Draft, not yet released. In stewardship review. Not indexed until the first approved release.

Power and siting limits meet fast-growing demand

A conditional statement under stated assumptions, never a prediction.

2 min read0 figures0 tables1 noteNR-XTECH-HPC-GLOBAL-2026-BASELINE

Contents
  1. ·Edition home
  2. ·Executive summary
  3. 1HPC is power, cooling and policy before it is speed
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Power and siting limits meet fast-growing demand
    1. 5.1 Assumptions
    2. 5.2 The cascade, step by step
    3. 5.3 The scenario as a table of steps
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. AMethodology
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

5.1Assumptions

Scenario SCN-XT07-PWR-01: what is assumed, and what is held constant.

Baseline
the 2026 reference state in this edition
Drivers
demand for large systems and data centres grows while grid connections and cooling capacity grow more slowly
Analogues
the 2023 US share of 4.4% and the 2028 range of 6.7% to 12%12
Interventions
none modelled: the specification describes the unmitigated case
Run state
narrative specification; quantified run scheduled for 2027

5.2The cascade, step by step

  1. 1

    ENE → INF

    new systems of 15 to 40 megawatts compete for grid connections

    2026

  2. 2

    INF → ENE

    accelerated systems raise facility load

    2026

  3. 3

    GOV → ENE

    reporting rules make load visible to regulators

    2026

  4. 4

    TRD → INF

    licence rules shape where new hardware can go

    2026

  5. 5

    FIN → INF

    public programmes favour sites with power and cooling

    2024

  6. 6

    INF → CLI

    electricity demand adds to emissions where grids are carbon-intensive

    2026

5.3The scenario as a table of steps

How the shock in scenario SCN-XT07-PWR-01 would travel through HPC and Advanced Computing’s coupled systems, step by step, under the assumptions the edition states.

StepWhat happensSource
01 Energy to infrastructureNew systems of 15 to 40 megawatts compete for grid connections. Analogue or source: 2026.Edition XT-07, scenario SCN-XT07-PWR-01, step 1
02 Infrastructure to energyAccelerated systems raise facility load. Analogue or source: 2026.Edition XT-07, scenario SCN-XT07-PWR-01, step 2
03 Governance to energyReporting rules make load visible to regulators. Analogue or source: 2026.Edition XT-07, scenario SCN-XT07-PWR-01, step 3
04 Trade to infrastructureLicence rules shape where new hardware can go. Analogue or source: 2026.Edition XT-07, scenario SCN-XT07-PWR-01, step 4
05 Finance to infrastructurePublic programmes favour sites with power and cooling. Analogue or source: 2024.Edition XT-07, scenario SCN-XT07-PWR-01, step 5
06 Infrastructure to climateElectricity demand adds to emissions where grids are carbon-intensive. Analogue or source: 2026.Edition XT-07, scenario SCN-XT07-PWR-01, step 6

A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: HPC and Advanced Computing 2026, scenario SCN-XT07-PWR-01 (2026); HPC and Advanced Computing 2026, references (NR-CIT-1) (2026).

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 5: Power and siting limits meet fast-growing demand. In Exponential Technology Report 2026: HPC and Advanced Computing (Baseline Edition 2026, Report No. NR-XTECH-HPC-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

ReportsContribute

Send evidence or a correction on HPC and Advanced Computing.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems Evidence deskExponential Technology

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

The Global Centre for Risk and Innovation

Science · evidence · measurement

Not for profit

Our articles, maps and twins are free to read and free to republish. Readers and partners keep it that way.

Partner with us

Who funds us

GCRI is a not-for-profit institution. To ask who funds a piece of work, use the funding questions form.

Independence

Editors and the expert reviewers named on each article decide what we publish. Funders and partners do not review or approve articles before publication.

Licence

Articles: CC BY 4.0. Figures, maps, twins and data: CC BY 4.0. Other uses: ask through the permissions form.