- AI and Agentic Systems 2026
- Chapter 7
The 2027 agenda
Eight bounded questions open the 2027 AI agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 edition.
Contents
- ·Edition home
- ·Executive summary
- 1AI is infrastructure, not only software
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Chip supply disruption under grid constraint
- 6Lenses and readings
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
7.1Questions for the operational series
- X-01
Where will data-centre demand exceed grid and water capacity first, and what does that do to local prices and reliability?
INI-XT01-GRD-01 · compute–grid–water; first output: cluster capacity register.
- X-02
How exposed is AI capability to a disruption in advanced chips, tools or minerals?
INI-XT01-CHP-02 · supply concentration; first output: single-point-of-failure map.
- X-03
How much energy does inference use as AI agents spread, compared with training?
INI-XT01-INF-03 · inference energy; first output: measured estimates by use.
- X-04
Which failure modes of agentic systems appear in real incidents, and how are they caught?
INI-XT01-SAF-04 · agentic incidents; first output: incident taxonomy and evidence grades.
- X-05
Is AI augmenting or substituting work, by occupation and region, on measured rather than modelled evidence?
INI-XT01-LAB-05 · measured labour effects; first output: evidence review.
- X-06
How is the EU AI Act being applied, and what evidence of compliance capacity exists?
To be admitted in 2027; first output: implementation note.
- X-07
How does AI change the cyber threat landscape for critical infrastructure?
With GS-13 cyber; first output: scoping note.
- X-08
Which AI capabilities in risk management have been tested in real operations?
Technology capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for the 2027 AI portfolio. They are programme objects, no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-XT01-GRD-01 | Compute–grid–water capacity | Initiative | X-01 | PROPOSED |
| INI-XT01-CHP-02 | Chip and mineral supply concentration | Initiative | X-02 | PROPOSED |
| INI-XT01-INF-03 | Inference energy measurement | Initiative | X-03 | PROPOSED |
| INI-XT01-SAF-04 | Agentic incident evidence | Initiative | X-04 | PROPOSED |
| INI-XT01-LAB-05 | Measured labour effects | Initiative | X-05 | PROPOSED |
| MSN-XT01-2027-01 | Chip–grid compound Universe mission | Mission | X-02 | Candidate |
7.3The pathway
The AI edition reads national readiness chapters, the sector reports on energy, water and cyber, and the global edition through one governed evidence graph. At baseline the federation is designed; Canada, Global and Water are issued.
- 01
National readiness chapters
AI and compute in each national edition
CANADA ISSUED · 25 further national baselines
- 02
Sector couplings
GS-02 energy · GS-01 water · GS-13 cyber
GS-01 ISSUED · energy and cyber baselines
- 03
Technology system model
compute, energy, chips, labour, governance
v0 SPECIFIED · v1 with federation evidence
- 04
Strategic links
SR-13 strategic technology · SR-04 minerals · SR-10 DPI
PLANNED · strategic baselines
- 05
Universe
annual proving environment
CANDIDATE MISSION · mandate in 2027
- 06
XT-01 report
this series
BASELINE ISSUED · 2027 annual edition
- 07
Evidence and correction
one graph, many projections
OPEN · first correction cycle in 2027
7.4Universe 2027, evidence pack for the AI candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | 2027 global annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-XT01-2027-01 · chip–grid compound disruption
- Role spine
- Leadership sponsor · Institutional anchor · Mission lead, drawn from national pathways
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| ENE-001 · electricity | GS-02 Energy edition | grid coupling | PUBLIC |
| ENE-002 · US share | INI-XT01-GRD-01 | cluster capacity | PUBLIC |
| CMP-003 · compute | public record | reference for the 2027 series | PUBLIC |
| MIN-005 · chips and minerals | INI-XT01-CHP-02 · SR-04 | supply concentration | PUBLIC |
| LAB-007 · labour | INI-XT01-LAB-05 | measured effects | PUBLIC |
| SAF-009 · incidents | INI-XT01-SAF-04 · GS-13 | agentic incidents | PUBLIC |
| DEV-011 · access | GS-06 Development edition | access coupling | PUBLIC |
| SYS-012 · compound pathway | MSN-XT01-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the federation | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| AI Incident Database | Responsible AI Collaborative | continuous | SAF-009 |
| AI Incidents and Hazards Monitor | OECD | continuous | SAF-009 |
| Electricity market reports | IEA | monthly | ENE-001 |
| Compute and model trends | Epoch AI | continuous | CMP-003 |
| Export-control notices | national authorities | per notice | MIN-005 |
| Grid interconnection queues | system operators | quarterly | RSK-XT01-ENE-002 |
| Model and system cards | developers | per release | capability register |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- annual publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-XT01-001 | Clustered data-centre load lengthening grid queues15 | CORROBORATED | ENE · INF | initiative X-01 |
| SIG-XT01-002 | Tightening export controls on chips, tools and minerals1929 | CORROBORATED | MIN · TRD | initiative X-02 |
| SIG-XT01-003 | Incidents involving autonomous agents | PARTIAL | AIC · DAT · FIN | initiative X-04 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 15A. Shehabi, S. J. Smith, A. Hubbard et al., 2024 United States Data Center Energy Usage Report. Lawrence Berkeley National Laboratory, Berkeley, CA, December 2024.back
- 19Ministry of Commerce of the People’s Republic of China (ed.), Announcement on implementing export control on gallium- and germanium-related items. MOFCOM, Beijing, July 2023.back
- 29U.S. Department of Commerce, Bureau of Industry and Security (ed.), Implementation of additional export controls: certain advanced computing and semiconductor manufacturing items. Federal Register, October 2022, as updated.back