Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

A loss year that meets tight public budgets

A conditional statement under stated assumptions, never a prediction.

2 min read0 figures0 tables2 notesNR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE

المحتويات
  1. ·Edition home
  2. ·Executive summary
  3. 1Money meets risk
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5A loss year that meets tight public budgets
    1. 5.1 Assumptions
    2. 5.2 The cascade, step by step
    3. 5.3 The scenario as a table of steps
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. Aالمنهجية
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

5.1الافتراضات

Scenario SCN-SR14-PRT-01: what is assumed, and what is held constant.

خط الأساس
the 2026 reference state in this edition
الدوافع
a year of large insured and uninsured disaster losses, coinciding with competing claims on public budgets
Analogues
loss year 20253; delayed US grant round 2025 to 202611
Interventions
none modelled: the specification describes the unmitigated case
Run state
narrative specification; quantified run scheduled for 2027

5.2The cascade, step by step

  1. 1

    CLI → INF

    storm, flood and wildfire losses damage assets and homes

    2025

  2. 2

    INF → FIN

    insurers pay; uninsured losses fall on households and budgets

    2025

  3. 3

    FIN → FIN

    cover is repriced and risk moves to bond markets

    2025

  4. 4

    FIN → INF

    repair claims compete with planned upkeep and adaptation grants

    2026

  5. 5

    FIN → DEV

    recovery pledges are slow to turn into payments

    2025

  6. 6

    DEV → INF

    delayed adaptation leaves assets exposed to the next loss year

    2026

5.3The scenario as a table of steps

How the shock in scenario SCN-SR14-PRT-01 would travel through Global Resilience Investment and National Portfolios’s coupled systems, step by step, under the assumptions the edition states.

خطوةما يحدثالمصدر
01 Climate to infrastructureStorm, flood and wildfire losses damage assets and homes. Analogue or source: 2025.Edition SR-14, scenario SCN-SR14-PRT-01, step 1
02 Infrastructure to financeInsurers pay; uninsured losses fall on households and budgets. Analogue or source: 2025.Edition SR-14, scenario SCN-SR14-PRT-01, step 2
03 Finance to financeCover is repriced and risk moves to bond markets. Analogue or source: 2025.Edition SR-14, scenario SCN-SR14-PRT-01, step 3
04 Finance to infrastructureRepair claims compete with planned upkeep and adaptation grants. Analogue or source: 2026.Edition SR-14, scenario SCN-SR14-PRT-01, step 4
05 Finance to developmentRecovery pledges are slow to turn into payments. Analogue or source: 2025.Edition SR-14, scenario SCN-SR14-PRT-01, step 5
06 Development to infrastructureDelayed adaptation leaves assets exposed to the next loss year. Analogue or source: 2026.Edition SR-14, scenario SCN-SR14-PRT-01, step 6

A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Global Resilience Investment and National Portfolios 2026, scenario SCN-SR14-PRT-01 (2026); Global Resilience Investment and National Portfolios 2026, references (NR-CIT-1) (2026).

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 3Munich Re (ed.), Natural disaster figures for 2025 (media information, 2026; overall losses about USD 224 billion; insured losses about USD 108 billion; weather events 92% of overall losses; Los Angeles wildfires about USD 53 billion overall). Munich Re, Munich. Observation year 2025. Accessed 2026-11-03.back
  2. 11FEMA (ed.), Building Resilient Infrastructure and Communities (programme page updated 3 September 2026; fiscal years 2024 and 2025 funding opportunity of USD 1 billion published 25 March 2026; applications closed 23 July 2026). Federal Emergency Management Agency, Washington. Observation year 2026. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • طباعة

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF111 pages997 KBTagged, with bookmarks

      SHA-256 72a00b60f490e712a52b2aa358ac55337c6ac7bb454c6fa52569e1b3f30ba8a0

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF116 pages1007 KBTagged, with bookmarks

      SHA-256 141e2c6b7b22f28c3ed88ccdfda557cdb00a8f120498b03201f0e97eccf083ef

  • Web edition

  • Data bundle

    • Indicators, CSV

      15 indicators with unit, year, status and source

      NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 fac919b5aa7c6af427e86faa4d6aac913233c5c3c9aedb68f5e8c6b1230cd60f

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 2c360f3246a6d1204fe0cc142fbd0d130b871e4f8ac7e63e55bbaa80e72fc6d8

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 109550a9407fe574ebc157c317c8bb03ee99ebd461cc370c1895d84b024e96c7

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 d1f51b9820f3d2854bd0a9ed963f89e2eddceeb86e4e7b9951442c3c7f5696e1

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 b9ed34ac759218048d0b01f86fb2887d9978591c37e427fd0ad2c83cb41d7e2b

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 03d2a54dd84c236f20f8c3c591f324c94befc2de6b5c5f01944b3fbc415087a7

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 5: A loss year that meets tight public budgets. In Strategic Systems Report 2026: Global Resilience Investment and National Portfolios (Baseline Edition 2026, Report No. NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

التقاريرساهم

Send evidence or a correction on Global Resilience Investment and National Portfolios.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

مكتب أدلة النظم في GCRIالنظم الاستراتيجية

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace