References and record
Every source the edition rests on, the publication record, the corrections log and the open record.
Inhalt
- ·Edition home
- ·Executive summary
- 1Advanced nuclear is firm infrastructure and a delivery test
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Fuel supply gap while first-of-a-kind units are delayed
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodik
- BData appendix
- CReferences and record
- ·Complete edition, for print
C.142 sources
NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).
- 1World Nuclear Association (ed.), Nuclear Power in the World Today (information library page; 443 operable reactors, 405,667 MWe net, about 9% of world electricity, 80 under construction with 87,813 MWe gross; electricity data for 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 2IAEA (ed.), Energy, Electricity and Nuclear Power Estimates for the Period up to 2050, Reference Data Series No. 1, 2025 edition (IAEA-RDS-1/45, September 2025; full text read; global operational capacity of 377 GW(e) in 2024; low case 561 GW(e) and high case 992 GW(e) in 2050). International Atomic Energy Agency, Vienna. Observation year 2025. Accessed 2026-11-05. Cited in chapter 2, chapter 6
- 3The White House (ed.), Ordering the Reform of the Nuclear Regulatory Commission, Executive Order 14300, 23 May 2025 (goal of 400 GW by 2050 from about 100 GW in 2024; 18-month limit for new reactor decisions; 1-year limit for continued operation). The White House, Washington. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 4The White House (ed.), Reinvigorating the Nuclear Industrial Base, Executive Order 14302, 23 May 2025 (5 GW of uprates; 10 new large reactors with complete designs under construction by 2030; fuel, enrichment and spent fuel directions). The White House, Washington. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 5The White House (ed.), Reforming Nuclear Reactor Testing at the Department of Energy, Executive Order 14301, 23 May 2025 (order text read; at least three reactors approved under the pilot program with the goal of criticality in each by 4 July 2026). The White House, Washington. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
- 6American Nuclear Society (ed.), The deadline arrives: checking in on the Reactor Pilot Program (news article, 2 July 2026; criticality by Antares 4 June, Valar 18 June, Deployable Energy 1 July; ten companies selected in August 2025; status of the remaining participants). American Nuclear Society, La Grange Park. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 8
- 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 9World Nuclear News (ed.), NRC issues construction permit for first Natrium plant (news report, 5 March 2026; 18-month review against 27 months initially; completion expected 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 2
- 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 13World Nuclear Association (ed.), Small Nuclear Power Reactors (information library page; definition of 300 MWe equivalent or less; microreactors under 20 MWe; the page lists no projects). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2
- 14World Nuclear Association (ed.), Nuclear Power in Canada (country profile; Darlington BWRX-300, construction licence April 2025, first nuclear concrete 26 June 2026, operation expected 2030, CAD 20.9 billion for four units; page lists 316 MWe gross and describes 300 MWe). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2, chapter 6, chapter 8
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 8
- 16POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Russia (country profile, first 100,000 characters read; 34 operable reactors, 27,969 MWe; BREST-OD-300 under construction since June 2021; Akademik Lomonosov 2 x 32 MWe, grid connection December 2019; Indonesia agreement October 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 8
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 8
- 18World Nuclear Association (ed.), Nuclear Power in China (country profile, first 100,000 characters read; 65 reactors, 65,085 MWe operable; 39 under construction; HTR-PM commercial operation December 2023; Linglong One commissioning expected during 2026; 110 GWe target by 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2, chapter 6, chapter 8
- 19World Nuclear Association (ed.), Nuclear Power in South Korea (country profile; 26 operable units, 25,609 MWe; i-SMR 170 MWe design, standard design approval application February 2026, approval targeted 2028; Barakah units in operation, last in September 2024). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2, chapter 3, chapter 6, chapter 8
- 20World Nuclear Association (ed.), Nuclear Power in France (country profile, first 100,000 characters read; 57 operable reactors; EPR2 six units, EUR 72.8 billion estimate of December 2025; Flamanville 3 grid connection December 2024, EUR 13.2 billion estimate of December 2022). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 4, chapter 5, chapter 6, chapter 8
- 21POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Finland (country profile; Olkiluoto 3 contract of EUR 3.2 billion for mid-2009, regular production April 2023; Onkalo operating licence granted October 2026 valid to the end of 2070, after the 30 September evidence close). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 22World Nuclear Association (ed.), Storage and Disposal of Radioactive Wastes (information library page; Finland, Sweden, France and US repository milestones; Cigéo commissioning planned for 2050; Yucca Mountain suspended). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 23World Nuclear Association (ed.), Advanced Nuclear Power Reactors (information library page, updated November 2025; Generation IV forum set up in 2001 with six concepts; sodium-cooled and lead-cooled fast reactors; molten salt reactors not covered). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 8
- 24US Department of Energy, Office of Nuclear Energy (ed.), Advanced Reactor Demonstration Program (programme page; USD 160 million initial funding; demonstrations within 7 years of award; ARC 20 designs for the mid-2030s). US Department of Energy, Washington. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
- 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 26Steigerwald, B. et al., Future nuclear fission reactors: uncertainties, the effect of parameter choice and an application to small modular reactor concepts, Safety of Nuclear Waste Disposal 2, 217, 2023 (abstract page read; 15 concepts; none competes with existing renewables on its assumptions). Copernicus Publications, Gottingen. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 6, chapter 8
- 27Krall, L.M., Macfarlane, A.M. and Ewing, R.C., Nuclear waste from small modular reactors, Proceedings of the National Academy of Sciences 119(23), e2111833119, 2022 (open-access full text, abstract and conclusions read; waste volume factors of 2 to 30; three designs). National Academy of Sciences, Washington. Observation year 2022. Accessed 2026-11-03. Cited in chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 28IEA (ed.), The Path to a New Era for Nuclear Energy (report of January 2025; full text read from the IEA file host; status of nuclear energy, risks of policy, construction and financing, role of small modular reactors; no figure from it is used). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
- 29OECD Nuclear Energy Agency (ed.), The NEA Small Modular Reactor Dashboard: Second Edition (2024; landing page read; 98 SMR technologies identified, 56 assessed, information to 10 November 2023; no figure from it is used). OECD Publishing, Paris. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
- 30American Nuclear Society (ed.), Latest Red Book stresses need for boosts in uranium development (news report of 10 April 2025 on Uranium 2024: Resources, Production and Demand, the 30th edition by the OECD NEA and IAEA; identified resources of nearly 8 million tonnes, sufficient for low and high demand cases through 2050; the Red Book itself returned forbidden and was not read; no figure from it is used). American Nuclear Society, La Grange Park. Observation year 2025. Accessed 2026-11-05. Cited in chapter 2, chapter 6
- 31US Nuclear Regulatory Commission (ed.), NRC Approves Standard Design for NuScale US460 Small Modular Reactor (news release No. 25-033, 29 May 2025; 77 MWe per module, six modules of about 460 MWe in total; a standard design approval does not license a plant). US NRC, Rockville. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
- 32IAEA (ed.), Nuclear Power Reactors in the World, Reference Data Series No. 2, 2025 edition (IAEA-RDS-2/45, August 2025; summary of the Power Reactor Information System at the end of 2024; full text read; no figure from it is used). International Atomic Energy Agency, Vienna. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
- 33World Bank Group (ed.), World Bank Group, IAEA Formalize Partnership to Collaborate on Nuclear Energy for Development (press release, Paris, 26 June 2025; first concrete step to reengage with nuclear power in decades; plant life extension and small modular reactors; no figure from it is used). World Bank, Washington. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
- 34US Department of Energy (ed.), At COP28, Countries Launch Declaration to Triple Nuclear Energy Capacity by 2050, Recognising the Key Role of Nuclear Energy in Reaching Net Zero (page of 1 December 2023 carrying the declaration text; global aspirational goal of tripling nuclear energy capacity from 2020 by 2050; 25 endorsing countries listed). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-05. Cited in chapter 6, chapter 8
- 35UNECE (ed.), Life Cycle Assessment of Electricity Generation Options (report released 29 October 2021, 107 pages; published in 2022 as Carbon Neutrality in the UNECE Region, ECE Energy Series, Crossref record read; the UNECE file returned forbidden; date, scope and the conclusion that nuclear has the lowest life-cycle emissions were confirmed through the Japan Atomic Industrial Forum summary of December 2021; no figure from it is used). United Nations Economic Commission for Europe, Geneva. Observation year 2021. Accessed 2026-11-05. Cited in chapter 6
- 36IPCC (ed.), Energy Systems, chapter 6 of Climate Change 2022: Mitigation of Climate Change, Contribution of Working Group III to the Sixth Assessment Report of the IPCC, pp. 613 to 746 (the IPCC site refused automated access; the Crossref records of the volume and chapter were read; no figure is used). Cambridge University Press, Cambridge, 2022. Observation year 2022. Accessed 2026-11-05. Cited in chapter 6
- 37United States Congress (ed.), Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024 (ADVANCE Act of 2024), Division B of Public Law 118-67, 9 July 2024 (enrolled text read; no figure from it is used). US Government Publishing Office, Washington. Observation year 2024. Accessed 2026-11-05. Cited in chapter 2, chapter 6
- 38US Nuclear Regulatory Commission (ed.), NRC Issues Construction Permits to Kairos Power LLC (news page of 21 November 2024, updated 18 July 2025; permits CPTR-7 and CPTR-8 for the two reactors of the Hermes 2 test facility in Oak Ridge, Tennessee; no figure from it is used). US NRC, Rockville. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
- 39Canadian Nuclear Safety Commission (ed.), Darlington New Nuclear Project (project status page, last modified 25 August 2026; licence to construct 1 BWRX-300 issued in April 2025, valid to 31 March 2035; up to 4 reactors at the site; operating licence application of March 2026; first regulatory hold point removed 30 March 2026; the OPG project page returned forbidden). CNSC, Ottawa. Observation year 2026. Accessed 2026-11-05. Cited in chapter 2, chapter 6
- 40Generation IV International Forum (ed.), Generation IV Goals, Technologies and GIF R and D Roadmap (portal page; eight technology goals; six systems selected from 130 concepts: gas-cooled fast, lead-cooled fast, molten salt, supercritical water-cooled, sodium-cooled fast and very high temperature reactors). GIF, Paris. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
- 41European Commission (ed.), Commission Delegated Regulation (EU) 2022/1214 of 9 March 2022 amending Delegated Regulation (EU) 2021/2139 as regards economic activities in certain energy sectors (the Complementary Climate Delegated Act adding nuclear and fossil gas activities to the EU taxonomy; text read through the Publications Office; no figure from it is used). Official Journal of the European Union L 188, 15 July 2022, Publications Office, Luxembourg. Observation year 2022. Accessed 2026-11-05. Cited in chapter 6, chapter 8
- 42IAEA (ed.), Advances in Small Modular Reactor Technology Developments, a supplement to the IAEA Advanced Reactors Information System, 2022 edition (September 2022; full text read; 83 designs listed; not an official IAEA publication by its own disclaimer; no figure from it is used). International Atomic Energy Agency, Vienna. Observation year 2022. Accessed 2026-11-05. Cited in chapter 6
C.2Publication record
Veröffentlichung
- Titel
- Exponential Technology Report 2026: Advanced Nuclear and Next-Generation Fission, Baseline Edition
- Serien
- Reports · Exponential Technology Series XT-15
- Ausgabe
- Baseline Edition 2026 · inaugural annual
- Version
- v1.0.0 · draft for stewardship review
- Publication ID
- NR-XTECH-FISSION-GLOBAL-2026-BASELINE-v1.0.0
- Evidenzschluss
- 30 September 2026
- Publication date
- Oktober 2026
- DOI
- concept and version DOI at deposit
Herausgeber
- Maßgeblicher Herausgeber
- The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
- Ort
- Toronto
- Redaktion
- Saeed Valadbaygi, Chief Steward and Managing Editor
- Sachwalter
- GCRI · technical truth · the Global Risks Forum (GRF) · public meaning · the Global Risks Alliance (GRA) · capital meaning
- Lizenz
- text CC BY 4.0; data on the terms of each source
- Copyright
- © 2026 GCRI · Nexus Consortium
- Sprache
- English (en-GB) source edition
- Correspondence
- Registry correction pathway · editorial office
Colophon
- Format
- A4 portrait · screen, print and archival PDF
- Typefaces
- Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
- Design standard
- Reports Foundational Edition, Volume I, Part VII
- Barrierefreiheit
- tagged PDF and HTML targets; text alternatives for every figure
- Produktion
- Reports editorial team, GCRI
Release path for this version
| Schritt | Was geschieht | Wann |
|---|---|---|
| Entwurf | editorial self-check complete at evidence close | Oktober 2026 |
| Steward review | five passes on the exact draft (keys T · M · F · N) | Q4 2026 |
| Genehmigung | publication authority approves the exact digest | before release |
| Deposit | concept and version DOI minted; registry pointer set | at release |
| Nachfolge | the 2027 advanced nuclear edition reports changes against this baseline | 2027 |
- Current version
- v1.0.0 draft, stewardship review
- Previous edition
- none, first edition of the series
- Next edition
- NR-XTECH-FISSION-GLOBAL-2027-v1.0.0
- Latest version
- resolve the concept DOI or the registry record
- Correction route
- Registry correction pathway
- Notice types
- erratum · addendum · supersession · withdrawal
C.3Korrekturprotokoll
0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.
| Ausgabe | Version | Date | Status | Veränderung | Notice |
|---|---|---|---|---|---|
| XT-15 | NR-XTECH-FISSION-GLOBAL-2026-BASELINE-v1.0.0 | Oktober 2026 | Entwurf | Baseline Edition 2026, inaugural annual edition, | Keine |
Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.
C.4Open record
This edition’s open record
- Publication ID
- NR-XTECH-FISSION-GLOBAL-2026-BASELINE-v1.0.0
- Desk identifier and series alias
- NR-GCRI-XT-15-2026-BASELINE-v1.0.0 · NR-XTC-XT-15-2026-BL
- Collection
- NR-COL-2026-BASELINE (IsPartOf at deposit)
- DOI
- Concept and version DOI at deposit, on Zenodo with DataCite metadata
- Versionen
- Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
- Bundle
- RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
- Lizenz
- CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0
Credit and identity
- ORCID
- Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
- ROR
- Your organisation by its ROR identifier, never by a typed name alone
- CRediT
- Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
- Konto
- None needed to contribute; never a password
Find and follow
Search the open indexes for Advanced Nuclear and Next-Generation Fission; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.
Mirrors and harvest
The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.
{
"metadata": {
"resource_type": {
"id": "dataset"
},
"title": "Evidence on Advanced Nuclear and Next-Generation Fission for Nexus Reports",
"publication_date": "YYYY-MM-DD",
"creators": [
{
"person_or_org": {
"type": "personal",
"family_name": "Your family name",
"given_name": "Your given name",
"identifiers": [
{
"scheme": "orcid",
"identifier": "0000-0000-0000-0000"
}
]
},
"affiliations": [
{
"id": "ROR identifier of your organisation"
}
]
}
],
"description": "What it is, where its record is kept and how it bears on Exponential Technology Report 2026: Advanced Nuclear and Next-Generation Fission.",
"rights": [
{
"id": "cc-by-4.0"
}
],
"subjects": [
{
"subject": "Nexus Reports"
},
{
"subject": "Advanced Nuclear and Next-Generation Fission"
},
{
"subject": "Exponential Technology Report · XT-15"
}
],
"related_identifiers": [
{
"identifier": "https://therisk.global/nexus-reports/editions/xt-15/",
"scheme": "url",
"relation_type": {
"id": "issupplementto"
},
"resource_type": {
"id": "publication-report"
}
}
],
"version": "1.0.0"
},
"custom_fields": {},
"access": {
"record": "public",
"files": "public"
},
"files": {
"enabled": true
},
"parent": {
"communities": {
"default": "nexusreports"
}
}
}C.5Where this edition sits among the six pillars
Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.
- F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
- F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
- F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
- Applied in editions Standards Nexus Standards: applied in editions.
- XT-15 edition Reports Advanced Nuclear and Next-Generation Fission 2026, published in every format with its sources, citation and corrections.
- F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
- F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
- Taught in the open Academy Risk Academy: taught in the open.
What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; XT-15 is a drafted Baseline Edition, so these handoffs run from its first operational quarter.
| Übergabe | Between | What crosses, and when |
|---|---|---|
| F03 | Foundry to Reports | Sealed observations and indicator series behind a profile (closeout). |
| F04 | Universe to Reports | After-action and scenario findings for chapters 10 and 13 (after action review). |
| F05 | Foundry to Reports | National Portfolio movement for chapter 11 (after action review). |
| Ring | Nexus Standards to Reports | Nexus Standards: applied in editions. |
| F06 | Reports to Nexus Standards | Method and correction findings as change proposals (correction). |
| F12 | Reports to Universe | Q4 synthesis informs the next-year mandate (renewal). |
| Ring | Reports to Risk Academy | Risk Academy: taught in the open. |