Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

References and record

Every source the edition rests on, the publication record, the corrections log and the open record.

16 min read0 figures1 table0 notesNR-XTECH-FISSION-GLOBAL-2026-BASELINE

İçindekiler
  1. ·Edition home
  2. ·Executive summary
  3. 1Advanced nuclear is firm infrastructure and a delivery test
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Fuel supply gap while first-of-a-kind units are delayed
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. AMetodoloji
  12. BData appendix
  13. CReferences and record
    1. C.1 42 sources
    2. C.2 Publication record
    3. C.3 Corrections log
    4. C.4 Open record
    5. C.5 Where this edition sits among the six pillars
  14. ·Complete edition, for print

C.142 sources

NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).

  1. 1World Nuclear Association (ed.), Nuclear Power in the World Today (information library page; 443 operable reactors, 405,667 MWe net, about 9% of world electricity, 80 under construction with 87,813 MWe gross; electricity data for 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  2. 2IAEA (ed.), Energy, Electricity and Nuclear Power Estimates for the Period up to 2050, Reference Data Series No. 1, 2025 edition (IAEA-RDS-1/45, September 2025; full text read; global operational capacity of 377 GW(e) in 2024; low case 561 GW(e) and high case 992 GW(e) in 2050). International Atomic Energy Agency, Vienna. Observation year 2025. Accessed 2026-11-05. Cited in chapter 2, chapter 6
  3. 3The White House (ed.), Ordering the Reform of the Nuclear Regulatory Commission, Executive Order 14300, 23 May 2025 (goal of 400 GW by 2050 from about 100 GW in 2024; 18-month limit for new reactor decisions; 1-year limit for continued operation). The White House, Washington. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  4. 4The White House (ed.), Reinvigorating the Nuclear Industrial Base, Executive Order 14302, 23 May 2025 (5 GW of uprates; 10 new large reactors with complete designs under construction by 2030; fuel, enrichment and spent fuel directions). The White House, Washington. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  5. 5The White House (ed.), Reforming Nuclear Reactor Testing at the Department of Energy, Executive Order 14301, 23 May 2025 (order text read; at least three reactors approved under the pilot program with the goal of criticality in each by 4 July 2026). The White House, Washington. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  6. 6American Nuclear Society (ed.), The deadline arrives: checking in on the Reactor Pilot Program (news article, 2 July 2026; criticality by Antares 4 June, Valar 18 June, Deployable Energy 1 July; ten companies selected in August 2025; status of the remaining participants). American Nuclear Society, La Grange Park. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 8
  7. 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  8. 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  9. 9World Nuclear News (ed.), NRC issues construction permit for first Natrium plant (news report, 5 March 2026; 18-month review against 27 months initially; completion expected 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 2
  10. 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  11. 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  12. 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  13. 13World Nuclear Association (ed.), Small Nuclear Power Reactors (information library page; definition of 300 MWe equivalent or less; microreactors under 20 MWe; the page lists no projects). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2
  14. 14World Nuclear Association (ed.), Nuclear Power in Canada (country profile; Darlington BWRX-300, construction licence April 2025, first nuclear concrete 26 June 2026, operation expected 2030, CAD 20.9 billion for four units; page lists 316 MWe gross and describes 300 MWe). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2, chapter 6, chapter 8
  15. 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 8
  16. 16POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Russia (country profile, first 100,000 characters read; 34 operable reactors, 27,969 MWe; BREST-OD-300 under construction since June 2021; Akademik Lomonosov 2 x 32 MWe, grid connection December 2019; Indonesia agreement October 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 8
  17. 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 8
  18. 18World Nuclear Association (ed.), Nuclear Power in China (country profile, first 100,000 characters read; 65 reactors, 65,085 MWe operable; 39 under construction; HTR-PM commercial operation December 2023; Linglong One commissioning expected during 2026; 110 GWe target by 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2, chapter 6, chapter 8
  19. 19World Nuclear Association (ed.), Nuclear Power in South Korea (country profile; 26 operable units, 25,609 MWe; i-SMR 170 MWe design, standard design approval application February 2026, approval targeted 2028; Barakah units in operation, last in September 2024). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2, chapter 3, chapter 6, chapter 8
  20. 20World Nuclear Association (ed.), Nuclear Power in France (country profile, first 100,000 characters read; 57 operable reactors; EPR2 six units, EUR 72.8 billion estimate of December 2025; Flamanville 3 grid connection December 2024, EUR 13.2 billion estimate of December 2022). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 4, chapter 5, chapter 6, chapter 8
  21. 21POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Finland (country profile; Olkiluoto 3 contract of EUR 3.2 billion for mid-2009, regular production April 2023; Onkalo operating licence granted October 2026 valid to the end of 2070, after the 30 September evidence close). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  22. 22World Nuclear Association (ed.), Storage and Disposal of Radioactive Wastes (information library page; Finland, Sweden, France and US repository milestones; Cigéo commissioning planned for 2050; Yucca Mountain suspended). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
  23. 23World Nuclear Association (ed.), Advanced Nuclear Power Reactors (information library page, updated November 2025; Generation IV forum set up in 2001 with six concepts; sodium-cooled and lead-cooled fast reactors; molten salt reactors not covered). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 8
  24. 24US Department of Energy, Office of Nuclear Energy (ed.), Advanced Reactor Demonstration Program (programme page; USD 160 million initial funding; demonstrations within 7 years of award; ARC 20 designs for the mid-2030s). US Department of Energy, Washington. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
  25. 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  26. 26Steigerwald, B. et al., Future nuclear fission reactors: uncertainties, the effect of parameter choice and an application to small modular reactor concepts, Safety of Nuclear Waste Disposal 2, 217, 2023 (abstract page read; 15 concepts; none competes with existing renewables on its assumptions). Copernicus Publications, Gottingen. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 6, chapter 8
  27. 27Krall, L.M., Macfarlane, A.M. and Ewing, R.C., Nuclear waste from small modular reactors, Proceedings of the National Academy of Sciences 119(23), e2111833119, 2022 (open-access full text, abstract and conclusions read; waste volume factors of 2 to 30; three designs). National Academy of Sciences, Washington. Observation year 2022. Accessed 2026-11-03. Cited in chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  28. 28IEA (ed.), The Path to a New Era for Nuclear Energy (report of January 2025; full text read from the IEA file host; status of nuclear energy, risks of policy, construction and financing, role of small modular reactors; no figure from it is used). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  29. 29OECD Nuclear Energy Agency (ed.), The NEA Small Modular Reactor Dashboard: Second Edition (2024; landing page read; 98 SMR technologies identified, 56 assessed, information to 10 November 2023; no figure from it is used). OECD Publishing, Paris. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
  30. 30American Nuclear Society (ed.), Latest Red Book stresses need for boosts in uranium development (news report of 10 April 2025 on Uranium 2024: Resources, Production and Demand, the 30th edition by the OECD NEA and IAEA; identified resources of nearly 8 million tonnes, sufficient for low and high demand cases through 2050; the Red Book itself returned forbidden and was not read; no figure from it is used). American Nuclear Society, La Grange Park. Observation year 2025. Accessed 2026-11-05. Cited in chapter 2, chapter 6
  31. 31US Nuclear Regulatory Commission (ed.), NRC Approves Standard Design for NuScale US460 Small Modular Reactor (news release No. 25-033, 29 May 2025; 77 MWe per module, six modules of about 460 MWe in total; a standard design approval does not license a plant). US NRC, Rockville. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  32. 32IAEA (ed.), Nuclear Power Reactors in the World, Reference Data Series No. 2, 2025 edition (IAEA-RDS-2/45, August 2025; summary of the Power Reactor Information System at the end of 2024; full text read; no figure from it is used). International Atomic Energy Agency, Vienna. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
  33. 33World Bank Group (ed.), World Bank Group, IAEA Formalize Partnership to Collaborate on Nuclear Energy for Development (press release, Paris, 26 June 2025; first concrete step to reengage with nuclear power in decades; plant life extension and small modular reactors; no figure from it is used). World Bank, Washington. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  34. 34US Department of Energy (ed.), At COP28, Countries Launch Declaration to Triple Nuclear Energy Capacity by 2050, Recognising the Key Role of Nuclear Energy in Reaching Net Zero (page of 1 December 2023 carrying the declaration text; global aspirational goal of tripling nuclear energy capacity from 2020 by 2050; 25 endorsing countries listed). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-05. Cited in chapter 6, chapter 8
  35. 35UNECE (ed.), Life Cycle Assessment of Electricity Generation Options (report released 29 October 2021, 107 pages; published in 2022 as Carbon Neutrality in the UNECE Region, ECE Energy Series, Crossref record read; the UNECE file returned forbidden; date, scope and the conclusion that nuclear has the lowest life-cycle emissions were confirmed through the Japan Atomic Industrial Forum summary of December 2021; no figure from it is used). United Nations Economic Commission for Europe, Geneva. Observation year 2021. Accessed 2026-11-05. Cited in chapter 6
  36. 36IPCC (ed.), Energy Systems, chapter 6 of Climate Change 2022: Mitigation of Climate Change, Contribution of Working Group III to the Sixth Assessment Report of the IPCC, pp. 613 to 746 (the IPCC site refused automated access; the Crossref records of the volume and chapter were read; no figure is used). Cambridge University Press, Cambridge, 2022. Observation year 2022. Accessed 2026-11-05. Cited in chapter 6
  37. 37United States Congress (ed.), Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024 (ADVANCE Act of 2024), Division B of Public Law 118-67, 9 July 2024 (enrolled text read; no figure from it is used). US Government Publishing Office, Washington. Observation year 2024. Accessed 2026-11-05. Cited in chapter 2, chapter 6
  38. 38US Nuclear Regulatory Commission (ed.), NRC Issues Construction Permits to Kairos Power LLC (news page of 21 November 2024, updated 18 July 2025; permits CPTR-7 and CPTR-8 for the two reactors of the Hermes 2 test facility in Oak Ridge, Tennessee; no figure from it is used). US NRC, Rockville. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
  39. 39Canadian Nuclear Safety Commission (ed.), Darlington New Nuclear Project (project status page, last modified 25 August 2026; licence to construct 1 BWRX-300 issued in April 2025, valid to 31 March 2035; up to 4 reactors at the site; operating licence application of March 2026; first regulatory hold point removed 30 March 2026; the OPG project page returned forbidden). CNSC, Ottawa. Observation year 2026. Accessed 2026-11-05. Cited in chapter 2, chapter 6
  40. 40Generation IV International Forum (ed.), Generation IV Goals, Technologies and GIF R and D Roadmap (portal page; eight technology goals; six systems selected from 130 concepts: gas-cooled fast, lead-cooled fast, molten salt, supercritical water-cooled, sodium-cooled fast and very high temperature reactors). GIF, Paris. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  41. 41European Commission (ed.), Commission Delegated Regulation (EU) 2022/1214 of 9 March 2022 amending Delegated Regulation (EU) 2021/2139 as regards economic activities in certain energy sectors (the Complementary Climate Delegated Act adding nuclear and fossil gas activities to the EU taxonomy; text read through the Publications Office; no figure from it is used). Official Journal of the European Union L 188, 15 July 2022, Publications Office, Luxembourg. Observation year 2022. Accessed 2026-11-05. Cited in chapter 6, chapter 8
  42. 42IAEA (ed.), Advances in Small Modular Reactor Technology Developments, a supplement to the IAEA Advanced Reactors Information System, 2022 edition (September 2022; full text read; 83 designs listed; not an official IAEA publication by its own disclaimer; no figure from it is used). International Atomic Energy Agency, Vienna. Observation year 2022. Accessed 2026-11-05. Cited in chapter 6

C.2Publication record

Yayım

Başlık
Exponential Technology Report 2026: Advanced Nuclear and Next-Generation Fission, Baseline Edition
Seri
Reports · Exponential Technology Series XT-15
Baskı
Baseline Edition 2026 · inaugural annual
Sürüm
v1.0.0 · draft for stewardship review
Publication ID
NR-XTECH-FISSION-GLOBAL-2026-BASELINE-v1.0.0
Kanıt kapanışı
30 September 2026
Publication date
Ekim 2026
DOI
concept and version DOI at deposit

Yayımcı

Kayıtlı yayımcı
The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
Yer
Toronto
Editör
Saeed Valadbaygi, Chief Steward and Managing Editor
Yöneticiler
GCRI · technical truth · the Global Risks Forum (GRF) · public meaning · the Global Risks Alliance (GRA) · capital meaning
Lisans
text CC BY 4.0; data on the terms of each source
Copyright
© 2026 GCRI · Nexus Consortium
Dil
English (en-GB) source edition
Correspondence
Registry correction pathway · editorial office

Colophon

Biçim
A4 portrait · screen, print and archival PDF
Typefaces
Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
Design standard
Reports Foundational Edition, Volume I, Part VII
Erişilebilirlik
tagged PDF and HTML targets; text alternatives for every figure
Üretim
Reports editorial team, GCRI

Release path for this version

Table C.1Release path for this version
AdımNe olurNe zaman
Taslakeditorial self-check complete at evidence closeEkim 2026
Steward reviewfive passes on the exact draft (keys T · M · F · N)Q4 2026
Onaypublication authority approves the exact digestbefore release
Depositconcept and version DOI minted; registry pointer setat release
Halefiyetthe 2027 advanced nuclear edition reports changes against this baseline2027
Current version
v1.0.0 draft, stewardship review
Previous edition
none, first edition of the series
Next edition
NR-XTECH-FISSION-GLOBAL-2027-v1.0.0
Latest version
resolve the concept DOI or the registry record
Correction route
Registry correction pathway
Notice types
erratum · addendum · supersession · withdrawal

C.3Düzeltme günlüğü

0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.

BaskıSürümTarihStatüDeğişimBildirim
XT-15NR-XTECH-FISSION-GLOBAL-2026-BASELINE-v1.0.0Ekim 2026TaslakBaseline Edition 2026, inaugural annual edition,Yok

Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.

C.4Açık kayıt

This edition’s open record

Publication ID
NR-XTECH-FISSION-GLOBAL-2026-BASELINE-v1.0.0
Desk identifier and series alias
NR-GCRI-XT-15-2026-BASELINE-v1.0.0 · NR-XTC-XT-15-2026-BL
Collection
NR-COL-2026-BASELINE (IsPartOf at deposit)
DOI
Concept and version DOI at deposit, on Zenodo with DataCite metadata
Versions
Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
Bundle
RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
Lisans
CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0

Credit and identity

ORCID
Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
ROR
Your organisation by its ROR identifier, never by a typed name alone
CRediT
Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
Hesap
None needed to contribute; never a password

Find and follow

Search the open indexes for Advanced Nuclear and Next-Generation Fission; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.

Mirrors and harvest

The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.

InvenioRDM metadata for a contribution on Advanced Nuclear and Next-Generation Fission, prefilled from this page
{
  "metadata": {
    "resource_type": {
      "id": "dataset"
    },
    "title": "Evidence on Advanced Nuclear and Next-Generation Fission for Nexus Reports",
    "publication_date": "YYYY-MM-DD",
    "creators": [
      {
        "person_or_org": {
          "type": "personal",
          "family_name": "Your family name",
          "given_name": "Your given name",
          "identifiers": [
            {
              "scheme": "orcid",
              "identifier": "0000-0000-0000-0000"
            }
          ]
        },
        "affiliations": [
          {
            "id": "ROR identifier of your organisation"
          }
        ]
      }
    ],
    "description": "What it is, where its record is kept and how it bears on Exponential Technology Report 2026: Advanced Nuclear and Next-Generation Fission.",
    "rights": [
      {
        "id": "cc-by-4.0"
      }
    ],
    "subjects": [
      {
        "subject": "Nexus Reports"
      },
      {
        "subject": "Advanced Nuclear and Next-Generation Fission"
      },
      {
        "subject": "Exponential Technology Report · XT-15"
      }
    ],
    "related_identifiers": [
      {
        "identifier": "https://therisk.global/nexus-reports/editions/xt-15/",
        "scheme": "url",
        "relation_type": {
          "id": "issupplementto"
        },
        "resource_type": {
          "id": "publication-report"
        }
      }
    ],
    "version": "1.0.0"
  },
  "custom_fields": {},
  "access": {
    "record": "public",
    "files": "public"
  },
  "files": {
    "enabled": true
  },
  "parent": {
    "communities": {
      "default": "nexusreports"
    }
  }
}

C.5Where this edition sits among the six pillars

Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.

  1. F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
  2. F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
  3. F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
  4. Applied in editions Standards Nexus Standards: applied in editions.
  5. XT-15 edition Reports Advanced Nuclear and Next-Generation Fission 2026, published in every format with its sources, citation and corrections.
  6. F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
  7. F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
  8. Taught in the open Academy Risk Academy: taught in the open.

What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; XT-15 is a drafted Baseline Edition, so these handoffs run from its first operational quarter.

DevirBetweenWhat crosses, and when
F03Foundry to ReportsSealed observations and indicator series behind a profile (closeout).
F04Universe to ReportsAfter-action and scenario findings for chapters 10 and 13 (after action review).
F05Foundry to ReportsNational Portfolio movement for chapter 11 (after action review).
RingNexus Standards to ReportsNexus Standards: applied in editions.
F06Reports to Nexus StandardsMethod and correction findings as change proposals (correction).
F12Reports to UniverseQ4 synthesis informs the next-year mandate (renewal).
RingReports to Risk AcademyRisk Academy: taught in the open.

İndirilenler

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Yazdır

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF115 pages1.1 MBTagged, with bookmarks

      SHA-256 22ffedb7adb2ae8c3d6966ed0c87a77d27eee4bf97895c2eba205ae25581bd16

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF119 pages1.1 MBTagged, with bookmarks

      SHA-256 8f561371af6b3081a346c773cd6cff47801df3fd8edf4915ae1ebe504666f0a1

  • Web edition

  • Data bundle

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 2ef816eb3345ec1ab90c3f78b56b59a22175c40aad1aca3fce650f72d8a47fbf

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 57737fec22e1c477892b03fc0ec9432254e46383f037fb23be5ac4975f64c703

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 90075a1b41fcbbc2d060c85b92b0fd6a969ac555e9e9937575ceb361e05da55c

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 92bc45d19e6305960d5ce961686c384f254f45b4e13fc12e5dc38c4c8ed4045b

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 c78d832647aaa2c07f4823182505accb83be04d82211f9ca68349f6a8891e5c0

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 27c7c9d6f1ee785004ff642c4407431ee5e5883e3ddfec1295791f69925ba4d9

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this annex

Valadbaygi, S. (Ed.). (2026). Annex C: References and record. In Exponential Technology Report 2026: Advanced Nuclear and Next-Generation Fission (Baseline Edition 2026, Report No. NR-XTECH-FISSION-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

RaporlarKatkıda bulunun

Send evidence or a correction on Advanced Nuclear and Next-Generation Fission.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the GCRI Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Sistemler Kanıt MasasıÜstel Teknoloji

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.