion

Exascale Computing Project, 2016 to 202417

8.2EUR billion

EuroHPC budget, 2021 to 2027, at least11

950projects

NAIRR pilot research projects, more than22

Table 8.4State at baseline
ComponentStateEvidenceStatus
US exascale programmeUSD 1.8 billion from 2016 to 2024; two GPU architectures proven17Reported
EuroHPCbudget of at least EUR 8.2 billion; EU contribution EUR 4.1 billion11Reported
Shared accessNAIRR pilot: more than 950 projects, 14 federal agencies, 26 non-governmental partners22Reported
WorkforceDOE Genesis page names a goal of 100,000 professionals over a decade26Reported

Couplings

  • FIN → INF scale-up
  • HLT → INF workforce
  • GOV → FIN programme lines

Evidence to bind in 2027

  • public funding outside the US and EU
  • workforce size and skills gaps

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • XT-01 Artificial Intelligence and Agentic Systems
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-08 Cloud, Edge and Distributed Computing
  • XT-02 Quantum Technologies

8.5Security, export controls and governance watch

Rules on advanced computing items are being adjusted in steps, and reporting rules for data centres are being drafted.

2026date

BIS timeline extended to 31 December13

500kW

IT power threshold in the EU reporting regulation, per a law firm summary34

2030target

FugakuNEXT operation, a plan14

Table 8.5State at baseline
ComponentStateEvidenceStatus
Export controlsauthorised designer timeline extended on 7 April 2026; guidance on D:5 headquartered entities in May 20261333Reported
Data centre reportingEU delegated regulation of 2024 sets reporting; rating scheme proposed in 2026 in draft3435Reported
StandardsMPI 5.0 in 2025; OpenMP 6.0 in 2024; OpenMP 6.1 draft in 20261516Reported
National platformsDOE Genesis Mission; UK compute plan; RIKEN FugakuNEXT262314Reported

Couplings

  • TRD → INF licence rules
  • GOV → ENE reporting
  • GOV → FIN programme lines

Evidence to bind in 2027

  • text of the 2023 US rule
  • EU delegated regulations from the primary text

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • XT-01 Artificial Intelligence and Agentic Systems
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-08 Cloud, Edge and Distributed Computing
  • XT-02 Quantum Technologies

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  2. 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  3. 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  4. 7Oak Ridge Leadership Computing Facility (ed.), Frontier (system page; 1.6 exaflops peak; 74 cabinets; delivered 2021; the page value differs from the peak on the list page). Oak Ridge National Laboratory, Oak Ridge. Observation year 2022. Accessed 2026-11-03.back
  5. 8Oak Ridge Leadership Computing Facility (ed.), compute systems (index page; Lux and Discovery labelled as introduced; no specifications). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
  6. 27Oak Ridge National Laboratory (ed.), The Genesis Mission (page; Lux and Discovery listed with one-line descriptions only). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
  7. 31UNVERIFIED, not opened: Argonne National Laboratory (ed.), Genesis Mission systems (Solstice and Equinox; reported plans of 100,000 and 10,000 NVIDIA Blackwell GPUs, vendor-stated AI performance figures), taken from search-result summaries that disagree on dates; the page returned an access error. Observation year 2026. Accessed 2026-11-03.back
  8. 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  9. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  10. 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
  11. 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03.back
  12. 25European Commission (ed.), European Chips Act (policy page; Regulation (EU) 2023/1781 in force 21 September 2023; 19 State aid decisions over EUR 33 billion; Chips Act 2.0 proposed June 2026). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2026. Accessed 2026-11-03.back
  13. 24POST-CLOSE, context only: Post-close, context only: NIST (ed.), CHIPS for America (programme page; USD 50 billion; USD 11 billion research and USD 39 billion incentives; awards of September and October 2026 listed). National Institute of Standards and Technology, Gaithersburg. Observation year 2026. Accessed 2026-11-03.back
  14. 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
  15. 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  16. 22National Artificial Intelligence Research Resource Pilot (ed.), NAIRR pilot site (more than 950 projects; 14 federal agencies; 26 non-governmental partners; Operations Center award of 1 September 2026). US National Science Foundation, Alexandria. Observation year 2026. Accessed 2026-11-03.back
  17. 26POST-CLOSE, context only: US Department of Energy (ed.), Genesis Mission (programme page; goal of 100,000 science and technology professionals over a decade; announcements dated August to October 2026; no systems named). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
  18. 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
  19. 34UNVERIFIED, not opened: European Commission, Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (500 kW threshold, annual reporting by 15 May), taken from law firm summaries; EUR-Lex returned no content. Observation year 2024. Accessed 2026-11-03.back
  20. 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
  21. 33UNVERIFIED, not opened: US Department of Commerce Bureau of Industry and Security, Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use (Federal Register, 25 October 2023), not retrieved; the page redirected. Observation year 2023. Accessed 2026-11-03.back
  22. 35UNVERIFIED, not opened: POST-CLOSE, context only: Noerr (ed.), note of October 2026 on the proposal of 21 September 2026 for a delegated regulation on an EU data centre rating scheme with grades A to G from 2027, taken from search-result summaries; preparatory working draft (2026). Observation year 2026. Accessed 2026-11-03.back
  23. 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03.back
  24. 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03.back
  25. 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back

Methodology

How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.

13 min read0 figures13 tables17 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

A.1Methods

The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.

Table A.1Methods
No.DerivationCalculationResult
(1)Combined power of the five largest systems, June 202642,220 + 29,685 + 24,607 + 38,698 + 15,794 kW151,004 kW, about 151 MW
(2)Growth of combined list performance in six months18.73 ÷ 14.99about 1.25 times
(3)Share of listed systems that use accelerators276 ÷ 50055.2%
(4)Ratio of El Capitan HPL-MxP to Linpack16.7 ÷ 1.809about 9.2 times
Table A.2Coupling strength scale (matrix and model card)
StrengthDefinition
STRONGa disruption in the source system has historically changed the target system’s service or output within one season, in more than one region
MODERATEan effect is documented but buffered or slower
WEAKan effect is plausible but not documented at global scale
Table A.3Status grammar
LabelRule
Reportedvalue as issued by its source, with year
Inferredreasoned from cited evidence; never a measurement
EstimatedNexus analytical value with stated method
Scenarioconditional on stated assumptions
Expert inputstructured editorial judgement awaiting evidence

A.2Model card, HPC System Model v0

Model ID
MDL-XT07-HPC · v0.1
Purpose
represent HPC and advanced computing as infrastructure coupled to electricity, cooling, chips, public funding, workforce and security policy
Family
graph-based system of systems
Inputs
the cited sources of this edition; no proprietary data
Method
expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
Validation
none yet, first validation against federation evidence in 2027
Uncertainty
qualitative; strengths are hypotheses, not measurements
Domain of validity
global scale; not for asset-, site- or country-level use
Reproducibility
strength table and sources published in this edition
20couplings

typed in v0

0strong

documented within one season

0moderate

documented, buffered

20weak

plausible, undocumented

A.3The baseline evidence cut

Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.

Cut ID
DC-XTECH-HPC-GLOBAL-2026-B0
Type
baseline documentary cut
Resolution policy
pinned · as of 30 September 2026
Sources pinned
43 cited sources, each at the edition and access date in the references
Model runs
none at baseline, analytical values are stated with their method
Digest
computed at freeze and recorded in the publication record
Supersedes
nothing, first cut of the series
Superseded by
the 2027 HPC annual cut

Lineage

  1. 01

    source edition

  2. 02

    pinned citation

  3. 03

    finding

  4. 04

    page

  5. 05

    publication record

Table A.4From the baseline cut to the federation cut
ElementBaseline 20262027 global annual
Sourcescited global publications, pinned by editionnational, regional and sector cuts through one graph
Analysisstated methods and editorial estimatestyped analysis specifications
ModelsHPC System Model v0 specificationmodel runs with receipts
Findingstwelve baseline findingsfindings re-bound to federation evidence
Reviewfive passes scheduledfive passes on the exact digest

A.4Evidence age and coverage

A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.

Table A.5Evidence age and coverage
IndicatorObservedReleasedCadenceNext release
Top-system results2026June 2026periodicNovember 2026 list
Efficiency results2026June 2026periodicNovember 2026 list
US data centre energy2023December 2024one-offnext national report
Export rule timeline2026April and May 2026per eventfurther guidance
EuroHPC budget2021 to 2027page read 2026-11-03continuousregulation changes
Footprint papers2021 to 2024preprints and papersone-offnew studies
MPI and OpenMP2024 to 2026June 2025 · July 2026periodicOpenMP 6.1
FugakuNEXT plan2025August 2025one-offdetailed design
Table A.6Coverage by system at baseline
SystemCoverageThinnest dimension
SystemsGOODunlisted systems
EfficiencyPARTIALfacility-level figures
EnergyPARTIALcommon basis for facilities
GovernancePARTIALtext of rules and guidance
InvestmentPARTIALpublic funding outside the US and EU
SupplyTHINaccelerator and memory supply
SkillsTHINworkforce numbers
WaterTHINcooling-water use
Table A.7Designed empty states: what is not bound, what would fill it and why
FieldSource that would fill itBlocker
Cooling-water use of large computing facilitiesoperators, national laboratories, regulators under the EU schemenot retrieved; no primary figure read
Facility energy and demand on a common basis for HPC and for commercial AI workloadsnational statistics, operators, IEAone national figure read through a DOE news item12; the IEA report was not opened28
IEA Energy and AI figures from the report itselfIEA Energy and AI28the report pages returned an access error; figures come from search summaries
Lawrence Berkeley report text, including water useLBNL 2024 United States Data Center Energy Usage Report29report pages returned an access error; share and range come from a DOE news item12
Power draw and cost of JUPITER from primary pagesEuroHPC, Jülich Supercomputing Centrepower and budget are not stated on the page read9; list value only1
LineShine architecture and independent descriptionoperator and peer-reviewed or institutional paperslist pages only; secondary reports not opened30
Specifications and schedules of DOE Solstice, Equinox, Lux and DiscoveryArgonne and Oak Ridge system pages31Argonne page returned an access error; Oak Ridge pages name the systems without specifications827; search summaries disagree on dates
El Capitan system description from the laboratoryLawrence Livermore National Laboratory32page returned an access error; list values only1
Text of the 2023 US advanced computing ruleFederal Register33page redirected; not opened
EU delegated regulations on data centre reporting and rating from the primary textEUR-Lex3435EUR-Lex returned no content; details come from law firm summaries
Supply of accelerators, high-bandwidth memory and fabrication capacity for HPCindustry and trade statisticsnot retrieved; no figure used
HPC workforce size and skills gapsnational statistics, OECD, industry surveysnot retrieved; capability rung stays LISTED
Survey data on data centre efficiency and densityUptime Institute global survey42page returned an access error; no figure used
Public funding totals for HPC outside the US and EUnational strategies and ministriesnot consolidated; UK plan gives no budget figure23
Results of the November 2026 TOP500 listTOP500 news and lists6not yet published at page read; the news page shows June 2026 as latest
Capability rungs beyond list monitoring, planning and fundingagencies, operators, laboratoriesnot reviewed

A.5Evidence cards, two anchor sources

Published by the TOP500 project at ISC 2026 on 23 June 2026, 67th edition. Periodic. Role: binds INF-001 and the dashboard power figures. Coverage: systems that submit results.

EVD-XT07-001

TOP500 list of June 20261

Published by the TOP500 project on the same date. Periodic. Role: binds ENE-004. Coverage: listed systems that report power.

EVD-XT07-002

Green500 list of June 20263

Table A.8Quality dimensions at baseline
DimensionEVD-XT07-001EVD-XT07-002
Completenesssubmitted systems onlylisted systems that report power
Timelinesstwice a yeartwice a year
Revisionnew list replaces oldnew list replaces old
Method transparencybenchmark method publishedpower method stated by the project
External validationresults reported by submittersresults reported by submitters

Evidence cards to follow in 2027

  • TOP5006: the November 2026 list
  • IEA28: report text on data centre demand
  • EUR-Lex3435: delegated regulations from the primary text
  • Argonne and Oak Ridge318: system specifications

A.6Publication acceptance record

Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.

Table A.9Publication acceptance record
GroupAreaItemsPassN/APending
D1Identity and scope8800
D2Source and data12912
D3Analysis and models12381
D4Findings and claims9801
D5Figures, tables, maps10622
D6Editorial and citations10802
D7Review and approval130013
D8Artefact and design12705
D9Registry and release9009

Publication gate

Conditions met
14 of 23 at evidence close
Blocking problems
none recorded
Open conditions
reviews, approval of the exact digest, deposit, registry pointer

Not applicable at baseline

Model runs
first runs in Q1 2027
Maps
plates in Q2 2027
Waivers
none

A.7Status words

Table A.10The status every value carries
StatusWhat it means
ObservedMeasured directly and published by the source.
ReportedPublished statistics of an official or institutional source.
DeclaredStated by the body concerned; not independently measured.
EstimatedA Nexus estimate from cited evidence, with its method in Annex A.
ModelledProduced by a stated model from cited inputs.
InferredReasoned from cited evidence; not measured.
ForecastA projection by the cited source.
SimulatedA simulation result under stated assumptions.
ScenarioA conditional statement under stated assumptions; never a prediction.
Expert inputExpert judgement, recorded with its basis.
CandidateProposed for a later edition; not yet evidence.
Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject.

A.8How the edition is made, released and corrected

Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.

StepWhat happensSource
01 Evidence arrives from the pillarsFoundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s.
02 The cut is sealedOn the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on.
03 The edition is assembledThe edition is drafted from its template and content pack. Agents may draft; they never publish and never decide.
04 The keys turnAt the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward.
05 The gate opensA named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit.
06 Signed and depositedThe PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI.
07 Published on its desk’s siteOnly then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part.
08 Corrections go to StandardsMethod and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut.

A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).

Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.

A.9Glossary and abbreviations

Table A.11Series terms
TermMeaning
Baseline Editionthe inaugural annual edition that fixes the reference state for the series
WEFH+Bwater, energy, food, health and biodiversity, the national nexus core
Couplinga typed dependency through which one system transmits to another
Protection gapthe share of losses not covered by insurance
Capability ladderLISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED
EQLevidence-quality level, 1–5
Evidence cuta frozen resolution of exact sources and versions
NNC · NLC · NWGNational Nexus Consortium · National Leadership Council · National Working Groups
Table A.12Abbreviations used in this edition
AbbreviationExpansion
BISBureau of Industry and Security
CPUcentral processing unit
DOEUS Department of Energy
ECPExascale Computing Project
EFexaflops
GPUgraphics processing unit
HBMhigh-bandwidth memory
HPChigh-performance computing
HPCGHigh Performance Conjugate Gradients benchmark
HPL-MxPmixed-precision High Performance Linpack benchmark
PUEpower usage effectiveness
TWhterawatt-hours

A.10Technical annex

Table A.13Technical annex
ItemAnnexContentsStatus
A.1Indicator definitionsthe global indicator set, with units and sourcesIN THIS EDITION
A.2Coupling strengthsthe twenty-cell matrix and its rationaleIN THIS EDITION
A.3Scenario specificationSCN-XT07-PWR-01 assumptions and signpostsIN THIS EDITION
A.4Capability placementsrung evidence for fifteen functionsIN THIS EDITION
A.5Model diagnosticsfirst runs and validation2027
A.6Sensitivity analysesinfluence of coupling strengths2027
A.7Cluster notescards for the major exascale and data centre clusters2027
A.8Review statementspass-by-pass review recordAT RELEASE

A.1 · indicator definition: Linpack result (Rmax)

Construct
sustained speed of a dense linear solve at the largest size the system can run
Unit
floating-point operations per second, shown here in exaflops
Method
the Linpack benchmark run by the submitter and reported to the list
Source
TOP500 list, June 20261
Uncertainty
reported by submitters; not independently repeated here
Known limits
one benchmark; dense algebra only; not a measure of useful scientific output

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  2. 28UNVERIFIED, not opened: IEA (ed.), Energy and AI (2025; about 415 TWh for data centres in 2024, about 945 TWh in 2030), taken from press and search-result summaries; the IEA pages returned an access error. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  3. 29UNVERIFIED, not opened: Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, December 2024; figures taken from a DOE news item [12]; the report pages returned an access error. Observation year 2023. Accessed 2026-11-03.back
  4. 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
  5. 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  6. 30UNVERIFIED, not opened: HPCwire (ed.), Surprise: Chinese LineShine takes number 1 on TOP500 (23 June 2026), and press coverage that China had stopped submitting to the list in 2023, taken from search-result summaries; the HPCwire page returned an access error. Observation year 2026. Accessed 2026-11-03.back
  7. 31UNVERIFIED, not opened: Argonne National Laboratory (ed.), Genesis Mission systems (Solstice and Equinox; reported plans of 100,000 and 10,000 NVIDIA Blackwell GPUs, vendor-stated AI performance figures), taken from search-result summaries that disagree on dates; the page returned an access error. Observation year 2026. Accessed 2026-11-03.back
  8. 8Oak Ridge Leadership Computing Facility (ed.), compute systems (index page; Lux and Discovery labelled as introduced; no specifications). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
  9. 27Oak Ridge National Laboratory (ed.), The Genesis Mission (page; Lux and Discovery listed with one-line descriptions only). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
  10. 32UNVERIFIED, not opened: Lawrence Livermore National Laboratory (ed.), El Capitan verified as world’s fastest supercomputer (news item, November 2024), not retrieved; list values only. Observation year 2024. Accessed 2026-11-03.back
  11. 33UNVERIFIED, not opened: US Department of Commerce Bureau of Industry and Security, Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use (Federal Register, 25 October 2023), not retrieved; the page redirected. Observation year 2023. Accessed 2026-11-03.back
  12. 34UNVERIFIED, not opened: European Commission, Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (500 kW threshold, annual reporting by 15 May), taken from law firm summaries; EUR-Lex returned no content. Observation year 2024. Accessed 2026-11-03.back
  13. 35UNVERIFIED, not opened: POST-CLOSE, context only: Noerr (ed.), note of October 2026 on the proposal of 21 September 2026 for a delegated regulation on an EU data centre rating scheme with grades A to G from 2027, taken from search-result summaries; preparatory working draft (2026). Observation year 2026. Accessed 2026-11-03.back
  14. 42UNVERIFIED, not opened: Uptime Institute (ed.), Global Data Center Survey 2025, not retrieved; the page returned an access error; no figure used. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
  15. 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
  16. 6POST-CLOSE, context only: TOP500 (ed.), TOP500 news index (headlines and dates of the lists of November 2024, June 2025, November 2025 and June 2026; no November 2026 list at page read). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  17. 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back

Data appendix

The indicator set with its sources, the source registers, the licences of every kind of material and the formats of the edition.

9 min read0 figures8 tables16 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

B.1The indicator set

Table B.1Global baseline indicator set
IndicatorValueUnitYearStateSource
LineShine Linpack result2.198exaflops2026Reported1
LineShine power42.2MW2026Reported1
LineShine efficiency52.07GFlops per watt2026Reported4
El Capitan Linpack result1.809exaflops2026Reported1
El Capitan efficiency60.94GFlops per watt2026Reported5
El Capitan HPL-MxP result16.7exaflops2026Reported5
LineShine HPCG result22.00petaflops2026Reported5
Combined list performance18.73exaflops2026Reported5
Systems with accelerators276of 5002026Reported5
Green500 leader efficiency73.282GFlops per watt2026Reported3
US data centre electricity use176TWh2023Reported12
US data centre electricity share4.4%2023Reported12
Exascale Computing Project budget1.8USD billion2024Reported17
CHIPS and Science Act funding to Commerce50USD billion2022Reported43
EuroHPC budget 2021 to 20278.2EUR billion2026Reported11
JUPITER GH200 superchips24,000about2025Reported9

B.2Global source register

The governed source set behind this edition. Each source keeps its authority, coverage, cadence and role; categories describe origin, not truth.

Domains bound by the register

  • INF
  • ENE
  • FIN
  • TRD
  • AIC
  • MIN
  • CLI
  • WAT
  • DAT
  • HLT
Table B.3Global source register
SourceCategoryCoveragePeriodCadenceRole
TOP500 list pages12benchmark projectglobal2025 to 2026twice a yearsystems
Green500 list3benchmark projectglobal2026twice a yearefficiency
TOP500 release and highlights45benchmark projectglobal2026twice a yeartotals and benchmarks
EuroHPC pages91011EU bodyEU2025 to 2026continuoussystems and budget
DOE news item12national agencyUS2024one-offdata centre energy
BIS homepage13national agencyUS2025 to 2026continuousexport rules
RIKEN page14national instituteJapan2025one-offroadmap
MPI and OpenMP pages1516standards forumsglobal2024 to 2026periodicsoftware standards
ECP page and CHIPS and Science Act1743national programme and statuteUS2022 to 2024one-offfunding
UK action plan23national governmentUK2025one-offcompute plan

B.3Regional reading, HPC across ten clusters

Regional plates follow with the regional editions. This page gives the regional reading of HPC infrastructure in table form and ranks no region.

Table B.4Regional reading, HPC across ten clusters
RegionPrincipal hazardsSystems most exposedBaseline evidence
North Americathree exascale systems at DOE laboratories; chips fundingsystems, finance, energyTOP5001; CHIPS and Science Act43; DOE12
South Americaregional evidence not boundnot boundregional evidence (not bound)
EuropeJUPITER; EuroHPC budget; AI Factories; rules for data centressystems, governanceEuroHPC91011
Eurasiaregional evidence not boundnot boundregional evidence (not bound)
Middle East and North Africaregional evidence not boundnot boundregional evidence (not bound)
Africaregional evidence not boundnot boundregional evidence (not bound)
South Asiaregional evidence not boundnot boundregional evidence (not bound)
East AsiaLineShine in China; Fugaku and FugakuNEXT plan in Japansystems, roadmapsTOP50014; RIKEN14
ASEANregional evidence not boundnot boundregional evidence (not bound)
Oceania-Pacificregional evidence not boundnot boundregional evidence (not bound)

B.4Cluster card: exascale systems on the June 2026 list

  • systems
  • power
  • efficiency
  • public lists
Systems in view
LineShine, El Capitan, Frontier, Aurora, JUPITER Booster
Defining events
LineShine entry at first place; JUPITER inauguration19
Couplings
ENE → INF facility power; TRD → INF licence rules
Capability evidence
warm-water cooling and heat reuse at one system9
Gaps
cooling water; newest system power from primary pages; supply
Agenda items
H-01 · H-04

The five largest systems draw from 15.8 to 42.2 megawatts, as the list reports [1].

POWER

Tens of megawatts

The Green500 leader draws 46 kilowatts and reaches 73.282 gigaflops per watt [3] [5].

EFFICIENCY

Small systems lead

JUPITER uses warm-water cooling and sends heat to a campus network. No other system is documented here [9].

RESPONSE

Heat reuse

B.5How countries appear in the HPC edition

Countries enter the HPC edition through the readiness chapters of their own national editions, on one card grammar. They are read against peer distributions and thresholds, never ranked.

Table B.5How countries appear in the HPC edition
Card fieldWhat it showsSource
WEFH+B stateeach core system against peer distribution bandsnational edition
Couplingsthe national dependency matrixnational edition
Risk objectsthe national risk portfolionational edition
Capability rungsthe national capability laddernational edition
Evidence ageoldest and newest source datesnational source register

Editions in the 2026 Baseline programme

26national

countries and unions

10regional

clusters

16global

flagship and sector

14strategic

systems reports

20frontier

technology reports

How to read a country card

  • Each system is shown against the distribution of its peers, with thresholds where they exist
  • Couplings and risk objects come from the country’s own national edition
  • Capability rungs record evidence, not a judgement of institutions
  • Evidence age is printed, so older national data are visible as such
Table B.6National Baseline Editions in the 2026 programme
WaveCountries and unionsState
W0CanadaISSUED
W1United States, United Kingdom, France, Germany, Italy, Japan, European Union, SwitzerlandPLANNED
W2Mexico, Brazil, Argentina, Türkiye, Russian Federation, Saudi Arabia, United Arab Emirates, South Africa, Senegal, Kenya, African Union, India, China, Republic of Korea, Indonesia, Singapore, AustraliaPLANNED

B.6Licences

Table B.7Licences of each kind of material
MaterialLicence
TextCC BY 4.0
Dataon the licence of each source; Nexus tables CC BY 4.0
FiguresNexus figures CC BY 4.0; third-party as credited
Mapsboundary source and licence printed on each plate
MetadataCC0 1.0, as Zenodo publishes it
Third-party data, figures and textThe source’s own licence, credited where it is used; never relicensed
Nexus-authored text, tables and figures: CC BY 4.0 (SPDX CC-BY-4.0). Map plates print their boundary source and licence.

B.7Formats and provenance

Table B.8This edition in every format
FormatKindStateWhat it isIdentifier
Web editionHTMLOn this siteDraft in stewardship review; every value resolves to its source.NR-XTECH-HPC-GLOBAL-2026-BASELINE-v1.0.0
Print editionPDFAt releaseA4 portrait · screen, print and archival PDF, signed with the web edition at release.NR-XTECH-HPC-GLOBAL-2026-BASELINE-v1.0.0
Indicator dataCSV · JSONOn this site16 indicators with unit, year, status and source; the machine-readable copy ships with the evidence bundle at release.NR-XTECH-HPC-GLOBAL-2026-BASELINE data release v1
FiguresSVG · PNGOn this site4 on the web edition: headline figure, figure 1.3, coupling instrument, capability ladder.FIG-XTECH-HPC-GLOBAL-2026-BASELINE-*
SlidesPDFNot recordedNo slide deck is recorded for this edition.
Evidence briefHTML · PDFNot recordedNo evidence brief is recorded for this edition.
Dataset with DOIDataCiteAt releaseConcept and version DOI are minted at deposit; none is recorded yet.

Provenance

Edition pack
The edition’s content pack (JSON), from which the print and web editions are built
Evidence cut
DC-XTECH-HPC-GLOBAL-2026-B0, closed 30 September 2026
Reproducibility
sourced values cited; analytical values reproducible from stated parameters
Self-check
14 of 23 at evidence close; a fail on any item blocks release
Review
five passes scheduled before release (in Annex C)
Publisher of record
GCRI for the Nexus Consortium
Corrections
Registry correction pathway; upheld corrections are published as notices with a new version

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  2. 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  3. 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  4. 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  5. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  6. 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
  7. 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03.back
  8. 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  9. 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
  10. 2TOP500 (ed.), TOP500 list, November 2025, 66th edition (list page; top systems, Rmax, Rpeak, power). TOP500 project, Hamburg. Observation year 2025. Accessed 2026-11-03.back
  11. 10EuroHPC Joint Undertaking (ed.), AI Factories (programme page; 19 AI Factories and 13 antennas stated; the page lists 18 sites and 15 antennas). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  12. 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
  13. 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
  14. 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03.back
  15. 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03.back
  16. 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back

References and record

Every source the edition rests on, the publication record, the corrections log and the open record.

14 min read0 figures1 table0 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

C.143 sources

NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).

  1. 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  2. 2TOP500 (ed.), TOP500 list, November 2025, 66th edition (list page; top systems, Rmax, Rpeak, power). TOP500 project, Hamburg. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6
  3. 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  4. 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  5. 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  6. 6POST-CLOSE, context only: TOP500 (ed.), TOP500 news index (headlines and dates of the lists of November 2024, June 2025, November 2025 and June 2026; no November 2026 list at page read). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03. Cited in chapter 6
  7. 7Oak Ridge Leadership Computing Facility (ed.), Frontier (system page; 1.6 exaflops peak; 74 cabinets; delivered 2021; the page value differs from the peak on the list page). Oak Ridge National Laboratory, Oak Ridge. Observation year 2022. Accessed 2026-11-03. Cited in chapter 8
  8. 8Oak Ridge Leadership Computing Facility (ed.), compute systems (index page; Lux and Discovery labelled as introduced; no specifications). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03. Cited in chapter 8
  9. 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03. Cited in chapter 1, chapter 2, chapter 3, chapter 4, chapter 8
  10. 10EuroHPC Joint Undertaking (ed.), AI Factories (programme page; 19 AI Factories and 13 antennas stated; the page lists 18 sites and 15 antennas). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 6
  11. 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  12. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
  13. 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  14. 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 4, chapter 6, chapter 8
  15. 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
  16. 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
  17. 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  18. 18Patterson, D. et al., Carbon Emissions and Large Neural Network Training, arXiv:2104.10350, submitted 21 April 2021 (abstract page). arXiv, Ithaca. Observation year 2021. Accessed 2026-11-03. Cited in chapter 6
  19. 19Luccioni, A.S., Jernite, Y. and Strubell, E., Power Hungry Processing: Watts Driving the Cost of AI Deployment?, ACM FAccT 2024, arXiv preprint of November 2023 (abstract page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03. Cited in chapter 6
  20. 20Luccioni, A.S., Viguier, S. and Ligozat, A.-L., Estimating the Carbon Footprint of BLOOM, a 176B Parameter Language Model, arXiv:2211.02001, submitted 3 November 2022 (abstract page; about 24.7 tonnes CO2eq dynamic, about 50.5 tonnes life cycle). arXiv, Ithaca. Observation year 2022. Accessed 2026-11-03. Cited in chapter 6
  21. 21Swiss National Supercomputing Centre (ed.), Alps (system page; 2,688 Grace-Hopper nodes; 434.9 petaflops; inaugurated September 2024). CSCS, Lugano. Observation year 2024. Accessed 2026-11-03. Cited in chapter 4, chapter 6
  22. 22National Artificial Intelligence Research Resource Pilot (ed.), NAIRR pilot site (more than 950 projects; 14 federal agencies; 26 non-governmental partners; Operations Center award of 1 September 2026). US National Science Foundation, Alexandria. Observation year 2026. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
  23. 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
  24. 24POST-CLOSE, context only: Post-close, context only: NIST (ed.), CHIPS for America (programme page; USD 50 billion; USD 11 billion research and USD 39 billion incentives; awards of September and October 2026 listed). National Institute of Standards and Technology, Gaithersburg. Observation year 2026. Accessed 2026-11-03. Cited in chapter 6, chapter 8
  25. 25European Commission (ed.), European Chips Act (policy page; Regulation (EU) 2023/1781 in force 21 September 2023; 19 State aid decisions over EUR 33 billion; Chips Act 2.0 proposed June 2026). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2026. Accessed 2026-11-03. Cited in chapter 6, chapter 8
  26. 26POST-CLOSE, context only: US Department of Energy (ed.), Genesis Mission (programme page; goal of 100,000 science and technology professionals over a decade; announcements dated August to October 2026; no systems named). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
  27. 27Oak Ridge National Laboratory (ed.), The Genesis Mission (page; Lux and Discovery listed with one-line descriptions only). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03. Cited in chapter 6, chapter 8
  28. 28UNVERIFIED, not opened: IEA (ed.), Energy and AI (2025; about 415 TWh for data centres in 2024, about 945 TWh in 2030), taken from press and search-result summaries; the IEA pages returned an access error. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03. Cited in chapter 2, chapter 6
  29. 29UNVERIFIED, not opened: Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, December 2024; figures taken from a DOE news item [12]; the report pages returned an access error. Observation year 2023. Accessed 2026-11-03. Cited in chapter 2
  30. 30UNVERIFIED, not opened: HPCwire (ed.), Surprise: Chinese LineShine takes number 1 on TOP500 (23 June 2026), and press coverage that China had stopped submitting to the list in 2023, taken from search-result summaries; the HPCwire page returned an access error. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 4, chapter 6
  31. 31UNVERIFIED, not opened: Argonne National Laboratory (ed.), Genesis Mission systems (Solstice and Equinox; reported plans of 100,000 and 10,000 NVIDIA Blackwell GPUs, vendor-stated AI performance figures), taken from search-result summaries that disagree on dates; the page returned an access error. Observation year 2026. Accessed 2026-11-03. Cited in chapter 8
  32. 32UNVERIFIED, not opened: Lawrence Livermore National Laboratory (ed.), El Capitan verified as world’s fastest supercomputer (news item, November 2024), not retrieved; list values only. Observation year 2024. Accessed 2026-11-03.
  33. 33UNVERIFIED, not opened: US Department of Commerce Bureau of Industry and Security, Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use (Federal Register, 25 October 2023), not retrieved; the page redirected. Observation year 2023. Accessed 2026-11-03. Cited in chapter 2, chapter 6, chapter 8
  34. 34UNVERIFIED, not opened: European Commission, Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (500 kW threshold, annual reporting by 15 May), taken from law firm summaries; EUR-Lex returned no content. Observation year 2024. Accessed 2026-11-03. Cited in chapter 1, chapter 6, chapter 8
  35. 35UNVERIFIED, not opened: POST-CLOSE, context only: Noerr (ed.), note of October 2026 on the proposal of 21 September 2026 for a delegated regulation on an EU data centre rating scheme with grades A to G from 2027, taken from search-result summaries; preparatory working draft (2026). Observation year 2026. Accessed 2026-11-03. Cited in chapter 6, chapter 8
  36. 36UNVERIFIED, not opened: ISO and IEC (eds.), ISO/IEC 30134-2 Information technology, Data centres key performance indicators, Part 2: Power usage effectiveness, cited from memory. International Organization for Standardization, Geneva. Observation year 2016. Accessed 2026-11-03. Cited in chapter 6
  37. 37UNVERIFIED, not opened: Dongarra, J.J., Luszczek, P. and Petitet, A., The LINPACK Benchmark: past, present and future, Concurrency and Computation: Practice and Experience 15, 803 to 820, 2003, cited from memory. Observation year 2003. Accessed 2026-11-03. Cited in chapter 6
  38. 38UNVERIFIED, not opened: Koomey, J.G. et al., Implications of historical trends in the electrical efficiency of computing, IEEE Annals of the History of Computing 33(3), 46 to 54, 2011, cited from memory. Observation year 2011. Accessed 2026-11-03. Cited in chapter 6
  39. 39UNVERIFIED, not opened: Shalf, J., The future of computing beyond Moore’s Law, Philosophical Transactions of the Royal Society A 378, 20190061, 2020, cited from memory. Observation year 2020. Accessed 2026-11-03. Cited in chapter 6
  40. 40UNVERIFIED, not opened: Dennard, R.H. et al., Design of ion-implanted MOSFET’s with very small physical dimensions, IEEE Journal of Solid-State Circuits 9(5), 256 to 268, 1974, cited from memory. Observation year 1974. Accessed 2026-11-03. Cited in chapter 6
  41. 41UNVERIFIED, not opened: DatacenterDynamics and The Next Platform (eds.), reports on FugakuNEXT (development budget above 110 billion yen, FP64 peak goal above 2.6 exaflops), taken from search-result summaries. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2
  42. 42UNVERIFIED, not opened: Uptime Institute (ed.), Global Data Center Survey 2025, not retrieved; the page returned an access error; no figure used. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.
  43. 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03. Cited in chapter 2, chapter 4, chapter 6, chapter 8

C.2Publication record

Publication

Title
Exponential Technology Report 2026: HPC and Advanced Computing, Baseline Edition
Series
Reports · Exponential Technology Series XT-07
Edition
Baseline Edition 2026 · inaugural annual
Version
v1.0.0 · draft for stewardship review
Publication ID
NR-XTECH-HPC-GLOBAL-2026-BASELINE-v1.0.0
Evidence close
30 September 2026
Publication date
October 2026
DOI
concept and version DOI at deposit

Publisher

Publisher of record
The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
Place
Toronto
Editor
Saeed Valadbaygi, Chief Steward and Managing Editor
Stewards
GCRI · technical truth · GRF · public meaning · GRA · capital meaning
Licence
text CC BY 4.0; data on the terms of each source
Copyright
© 2026 GCRI · Nexus Consortium
Language
English (en-GB) source edition
Correspondence
Registry correction pathway · editorial office

Colophon

Format
A4 portrait · screen, print and archival PDF
Typefaces
Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
Design standard
Reports Foundational Edition, Volume I, Part VII
Accessibility
tagged PDF and HTML targets; text alternatives for every figure
Production
Reports editorial team, GCRI

Release path for this version

Table C.1Release path for this version
StepWhat happensWhen
Drafteditorial self-check complete at evidence closeOctober 2026
Steward reviewfive passes on the exact draft (keys T · M · F · N)Q4 2026
Approvalpublication authority approves the exact digestbefore release
Depositconcept and version DOI minted; registry pointer setat release
Successionthe 2027 HPC edition reports changes against this baseline2027
Current version
v1.0.0 draft, stewardship review
Previous edition
none, first edition of the series
Next edition
NR-XTECH-HPC-GLOBAL-2027-v1.0.0
Latest version
resolve the concept DOI or the registry record
Correction route
Registry correction pathway
Notice types
erratum · addendum · supersession · withdrawal

C.3Corrections log

0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.

EditionVersionDateStateChangeNotice
XT-07NR-XTECH-HPC-GLOBAL-2026-BASELINE-v1.0.0October 2026DraftBaseline Edition 2026, inaugural annual edition,None

Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.

C.4Open record

This edition’s open record

Publication ID
NR-XTECH-HPC-GLOBAL-2026-BASELINE-v1.0.0
Desk identifier and series alias
NR-XTC-XT-07-2026-BL
Collection
None
DOI
Concept and version DOI at deposit, on Zenodo with DataCite metadata
Versions
Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
Bundle
RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
Licence
CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0

Credit and identity

ORCID
Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
ROR
Your organisation by its ROR identifier, never by a typed name alone
CRediT
Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
Account
None needed to contribute; never a password

Find and follow

Search the open indexes for HPC and Advanced Computing; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.

Mirrors and harvest

The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.

InvenioRDM metadata for a contribution on HPC and Advanced Computing, prefilled from this page
{
  "metadata": {
    "resource_type": {
      "id": "dataset"
    },
    "title": "Evidence on HPC and Advanced Computing for Nexus Reports",
    "publication_date": "YYYY-MM-DD",
    "creators": [
      {
        "person_or_org": {
          "type": "personal",
          "family_name": "Your family name",
          "given_name": "Your given name",
          "identifiers": [
            {
              "scheme": "orcid",
              "identifier": "0000-0000-0000-0000"
            }
          ]
        },
        "affiliations": [
          {
            "id": "ROR identifier of your organisation"
          }
        ]
      }
    ],
    "description": "What it is, where its record is kept and how it bears on Exponential Technology Report 2026: HPC and Advanced Computing.",
    "rights": [
      {
        "id": "cc-by-4.0"
      }
    ],
    "subjects": [
      {
        "subject": "Nexus Reports"
      },
      {
        "subject": "HPC and Advanced Computing"
      },
      {
        "subject": "Exponential Technology Report · XT-07"
      }
    ],
    "related_identifiers": [
      {
        "identifier": "https://therisk.global/nexus-reports/editions/xt-07/",
        "scheme": "url",
        "relation_type": {
          "id": "issupplementto"
        },
        "resource_type": {
          "id": "publication-report"
        }
      }
    ],
    "version": "1.0.0"
  },
  "custom_fields": {},
  "access": {
    "record": "public",
    "files": "public"
  },
  "files": {
    "enabled": true
  },
  "parent": {
    "communities": {
      "default": "nexusreports"
    }
  }
}

C.5Where this edition sits among the six pillars

Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.

  1. F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
  2. F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
  3. F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
  4. Applied in editions Standards Nexus Standards: applied in editions.
  5. XT-07 edition Reports HPC and Advanced Computing 2026, published in every format with its sources, citation and corrections.
  6. F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
  7. F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
  8. Taught in the open Academy Risk Academy: taught in the open.

What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; XT-07 is a drafted Baseline Edition, so these handoffs run from its first operational quarter.

HandoffBetweenWhat crosses, and when
F03Foundry to ReportsSealed observations and indicator series behind a profile (closeout).
F04Universe to ReportsAfter-action and scenario findings for chapters 10 and 13 (after action review).
F05Foundry to ReportsNational Portfolio movement for chapter 11 (after action review).
RingNexus Standards to ReportsNexus Standards: applied in editions.
F06Reports to Nexus StandardsMethod and correction findings as change proposals (correction).
F12Reports to UniverseQ4 synthesis informs the next-year mandate (renewal).
RingReports to Risk AcademyRisk Academy: taught in the open.
ReportsContribute

Send evidence or a correction on HPC and Advanced Computing.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the GCRI Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems Evidence deskExponential Technology

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

The Global Centre for Risk and Innovation

Science · evidence · measurement

Not for profit

Our articles, maps and twins are free to read and free to republish. Readers and partners keep it that way.

Partner with us

Who funds us

GCRI is a not-for-profit institution. To ask who funds a piece of work, use the funding questions form.

Independence

Editors and the expert reviewers named on each article decide what we publish. Funders and partners do not review or approve articles before publication.

Licence

Articles: CC BY 4.0. Figures, maps, twins and data: CC BY 4.0. Other uses: ask through the permissions form.