Méthodologie
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
Sommaire
- ·Edition home
- ·Executive summary
- 1Connectivity is radio, compute and electricity
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Compute-heavy radio networks built ahead of Release 21
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMéthodologie
- BData appendix
- CReferences and record
- ·Complete edition, for print
A.1Méthodes
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| Non. | Derivation | Calculation | Résultat |
|---|---|---|---|
| (1) | Highest IMT-2030 peak rate example against the IMT-2020 reference | 200 ÷ 20 | 10 fois |
| (2) | Growth of 5G subscriptions from Q2 2026 to the 2031 forecast | 6.4 ÷ 3.3 | about 1.9 times |
| (3) | Months from the Release 21 Stage-1 freeze (March 2027) to later milestones | March 2028, June 2028, December 2028 and March 2029 minus March 2027 | 12, 15, 21 and 24 months |
| (4) | Share of 5G providers with standalone launched, lower bound | 90 ÷ 390 | at least 23% |
| Strength | Définition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| Étiquette | Règle |
|---|---|
| Déclaré | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Estimé | Nexus analytical value with stated method |
| Scénario | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, 6G System Model v0
- Model ID
- MDL-XT09-6G · v0.1
- Objet
- represent next-generation connectivity as infrastructure coupled to energy, compute chips, spectrum, materials, finance, workforce and security
- Famille
- graph-based system of systems
- Entrées
- the cited sources of this edition; no proprietary data
- Méthode
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- Validation
- none yet, first validation against federation evidence in 2027
- Incertitude
- qualitative; strengths are hypotheses, not measurements
- Domaine de validité
- global scale; not for asset-, site- or country-level use
- Reproductibilité
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-XTECH-6G-GLOBAL-2026-B0
- Type
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 42 cited sources, each at the edition and access date in the references
- Exécutions de modèles
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 6G annual cut
Lignage
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Élément | Baseline 2026 | 2027 global annual |
|---|---|---|
| Sources | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Modèles | 6G System Model v0 specification | model runs with receipts |
| Constats | twelve baseline findings | findings re-bound to federation evidence |
| Examen | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicateur | Observé | Publié | Fréquence | Next release |
|---|---|---|---|---|
| IMT-2030 framework | 2023 | Nov 2023 | one-off | IMT-2030 reports |
| ITU requirements and evaluation reports | 2026 | Feb and Jun 2026 | périodique | SG 5 in Dec 2026 |
| 3GPP Release 21 timetable | 2026 | Jun 2026 | per plenary | package approval Mar 2027 |
| 5G subscriptions | 2026 | Jun 2026 | half-yearly | next report |
| RAN market | 2025 | Feb 2026 | trimestriel | next release |
| AI-RAN announcement | 2025 | Oct 2025 | one-off | trial results |
| EU proposal and funding | 2026 | Jan and Mar 2026 | par publication | legislative steps |
| Energy survey | 2024 | Nov 2024 | one-off | new measurements |
| Système | Couverture | Thinnest dimension |
|---|---|---|
| Normes | GOOD | text of the draft ITU reports |
| Deployment | PARTIAL | operator 6G plans |
| Market | PARTIAL | supplier shares |
| Calcul | THIN | independent AI-RAN data |
| Énergie | THIN | energy per bit |
| Supply | THIN | chips and minerals |
| Compétences | THIN | workforce numbers |
| Sensing and satellite links | THIN | deployment data |
| Domaine | Source that would fill it | Blocker |
|---|---|---|
| Energy per bit and total energy of AI-RAN platforms on a common basis | vendors, operators, peer-reviewed measurements | company announcements only; the survey notes real-world data is hard to obtain1016 |
| RAN share of operator energy from the primary GSMA material | GSMA Intelligence reports22 | benchmark slides read; the full report is gated and the sample is participating operators only |
| WRC-23 outcomes and WRC-27 candidate bands from final texts | ITU Radio Regulations and final acts25 | conference material only; item 1.7 bands are still under study |
| Release 21 content beyond the timetable | 3GPP TR 21.921 and the 6G study reports32829 | TR 22.870 (March 2026) and TR 38.914 (September 2026) read; the release description is published at the end of the release |
| Text of the 20 IMT-2030 minimum technical performance requirements | ITU draft report 5/116226 | draft pending SG 5 approval; the page names it and the text was not opened |
| Operator 6G deployment plans and capital expenditure | operators and GSMA32 | the GSMA report gives aggregate capex for 2025 to 2030, not 6G plans by operator |
| RAN market shares by supplier | Dell’Oro and Omdia full reports923 | the release gives order and direction, not shares; Omdia figures come from a summary |
| AI-RAN market size from the analyst report | Omdia report24 | cited in a company announcement only |
| GPU-based RAN performance against conventional RAN on a common basis | independent measurement31 | vendor trial claims; analyst commentary says software maturity differs |
| RF semiconductor and critical mineral dependence of radio equipment | IEA and trade statistics34 | the 2026 edition returned an access error; the 2025 edition read; no figure used |
| Electricity demand of data centres linked to AI load | IEA Energy and AI33 | the main report returned an access error; an IEA regional report restating it read; no figure used |
| Direct-to-device satellite deployment and spectrum use | FCC and operators3614 | framework read (FCC 24-28, March 2024) |
| Funding for national 6G programmes outside the EU | national programmes and industry roadmaps383940 | roadmaps and programme records read; no funding figures for programmes outside the EU |
| Membership and working groups of the AI-RAN Alliance | AI-RAN Alliance publications30 | the website renders no text; a founding member announcement gives the working groups |
| Workforce size and skills for radio and network engineering | national statistics, industry surveys | not retrieved; capability rung stays LISTED |
A.5Evidence cards, two anchor sources
Adopted by the ITU Radiocommunication Assembly in November 2023. One-off. Role: binds INF-001 and the standards tiles. Coverage: terrestrial component of IMT-2030.
EVD-XT09-001
IMT-2030 framework, Recommendation ITU-R M.21601
Published by 3GPP; timetable agreed at the June 2026 plenaries. Continuous. Role: binds INF-002 and the milestone chart. Coverage: global specifications.
EVD-XT09-002
3GPP Release 21 page3
| Dimension | EVD-XT09-001 | EVD-XT09-002 |
|---|---|---|
| Completeness | research targets with examples and ranges | five milestone dates |
| Timeliness | adopted in November 2023 | agreed in June 2026 |
| Revision | first version; no revision seen | dates can move at plenaries |
| Method transparency | targets stated with scenario caveats | work plan stated |
| Validation externe | adopted by member states | agreed by member companies |
Evidence cards to follow in 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Groupe | Domaine | Éléments | Réussite | N/A | En attente |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Exécutions de modèles
- first runs in Q1 2027
- Cartes
- plates in Q2 2027
- Waivers
- aucun
A.7Status words
| Statut | Ce que cela signifie |
|---|---|
| Observé | Measured directly and published by the source. |
| Déclaré | Published statistics of an official or institutional source. |
| Déclaré | Stated by the body concerned; not independently measured. |
| Estimé | A Nexus estimate from cited evidence, with its method in Annex A. |
| Modélisé | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Prévision | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Scénario | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Étape | Ce qui se passe | Sources |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Terme | Signification |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Couplage | a typed dependency through which one system transmits to another |
| Déficit de protection | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| 3GPP | Third Generation Partnership Project |
| AI-RAN | radio access network that combines AI and radio compute |
| DNA | Digital Networks Act |
| FWA | fixed wireless access |
| IMT | International Mobile Telecommunications |
| ISAC | integrated sensing and communication |
| ITU-R | ITU Radiocommunication Sector |
| NTN | non-terrestrial network |
| O-RAN | open radio access network |
| RAN | radio access network |
| SA | standalone 5G |
| WRC | World Radiocommunication Conference |
A.10Technical annex
| Élément | Annex | Sommaire | Statut |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-XT09-CMP-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Analyses de sensibilité | influence of coupling strengths | 2027 |
| A.7 | Cluster notes | cards for the major radio and compute supply clusters | 2027 |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: peak data rate
- Construct
- maximum achievable data rate per device under ideal conditions
- Unité
- Gbit/s
- Méthode
- research-target example set by ITU-R for specific usage scenarios
- Sources
- Recommendation ITU-R M.2160-0 (2023)1
- Incertitude
- examples of 50, 100 and 200 Gbit/s; other values may be considered
- Limites connues
- values depend on frequency range, bandwidth and deployment scenario and may not be reached together
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 10NVIDIA and Nokia (eds.), NVIDIA to invest USD 1 billion in Nokia to accelerate AI-RAN innovation (joint company press release of 28 October 2025; USD 6.01 per share; ARC-Pro platform; T-Mobile field evaluations from 2026; company announcement, weak evidence). NVIDIA, Santa Clara, and Nokia, Espoo. Observation year 2025. Accessed 2026-11-03.back
- 16Sthankiya, K., Saeed, N., McSorley, G., Jaber, M. and Clegg, R.G., A Survey on AI-driven Energy Optimisation in Terrestrial Next Generation Radio Access Networks, IEEE Access 12, 157540 to 157555, 2024 (arXiv:2411.02164, submitted 4 November 2024; abstract page opened). IEEE, Piscataway. Observation year 2024. Accessed 2026-11-03.back
- 22GSMA Intelligence (ed.), Energy and Towers Efficiency Benchmark, presentation by Tim Hatt, March 2026 (PDF slides; Telco Energy Benchmark 2026 covering 19 network operator groups and TowerCos, 118 networks in 76 countries; radio access network 87% of participating operators’ energy use, core and data centres 11%, others 2%; headline efficiency 0.08 kWh per GB; the full report is gated and was not opened). GSMA, London. Observation year 2026. Accessed 2026-11-05.back
- 25ITU (ed.), Resolution 256 (WRC-23), Sharing and compatibility studies and development of technical conditions for the use of IMT in the frequency bands 4400 to 4800 MHz, 7125 to 8400 MHz (or parts thereof) and 14.8 to 15.35 GHz for the terrestrial component of IMT, World Radiocommunication Conference, Dubai, 2023 (PDF of the resolution; studies to be completed in time for WRC-27, which is invited to consider identification of the bands; WRC-27 agenda item 1.7). International Telecommunication Union, Geneva. Observation year 2023. Accessed 2026-11-05.back
- 33GPP (ed.), Release 21 page (timetable agreed at the June 2026 TSG#112 plenaries; first normative 6G release; Stage-3 freeze December 2028; ASN.1 freeze March 2029). 3rd Generation Partnership Project, Sophia Antipolis. Observation year 2026. Accessed 2026-11-03.back
- 283GPP (ed.), TR 22.870 V20.0.0, Study on 6G Use Cases and Service Requirements, Stage 1 (Release 20), March 2026 (report opened from the 3GPP specifications archive). 3rd Generation Partnership Project, Sophia Antipolis. Observation year 2026. Accessed 2026-11-05.back
- 293GPP (ed.), TR 38.914 V20.1.0, Study on 6G Scenarios and Requirements (Release 20), September 2026 (report opened from the 3GPP specifications archive). 3rd Generation Partnership Project, Sophia Antipolis. Observation year 2026. Accessed 2026-11-05.back
- 2ITU-R (ed.), IMT-2030 process page of Working Party 5D (timeline; candidate proposal window February 2027 to February 2029; draft reports 5/116 and 5/119 completed in 2026 and due for SG 5 approval in December 2026). International Telecommunication Union, Geneva. Observation year 2026. Accessed 2026-11-03.back
- 26ITU-R (ed.), Report ITU-R M.2516-0, Future technology trends of terrestrial International Mobile Telecommunications systems towards 2030 and beyond, November 2022 (publication page; in force). International Telecommunication Union, Geneva. Observation year 2022. Accessed 2026-11-05.back
- 32GSMA (ed.), The Mobile Economy 2026 (PDF, released March 2026; operator capex USD 1.2 trillion for 2025 to 2030; 50 million jobs supported by the mobile ecosystem in 2025; 6G expected to be deployed from around 2030; no figure taken from it in this edition). GSMA, London. Observation year 2025. Accessed 2026-11-05.back
- 9Dell’Oro Group (ed.), RAN market stabilised in 2025 (press release of 17 February 2026; analyst release; stable 2025 revenue; Huawei, Ericsson, Nokia, ZTE and Samsung in unchanged order; concentration at a ten-year high; 1% a year growth forecast 2025 to 2030; about a fifth of value lost 2022 to 2024). Dell’Oro Group, Redwood City. Observation year 2025. Accessed 2026-11-03.back
- 23TelecomTV (ed.), RAN market stabilises at $35bn: Omdia (news article of 18 February 2026 by Ray Le Maistre; Omdia fourth quarter and full year 2025 RAN market report: global RAN market, hardware and software excluding services, about USD 35 billion in 2025, essentially flat on 2024; trade press, secondary). TelecomTV, London. Observation year 2025. Accessed 2026-11-05.back
- 24NVIDIA (ed.), NVIDIA and Nokia to Pioneer the AI Platform for 6G (company press release of 28 October 2025; the AI-RAN opportunity is expected to exceed a cumulative USD 200 billion by 2030, citing the Omdia RAN Market Tracker 2Q25 forecast for 2025 to 2030; analyst projection in a company announcement, weak evidence). NVIDIA, Santa Clara. Observation year 2025. Accessed 2026-11-05.back
- 31ABI Research (ed.), Mavrakis, D., Are GPUs worth considering for 5G RAN?, insight IN-7808, 17 April 2025 (analyst commentary on the NVIDIA and SoftBank GPU-based AI-RAN trial claims; ABI estimates about 1 Gbps per cell and up to 20 cells per server and finds custom silicon ahead for RAN processing alone, attributing the gap to software optimisation). ABI Research, Oyster Bay. Observation year 2025. Accessed 2026-11-05.back
- 34IEA (ed.), Global Critical Minerals Outlook 2025 (PDF, May 2025; the 2026 edition returned access errors; average share of the top three mining countries for key energy minerals 77% in 2024; export restrictions on gallium, germanium and antimony, key minerals for semiconductor production, from December 2024; no figure taken from it in this edition). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05.back
- 33IEA (ed.), Energy and AI in East Asia, revised version April 2026, prepared with the Korea Energy Economics Institute (PDF; extends the IEA report Energy and AI of April 2025, whose pages returned access errors; restates the base case of data centres at about 415 TWh in 2024 and about 945 TWh by 2030; no figure taken from it in this edition). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05.back
- 36US Federal Communications Commission (ed.), Single Network Future: Supplemental Coverage from Space, Report and Order and Further Notice of Proposed Rulemaking, FCC 24-28, GN Docket No. 23-65, adopted 14 March 2024, released 15 March 2024 (PDF; establishes a regulatory framework for supplemental coverage from space). FCC, Washington. Observation year 2024. Accessed 2026-11-05.back
- 143GPP (ed.), Non-terrestrial networks overview (first normative requirements in Release 17; Release 19 core completed September 2025 and performance March 2026). 3rd Generation Partnership Project, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03.back
- 38Next G Alliance (ed.), Roadmap to 6G, February 2022 (ATIS press release of 3 February 2022 opened; first 6G vision for North America, written by the National 6G Roadmap Working Group with over 600 experts from 80 member organisations; the report PDF was not opened). ATIS, Washington. Observation year 2022. Accessed 2026-11-05.back
- 39IMT-2030 (6G) Promotion Group (ed.), 6G Vision and Candidate Technologies, white paper, June 2021 (English PDF hosted by CAICT; the group was established in June 2019 by the Ministry of Industry and Information Technology of China). China Academy of Information and Communications Technology, Beijing. Observation year 2021. Accessed 2026-11-05.back
- 40Hexa-X project consortium (eds.), Hexa-X: A flagship for B5G/6G vision and intelligent fabric of technology enablers connecting human, physical, and digital worlds, Horizon 2020 grant agreement 101015956, DOI 10.3030/101015956 (CORDIS fact sheet; 1 January 2021 to 30 June 2023; coordinated by Nokia Solutions and Networks; total cost EUR 11.9 million; project deliverables not opened). Publications Office of the European Union, Luxembourg. Observation year 2023. Accessed 2026-11-05. doi:10.3030/101015956back
- 30SoftBank Corp. (ed.), AI-RAN Alliance: leading companies and academic institution in the AI and telecom fields unite (founding member announcement of 26 February 2024; alliance founded with 10 telecom and AI companies and one academic institution; three working groups, AI for RAN, AI and RAN, AI on RAN; the alliance website renders no text and no member count was bound). SoftBank, Tokyo. Observation year 2024. Accessed 2026-11-05.back
- 1ITU-R (ed.), Recommendation ITU-R M.2160-0, Framework and overall objectives of the future development of IMT for 2030 and beyond, November 2023 (PDF opened; capability research targets in section 4). International Telecommunication Union, Geneva. Observation year 2023. Accessed 2026-11-03.back