- AI and Agentic Systems 2026
- Annex A
Methodology
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
Contents
- ·Edition home
- ·Executive summary
- 1AI is infrastructure, not only software
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Chip supply disruption under grid constraint
- 6Lenses and readings
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
A.1Methods
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | Result |
|---|---|---|---|
| (1) | Growth in data-centre electricity to 2030 | 945 ÷ 415 | ≈ 2.3× |
| (2) | Increase in organisational AI use, 2023–2024 | 78 − 55 | 23 points |
| (3) | Net job change expected by 2030 | 170 − 92 | ≈ 78 million |
| (4) | Compute growth over five years at 4–5× a year | 4⁵ to 5⁵ | ≈ 1,000–3,000× |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| Label | Rule |
|---|---|
| Reported | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Estimated | Nexus analytical value with stated method |
| Scenario | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, Technology System Model v0
- Model ID
- MDL-XT01-AI · v0.1
- Purpose
- represent AI as infrastructure coupled to energy, water, minerals, labour and institutions
- Family
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- Method
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- Validation
- none yet, first validation against federation evidence in 2027
- Uncertainty
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for site, company or model-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-XTECH-AI-GLOBAL-2026-B0
- Type
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 40 cited sources, each at the edition and retrieval date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 AI annual cut
Lineage
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | 2027 global annual |
|---|---|---|
| Sources | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | Technology System Model v0 specification | model runs with receipts |
| Findings | twelve baseline findings | findings re-bound to federation evidence |
| Review | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | Observed | Released | Cadence | Next release |
|---|---|---|---|---|
| Data-centre electricity use | 2024 | Apr 2025 | periodic | next IEA update |
| US data-centre share | 2023 | Dec 2024 | periodic | next LBNL report |
| Organisations using AI | 2024 | Apr 2025 | annual | AI Index 2026 |
| Training compute trend | 2010–2024 | 2024 | continuous | continuous |
| Leading-edge chip capacity share | 2019 | 2021 | one-off | new studies |
| Reported AI incidents | 2024 | Apr 2025 | annual | AI Index 2026 |
| Jobs exposed to AI | 2024–2025 | 2024–2025 | periodic | new estimates |
| People offline | 2024 | Nov 2024 | annual | annual |
| System | Coverage | Thinnest dimension |
|---|---|---|
| Energy | GOOD | inference against training |
| Water | THIN | use outside the United States |
| Compute and cost | GOOD | efficiency of deployed systems |
| Chips and minerals | PARTIAL | current capacity shares |
| Adoption | PARTIAL | small firms and public sector |
| Labour | PARTIAL | measured, not modelled, effects |
| Safety | THIN | agentic incidents |
| Governance | GOOD | implementation evidence |
A.5Evidence cards, two anchor sources
Issued by the International Energy Agency from data-centre, grid and industry data with scenario modelling to 2030. Role: binds ENE-001 and the 2030 projection, labelled as a projection.
EVD-XT01-001
Energy and AI1
Issued by Stanford HAI from surveys, public datasets and incident databases. Annual. Role: binds adoption, cost, investment and incident findings.
EVD-XT01-002
Artificial Intelligence Index Report 20252
| Dimension | EVD-GLB-001 | EVD-GLB-002 |
|---|---|---|
| Completeness | company disclosure incomplete | survey samples skew to large firms |
| Timeliness | about a year after the data | about four months after the year |
| Revision | projections revised with new data | series revised annually |
| Method transparency | methods and scenarios published | methods published by chapter |
| External validation | compared with national laboratory estimates | widely cited; no formal audit |
Evidence cards to follow in 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Group | Area | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- Maps
- plates in Q2 2027
- Waivers
- none
A.7Status words
| Status | What it means |
|---|---|
| Observed | Measured directly and published by the source. |
| Reported | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| Estimated | A Nexus estimate from cited evidence, with its method in Annex A. |
| Modelled | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Scenario | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Step | What happens | Source |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on five sites | Only then do the five Reports sites show the edition as published, each reading it through its own lens. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Term | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Coupling | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| AI | artificial intelligence |
| AI RMF | NIST Artificial Intelligence Risk Management Framework |
| BIS | US Bureau of Industry and Security |
| CETS | Council of Europe Treaty Series |
| GPU | graphics processing unit, used as an AI accelerator |
| HAI | Stanford Institute for Human-Centered Artificial Intelligence |
| IEA | International Energy Agency |
| ILO | International Labour Organization |
| ITU | International Telecommunication Union |
| LBNL | Lawrence Berkeley National Laboratory |
| TWh | terawatt-hour |
| UNESCO | United Nations Educational, Scientific and Cultural Organization |
A.10Technical annex
| Item | Annex | Contents | Status |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-XT01-CHG-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Cluster notes | cards for the major data-centre clusters | 2027 |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition, data-centre electricity use
- Construct
- annual electricity consumed by data centres, including cooling
- Unit
- TWh a year
- Method
- IEA bottom-up estimate from server, storage, network and cooling loads
- Source
- IEA, Energy and AI1
- Uncertainty
- company disclosure incomplete; range published
- Known limits
- does not separate AI from other workloads exactly
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1International Energy Agency (ed.), Energy and AI. World Energy Outlook Special Report. IEA, Paris, 2025.back
- 2Stanford Institute for Human-Centered Artificial Intelligence (ed.), Artificial Intelligence Index Report 2025. Stanford HAI, Stanford, 2025.back
- 15A. Shehabi, S. J. Smith, A. Hubbard et al., 2024 United States Data Center Energy Usage Report. Lawrence Berkeley National Laboratory, Berkeley, CA, December 2024.back
- 14J. Sevilla and E. Roldán, “Training compute of frontier AI models grows by 4–5x per year.” Epoch AI, 2024.back
- 3Y. Bengio (ed.), International AI Safety Report. Department for Science, Innovation and Technology, London, January 2025.back
- 32International Labour Organization (ed.), Generative AI and Jobs: A Refined Global Index of Occupational Exposure. ILO, Geneva, 2025.back