Exponential Technology Report 2026: Advanced Nuclear and Next-Generation Fission
Exponential Technology
Advanced Nuclear and Next-Generation Fission 2026
Imprint
- Editor
- Saeed Valadbaygi, Chief Steward and Managing Editor, the Global Centre for Risk and Innovation (GCRI)
- Publisher of record
- The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium, Toronto
- Report number
- NR-XTECH-FISSION-GLOBAL-2026-BASELINE
- Evidence close
- 30 September 2026, cut DC-XTECH-FISSION-GLOBAL-2026-B0
- Status
- Draft under stewardship review; not yet released
- DOI and UNI
- Issued at deposit
- Licence
- CC BY 4.0 for Nexus-authored text, tables and figures; third-party material keeps its own licence
- Cite as
- Valadbaygi, S. (Ed.). (2026). Exponential Technology Report 2026: Advanced Nuclear and Next-Generation Fission (Baseline Edition 2026, Report No. NR-XTECH-FISSION-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI). https://therisk.global/nexus-reports/editions/xt-15/
Contents
- Advanced Nuclear and Next-Generation Fission 2026
- Executive summary
Executive summary
The edition on a few pages: the abstract, the key messages, the headline finding and what each steward reads in it.
S.1Abstract
Advanced nuclear fission matters to the Nexus programme as firm power infrastructure and as a test of how fast a regulated industry can deliver new designs. The fleet is large and old: 443 operable reactors with 405,667 MWe of net capacity supplied about 9% of world electricity in 2025, and 80 more were under construction1. Next-generation designs are at the demonstration stage. The US Department of Energy reported that four test reactors reached zero-power criticality under its pilot program by 4 July 2026, against a goal of three67. The US Nuclear Regulatory Commission issued a construction permit in March 2026 for a 345 MWe sodium-cooled fast reactor in Wyoming, the first such permit for a commercial non-light-water power reactor89. Policy is moving fast. Executive orders of May 2025 set a goal of 400 GW of US nuclear capacity by 20503, and a final rule for a technology-inclusive licensing framework was published in 202610. The binding inputs are fuel, cost and time. Fuel for many new designs is high-assay low-enriched uranium, and DOE estimates demand could reach 50 tonnes a year by 203511. Recent large reactors ran far over their first estimates1517, and a peer-reviewed study found that none of 15 small reactor concepts competed with existing renewables on its assumptions2526. This baseline sets out what the evidence supports and where it is thin. It forecasts no delivery date and orders no country or vendor.
S.2Key messages
Six readings that frame the advanced nuclear baseline, and the eight questions this edition answers, each with its status and source.
443 operable reactors with 405,667 MWe, about 9% of world electricity, in 2025.1
How large is the nuclear fleet?Reported
Four DOE-authorized test reactors reached zero-power criticality by 4 July 2026; no commercial advanced power reactor was found operating.67
Are advanced reactors operating?Reported
A construction permit for a 345 MWe sodium-cooled reactor in March 2026.89
What did the NRC license?Reported
Part 53, an optional technology-inclusive framework published in 2026.10
What is the new licensing route?Reported
HALEU, enriched to 5% up to less than 20% U-235; DOE sees demand up to 50 tonnes a year by 2035.11
What fuel do many new designs need?Reported
Rosatom held about 42.8% of 2025 capacity; the US bars Russian low-enriched uranium imports from August 2024, with waivers.12
Who supplies enrichment?Reported
Recent large units ran far over first estimates; small-reactor costs are modelled and contested.1525
What do reactors cost?Reported
Whether announced schedules meet delivered units, with fuel supply as the limit. SCN-XT15-FUE-01
What will 2027 test first?Expert input
S.3Headline finding
ReportedEQL 4NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-INF-003
The US NRC issued a construction permit in March 2026 for the Natrium reactor at Kemmerer, Wyoming: a 345 MWe sodium-cooled fast reactor with a molten-salt storage system that can raise output to 500 MW.
| Item | Bar, scaled to the largest value | Value |
|---|---|---|
| Base output (MWe) | 345 | |
| Output with storage (MW) | 500 |
Source: US Department of Energy release of March 20268. The release gives the boosted figure in megawatts, not MWe.
A commercial non-light-water power reactor has passed construction licensing in the United States. The NRC review ran 18 months against an initial 27-month schedule9. The permit does not cover operation: an operating licence application is still needed, and completion is expected in 20309.
S.4At a glance
S.5What each steward reads in it
GCRI · KEY T
Technical Truth
The evidence supports reading advanced nuclear as firm infrastructure at baseline and as a delivery test for the next decade.
GRF · KEY M
Public Meaning
For most people the story arrives as a headline about a test reactor, an executive order or a data-centre deal.
GRA · KEY F
Capital Meaning
Readiness implications only. Recent large units ran far over first estimates, and small-reactor costs are modelled and contested.
NEXUS
Synthesis
Advanced nuclear is well described by permits and announcements and thinly measured as a system.
S.6What this edition is, and is not
What this edition is
A baseline: the 2026 state of advanced nuclear and next-generation fission and the couplings through which it carries risk into other systems. It synthesises published evidence and ranks no country, company or asset.
What it is not
Not a forecast of when any reactor will operate, a technology comparison, an endorsement of any vendor or an assessment of any programme. Licensing, safeguards, fuel policy and funding are decisions of competent authorities.
What comes next
National, regional and sector evidence feeds the 2027 advanced nuclear edition through the federation. Each edition reports what changed against this baseline: observations, source revisions, method changes, scenario updates and corrections.
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1World Nuclear Association (ed.), Nuclear Power in the World Today (information library page; 443 operable reactors, 405,667 MWe net, about 9% of world electricity, 80 under construction with 87,813 MWe gross; electricity data for 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 6American Nuclear Society (ed.), The deadline arrives: checking in on the Reactor Pilot Program (news article, 2 July 2026; criticality by Antares 4 June, Valar 18 June, Deployable Energy 1 July; ten companies selected in August 2025; status of the remaining participants). American Nuclear Society, La Grange Park. Observation year 2026. Accessed 2026-11-03.back
- 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 9World Nuclear News (ed.), NRC issues construction permit for first Natrium plant (news report, 5 March 2026; 18-month review against 27 months initially; completion expected 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 3The White House (ed.), Ordering the Reform of the Nuclear Regulatory Commission, Executive Order 14300, 23 May 2025 (goal of 400 GW by 2050 from about 100 GW in 2024; 18-month limit for new reactor decisions; 1-year limit for continued operation). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03.back
- 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03.back
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03.back
- 26Steigerwald, B. et al., Future nuclear fission reactors: uncertainties, the effect of parameter choice and an application to small modular reactor concepts, Safety of Nuclear Waste Disposal 2, 217, 2023 (abstract page read; 15 concepts; none competes with existing renewables on its assumptions). Copernicus Publications, Gottingen. Observation year 2023. Accessed 2026-11-03.back
- 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
Advanced nuclear is firm infrastructure and a delivery test
Part I describes systems and their couplings. It ranks no country or operator and assesses no authority.
1.1The questions this part answers
Key questions
- Where is advanced nuclear risk concentrated?
- Which couplings carry advanced nuclear shocks into other systems?
- Which advanced nuclear capabilities hold under compound stress?
- What must 2027 evidence measure first?
In this part
- Narrative
- Headline finding
- Lead figure
- Five footprint and governance chapters
- Twelve-domain reading
- Sector screens
- Dependency matrix
- Risk objects
- Capability ladder
- Scenario
- Three lenses
- Portfolio
1.2The argument
Advanced nuclear is usually discussed as a technology race. The 2026 evidence reads it as two things at once: a physical infrastructure that needs fuel, sites, cooling and waste routes, and a test of how fast a regulated industry can deliver designs that have not yet run commercially1811.
The fleet is the base. In 2025 there were 443 operable reactors with 405,667 MWe, about 9% of world electricity, and 80 reactors under construction1. Next-generation designs are small beside it. Four test reactors reached zero-power criticality by 4 July 2026, and one sodium-cooled power reactor holds a construction permit78.
Policy and licensing are moving. Executive orders of May 2025 set a goal of 400 GW of US capacity by 20503, and the NRC published a final Part 53 rule in 202610. Goals are intentions, not capacity.
Fuel, cost and waste are the least settled parts. HALEU demand is an estimate against a small current supply11, enrichment capacity is concentrated12, recent large units ran far over cost1517, and peer-reviewed studies of small reactors on cost and waste are model-based and contested2527.
Four operators hold nearly all enrichment capacity, and one holds about 43% of the 2025 total. The China figure is an estimate that assumes enough capacity is built for its own fleet. Capacity is not output12.
| Item | Bar, scaled to the largest value | Value |
|---|---|---|
| Rosatom | 29.133 | |
| Urenco | 17.3 | |
| CNNC (estimate) | 13.789 | |
| Orano | 7.5 | |
| Other (INB, JNFL) | 0.355 |
Source: as cited in the note to this figure. Year 2025.
Figure ID FIG-XTECH-FISSION-GLOBAL-2026-BASELINE-01-003
1.3Twenty couplings between five systems
The advanced nuclear-centred matrix types the twenty couplings between the five core systems, read for their advanced nuclear content. Strengths are Nexus estimates (ESTIMATED) from the cited evidence and analogue events; they set the graph that 2027 evidence will test.
Each line is one coupling from one system to another, drawn by the strength the edition assigns. Strengths are Nexus estimates from the cited evidence and analogue events.
- Strong
- Moderate
- Weak
Source: this edition’s coupling matrix (Table 1.1); status Estimated.
| From, to | WAT | ENE | FOO | HLT | BIO |
|---|---|---|---|---|---|
| WAT Water | · | WEAK no documented link | WEAK no documented link | WEAK no documented link | WEAK no documented link |
| ENE Energy | WEAK reactor cooling, not quantified | · | WEAK process heat, undocumented | WEAK isotope supply, undocumented | WEAK no documented link |
| FOO Food | WEAK no documented link | WEAK no documented link | · | WEAK no documented link | WEAK no documented link |
| HLT Health | WEAK no documented link | WEAK workforce | WEAK no documented link | · | WEAK no documented link |
| BIO Biodiversity | WEAK no documented link | WEAK no documented link | WEAK no documented link | WEAK no documented link | · |
| Strength: strong, moderate or weak; a Nexus estimate (status Estimated) from cited evidence and analogue events. The scale is defined in Annex A. | |||||
Transmission paths
- 01
TRD → MIN → ENE
Concentrated enrichment and fuel supply limit new reactor fuel.
- 02
FIN → INF
Cost overruns and financing terms set the pace of construction.
- 03
GOV → INF
Licensing frameworks and goals shape what is permitted and built.
- 04
INF → ENE
Delivered units add firm capacity only after first power.
Inferred fleet and construction counts1
- 05
ENE → WAT
Siting and cooling tie plants to water sources.
Inferred not quantified in sources opened
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1World Nuclear Association (ed.), Nuclear Power in the World Today (information library page; 443 operable reactors, 405,667 MWe net, about 9% of world electricity, 80 under construction with 87,813 MWe gross; electricity data for 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03.back
- 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 3The White House (ed.), Ordering the Reform of the Nuclear Regulatory Commission, Executive Order 14300, 23 May 2025 (goal of 400 GW by 2050 from about 100 GW in 2024; 18-month limit for new reactor decisions; 1-year limit for continued operation). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03.back
- 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03.back
- 27Krall, L.M., Macfarlane, A.M. and Ewing, R.C., Nuclear waste from small modular reactors, Proceedings of the National Academy of Sciences 119(23), e2111833119, 2022 (open-access full text, abstract and conclusions read; waste volume factors of 2 to 30; three designs). National Academy of Sciences, Washington. Observation year 2022. Accessed 2026-11-03.back
Key findings
Twelve findings carry the advanced nuclear baseline. They are grouped by coupling and never ranked. Each resolves to its source or, where Nexus analysis is involved, to its stated method.
2.1Headline finding
ReportedEQL 4NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-INF-003
The US NRC issued a construction permit in March 2026 for the Natrium reactor at Kemmerer, Wyoming: a 345 MWe sodium-cooled fast reactor with a molten-salt storage system that can raise output to 500 MW.
| Item | Bar, scaled to the largest value | Value |
|---|---|---|
| Base output (MWe) | 345 | |
| Output with storage (MW) | 500 |
Source: US Department of Energy release of March 20268. The release gives the boosted figure in megawatts, not MWe.
Implication
A commercial non-light-water power reactor has passed construction licensing in the United States. The NRC review ran 18 months against an initial 27-month schedule9. The permit does not cover operation: an operating licence application is still needed, and completion is expected in 20309.
What would move it
The operating licence application, first fuel load, delivered cost and the date of first power would each move this finding.
2.2Infrastructure
ReportedEQL 4NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-INF-001
The world fleet had 443 operable reactors with 405,667 MWe of net capacity in 2025, supplying about 9% of world electricity, and 80 reactors with 87,813 MWe gross were under construction.12
ReportedEQL 2NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-INF-002
The US Department of Energy reported that four DOE-authorized advanced test reactors reached zero-power criticality by 4 July 2026, against a goal of three, in company and agency announcements.67
ReportedEQL 4NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-INF-003
The NRC issued a construction permit in March 2026 for the 345 MWe Natrium sodium-cooled reactor at Kemmerer, Wyoming, after an 18-month review against an initial 27-month schedule; operation needs a separate licence.89
ReportedEQL 3NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-INF-011
First-of-a-kind small and advanced units are in construction or planning in several countries, including a BWRX-300 at Darlington with operation expected in 2030 and a three-unit Rolls-Royce SMR contract at Wylfa signed in April 2026.131417181939
2.3Governance
ReportedEQL 4NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-GOV-004
The NRC published a final rule for 10 CFR Part 53, an optional risk-informed, performance-based and technology-inclusive licensing framework, in 2026.1037
ReportedEQL 3NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-GOV-005
Executive orders of 23 May 2025 set goals of 400 GW of US nuclear capacity by 2050, 5 GW of uprates and 10 large reactors under construction by 2030, and an 18-month limit on new reactor licensing decisions.34
2.4Minerals
ReportedEQL 3NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-MIN-006
High-assay low-enriched uranium is enriched to 5% up to less than 20% U-235, DOE estimates US demand could reach 50 tonnes a year by 2035, and the Piketon plant had enriched more than 100 kg by late 2024.11
2.5Trade
ReportedEQL 4NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-TRD-007
World enrichment capacity was 68.076 million SWU a year in 2025, with Rosatom holding about 42.8%, and the US prohibited imports of Russian low-enriched uranium from August 2024, subject to waivers.1230
2.6Finance
ReportedEQL 4NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-FIN-008
Recent large reactors ran far over first estimates: Vogtle 3 and 4 at USD 30.34 billion in May 2022 against an initial USD 14 billion, and Hinkley Point C at GBP 35 billion in 2015 prices in February 2026.151720
ReportedEQL 3NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-FIN-009
A peer-reviewed study of 15 small modular reactor concepts found that none competed economically with existing renewables on its assumptions, and that results depend on the production theory and parameters chosen.2526
2.7WAS
ReportedEQL 3NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-WAS-010
A peer-reviewed study of three small reactor designs found that water-, molten-salt- and sodium-cooled units would raise the volume of waste needing management by factors of 2 to 30, and argued that volume is not the key metric.27
2.8Systemic
Expert inputEQL 2NRF-XTECH-FISSION-GLOBAL-2026-BASELINE-SYS-012
The leading compound pathway for 2027 testing is a gap between announced schedules and delivered first-of-a-kind units, with HALEU and enrichment supply as the binding input. § scenario
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 9World Nuclear News (ed.), NRC issues construction permit for first Natrium plant (news report, 5 March 2026; 18-month review against 27 months initially; completion expected 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 1World Nuclear Association (ed.), Nuclear Power in the World Today (information library page; 443 operable reactors, 405,667 MWe net, about 9% of world electricity, 80 under construction with 87,813 MWe gross; electricity data for 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 2UNVERIFIED, not opened: IAEA (ed.), Energy, Electricity and Nuclear Power Estimates for the Period up to 2050, 2025 edition (377 GW at end of 2024; high case 992 GW and low case 561 GW in 2050), taken from search-result summaries of trade reports; the IAEA page was not retrieved. International Atomic Energy Agency, Vienna. Observation year 2025. Accessed 2026-11-03.back
- 6American Nuclear Society (ed.), The deadline arrives: checking in on the Reactor Pilot Program (news article, 2 July 2026; criticality by Antares 4 June, Valar 18 June, Deployable Energy 1 July; ten companies selected in August 2025; status of the remaining participants). American Nuclear Society, La Grange Park. Observation year 2026. Accessed 2026-11-03.back
- 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 13World Nuclear Association (ed.), Small Nuclear Power Reactors (information library page; definition of 300 MWe equivalent or less; microreactors under 20 MWe; the page lists no projects). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 14World Nuclear Association (ed.), Nuclear Power in Canada (country profile; Darlington BWRX-300, construction licence April 2025, first nuclear concrete 26 June 2026, operation expected 2030, CAD 20.9 billion for four units; page lists 316 MWe gross and describes 300 MWe). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 18World Nuclear Association (ed.), Nuclear Power in China (country profile, first 100,000 characters read; 65 reactors, 65,085 MWe operable; 39 under construction; HTR-PM commercial operation December 2023; Linglong One commissioning expected during 2026; 110 GWe target by 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 19World Nuclear Association (ed.), Nuclear Power in South Korea (country profile; 26 operable units, 25,609 MWe; i-SMR 170 MWe design, standard design approval application February 2026, approval targeted 2028; Barakah units in operation, last in September 2024). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 39UNVERIFIED, not opened: Ontario Power Generation (ed.), Darlington New Nuclear Project page, the page returned forbidden; Darlington figures are taken from the World Nuclear Association country profile. OPG, Toronto. Observation year 2026. Accessed 2026-11-03.back
- 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03.back
- 37UNVERIFIED, not opened: ADVANCE Act of 2024, Public Law 118-67, United States Congress, cited from memory without a figure; the NRC Part 53 page names the Act as background. Observation year 2024. Accessed 2026-11-03.back
- 3The White House (ed.), Ordering the Reform of the Nuclear Regulatory Commission, Executive Order 14300, 23 May 2025 (goal of 400 GW by 2050 from about 100 GW in 2024; 18-month limit for new reactor decisions; 1-year limit for continued operation). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 4The White House (ed.), Reinvigorating the Nuclear Industrial Base, Executive Order 14302, 23 May 2025 (5 GW of uprates; 10 new large reactors with complete designs under construction by 2030; fuel, enrichment and spent fuel directions). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03.back
- 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 30UNVERIFIED, not opened: OECD NEA and IAEA (eds.), Uranium 2024: Resources, Production and Demand, the page returned forbidden; no figure from it is used. OECD NEA, Paris. Observation year 2025. Accessed 2026-11-03.back
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 20World Nuclear Association (ed.), Nuclear Power in France (country profile, first 100,000 characters read; 57 operable reactors; EPR2 six units, EUR 72.8 billion estimate of December 2025; Flamanville 3 grid connection December 2024, EUR 13.2 billion estimate of December 2022). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03.back
- 26Steigerwald, B. et al., Future nuclear fission reactors: uncertainties, the effect of parameter choice and an application to small modular reactor concepts, Safety of Nuclear Waste Disposal 2, 217, 2023 (abstract page read; 15 concepts; none competes with existing renewables on its assumptions). Copernicus Publications, Gottingen. Observation year 2023. Accessed 2026-11-03.back
- 27Krall, L.M., Macfarlane, A.M. and Ewing, R.C., Nuclear waste from small modular reactors, Proceedings of the National Academy of Sciences 119(23), e2111833119, 2022 (open-access full text, abstract and conclusions read; waste volume factors of 2 to 30; three designs). National Academy of Sciences, Washington. Observation year 2022. Accessed 2026-11-03.back
Systems and sectors at baseline
3.1Where each system stood at evidence close
INF · Fleet
Operable reactors, world
443reactors405,667 MWe net, about 9% of world electricity.
Reported2025WNA1
INF · Demonstration
Reactors critical under the DOE pilot program
4test reactorszero-power tests, by 4 July 2026.
Reported2026DOE7
INF · Licensing
Natrium reactor under a construction permit
345MWesodium-cooled; storage lifts output to 500 MW.
Reported2026DOE8
MIN · Fuel
DOE estimate of US HALEU demand by 2035
50tonnes a yearan estimate of what demand could reach.
Reported2024DOE11
TRD · Supply
Rosatom share of world enrichment capacity, 2025
42.8%derived from the capacity table, method (1).
Estimated2025WNA12
FIN · Cost
Vogtle 3 and 4 total cost estimate, May 2022
30.34USD billionagainst an initial estimate of 14.
Reported2022WNA15
3.2Domain posture
Each of the twelve coupled domains is read through advanced nuclear, in words, not scored. The coupling column names the dependency that carries advanced nuclear risk into each domain.
| Domain | Posture at baseline | Coupling | Status |
|---|---|---|---|
| WAT | Cooling-water use and site siting of new reactors were not bound in the sources opened. | ENE → WAT | Expert input EQL 1 |
| ENE | The core system: 443 operable reactors, 405,667 MWe, about 9% of world electricity, and 80 under construction. | the core system | Reported EQL 4 |
| FOO | No documented coupling at baseline; process-heat and desalination uses are not evidenced here. | none documented | Expert input EQL 1 |
| HLT | No documented coupling at baseline; an isotope test reactor reached criticality in 2026 but isotope supply is not evidenced here. | none documented | Expert input EQL 1 |
| BIO | No documented coupling at baseline. | none documented | Expert input EQL 1 |
| CLI | Low-carbon generation is the climate role; life-cycle emission figures were not opened. | ENE → CLI | Expert input EQL 1 |
| INF | Construction, licensing and first-of-a-kind delivery: a construction permit, test criticality and one planned unit in construction in Canada. | ENE ↔ INF | Reported EQL 4 |
| FIN | Recent large units ran far over first estimates; small-reactor costs are modelled and contested. | FIN → ENE | Reported EQL 4 |
| DAT | No documented coupling at baseline; digital controls and records are not evidenced here. | none documented | Expert input EQL 1 |
| AIC | No documented coupling opened at baseline; data-centre supply agreements were not opened. | none documented | Expert input EQL 1 |
| MIN | Uranium, enrichment and HALEU: demand estimates are far above current supply of HALEU. | MIN → ENE | Reported EQL 3 |
| TRD | Enrichment capacity is concentrated and the US restricts Russian low-enriched uranium imports. | ENE ↔ TRD | Reported EQL 4 |
3.3Sector screens
All sixteen sectors are screened for their dependence on advanced nuclear, on the same grammar as every national edition. The evidence column describes coverage of the baseline evidence, not the performance of the sector.
| Code | Sector | Baseline evidence | Exposure to watch | Evidence coverage |
|---|---|---|---|---|
| GS-00 | Cross-system | fission couples to energy, fuel supply and finance | delivery against schedule | THIN |
| GS-01 | Water | cooling-water use of new sites not bound | site siting | THIN |
| GS-02 | Energy | fleet of 443 reactors and 80 under construction1 | first-of-a-kind delivery | GOOD |
| GS-03 | Food | no documented coupling | none documented | THIN |
| GS-04 | Health | no documented coupling | none documented | THIN |
| GS-05 | Finance | cost overruns on large units1517 | financing of first-of-a-kind units | PARTIAL |
| GS-06 | Development | export projects reported19 | access to fuel and finance | THIN |
| GS-07 | Climate | life-cycle emissions not opened | none documented | THIN |
| GS-08 | Disaster | no documented coupling | none documented | THIN |
| GS-09 | Infrastructure | sites, repositories and fabrication2122 | long project lead times | PARTIAL |
| GS-10 | Cities | no documented coupling | none documented | THIN |
| GS-11 | Biodiversity | no documented coupling | none documented | THIN |
| GS-12 | Earth observation | no documented coupling | none documented | THIN |
| GS-13 | Cyber and digital | no documented coupling | none documented | THIN |
| GS-14 | Policy | executive orders and the Part 53 rule3410 | goals against delivery | PARTIAL |
| GS-15 | Science | peer-reviewed cost and waste studies2527 | common benchmarks | PARTIAL |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1World Nuclear Association (ed.), Nuclear Power in the World Today (information library page; 443 operable reactors, 405,667 MWe net, about 9% of world electricity, 80 under construction with 87,813 MWe gross; electricity data for 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03.back
- 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 19World Nuclear Association (ed.), Nuclear Power in South Korea (country profile; 26 operable units, 25,609 MWe; i-SMR 170 MWe design, standard design approval application February 2026, approval targeted 2028; Barakah units in operation, last in September 2024). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 21POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Finland (country profile; Olkiluoto 3 contract of EUR 3.2 billion for mid-2009, regular production April 2023; Onkalo operating licence granted October 2026 valid to the end of 2070, after the 30 September evidence close). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 22World Nuclear Association (ed.), Storage and Disposal of Radioactive Wastes (information library page; Finland, Sweden, France and US repository milestones; Cigéo commissioning planned for 2050; Yucca Mountain suspended). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 3The White House (ed.), Ordering the Reform of the Nuclear Regulatory Commission, Executive Order 14300, 23 May 2025 (goal of 400 GW by 2050 from about 100 GW in 2024; 18-month limit for new reactor decisions; 1-year limit for continued operation). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 4The White House (ed.), Reinvigorating the Nuclear Industrial Base, Executive Order 14302, 23 May 2025 (5 GW of uprates; 10 new large reactors with complete designs under construction by 2030; fuel, enrichment and spent fuel directions). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03.back
- 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03.back
- 27Krall, L.M., Macfarlane, A.M. and Ewing, R.C., Nuclear waste from small modular reactors, Proceedings of the National Academy of Sciences 119(23), e2111833119, 2022 (open-access full text, abstract and conclusions read; waste volume factors of 2 to 30; three designs). National Academy of Sciences, Washington. Observation year 2022. Accessed 2026-11-03.back
Risks and capability
Four advanced nuclear risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence.
4.1Risk objects
Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.
InferredEQL 4RSK-XT15-MIN-001
Fuel supply chokepoint
InferredEQL 4RSK-XT15-FIN-002
First-of-a-kind cost and delay
InferredEQL 3RSK-XT15-WAS-003
Waste and disposal readiness
Expert inputEQL 3RSK-XT15-GOV-004
Goals outrun delivery
4.2Capability ladder
Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence for advanced nuclear at the global level.
| Function | Rung | Level | Strongest public evidence at baseline |
|---|---|---|---|
| Prevention and mitigation | EXISTS | licensing frameworks and a technology-inclusive rule published10 | |
| Monitoring and observation | LISTED | no common tracker of delivered units against announced schedules | |
| Early warning | LISTED | no consolidated warning of fuel supply shortfalls | |
| Preparedness and planning | EXISTS | national goals and demonstration programmes37 | |
| Redundancy and reserves | LISTED | HALEU and enrichment reserves are not documented11 | |
| Response | LISTED | no tested response to a fuel supply interruption | |
| Continuity of critical services | LISTED | not applicable to advanced units at baseline | |
| Recovery | LISTED | not applicable at baseline; no event to recover from | |
| Adaptation | LISTED | design change across first-of-a-kind units is not reported | |
| Social protection | LISTED | not applicable at baseline | |
| Finance and insurance | LISTED | public support reported for individual projects; no consolidated figure817 | |
| Institutional coordination | EXISTS | regulators, agencies and executive orders3410 | |
| Technical infrastructure | EXISTS | a large operating fleet and a first non-light-water construction permit18 | |
| Workforce | LISTED | skills gaps are likely but no figure was bound | |
| Research capacity | ADEQUATE | national laboratories and peer-reviewed studies2527 | |
| A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline. | |||
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03.back
- 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 20World Nuclear Association (ed.), Nuclear Power in France (country profile, first 100,000 characters read; 57 operable reactors; EPR2 six units, EUR 72.8 billion estimate of December 2025; Flamanville 3 grid connection December 2024, EUR 13.2 billion estimate of December 2022). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03.back
- 27Krall, L.M., Macfarlane, A.M. and Ewing, R.C., Nuclear waste from small modular reactors, Proceedings of the National Academy of Sciences 119(23), e2111833119, 2022 (open-access full text, abstract and conclusions read; waste volume factors of 2 to 30; three designs). National Academy of Sciences, Washington. Observation year 2022. Accessed 2026-11-03.back
- 22World Nuclear Association (ed.), Storage and Disposal of Radioactive Wastes (information library page; Finland, Sweden, France and US repository milestones; Cigéo commissioning planned for 2050; Yucca Mountain suspended). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 21POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Finland (country profile; Olkiluoto 3 contract of EUR 3.2 billion for mid-2009, regular production April 2023; Onkalo operating licence granted October 2026 valid to the end of 2070, after the 30 September evidence close). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 3The White House (ed.), Ordering the Reform of the Nuclear Regulatory Commission, Executive Order 14300, 23 May 2025 (goal of 400 GW by 2050 from about 100 GW in 2024; 18-month limit for new reactor decisions; 1-year limit for continued operation). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 4The White House (ed.), Reinvigorating the Nuclear Industrial Base, Executive Order 14302, 23 May 2025 (5 GW of uprates; 10 new large reactors with complete designs under construction by 2030; fuel, enrichment and spent fuel directions). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03.back
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 1World Nuclear Association (ed.), Nuclear Power in the World Today (information library page; 443 operable reactors, 405,667 MWe net, about 9% of world electricity, 80 under construction with 87,813 MWe gross; electricity data for 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
Fuel supply gap while first-of-a-kind units are delayed
A conditional statement under stated assumptions, never a prediction.
5.1Assumptions
Scenario SCN-XT15-FUE-01: what is assumed, and what is held constant.
- Baseline
- the 2026 reference state in this edition
- Drivers
- several first-of-a-kind units reach fuel load in the same years while HALEU output stays below demand
- Analogues
- schedule and cost records of recent large units151720
- Interventions
- none modelled: the specification describes the unmitigated case
- Run state
- narrative specification; quantified run scheduled for 2027
5.2The cascade, step by step
- 1
MIN → ENE
HALEU output falls short of first-core needs for new designs
2024
- 2
TRD → MIN
enrichment restrictions narrow supply options
2025
- 3
ENE → FIN
first-of-a-kind schedules slip and costs rise
2022
- 4
FIN → INF
lenders reprice later projects
2026
- 5
GOV → INF
goals and licensing deadlines meet delivery limits
2025
- 6
INF → ENE
firm capacity arrives later than plans assumed
2026
5.3The scenario as a table of steps
How the shock in scenario SCN-XT15-FUE-01 would travel through Advanced Nuclear and Next-Generation Fission’s coupled systems, step by step, under the assumptions the edition states.
| Step | What happens | Source |
|---|---|---|
| 01 Minerals to energy | HALEU output falls short of first-core needs for new designs. Analogue or source: 2024. | Edition XT-15, scenario SCN-XT15-FUE-01, step 1 |
| 02 Trade to minerals | Enrichment restrictions narrow supply options. Analogue or source: 2025. | Edition XT-15, scenario SCN-XT15-FUE-01, step 2 |
| 03 Energy to finance | First-of-a-kind schedules slip and costs rise. Analogue or source: 2022. | Edition XT-15, scenario SCN-XT15-FUE-01, step 3 |
| 04 Finance to infrastructure | Lenders reprice later projects. Analogue or source: 2026. | Edition XT-15, scenario SCN-XT15-FUE-01, step 4 |
| 05 Governance to infrastructure | Goals and licensing deadlines meet delivery limits. Analogue or source: 2025. | Edition XT-15, scenario SCN-XT15-FUE-01, step 5 |
| 06 Infrastructure to energy | Firm capacity arrives later than plans assumed. Analogue or source: 2026. | Edition XT-15, scenario SCN-XT15-FUE-01, step 6 |
A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Advanced Nuclear and Next-Generation Fission 2026, scenario SCN-XT15-FUE-01 (2026); Advanced Nuclear and Next-Generation Fission 2026, references (NR-CIT-1) (2026).
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 20World Nuclear Association (ed.), Nuclear Power in France (country profile, first 100,000 characters read; 57 operable reactors; EPR2 six units, EUR 72.8 billion estimate of December 2025; Flamanville 3 grid connection December 2024, EUR 13.2 billion estimate of December 2022). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
Readings from the other desks
The advanced nuclear baseline is read through each steward’s lens, then once as a whole. Each lens is a projection of reviewed findings, not a separate argument. The other desks’ own editions of this subject are listed first, as cross-references, not copies.
6.1The other desks’ editions of this subject
Federation: each desk writes its own edition for the subjects in its remit. Until a desk releases, its edition shows its frame and the reading this edition printed for it.
| Desk | Edition | State | Identifier |
|---|---|---|---|
| GCRI Systems Evidence | No edition of this subject at this desk in the 2026 Baseline cycle | Not in this cycle | |
| GRF Public Deliberation | Outside this desk’s remit | Not in remit | |
| GRA Capital Readiness | Outside this desk’s remit | Not in remit | |
| Standards Progress | No edition of this subject at this desk in the 2026 Baseline cycle | Not in this cycle | |
| Academy Capability | No edition of this subject at this desk in the 2026 Baseline cycle | Not in this cycle | |
| Index Measurement | Outside this desk’s remit | Not in remit |
6.2Three lenses
One edition, read by each steward. The lens of this site comes first.
GCRI · KEY T
Technical Truth
The evidence supports reading advanced nuclear as firm infrastructure at baseline and as a delivery test for the next decade. Licensing has moved, test reactors have reached criticality, and the operating record, delivered cost and fuel supply are unproven. Evidence is strongest for the fleet and for permits, and weakest for cost, waste and fuel volumes.
INF-001 · INF-003 · FIN-008 · SYS-012
GRF · KEY M
Public Meaning
For most people the story arrives as a headline about a test reactor, an executive order or a data-centre deal. The baseline asks that public debate separate permits, tests and plans from operating plants, and keep waste and cost in view.
INF-002 · GOV-005 · WAS-010
GRA · KEY F
Capital Meaning
Readiness implications only. Recent large units ran far over first estimates, and small-reactor costs are modelled and contested. These show where finance-readiness evidence will matter. Nothing here is advice, a rating or an approval.
FIN-008 · FIN-009
NEXUS
Synthesis
Advanced nuclear is well described by permits and announcements and thinly measured as a system. The 2027 programme should bind fuel supply, track delivered units against schedules and compare cost and waste on a common basis.
SYS-012 · Q-01 · Q-02
6.3Standards, Academy and steward contributions
How the Nexus Standards drafts, the Risk Academy and the three stewards feed each quarterly edition for advanced nuclear. The standards are a preparatory working draft (2026) and are cited as drafts, never as adopted standards.
| Quarter | Edition | Question | Boundary |
|---|---|---|---|
| Q1 | State and Agenda | What matters this year, and what is the starting position? | observed baseline stays distinct from planned work |
| Q2 | Evidence and Build | What new evidence and capability exist? | a configured capability is not a validated result |
| Q3 | Stress Test and Readiness | What do scenarios and tests show? | simulated loss or performance is not observed impact |
| Q4 | Annual Synthesis and Renewal | What changed in the year, and what renews? | release follows review, not event publicity deadlines |
| Steward or body | Role | Contribution route |
|---|---|---|
| GCRI Canada | Lead Institution and Consortium Secretariat; publisher of record; technical truth (key T) | science and practice communities · GCRI gateway |
| The Global Risks Forum (GRF) | leadership, dialogue and the Universe programme; public meaning (key M) | policy, Universe and national adoption · GRF gateway |
| The Global Risks Alliance (GRA) | finance, insurance and development readiness; capital meaning (key F) | finance and insurance · GRA gateway |
| Nexus Standards | preparatory drafts on vocabulary, hazards, indicators and methods | Standards site · working groups HAZ, IND, MTH, FIN, AI |
| Risk Academy | learning pathways tied to the agenda questions | Academy gateway · learning by review |
| Nexus Standards and Academy | technology chapter inputs: GCRI evidence, NXS standards, RA capability | technology editorial board |
Standards drafts used in this edition
- Risk vocabulary NRS-C1 (424 terms) for terms in the glossary
- Hazard atlas NHS-1 1.1.0 (905 hazards in 120 families) for risk objects
- Seven risk classes: global, catastrophic, existential, emerging, planetary, exponential, frontier-tech
Standards calendar to watch
- Founding calls from 20 October 2026; working groups meet from 5 November 2026
- Inaugural Global Standards Council session, 12 January 2027
- Quarterly reviews in March, June, September and December, aligned with each edition
6.4GCRI reading: the model card
GCRI’s reading of this edition is its model card: what the national model is, what it computes and where it stops. It is printed in full in Annex A, with the methods it belongs to. Annex A, methodology
6.5Global Risks Forum reading: editorial essays
Four signed essays by the Reports editorial team set out the positions this edition takes. They are interpretation, labelled as such; the evidence they draw on is in the findings register.
Advanced nuclear is a mature fleet and a set of unproven designs. The first is slow and material; the second is a delivery question that the next five years will answer. Keeping them apart avoids both hype and dismissal.
EDITORIAL ESSAY · 01
Two stories, one technology
A construction permit, a zero-power test and an operating plant carry different weight. This edition labels each, and asks for operating records before capability is claimed.
EDITORIAL ESSAY · 02
Separate permits, tests and plants
Enrichment capacity is concentrated and HALEU is scarce against estimated demand. A published supply path by year would show whether delivery is limited by fuel, money or licensing.
EDITORIAL ESSAY · 03
Fuel is the quiet constraint
Recent large units ran far over first estimates, and modelled small-reactor costs are contested. Delivered costs of the first advanced units will settle more than any forecast.
EDITORIAL ESSAY · 04
Cost is the open question
6.6Global Risks Alliance reading: 2027 advanced nuclear readiness pack
The registers that open the 2027 global cycle. At baseline each is initialised from this edition.
| Item | Register | State at baseline | First 2027 entry |
|---|---|---|---|
| E1 | Advanced nuclear risk state delta | baseline set by this edition | changes against the baseline |
| E2 | WEFH+B state delta | five global system readings set | indicator updates and freshness |
| E3 | Agenda and Portfolio movement | eight agenda items · 6 proposed objects | admission decisions |
| E4 | Federation delivery register | national chapters in preparation | national chapters |
| E5 | Consortium capability register | national consortia forming | first contributions |
| E6 | Leadership questions and challenges | none yet | first challenge log |
| E7 | Foundry technical state | national environments prepared | first federation cut |
| E8 | Publication candidates | twelve findings carried forward | PUBLISH · HOLD dispositions |
| E9 | Universe readiness | one candidate mission | admission and role spine |
| E10 | Correction register | none | first federation-wide cycle |
Publication dispositions
- Publish
- Hold
- Needs evidence
- Restricted
- Superseded
6.7Nexus Standards reading: standards and regulatory watch
Instruments and published guidance that shape the systems in this edition, by status on the retrieval date. The edition assesses no one’s compliance.
- IN FORCE
- PUBLISHED
- DRAFT
- PUBLISHED · VOLUNTARY
| Instrument | Body | Scope | Status | Relevance |
|---|---|---|---|---|
| 10 CFR Part 53 final rule10 | US Nuclear Regulatory Commission | US | PUBLISHED 2026 | licensing framework |
| Executive Order 143003 | White House | US | PUBLISHED 2025 | licensing reform and goals |
| Executive Order 143015 | White House | US | PUBLISHED 2025 | test reactor goal |
| Executive Order 143024 | White House | US | PUBLISHED 2025 | industrial base and fuel |
| ADVANCE Act37 | US Congress | US | IN FORCE 2024 | licensing statute |
| Prohibition on Russian low-enriched uranium imports12 | US government | US | IN FORCE FROM AUGUST 2024 | fuel supply |
| CNSC construction licence for Darlington14 | Canadian Nuclear Safety Commission | Canada | PUBLISHED APRIL 2025 | construction |
| i-SMR standard design approval application19 | Nuclear Safety and Security Commission | Korea | IN REVIEW FROM FEBRUARY 2026 | design approval |
| Generation IV International Forum40 | GIF member states | global | PUBLISHED · VOLUNTARY | six reactor concepts |
| EU taxonomy delegated act41 | European Commission | EU | IN FORCE 2022 | finance classification |
Changed since 2024
6.8Risk Academy reading: literature and evidence review, science and assessments
The review behind this edition covers advanced nuclear assessments, peer-reviewed science and the institutional reports that bind its findings. Systematic reviews for each agenda item begin in 2027.
Review protocol
- Question
- What does the published evidence establish about advanced nuclear and next-generation fission and its couplings?
- Sources searched
- peer-reviewed journals; regulator and agency pages; executive orders and rules; industry association and intergovernmental overviews
- Window
- releases available at evidence close, 30 September 2026
- Selection
- sources that bind or contextualise a finding in this edition
- Next step
- systematic reviews for agenda items 01 to 05 in 2027
| Reference | Type | Year | Role | Used for |
|---|---|---|---|---|
| Steigerwald et al.25 | journal article | 2023 | supports | small-reactor cost uncertainty |
| Steigerwald et al.26 | journal article | 2023 | supports | fifteen concepts compared |
| Krall, Macfarlane and Ewing27 | journal article | 2022 | supports | waste volumes |
| IPCC Working Group III36 | assessment report | 2022 | context | mitigation options |
| UNECE life-cycle assessment35 | assessment report | 2021 | context | life-cycle emissions |
| Reference | Issuer | Year | Role | Used for |
|---|---|---|---|---|
| DOE Natrium permit release8 | US Department of Energy | 2026 | supports | permit |
| DOE pilot program release7 | US Department of Energy | 2026 | supports | test reactors |
| DOE HALEU page11 | US Department of Energy | 2024 | supports | fuel |
| DOE advanced reactor demonstration page24 | US Department of Energy | 2025 | context | demonstration funding |
| NRC NuScale design approval page31 | US NRC | 2025 | context | design approval |
| NRC Kairos Hermes page38 | US NRC | 2025 | context | test reactor permit |
| CNSC and OPG Darlington page39 | Ontario Power Generation | 2026 | context | Canadian unit |
| Reference | Issuer | Year | Role | Used for |
|---|---|---|---|---|
| Executive Order 143003 | White House | 2025 | supports | licensing reform |
| Executive Order 143024 | White House | 2025 | supports | industrial base |
| Executive Order 143015 | White House | 2025 | context | testing reform |
| NRC Part 53 page10 | US NRC | 2026 | supports | framework |
| ADVANCE Act37 | US Congress | 2024 | context | licensing statute |
| COP28 declaration34 | national governments | 2023 | context | tripling goal |
| EU taxonomy delegated act41 | European Commission | 2022 | context | finance classification |
| World Bank financing policy33 | World Bank | 2025 | context | finance policy |
| Reference | Issuer | Year | Role | Used for |
|---|---|---|---|---|
| WNA world nuclear power page1 | World Nuclear Association | 2025 | supports | fleet |
| IAEA projections2 | IAEA | 2025 | context | 2050 cases |
| IEA nuclear report28 | IEA | 2025 | context | pathway |
| NEA small reactor dashboard29 | OECD NEA | 2024 | context | design counts |
| Uranium Red Book30 | OECD NEA and IAEA | 2024 | context | resources and demand |
| IAEA small reactor booklet42 | IAEA | 2022 | context | design catalogue |
| WNA enrichment page12 | World Nuclear Association | 2025 | supports | capacity |
| IAEA reactor database32 | IAEA | 2026 | context | reactor records |
Where the evidence agrees
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03.back
- 3The White House (ed.), Ordering the Reform of the Nuclear Regulatory Commission, Executive Order 14300, 23 May 2025 (goal of 400 GW by 2050 from about 100 GW in 2024; 18-month limit for new reactor decisions; 1-year limit for continued operation). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 5UNVERIFIED, not opened: The White House (ed.), Reforming Nuclear Reactor Testing at the Department of Energy, Executive Order 14301, 23 May 2025, the page address returned not found; the goal of three reactors achieving criticality by 4 July 2026 is taken from the American Nuclear Society report. The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 4The White House (ed.), Reinvigorating the Nuclear Industrial Base, Executive Order 14302, 23 May 2025 (5 GW of uprates; 10 new large reactors with complete designs under construction by 2030; fuel, enrichment and spent fuel directions). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 37UNVERIFIED, not opened: ADVANCE Act of 2024, Public Law 118-67, United States Congress, cited from memory without a figure; the NRC Part 53 page names the Act as background. Observation year 2024. Accessed 2026-11-03.back
- 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 14World Nuclear Association (ed.), Nuclear Power in Canada (country profile; Darlington BWRX-300, construction licence April 2025, first nuclear concrete 26 June 2026, operation expected 2030, CAD 20.9 billion for four units; page lists 316 MWe gross and describes 300 MWe). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 19World Nuclear Association (ed.), Nuclear Power in South Korea (country profile; 26 operable units, 25,609 MWe; i-SMR 170 MWe design, standard design approval application February 2026, approval targeted 2028; Barakah units in operation, last in September 2024). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 40UNVERIFIED, not opened: Generation IV International Forum (ed.), Generation IV systems, the page address returned not found; the forum and its six concepts are described in the World Nuclear Association page. GIF, Paris. Observation year 2025. Accessed 2026-11-03.back
- 41UNVERIFIED, not opened: European Commission (ed.), Complementary Climate Delegated Act on nuclear and gas activities in the EU taxonomy, 2022, cited from memory without a figure. European Commission, Brussels. Observation year 2022. Accessed 2026-11-03.back
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 21POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Finland (country profile; Olkiluoto 3 contract of EUR 3.2 billion for mid-2009, regular production April 2023; Onkalo operating licence granted October 2026 valid to the end of 2070, after the 30 September evidence close). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03.back
- 26Steigerwald, B. et al., Future nuclear fission reactors: uncertainties, the effect of parameter choice and an application to small modular reactor concepts, Safety of Nuclear Waste Disposal 2, 217, 2023 (abstract page read; 15 concepts; none competes with existing renewables on its assumptions). Copernicus Publications, Gottingen. Observation year 2023. Accessed 2026-11-03.back
- 27Krall, L.M., Macfarlane, A.M. and Ewing, R.C., Nuclear waste from small modular reactors, Proceedings of the National Academy of Sciences 119(23), e2111833119, 2022 (open-access full text, abstract and conclusions read; waste volume factors of 2 to 30; three designs). National Academy of Sciences, Washington. Observation year 2022. Accessed 2026-11-03.back
- 36UNVERIFIED, not opened: IPCC (ed.), Climate Change 2022: Mitigation of Climate Change, Working Group III, chapter 6, the page returned forbidden; no figure from it is used. Intergovernmental Panel on Climate Change, Geneva. Observation year 2022. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: UNECE (ed.), Life Cycle Assessment of Electricity Generation Options, 2021, the page returned forbidden; no figure from it is used. United Nations Economic Commission for Europe, Geneva. Observation year 2021. Accessed 2026-11-03.back
- 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03.back
- 24US Department of Energy, Office of Nuclear Energy (ed.), Advanced Reactor Demonstration Program (programme page; USD 160 million initial funding; demonstrations within 7 years of award; ARC 20 designs for the mid-2030s). US Department of Energy, Washington. Observation year 2025. Accessed 2026-11-03.back
- 31UNVERIFIED, not opened: US Nuclear Regulatory Commission (ed.), NuScale US460 standard design approval page, the page address returned not found; the approval is cited from memory without a figure. US NRC, Rockville. Observation year 2025. Accessed 2026-11-03.back
- 38UNVERIFIED, not opened: US Nuclear Regulatory Commission (ed.), Kairos Power Hermes test reactor licensing page, the page address returned not found; no figure from it is used. US NRC, Rockville. Observation year 2025. Accessed 2026-11-03.back
- 39UNVERIFIED, not opened: Ontario Power Generation (ed.), Darlington New Nuclear Project page, the page returned forbidden; Darlington figures are taken from the World Nuclear Association country profile. OPG, Toronto. Observation year 2026. Accessed 2026-11-03.back
- 34UNVERIFIED, not opened: Declaration to Triple Nuclear Energy, COP28, December 2023, cited from memory without a figure. Signatory national governments. Observation year 2023. Accessed 2026-11-03.back
- 33UNVERIFIED, not opened: World Bank Group (ed.), press release on ending the ban on financing nuclear energy, June 2025, the page address returned not found; cited from memory without a figure. World Bank, Washington. Observation year 2025. Accessed 2026-11-03.back
- 1World Nuclear Association (ed.), Nuclear Power in the World Today (information library page; 443 operable reactors, 405,667 MWe net, about 9% of world electricity, 80 under construction with 87,813 MWe gross; electricity data for 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 2UNVERIFIED, not opened: IAEA (ed.), Energy, Electricity and Nuclear Power Estimates for the Period up to 2050, 2025 edition (377 GW at end of 2024; high case 992 GW and low case 561 GW in 2050), taken from search-result summaries of trade reports; the IAEA page was not retrieved. International Atomic Energy Agency, Vienna. Observation year 2025. Accessed 2026-11-03.back
- 28UNVERIFIED, not opened: IEA (ed.), The Path to a New Era for Nuclear Energy, January 2025, the page returned forbidden; no figure from it is used. International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 29UNVERIFIED, not opened: OECD Nuclear Energy Agency (ed.), The NEA Small Modular Reactor Dashboard, second edition, the page returned a service error; no figure from it is used. OECD NEA, Paris. Observation year 2024. Accessed 2026-11-03.back
- 30UNVERIFIED, not opened: OECD NEA and IAEA (eds.), Uranium 2024: Resources, Production and Demand, the page returned forbidden; no figure from it is used. OECD NEA, Paris. Observation year 2025. Accessed 2026-11-03.back
- 42UNVERIFIED, not opened: IAEA (ed.), Advances in Small Modular Reactor Technology Developments, 2022 edition, cited from memory without a figure. International Atomic Energy Agency, Vienna. Observation year 2022. Accessed 2026-11-03.back
- 32UNVERIFIED, not opened: IAEA (ed.), Power Reactor Information System, the analytics page returned only its title; no figure from it is used. International Atomic Energy Agency, Vienna. Observation year 2026. Accessed 2026-11-03.back
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 20World Nuclear Association (ed.), Nuclear Power in France (country profile, first 100,000 characters read; 57 operable reactors; EPR2 six units, EUR 72.8 billion estimate of December 2025; Flamanville 3 grid connection December 2024, EUR 13.2 billion estimate of December 2022). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 22World Nuclear Association (ed.), Storage and Disposal of Radioactive Wastes (information library page; Finland, Sweden, France and US repository milestones; Cigéo commissioning planned for 2050; Yucca Mountain suspended). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 18World Nuclear Association (ed.), Nuclear Power in China (country profile, first 100,000 characters read; 65 reactors, 65,085 MWe operable; 39 under construction; HTR-PM commercial operation December 2023; Linglong One commissioning expected during 2026; 110 GWe target by 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
The 2027 agenda
Eight bounded questions open the 2027 advanced nuclear agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 advanced nuclear edition.
7.1Questions for the operational series
- Q-01
How much enrichment and HALEU capacity will exist each year to 2030, and where are the chokepoints?
INI-XT15-FUE-01 · fuel supply; first output: fuel supply map.
- Q-02
How do announced schedules compare with delivered first-of-a-kind units?
INI-XT15-DLV-02 · schedule against delivery; first output: schedule-against-delivery table.
- Q-03
How do waste and spent-fuel volumes of advanced designs compare on a common basis?
INI-XT15-WST-03 · waste on a common basis; first output: waste comparison table.
- Q-04
What do first-of-a-kind and later units cost on a common basis, and what was assumed?
INI-XT15-CST-04 · cost on a common basis; first output: cost table.
- Q-05
How long do licensing reviews take under Part 53 and in other jurisdictions?
INI-XT15-LIC-05 · licensing pace; first output: review-time table.
- Q-06
Which national fuel-cycle and uranium supply data can be bound from primary sources?
To be admitted in 2027; first output: data gap register.
- Q-07
What workforce and fabrication capacity exists for reactor construction and fuel production?
To be admitted in 2027; first output: scoping note.
- Q-08
Which readiness capabilities have been tested in real projects, and which are only planned?
Readiness capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for the 2027 advanced nuclear portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-XT15-FUE-01 | Fuel supply | Initiative | Q-01 | PROPOSED |
| INI-XT15-DLV-02 | Schedule against delivery | Initiative | Q-02 | PROPOSED |
| INI-XT15-WST-03 | Waste on a common basis | Initiative | Q-03 | PROPOSED |
| INI-XT15-CST-04 | Cost on a common basis | Initiative | Q-04 | PROPOSED |
| INI-XT15-LIC-05 | Licensing pace | Initiative | Q-05 | PROPOSED |
| MSN-XT15-2027-01 | Fuel and delivery Universe mission | Mission | Q-01 | Candidate |
7.3The pathway
The advanced nuclear edition reads national readiness chapters, the coupled sector reports on energy, minerals and supply chains, and the global edition through one governed evidence graph. At baseline the federation is designed; the global energy and lifeline editions are drafted. This page states what exists today and what comes next.
- 01
National readiness chapters
nuclear programme and fuel readiness in each national edition
IN PREPARATION · national baselines
- 02
Sector couplings
GS-02 energy · SR-04 minerals · SR-03 supply chains
GS-02 DRAFTED · sector baselines
- 03
Technology system model
reactors, fuel cycle, siting, waste, licensing
v0 SPECIFIED · v1 with federation evidence
- 04
Strategic links
SR-02 lifeline systems · SR-13 strategic technology
PLANNED · strategic baselines
- 05
Universe
annual proving environment
CANDIDATE MISSION · mandate in 2027
- 06
XT-15 report
this series
BASELINE DRAFT · 2027 annual edition
- 07
Evidence and correction
one graph, many projections
OPEN · first correction cycle in 2027
7.4Universe 2027: evidence pack for the advanced nuclear candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | 2027 global annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-XT15-2027-01 · Fuel and delivery Universe mission
- Role spine
- Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| INF-001 · fleet | INI-XT15-DLV-02 | schedule against delivery | PUBLIC |
| INF-003 · Natrium permit | INI-XT15-DLV-02 | schedule against delivery | PUBLIC |
| GOV-004 · Part 53 | INI-XT15-LIC-05 | licensing pace | PUBLIC |
| MIN-006 · HALEU | INI-XT15-FUE-01 | fuel supply | PUBLIC |
| TRD-007 · enrichment | INI-XT15-FUE-01 | fuel supply | PUBLIC |
| FIN-008 · large-unit cost | INI-XT15-CST-04 | cost on a common basis | PUBLIC |
| WAS-010 · waste volumes | INI-XT15-WST-03 | waste on a common basis | PUBLIC |
| SYS-012 · compound pathway | MSN-XT15-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the federation | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| NRC and DOE news pages on advanced reactors | regulator and agency | per release | INF-003 |
| Reactor Pilot Program updates | DOE and companies | per event | INF-002 |
| World nuclear fleet and country pages | industry association | continuous | INF-001 |
| HALEU and enrichment notices | DOE and operators | per event | MIN-006 |
| Enrichment capacity data | industry association | annual | TRD-007 |
| Country cost and schedule records | owners and national audit bodies | per event | FIN-008 |
| Repository licensing notices | national regulators | per event | WAS-010 |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- annual publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-XT15-001 | Four DOE-authorized test reactors reached criticality by 4 July 20267 | CORROBORATED | INF | research question Q-02 |
| SIG-XT15-002 | NRC construction permit for a sodium-cooled power reactor in March 20268 | CORROBORATED | INF · GOV | research question Q-05 |
| SIG-XT15-003 | Operating licence for Finnish used-fuel disposal in October 202621 | PARTIAL | WAS · GOV | initiative Q-03 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 21POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Finland (country profile; Olkiluoto 3 contract of EUR 3.2 billion for mid-2009, regular production April 2023; Onkalo operating licence granted October 2026 valid to the end of 2070, after the 30 September evidence close). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
Systems in depth
One section per system: its state at evidence close, its exposures and what the operational series will watch.
8.1Reactor designs and deployment
The fleet is large and mature. New designs are at the demonstration stage, with test reactors, one construction permit for a sodium-cooled power reactor and first small units in construction or contract.
| Component | State | Evidence | Status |
|---|---|---|---|
| World fleet | 443 operable and 80 under construction in 2025 | 1 | Reported |
| Test reactors | four DOE-authorized reactors reached zero-power criticality in June and July 2026 | 67 | Reported |
| Small and advanced units | BWRX-300 in construction at Darlington; Rolls-Royce SMR contract for Wylfa; i-SMR design in review; Linglong One in commissioning | 14171819 | Reported |
| Fast and floating reactors | BREST-OD-300 under construction in Russia; two KLT-40S units supplying power since 2019 | 1623 | Reported |
Couplings
- ENE ↔ INF capacity and delivery
- MIN → INF fuel
- FIN → INF construction
Evidence to bind in 2027
- operating record of advanced units
- delivered cost against plan
Related editions
- GLB Global Systems
- GS-02 Energy
- XT-14 Fusion and Frontier Energy
- XT-16 Advanced Energy Storage
- SR-04 Critical Minerals and Strategic Materials
- SR-03 Global Supply Chains, Trade and Chokepoints
8.2Siting, cooling, heat and waste
Reactors need sites, cooling and a route for used fuel. Waste volume of new designs is contested, and the first operating licence for used-fuel disposal was granted in Finland in October 2026.
| Component | State | Evidence | Status |
|---|---|---|---|
| Waste volume | water-, molten-salt- and sodium-cooled small reactors raise waste volume by factors of 2 to 30 in one study | 27 | Reported |
| Repositories | Finland licensed in October 2026; Sweden building on site; France plans commissioning in 2050; the US Yucca Mountain project is suspended | 2122 | Reported |
| Cooling water | not published for new sites in the sources opened | 1 | Expert input |
| Siting | one new unit sited near an existing coal-fired plant | 8 | Reported |
Couplings
- ENE → WAT cooling water
- WAS → GOV repository licensing
- INF → ENE site delivery
Evidence to bind in 2027
- cooling-water and land use of new sites
- waste on a common basis
Related editions
- GLB Global Systems
- GS-02 Energy
- XT-14 Fusion and Frontier Energy
- XT-16 Advanced Energy Storage
- SR-04 Critical Minerals and Strategic Materials
- SR-03 Global Supply Chains, Trade and Chokepoints
8.3Fuel, enrichment and materials
Many new designs need HALEU. Enrichment capacity is concentrated, and the United States restricts imports of Russian low-enriched uranium.
| Component | State | Evidence | Status |
|---|---|---|---|
| HALEU | DOE estimates demand up to 50 tonnes a year by 2035; Piketon had enriched more than 100 kg | 11 | Reported |
| Enrichment capacity | four operators hold nearly all capacity; China values are estimates | 12 | Reported |
| Import limits | US ban on Russian low-enriched uranium from August 2024, with waivers | 12 | Reported |
| Fabrication and materials | capacity by country not bound | 11 | Expert input |
Couplings
- MIN → ENE fuel supply
- TRD → MIN import limits
- FIN → MIN enrichment investment
Evidence to bind in 2027
- HALEU output by year
- fabrication capacity by country
Related editions
- GLB Global Systems
- GS-02 Energy
- XT-14 Fusion and Frontier Energy
- XT-16 Advanced Energy Storage
- SR-04 Critical Minerals and Strategic Materials
- SR-03 Global Supply Chains, Trade and Chokepoints
8.4Economy, cost and workforce
Recent large reactors ran far over first estimates. Small-reactor costs are modelled, contested and not yet delivered.
| Component | State | Evidence | Status |
|---|---|---|---|
| Large units | Vogtle 3 and 4 at USD 30.34 billion against an initial USD 14 billion; Hinkley Point C at GBP 35 billion in 2015 prices | 1517 | Reported |
| Small reactors | none of 15 modelled concepts competed with existing renewables in one study; results depend on assumptions | 2526 | Reported |
| Programme estimates | EPR2 at EUR 72.8 billion for six units; Darlington at CAD 20.9 billion for four | 1420 | Reported |
| Workforce | skills gaps likely; no figure bound | 1 | Expert input |
Couplings
- FIN → INF construction
- ENE → FIN revenue
- HLT → INF workforce
Evidence to bind in 2027
- delivered cost of advanced units
- workforce size and skills gaps
Related editions
- GLB Global Systems
- GS-02 Energy
- XT-14 Fusion and Frontier Energy
- XT-16 Advanced Energy Storage
- SR-04 Critical Minerals and Strategic Materials
- SR-03 Global Supply Chains, Trade and Chokepoints
8.5Safety, licensing and governance watch
Licensing is the main public lever. The United States has published a technology-inclusive framework and set goals, and other regulators are reviewing first designs.
| Component | State | Evidence | Status |
|---|---|---|---|
| Licensing framework | Part 53 final rule published in 2026 | 10 | Reported |
| Executive goals | 400 GW by 2050; 5 GW of uprates and 10 large reactors under construction by 2030 | 34 | Reported |
| Other regulators | Canadian construction licence in April 2025; Korean design review from February 2026 | 1419 | Reported |
| Finance and policy | tripling goal and taxonomy treatment noted; texts not opened | 3441 | Inferred |
Couplings
- GOV → INF licensing pace
- GOV → MIN fuel policy
- GOV → TRD import limits
Evidence to bind in 2027
- review times outside the United States
- text of national policies
Related editions
- GLB Global Systems
- GS-02 Energy
- XT-14 Fusion and Frontier Energy
- XT-16 Advanced Energy Storage
- SR-04 Critical Minerals and Strategic Materials
- SR-03 Global Supply Chains, Trade and Chokepoints
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1World Nuclear Association (ed.), Nuclear Power in the World Today (information library page; 443 operable reactors, 405,667 MWe net, about 9% of world electricity, 80 under construction with 87,813 MWe gross; electricity data for 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 6American Nuclear Society (ed.), The deadline arrives: checking in on the Reactor Pilot Program (news article, 2 July 2026; criticality by Antares 4 June, Valar 18 June, Deployable Energy 1 July; ten companies selected in August 2025; status of the remaining participants). American Nuclear Society, La Grange Park. Observation year 2026. Accessed 2026-11-03.back
- 14World Nuclear Association (ed.), Nuclear Power in Canada (country profile; Darlington BWRX-300, construction licence April 2025, first nuclear concrete 26 June 2026, operation expected 2030, CAD 20.9 billion for four units; page lists 316 MWe gross and describes 300 MWe). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 18World Nuclear Association (ed.), Nuclear Power in China (country profile, first 100,000 characters read; 65 reactors, 65,085 MWe operable; 39 under construction; HTR-PM commercial operation December 2023; Linglong One commissioning expected during 2026; 110 GWe target by 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 19World Nuclear Association (ed.), Nuclear Power in South Korea (country profile; 26 operable units, 25,609 MWe; i-SMR 170 MWe design, standard design approval application February 2026, approval targeted 2028; Barakah units in operation, last in September 2024). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 16POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Russia (country profile, first 100,000 characters read; 34 operable reactors, 27,969 MWe; BREST-OD-300 under construction since June 2021; Akademik Lomonosov 2 x 32 MWe, grid connection December 2019; Indonesia agreement October 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 23World Nuclear Association (ed.), Advanced Nuclear Power Reactors (information library page, updated November 2025; Generation IV forum set up in 2001 with six concepts; sodium-cooled and lead-cooled fast reactors; molten salt reactors not covered). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 27Krall, L.M., Macfarlane, A.M. and Ewing, R.C., Nuclear waste from small modular reactors, Proceedings of the National Academy of Sciences 119(23), e2111833119, 2022 (open-access full text, abstract and conclusions read; waste volume factors of 2 to 30; three designs). National Academy of Sciences, Washington. Observation year 2022. Accessed 2026-11-03.back
- 21POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Finland (country profile; Olkiluoto 3 contract of EUR 3.2 billion for mid-2009, regular production April 2023; Onkalo operating licence granted October 2026 valid to the end of 2070, after the 30 September evidence close). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 22World Nuclear Association (ed.), Storage and Disposal of Radioactive Wastes (information library page; Finland, Sweden, France and US repository milestones; Cigéo commissioning planned for 2050; Yucca Mountain suspended). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03.back
- 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 20World Nuclear Association (ed.), Nuclear Power in France (country profile, first 100,000 characters read; 57 operable reactors; EPR2 six units, EUR 72.8 billion estimate of December 2025; Flamanville 3 grid connection December 2024, EUR 13.2 billion estimate of December 2022). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03.back
- 26Steigerwald, B. et al., Future nuclear fission reactors: uncertainties, the effect of parameter choice and an application to small modular reactor concepts, Safety of Nuclear Waste Disposal 2, 217, 2023 (abstract page read; 15 concepts; none competes with existing renewables on its assumptions). Copernicus Publications, Gottingen. Observation year 2023. Accessed 2026-11-03.back
- 3The White House (ed.), Ordering the Reform of the Nuclear Regulatory Commission, Executive Order 14300, 23 May 2025 (goal of 400 GW by 2050 from about 100 GW in 2024; 18-month limit for new reactor decisions; 1-year limit for continued operation). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03.back
- 4The White House (ed.), Reinvigorating the Nuclear Industrial Base, Executive Order 14302, 23 May 2025 (5 GW of uprates; 10 new large reactors with complete designs under construction by 2030; fuel, enrichment and spent fuel directions). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 34UNVERIFIED, not opened: Declaration to Triple Nuclear Energy, COP28, December 2023, cited from memory without a figure. Signatory national governments. Observation year 2023. Accessed 2026-11-03.back
- 41UNVERIFIED, not opened: European Commission (ed.), Complementary Climate Delegated Act on nuclear and gas activities in the EU taxonomy, 2022, cited from memory without a figure. European Commission, Brussels. Observation year 2022. Accessed 2026-11-03.back
Methodology
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
A.1Methods
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | Result |
|---|---|---|---|
| (1) | Rosatom share of 2025 world enrichment capacity | 29.133 ÷ 68.076 | ≈ 42.8% |
| (2) | Ratio of Vogtle 3 and 4 cost estimate of May 2022 to the initial estimate | 30.34 ÷ 14 | ≈ 2.17 times |
| (3) | NRC review time for the Natrium permit against the initial schedule | 18 ÷ 27 | ≈ 0.67 |
| (4) | Average net capacity per operable reactor, 2025 | 405,667 ÷ 443 | ≈ 916 MWe |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| Label | Rule |
|---|---|
| Reported | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Estimated | Nexus analytical value with stated method |
| Scenario | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, Advanced nuclear System Model v0
- Model ID
- MDL-XT15-FISSION · v0.1
- Purpose
- represent advanced nuclear fission as infrastructure coupled to energy, fuel supply and enrichment, siting and waste, finance, workforce and licensing
- Family
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- Method
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- Validation
- none yet, first validation against federation evidence in 2027
- Uncertainty
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for asset-, site- or country-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-XTECH-FISSION-GLOBAL-2026-B0
- Type
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 42 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 advanced nuclear annual cut
Lineage
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | 2027 global annual |
|---|---|---|
| Sources | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | Advanced nuclear System Model v0 specification | model runs with receipts |
| Findings | twelve baseline findings | findings re-bound to federation evidence |
| Review | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | Observed | Released | Cadence | Next release |
|---|---|---|---|---|
| Fleet counts | 2025 | page read 2026-11-03 | continuous | next annual update |
| Pilot program criticality | 2026 | Jun to Jul 2026 | per event | remaining participants |
| Natrium permit | 2026 | Mar 2026 | one-off | operating licence |
| Part 53 rule | 2026 | Mar 2026 | one-off | first application |
| HALEU page | 2024 | Dec 2024 | periodic | new DOE update |
| Enrichment capacity | 2025 | fuel report 2025 | annual | next report |
| Reactor cost records | 2022 to 2026 | May 2022 to Feb 2026 | per event | new estimates |
| Waste volume study | 2022 | May 2022 | one-off | new studies |
| System | Coverage | Thinnest dimension |
|---|---|---|
| Reactors | PARTIAL | operating record of advanced units |
| Licensing | GOOD | review times outside the United States |
| Fuel | PARTIAL | HALEU output by year |
| Cost | PARTIAL | delivered cost of advanced units |
| Waste | THIN | common basis for comparison |
| Supply chain | THIN | fabrication capacity |
| Skills | THIN | workforce numbers |
| Climate role | THIN | life-cycle emissions |
| Field | Source that would fill it | Blocker |
|---|---|---|
| Delivered cost of first-of-a-kind advanced and small reactors | owners, national audit bodies, regulator filings | no advanced unit is complete; only modelled costs and large-unit records were read151725 |
| HALEU production against demand, by year | DOE, Centrus, national statistics | one DOE page read; output by year not found11 |
| World nuclear capacity projections for 2050 from the IAEA report | IAEA Energy, Electricity and Nuclear Power Estimates | the report page was not opened; figures appear only in trade summaries2 |
| Executive Order 14301 text on the test reactor goal | White House presidential actions | the page address returned not found; the goal comes from a society report56 |
| Operating record of any commercial advanced reactor | operators and regulators | none found operating at baseline |
| Linglong One commissioning and commercial operation | CNNC and national regulator releases | the profile page says commissioning is expected during 2026; no confirmation was found18 |
| Count of small reactor designs and projects | OECD NEA dashboard, IAEA booklet | the dashboard page returned a service error; the booklet was not opened2942 |
| Uranium resources and demand projections | OECD NEA and IAEA Red Book | the page returned forbidden30 |
| Life-cycle emissions of nuclear generation | UNECE, IPCC | both pages returned forbidden or could not be read3536 |
| Cooling-water and land use of new sites | site licence applications and environmental reports | not retrieved |
| Fabrication capacity and materials dependence by country | industry and trade statistics | not retrieved |
| Nuclear workforce size and skills gaps | national statistics, OECD, industry surveys | not retrieved; capability rung stays LISTED |
| Regulator pages for NuScale, Kairos and Darlington | NRC, CNSC, OPG | pages returned not found or forbidden; figures come from country profiles14313839 |
| Capability rungs beyond licensing and planning | agencies, operators, laboratories | not reviewed |
A.5Evidence cards, two anchor sources
Issued by the US Department of Energy in March 2026. One-off. Role: binds INF-003 and the licensing tile. Coverage: one sodium-cooled reactor at one site.
EVD-XT15-001
Natrium construction permit release8
Compiled by the World Nuclear Association from its 2025 fuel report. Annual. Role: binds TRD-007 and the supply tile. Coverage: operator capacity for 2022, 2025 and a 2030 projection.
EVD-XT15-002
Uranium enrichment capacity table12
| Dimension | EVD-XT15-001 | EVD-XT15-002 |
|---|---|---|
| Completeness | one reactor; scope of permit stated | four operators plus others; China estimated |
| Timeliness | issued within days of the permit | annual; 2025 data |
| Revision | no correction seen | annual updates |
| Method transparency | review process described by the agency | compiled data; China method stated |
| External validation | regulator decision | industry compilation |
Evidence cards to follow in 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Group | Area | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- Maps
- plates in Q2 2027
- Waivers
- none
A.7Status words
| Status | What it means |
|---|---|
| Observed | Measured directly and published by the source. |
| Reported | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| Estimated | A Nexus estimate from cited evidence, with its method in Annex A. |
| Modelled | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Scenario | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Step | What happens | Source |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Term | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Coupling | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| CFR | Code of Federal Regulations |
| DOE | US Department of Energy |
| EO | executive order |
| HALEU | high-assay low-enriched uranium |
| HTR-PM | high-temperature gas-cooled reactor pebble-bed module |
| IAEA | International Atomic Energy Agency |
| LEU | low-enriched uranium |
| MWe | megawatts of electrical output |
| NRC | US Nuclear Regulatory Commission |
| SMR | small modular reactor |
| SWU | separative work unit |
| STUK | Finnish radiation and nuclear safety authority |
A.10Technical annex
| Item | Annex | Contents | Status |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-XT15-FUE-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Cluster notes | cards for the major reactor and fuel supply clusters | 2027 |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: enrichment capacity
- Construct
- annual separative work capacity of uranium enrichment plants, by operator
- Unit
- million separative work units (SWU) a year
- Method
- operator capacity as compiled in a 2025 industry fuel report and shown on the page
- Source
- World Nuclear Association enrichment page12
- Uncertainty
- China values are estimates that assume enough capacity is built for its domestic fleet
- Known limits
- capacity is not output; shares are derived by the editors, method (1)
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03.back
- 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03.back
- 2UNVERIFIED, not opened: IAEA (ed.), Energy, Electricity and Nuclear Power Estimates for the Period up to 2050, 2025 edition (377 GW at end of 2024; high case 992 GW and low case 561 GW in 2050), taken from search-result summaries of trade reports; the IAEA page was not retrieved. International Atomic Energy Agency, Vienna. Observation year 2025. Accessed 2026-11-03.back
- 5UNVERIFIED, not opened: The White House (ed.), Reforming Nuclear Reactor Testing at the Department of Energy, Executive Order 14301, 23 May 2025, the page address returned not found; the goal of three reactors achieving criticality by 4 July 2026 is taken from the American Nuclear Society report. The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 6American Nuclear Society (ed.), The deadline arrives: checking in on the Reactor Pilot Program (news article, 2 July 2026; criticality by Antares 4 June, Valar 18 June, Deployable Energy 1 July; ten companies selected in August 2025; status of the remaining participants). American Nuclear Society, La Grange Park. Observation year 2026. Accessed 2026-11-03.back
- 18World Nuclear Association (ed.), Nuclear Power in China (country profile, first 100,000 characters read; 65 reactors, 65,085 MWe operable; 39 under construction; HTR-PM commercial operation December 2023; Linglong One commissioning expected during 2026; 110 GWe target by 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 29UNVERIFIED, not opened: OECD Nuclear Energy Agency (ed.), The NEA Small Modular Reactor Dashboard, second edition, the page returned a service error; no figure from it is used. OECD NEA, Paris. Observation year 2024. Accessed 2026-11-03.back
- 42UNVERIFIED, not opened: IAEA (ed.), Advances in Small Modular Reactor Technology Developments, 2022 edition, cited from memory without a figure. International Atomic Energy Agency, Vienna. Observation year 2022. Accessed 2026-11-03.back
- 30UNVERIFIED, not opened: OECD NEA and IAEA (eds.), Uranium 2024: Resources, Production and Demand, the page returned forbidden; no figure from it is used. OECD NEA, Paris. Observation year 2025. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: UNECE (ed.), Life Cycle Assessment of Electricity Generation Options, 2021, the page returned forbidden; no figure from it is used. United Nations Economic Commission for Europe, Geneva. Observation year 2021. Accessed 2026-11-03.back
- 36UNVERIFIED, not opened: IPCC (ed.), Climate Change 2022: Mitigation of Climate Change, Working Group III, chapter 6, the page returned forbidden; no figure from it is used. Intergovernmental Panel on Climate Change, Geneva. Observation year 2022. Accessed 2026-11-03.back
- 14World Nuclear Association (ed.), Nuclear Power in Canada (country profile; Darlington BWRX-300, construction licence April 2025, first nuclear concrete 26 June 2026, operation expected 2030, CAD 20.9 billion for four units; page lists 316 MWe gross and describes 300 MWe). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 31UNVERIFIED, not opened: US Nuclear Regulatory Commission (ed.), NuScale US460 standard design approval page, the page address returned not found; the approval is cited from memory without a figure. US NRC, Rockville. Observation year 2025. Accessed 2026-11-03.back
- 38UNVERIFIED, not opened: US Nuclear Regulatory Commission (ed.), Kairos Power Hermes test reactor licensing page, the page address returned not found; no figure from it is used. US NRC, Rockville. Observation year 2025. Accessed 2026-11-03.back
- 39UNVERIFIED, not opened: Ontario Power Generation (ed.), Darlington New Nuclear Project page, the page returned forbidden; Darlington figures are taken from the World Nuclear Association country profile. OPG, Toronto. Observation year 2026. Accessed 2026-11-03.back
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03.back
Data appendix
The indicator set with its sources, the source registers, the licences of every kind of material and the formats of the edition.
B.1The indicator set
| Indicator | Value | Unit | Year | State | Source |
|---|---|---|---|---|---|
| Operable reactors, world | 443 | reactors | 2025 | Reported | 1 |
| Net capacity of operable reactors | 405,667 | MWe | 2025 | Reported | 1 |
| Share of world electricity | ≈9 | % | 2025 | Reported | 1 |
| Reactors under construction | 80 | reactors | 2025 | Reported | 1 |
| Test reactors critical under the DOE pilot program | 4 | reactors | 2026 | Reported | 7 |
| Natrium base output | 345 | MWe | 2026 | Reported | 8 |
| Natrium output with storage | 500 | MW | 2026 | Reported | 8 |
| NRC review time for the Natrium permit | 18 | months | 2026 | Reported | 9 |
| HALEU enrichment range | 5 to <20 | % U-235 | 2024 | Reported | 11 |
| DOE estimate of US HALEU demand in 2035 | 50 | tonnes a year | 2024 | Reported | 11 |
| World enrichment capacity | 68.076 | million SWU a year | 2025 | Reported | 12 |
| Rosatom enrichment capacity | 29.133 | million SWU a year | 2025 | Reported | 12 |
| Vogtle 3 and 4 total cost estimate, May 2022 | 30.34 | USD billion | 2022 | Reported | 15 |
| Hinkley Point C cost estimate, February 2026 | 35 | GBP billion, 2015 prices | 2026 | Reported | 17 |
| EPR2 programme cost estimate, six units | 72.8 | EUR billion | 2025 | Reported | 20 |
| Darlington four-unit cost estimate | 20.9 | CAD billion | 2026 | Reported | 14 |
B.2Global source register
The governed source set behind this edition. Each source keeps its authority, coverage, cadence and role; categories describe origin, not truth.
Domains bound by the register
- INF
- MIN
- FIN
- TRD
- ENE
- CLI
- GOV
- WAT
- HLT
- FOO
| Source | Category | Coverage | Period | Cadence | Role |
|---|---|---|---|---|---|
| WNA world nuclear power page1 | industry association | global | 2025 | continuous | fleet |
| IAEA projections2 | intergovernmental agency | global | 2025 | annual | 2050 cases |
| White House orders345 | head of government | US | 2025 | one-off | goals |
| ANS and DOE pilot program reports67 | professional society and agency | US | 2026 | per event | test reactors |
| DOE and trade reports on Natrium89 | agency and trade press | US | 2026 | per event | permit |
| NRC Part 53 page10 | national regulator | US | 2026 | periodic | licensing |
| DOE HALEU page11 | agency | US | 2024 | periodic | fuel |
| WNA enrichment page12 | industry association | global | 2025 | annual | capacity |
| WNA country pages14 to21 | industry association | eight countries | 2025 to 2026 | continuous | projects and cost |
| Steigerwald et al. and Krall et al.252627 | peer-reviewed journals | method | 2022 to 2023 | one-off | cost and waste |
B.3Regional reading, advanced nuclear across ten clusters
Regional plates follow with the regional editions. This page gives the regional reading of advanced nuclear infrastructure and fuel exposure in table form and orders no region.
| Region | Principal hazards | Systems most exposed | Baseline evidence |
|---|---|---|---|
| North America | NRC permits and DOE test reactors; Canadian small reactor under construction | licensing, fuel | DOE78; WNA1415 |
| South America | national programmes | none bound | regional evidence (not bound) |
| Europe | UK small reactor contract; French EPR2 programme; Finnish repository licence (post-close, context only21) | cost, waste | WNA1720 |
| Eurasia | sodium-cooled and lead-cooled reactors; floating units | delivery, fuel | WNA1623 |
| Middle East and North Africa | four APR1400 units in operation at Barakah | export delivery | WNA19 |
| Africa | national programmes | none bound | regional evidence (not bound) |
| South Asia | national programmes | none bound | regional evidence (not bound) |
| East Asia | Chinese fleet and gas-cooled reactor; Korean small reactor design review | delivery, enrichment | WNA181912 |
| ASEAN | Indonesia agreement for floating small units, October 2026 | export delivery | WNA16 |
| Oceania-Pacific | national programmes | none bound | regional evidence (not bound) |
B.4Cluster card: enrichment and HALEU supply chain
- fuel supply
- enrichment
- HALEU
- single point
- Systems in view
- enrichment plants, deconversion, fuel fabrication, reactor developers
- Defining events
- US ban on Russian low-enriched uranium imports from August 202412
- Couplings
- MIN → ENE fuel; TRD → MIN restrictions
- Capability evidence
- Piketon centrifuge cascade and recovery of existing material reported by DOE11
- Gaps
- HALEU output by year; reserves; fabrication capacity
- Agenda items
- Q-01 · Q-04
Four operators hold nearly all world enrichment capacity, and one holds about 43% of the 2025 total [12].
SUPPLY
Concentrated capacity
DOE estimates US HALEU demand could reach 50 tonnes a year by 2035, while Piketon had enriched more than 100 kg by late 2024 [11].
DEMAND
HALEU against supply
The US prohibits imports of Russian low-enriched uranium from August 2024, with waivers to the start of 2028 [12].
POLICY
Import limits
B.5How countries appear in the advanced nuclear edition
Countries enter the advanced nuclear edition through the readiness chapters of their own national editions, on one card grammar. They are read against peer distributions and thresholds, never ordered.
| Card field | What it shows | Source |
|---|---|---|
| WEFH+B state | each core system against peer distribution bands | national edition |
| Couplings | the national dependency matrix | national edition |
| Risk objects | the national risk portfolio | national edition |
| Capability rungs | the national capability ladder | national edition |
| Evidence age | oldest and newest source dates | national source register |
Editions in the 2026 Baseline programme
countries and unions
clusters
flagship and sector
technology reports
How to read a country card
- Each system is shown against the distribution of its peers, with thresholds where they exist
- Couplings and risk objects come from the country’s own national edition
- Capability rungs record evidence, not a judgement of institutions
- Evidence age is printed, so older national data are visible as such
| Wave | Countries and unions | State |
|---|---|---|
| W0 | Canada | ISSUED |
| W1 | United States, United Kingdom, France, Germany, Italy, Japan, European Union, Switzerland | PLANNED |
| W2 | Mexico, Brazil, Argentina, Türkiye, Russian Federation, Saudi Arabia, United Arab Emirates, South Africa, Senegal, Kenya, African Union, India, China, Republic of Korea, Indonesia, Singapore, Australia | PLANNED |
B.6Licences
| Material | Licence |
|---|---|
| Text | CC BY 4.0 |
| Data | on the licence of each source; Nexus tables CC BY 4.0 |
| Figures | Nexus figures CC BY 4.0; third-party as credited |
| Maps | boundary source and licence printed on each plate |
| Metadata | CC0 1.0, as Zenodo publishes it |
| Third-party data, figures and text | The source’s own licence, credited where it is used; never relicensed |
| Nexus-authored text, tables and figures: CC BY 4.0 (SPDX CC-BY-4.0). Map plates print their boundary source and licence. | |
B.7Formats and provenance
| Format | Kind | State | What it is | Identifier |
|---|---|---|---|---|
| Web edition | HTML | On this site | Draft in stewardship review; every value resolves to its source. | NR-XTECH-FISSION-GLOBAL-2026-BASELINE-v1.0.0 |
| Print edition | At release | A4 portrait · screen, print and archival PDF, signed with the web edition at release. | NR-XTECH-FISSION-GLOBAL-2026-BASELINE-v1.0.0 | |
| Indicator data | CSV · JSON | On this site | 16 indicators with unit, year, status and source; the machine-readable copy ships with the evidence bundle at release. | NR-XTECH-FISSION-GLOBAL-2026-BASELINE data release v1 |
| Figures | SVG · PNG | On this site | 4 on the web edition: headline figure, figure 1.3, coupling instrument, capability ladder. | FIG-XTECH-FISSION-GLOBAL-2026-BASELINE-* |
| Slides | Not recorded | No slide deck is recorded for this edition. | ||
| Evidence brief | HTML · PDF | Not recorded | No evidence brief is recorded for this edition. | |
| Dataset with DOI | DataCite | At release | Concept and version DOI are minted at deposit; none is recorded yet. |
Provenance
- Edition pack
- The edition’s content pack (JSON), from which the print and web editions are built
- Evidence cut
- DC-XTECH-FISSION-GLOBAL-2026-B0, closed 30 September 2026
- Reproducibility
- sourced values cited; analytical values reproducible from stated parameters
- Self-check
- 14 of 23 at evidence close; a fail on any item blocks release
- Review
- five passes scheduled before release (in Annex C)
- Publisher of record
- GCRI for the Nexus Consortium
- Corrections
- Registry correction pathway; upheld corrections are published as notices with a new version
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1World Nuclear Association (ed.), Nuclear Power in the World Today (information library page; 443 operable reactors, 405,667 MWe net, about 9% of world electricity, 80 under construction with 87,813 MWe gross; electricity data for 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 9World Nuclear News (ed.), NRC issues construction permit for first Natrium plant (news report, 5 March 2026; 18-month review against 27 months initially; completion expected 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03.back
- 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 20World Nuclear Association (ed.), Nuclear Power in France (country profile, first 100,000 characters read; 57 operable reactors; EPR2 six units, EUR 72.8 billion estimate of December 2025; Flamanville 3 grid connection December 2024, EUR 13.2 billion estimate of December 2022). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 14World Nuclear Association (ed.), Nuclear Power in Canada (country profile; Darlington BWRX-300, construction licence April 2025, first nuclear concrete 26 June 2026, operation expected 2030, CAD 20.9 billion for four units; page lists 316 MWe gross and describes 300 MWe). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 2UNVERIFIED, not opened: IAEA (ed.), Energy, Electricity and Nuclear Power Estimates for the Period up to 2050, 2025 edition (377 GW at end of 2024; high case 992 GW and low case 561 GW in 2050), taken from search-result summaries of trade reports; the IAEA page was not retrieved. International Atomic Energy Agency, Vienna. Observation year 2025. Accessed 2026-11-03.back
- 3The White House (ed.), Ordering the Reform of the Nuclear Regulatory Commission, Executive Order 14300, 23 May 2025 (goal of 400 GW by 2050 from about 100 GW in 2024; 18-month limit for new reactor decisions; 1-year limit for continued operation). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 4The White House (ed.), Reinvigorating the Nuclear Industrial Base, Executive Order 14302, 23 May 2025 (5 GW of uprates; 10 new large reactors with complete designs under construction by 2030; fuel, enrichment and spent fuel directions). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 5UNVERIFIED, not opened: The White House (ed.), Reforming Nuclear Reactor Testing at the Department of Energy, Executive Order 14301, 23 May 2025, the page address returned not found; the goal of three reactors achieving criticality by 4 July 2026 is taken from the American Nuclear Society report. The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 6American Nuclear Society (ed.), The deadline arrives: checking in on the Reactor Pilot Program (news article, 2 July 2026; criticality by Antares 4 June, Valar 18 June, Deployable Energy 1 July; ten companies selected in August 2025; status of the remaining participants). American Nuclear Society, La Grange Park. Observation year 2026. Accessed 2026-11-03.back
- 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03.back
- 21POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Finland (country profile; Olkiluoto 3 contract of EUR 3.2 billion for mid-2009, regular production April 2023; Onkalo operating licence granted October 2026 valid to the end of 2070, after the 30 September evidence close). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03.back
- 26Steigerwald, B. et al., Future nuclear fission reactors: uncertainties, the effect of parameter choice and an application to small modular reactor concepts, Safety of Nuclear Waste Disposal 2, 217, 2023 (abstract page read; 15 concepts; none competes with existing renewables on its assumptions). Copernicus Publications, Gottingen. Observation year 2023. Accessed 2026-11-03.back
- 27Krall, L.M., Macfarlane, A.M. and Ewing, R.C., Nuclear waste from small modular reactors, Proceedings of the National Academy of Sciences 119(23), e2111833119, 2022 (open-access full text, abstract and conclusions read; waste volume factors of 2 to 30; three designs). National Academy of Sciences, Washington. Observation year 2022. Accessed 2026-11-03.back
- 16POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Russia (country profile, first 100,000 characters read; 34 operable reactors, 27,969 MWe; BREST-OD-300 under construction since June 2021; Akademik Lomonosov 2 x 32 MWe, grid connection December 2019; Indonesia agreement October 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 23World Nuclear Association (ed.), Advanced Nuclear Power Reactors (information library page, updated November 2025; Generation IV forum set up in 2001 with six concepts; sodium-cooled and lead-cooled fast reactors; molten salt reactors not covered). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 19World Nuclear Association (ed.), Nuclear Power in South Korea (country profile; 26 operable units, 25,609 MWe; i-SMR 170 MWe design, standard design approval application February 2026, approval targeted 2028; Barakah units in operation, last in September 2024). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 18World Nuclear Association (ed.), Nuclear Power in China (country profile, first 100,000 characters read; 65 reactors, 65,085 MWe operable; 39 under construction; HTR-PM commercial operation December 2023; Linglong One commissioning expected during 2026; 110 GWe target by 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
References and record
Every source the edition rests on, the publication record, the corrections log and the open record.
C.142 sources
NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).
- 1World Nuclear Association (ed.), Nuclear Power in the World Today (information library page; 443 operable reactors, 405,667 MWe net, about 9% of world electricity, 80 under construction with 87,813 MWe gross; electricity data for 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 2UNVERIFIED, not opened: IAEA (ed.), Energy, Electricity and Nuclear Power Estimates for the Period up to 2050, 2025 edition (377 GW at end of 2024; high case 992 GW and low case 561 GW in 2050), taken from search-result summaries of trade reports; the IAEA page was not retrieved. International Atomic Energy Agency, Vienna. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6
- 3The White House (ed.), Ordering the Reform of the Nuclear Regulatory Commission, Executive Order 14300, 23 May 2025 (goal of 400 GW by 2050 from about 100 GW in 2024; 18-month limit for new reactor decisions; 1-year limit for continued operation). The White House, Washington. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 4The White House (ed.), Reinvigorating the Nuclear Industrial Base, Executive Order 14302, 23 May 2025 (5 GW of uprates; 10 new large reactors with complete designs under construction by 2030; fuel, enrichment and spent fuel directions). The White House, Washington. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 5UNVERIFIED, not opened: The White House (ed.), Reforming Nuclear Reactor Testing at the Department of Energy, Executive Order 14301, 23 May 2025, the page address returned not found; the goal of three reactors achieving criticality by 4 July 2026 is taken from the American Nuclear Society report. The White House, Washington. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
- 6American Nuclear Society (ed.), The deadline arrives: checking in on the Reactor Pilot Program (news article, 2 July 2026; criticality by Antares 4 June, Valar 18 June, Deployable Energy 1 July; ten companies selected in August 2025; status of the remaining participants). American Nuclear Society, La Grange Park. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 8
- 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 9World Nuclear News (ed.), NRC issues construction permit for first Natrium plant (news report, 5 March 2026; 18-month review against 27 months initially; completion expected 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 2
- 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 13World Nuclear Association (ed.), Small Nuclear Power Reactors (information library page; definition of 300 MWe equivalent or less; microreactors under 20 MWe; the page lists no projects). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2
- 14World Nuclear Association (ed.), Nuclear Power in Canada (country profile; Darlington BWRX-300, construction licence April 2025, first nuclear concrete 26 June 2026, operation expected 2030, CAD 20.9 billion for four units; page lists 316 MWe gross and describes 300 MWe). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2, chapter 6, chapter 8
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 8
- 16POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Russia (country profile, first 100,000 characters read; 34 operable reactors, 27,969 MWe; BREST-OD-300 under construction since June 2021; Akademik Lomonosov 2 x 32 MWe, grid connection December 2019; Indonesia agreement October 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 8
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 8
- 18World Nuclear Association (ed.), Nuclear Power in China (country profile, first 100,000 characters read; 65 reactors, 65,085 MWe operable; 39 under construction; HTR-PM commercial operation December 2023; Linglong One commissioning expected during 2026; 110 GWe target by 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2, chapter 6, chapter 8
- 19World Nuclear Association (ed.), Nuclear Power in South Korea (country profile; 26 operable units, 25,609 MWe; i-SMR 170 MWe design, standard design approval application February 2026, approval targeted 2028; Barakah units in operation, last in September 2024). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2, chapter 3, chapter 6, chapter 8
- 20World Nuclear Association (ed.), Nuclear Power in France (country profile, first 100,000 characters read; 57 operable reactors; EPR2 six units, EUR 72.8 billion estimate of December 2025; Flamanville 3 grid connection December 2024, EUR 13.2 billion estimate of December 2022). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 4, chapter 5, chapter 6, chapter 8
- 21POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Finland (country profile; Olkiluoto 3 contract of EUR 3.2 billion for mid-2009, regular production April 2023; Onkalo operating licence granted October 2026 valid to the end of 2070, after the 30 September evidence close). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 22World Nuclear Association (ed.), Storage and Disposal of Radioactive Wastes (information library page; Finland, Sweden, France and US repository milestones; Cigéo commissioning planned for 2050; Yucca Mountain suspended). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 23World Nuclear Association (ed.), Advanced Nuclear Power Reactors (information library page, updated November 2025; Generation IV forum set up in 2001 with six concepts; sodium-cooled and lead-cooled fast reactors; molten salt reactors not covered). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 8
- 24US Department of Energy, Office of Nuclear Energy (ed.), Advanced Reactor Demonstration Program (programme page; USD 160 million initial funding; demonstrations within 7 years of award; ARC 20 designs for the mid-2030s). US Department of Energy, Washington. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
- 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 26Steigerwald, B. et al., Future nuclear fission reactors: uncertainties, the effect of parameter choice and an application to small modular reactor concepts, Safety of Nuclear Waste Disposal 2, 217, 2023 (abstract page read; 15 concepts; none competes with existing renewables on its assumptions). Copernicus Publications, Gottingen. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 6, chapter 8
- 27Krall, L.M., Macfarlane, A.M. and Ewing, R.C., Nuclear waste from small modular reactors, Proceedings of the National Academy of Sciences 119(23), e2111833119, 2022 (open-access full text, abstract and conclusions read; waste volume factors of 2 to 30; three designs). National Academy of Sciences, Washington. Observation year 2022. Accessed 2026-11-03. Cited in chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 28UNVERIFIED, not opened: IEA (ed.), The Path to a New Era for Nuclear Energy, January 2025, the page returned forbidden; no figure from it is used. International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
- 29UNVERIFIED, not opened: OECD Nuclear Energy Agency (ed.), The NEA Small Modular Reactor Dashboard, second edition, the page returned a service error; no figure from it is used. OECD NEA, Paris. Observation year 2024. Accessed 2026-11-03. Cited in chapter 6
- 30UNVERIFIED, not opened: OECD NEA and IAEA (eds.), Uranium 2024: Resources, Production and Demand, the page returned forbidden; no figure from it is used. OECD NEA, Paris. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6
- 31UNVERIFIED, not opened: US Nuclear Regulatory Commission (ed.), NuScale US460 standard design approval page, the page address returned not found; the approval is cited from memory without a figure. US NRC, Rockville. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
- 32UNVERIFIED, not opened: IAEA (ed.), Power Reactor Information System, the analytics page returned only its title; no figure from it is used. International Atomic Energy Agency, Vienna. Observation year 2026. Accessed 2026-11-03. Cited in chapter 6
- 33UNVERIFIED, not opened: World Bank Group (ed.), press release on ending the ban on financing nuclear energy, June 2025, the page address returned not found; cited from memory without a figure. World Bank, Washington. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
- 34UNVERIFIED, not opened: Declaration to Triple Nuclear Energy, COP28, December 2023, cited from memory without a figure. Signatory national governments. Observation year 2023. Accessed 2026-11-03. Cited in chapter 6, chapter 8
- 35UNVERIFIED, not opened: UNECE (ed.), Life Cycle Assessment of Electricity Generation Options, 2021, the page returned forbidden; no figure from it is used. United Nations Economic Commission for Europe, Geneva. Observation year 2021. Accessed 2026-11-03. Cited in chapter 6
- 36UNVERIFIED, not opened: IPCC (ed.), Climate Change 2022: Mitigation of Climate Change, Working Group III, chapter 6, the page returned forbidden; no figure from it is used. Intergovernmental Panel on Climate Change, Geneva. Observation year 2022. Accessed 2026-11-03. Cited in chapter 6
- 37UNVERIFIED, not opened: ADVANCE Act of 2024, Public Law 118-67, United States Congress, cited from memory without a figure; the NRC Part 53 page names the Act as background. Observation year 2024. Accessed 2026-11-03. Cited in chapter 2, chapter 6
- 38UNVERIFIED, not opened: US Nuclear Regulatory Commission (ed.), Kairos Power Hermes test reactor licensing page, the page address returned not found; no figure from it is used. US NRC, Rockville. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
- 39UNVERIFIED, not opened: Ontario Power Generation (ed.), Darlington New Nuclear Project page, the page returned forbidden; Darlington figures are taken from the World Nuclear Association country profile. OPG, Toronto. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2, chapter 6
- 40UNVERIFIED, not opened: Generation IV International Forum (ed.), Generation IV systems, the page address returned not found; the forum and its six concepts are described in the World Nuclear Association page. GIF, Paris. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
- 41UNVERIFIED, not opened: European Commission (ed.), Complementary Climate Delegated Act on nuclear and gas activities in the EU taxonomy, 2022, cited from memory without a figure. European Commission, Brussels. Observation year 2022. Accessed 2026-11-03. Cited in chapter 6, chapter 8
- 42UNVERIFIED, not opened: IAEA (ed.), Advances in Small Modular Reactor Technology Developments, 2022 edition, cited from memory without a figure. International Atomic Energy Agency, Vienna. Observation year 2022. Accessed 2026-11-03. Cited in chapter 6
C.2Publication record
Publication
- Title
- Exponential Technology Report 2026: Advanced Nuclear and Next-Generation Fission, Baseline Edition
- Series
- Reports · Exponential Technology Series XT-15
- Edition
- Baseline Edition 2026 · inaugural annual
- Version
- v1.0.0 · draft for stewardship review
- Publication ID
- NR-XTECH-FISSION-GLOBAL-2026-BASELINE-v1.0.0
- Evidence close
- 30 September 2026
- Publication date
- October 2026
- DOI
- concept and version DOI at deposit
Publisher
- Publisher of record
- The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
- Place
- Toronto
- Editor
- Saeed Valadbaygi, Chief Steward and Managing Editor
- Stewards
- GCRI · technical truth · GRF · public meaning · GRA · capital meaning
- Licence
- text CC BY 4.0; data on the terms of each source
- Copyright
- © 2026 GCRI · Nexus Consortium
- Language
- English (en-GB) source edition
- Correspondence
- Registry correction pathway · editorial office
Colophon
- Format
- A4 portrait · screen, print and archival PDF
- Typefaces
- Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
- Design standard
- Reports Foundational Edition, Volume I, Part VII
- Accessibility
- tagged PDF and HTML targets; text alternatives for every figure
- Production
- Reports editorial team, GCRI
Release path for this version
| Step | What happens | When |
|---|---|---|
| Draft | editorial self-check complete at evidence close | October 2026 |
| Steward review | five passes on the exact draft (keys T · M · F · N) | Q4 2026 |
| Approval | publication authority approves the exact digest | before release |
| Deposit | concept and version DOI minted; registry pointer set | at release |
| Succession | the 2027 advanced nuclear edition reports changes against this baseline | 2027 |
- Current version
- v1.0.0 draft, stewardship review
- Previous edition
- none, first edition of the series
- Next edition
- NR-XTECH-FISSION-GLOBAL-2027-v1.0.0
- Latest version
- resolve the concept DOI or the registry record
- Correction route
- Registry correction pathway
- Notice types
- erratum · addendum · supersession · withdrawal
C.3Corrections log
0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.
| Edition | Version | Date | State | Change | Notice |
|---|---|---|---|---|---|
| XT-15 | NR-XTECH-FISSION-GLOBAL-2026-BASELINE-v1.0.0 | October 2026 | Draft | Baseline Edition 2026, inaugural annual edition, | None |
Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.
C.4Open record
This edition’s open record
- Publication ID
- NR-XTECH-FISSION-GLOBAL-2026-BASELINE-v1.0.0
- Desk identifier and series alias
- NR-XTC-XT-15-2026-BL
- Collection
- None
- DOI
- Concept and version DOI at deposit, on Zenodo with DataCite metadata
- Versions
- Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
- Bundle
- RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
- Licence
- CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0
Credit and identity
- ORCID
- Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
- ROR
- Your organisation by its ROR identifier, never by a typed name alone
- CRediT
- Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
- Account
- None needed to contribute; never a password
Find and follow
Search the open indexes for Advanced Nuclear and Next-Generation Fission; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.
Mirrors and harvest
The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.
{
"metadata": {
"resource_type": {
"id": "dataset"
},
"title": "Evidence on Advanced Nuclear and Next-Generation Fission for Nexus Reports",
"publication_date": "YYYY-MM-DD",
"creators": [
{
"person_or_org": {
"type": "personal",
"family_name": "Your family name",
"given_name": "Your given name",
"identifiers": [
{
"scheme": "orcid",
"identifier": "0000-0000-0000-0000"
}
]
},
"affiliations": [
{
"id": "ROR identifier of your organisation"
}
]
}
],
"description": "What it is, where its record is kept and how it bears on Exponential Technology Report 2026: Advanced Nuclear and Next-Generation Fission.",
"rights": [
{
"id": "cc-by-4.0"
}
],
"subjects": [
{
"subject": "Nexus Reports"
},
{
"subject": "Advanced Nuclear and Next-Generation Fission"
},
{
"subject": "Exponential Technology Report · XT-15"
}
],
"related_identifiers": [
{
"identifier": "https://therisk.global/nexus-reports/editions/xt-15/",
"scheme": "url",
"relation_type": {
"id": "issupplementto"
},
"resource_type": {
"id": "publication-report"
}
}
],
"version": "1.0.0"
},
"custom_fields": {},
"access": {
"record": "public",
"files": "public"
},
"files": {
"enabled": true
},
"parent": {
"communities": {
"default": "nexusreports"
}
}
}C.5Where this edition sits among the six pillars
Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.
- F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
- F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
- F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
- Applied in editions Standards Nexus Standards: applied in editions.
- XT-15 edition Reports Advanced Nuclear and Next-Generation Fission 2026, published in every format with its sources, citation and corrections.
- F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
- F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
- Taught in the open Academy Risk Academy: taught in the open.
What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; XT-15 is a drafted Baseline Edition, so these handoffs run from its first operational quarter.
| Handoff | Between | What crosses, and when |
|---|---|---|
| F03 | Foundry to Reports | Sealed observations and indicator series behind a profile (closeout). |
| F04 | Universe to Reports | After-action and scenario findings for chapters 10 and 13 (after action review). |
| F05 | Foundry to Reports | National Portfolio movement for chapter 11 (after action review). |
| Ring | Nexus Standards to Reports | Nexus Standards: applied in editions. |
| F06 | Reports to Nexus Standards | Method and correction findings as change proposals (correction). |
| F12 | Reports to Universe | Q4 synthesis informs the next-year mandate (renewal). |
| Ring | Reports to Risk Academy | Risk Academy: taught in the open. |