Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

Metodolojî

How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.

16 min read0 figures13 tables23 notesNR-XTECH-6G-GLOBAL-2026-BASELINE

Naverok
  1. ·Edition home
  2. ·Executive summary
  3. 1Connectivity is radio, compute and electricity
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Compute-heavy radio networks built ahead of Release 21
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. AMetodolojî
    1. A.1 Methods
    2. A.2 Model card, 6G System Model v0
    3. A.3 The baseline evidence cut
    4. A.4 Evidence age and coverage
    5. A.5 Evidence cards, two anchor sources
    6. A.6 Publication acceptance record
    7. A.7 Status words
    8. A.8 How the edition is made, released and corrected
    9. A.9 Glossary and abbreviations
    10. A.10 Technical annex
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

A.1Rêbaz

The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.

Table A.1Methods
No.DerivationCalculationEncam
(1)Highest IMT-2030 peak rate example against the IMT-2020 reference200 ÷ 2010 times
(2)Growth of 5G subscriptions from Q2 2026 to the 2031 forecast6.4 ÷ 3.3about 1.9 times
(3)Months from the Release 21 Stage-1 freeze (March 2027) to later milestonesMarch 2028, June 2028, December 2028 and March 2029 minus March 202712, 15, 21 and 24 months
(4)Share of 5G providers with standalone launched, lower bound90 ÷ 390at least 23%
Table A.2Coupling strength scale (matrix and model card)
StrengthPênase
STRONGa disruption in the source system has historically changed the target system’s service or output within one season, in more than one region
MODERATEan effect is documented but buffered or slower
WEAKan effect is plausible but not documented at global scale
Table A.3Status grammar
NîşanRêgez
Raportkirîvalue as issued by its source, with year
Inferredreasoned from cited evidence; never a measurement
TexmînkirîNexus analytical value with stated method
Senaryoconditional on stated assumptions
Expert inputstructured editorial judgement awaiting evidence

A.2Model card, 6G System Model v0

Model ID
MDL-XT09-6G · v0.1
Armanc
represent next-generation connectivity as infrastructure coupled to energy, compute chips, spectrum, materials, finance, workforce and security
Malbat
graph-based system of systems
Têketin
the cited sources of this edition; no proprietary data
Rêbaz
expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
Erêkirin
none yet, first validation against federation evidence in 2027
Nediyarî
qualitative; strengths are hypotheses, not measurements
Domain of validity
global scale; not for asset-, site- or country-level use
Reproducibility
strength table and sources published in this edition
20couplings

typed in v0

0strong

documented within one season

0moderate

documented, buffered

20weak

plausible, undocumented

A.3The baseline evidence cut

Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.

Cut ID
DC-XTECH-6G-GLOBAL-2026-B0
Cure
baseline documentary cut
Resolution policy
pinned · as of 30 September 2026
Sources pinned
42 cited sources, each at the edition and access date in the references
Model runs
none at baseline, analytical values are stated with their method
Digest
computed at freeze and recorded in the publication record
Supersedes
nothing, first cut of the series
Superseded by
the 2027 6G annual cut

Xetên eslê daneyê

  1. 01

    source edition

  2. 02

    pinned citation

  3. 03

    finding

  4. 04

    page

  5. 05

    publication record

Table A.4From the baseline cut to the federation cut
ElementBaseline 20262027 global annual
Çavkanîcited global publications, pinned by editionnational, regional and sector cuts through one graph
Analysisstated methods and editorial estimatestyped analysis specifications
Model6G System Model v0 specificationmodel runs with receipts
Encamtwelve baseline findingsfindings re-bound to federation evidence
Nirxandinfive passes scheduledfive passes on the exact digest

A.4Evidence age and coverage

A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.

Table A.5Evidence age and coverage
NîşaneÇavdêrîkirîHatiye weşandinRîtmNext release
IMT-2030 framework2023Nov 2023one-offIMT-2030 reports
ITU requirements and evaluation reports2026Feb and Jun 2026periodicSG 5 in Dec 2026
3GPP Release 21 timetable2026Jun 2026per plenarypackage approval Mar 2027
5G subscriptions2026Jun 2026half-yearlynext report
RAN market2025Feb 2026sê-mehanenext release
AI-RAN announcement2025Oct 2025one-offtrial results
EU proposal and funding2026Jan and Mar 2026her weşanlegislative steps
Energy survey2024Nov 2024one-offnew measurements
Table A.6Coverage by system at baseline
PergalVegirtinThinnest dimension
StandardsGOODtext of the draft ITU reports
DeploymentPARTIALoperator 6G plans
MarketPARTIALsupplier shares
HesabkirinTHINindependent AI-RAN data
EnerjîTHINenergy per bit
SupplyTHINchips and minerals
SkillsTHINworkforce numbers
Sensing and satellite linksTHINdeployment data
Table A.7Designed empty states: what is not bound, what would fill it and why
WarSource that would fill itBlocker
Energy per bit and total energy of AI-RAN platforms on a common basisvendors, operators, peer-reviewed measurementscompany announcements only; the survey notes real-world data is hard to obtain1016
RAN share of operator energy from the primary GSMA materialGSMA Intelligence reports22benchmark slides read; the full report is gated and the sample is participating operators only
WRC-23 outcomes and WRC-27 candidate bands from final textsITU Radio Regulations and final acts25conference material only; item 1.7 bands are still under study
Release 21 content beyond the timetable3GPP TR 21.921 and the 6G study reports32829TR 22.870 (March 2026) and TR 38.914 (September 2026) read; the release description is published at the end of the release
Text of the 20 IMT-2030 minimum technical performance requirementsITU draft report 5/116226draft pending SG 5 approval; the page names it and the text was not opened
Operator 6G deployment plans and capital expenditureoperators and GSMA32the GSMA report gives aggregate capex for 2025 to 2030, not 6G plans by operator
RAN market shares by supplierDell’Oro and Omdia full reports923the release gives order and direction, not shares; Omdia figures come from a summary
AI-RAN market size from the analyst reportOmdia report24cited in a company announcement only
GPU-based RAN performance against conventional RAN on a common basisindependent measurement31vendor trial claims; analyst commentary says software maturity differs
RF semiconductor and critical mineral dependence of radio equipmentIEA and trade statistics34the 2026 edition returned an access error; the 2025 edition read; no figure used
Electricity demand of data centres linked to AI loadIEA Energy and AI33the main report returned an access error; an IEA regional report restating it read; no figure used
Direct-to-device satellite deployment and spectrum useFCC and operators3614framework read (FCC 24-28, March 2024)
Funding for national 6G programmes outside the EUnational programmes and industry roadmaps383940roadmaps and programme records read; no funding figures for programmes outside the EU
Membership and working groups of the AI-RAN AllianceAI-RAN Alliance publications30the website renders no text; a founding member announcement gives the working groups
Workforce size and skills for radio and network engineeringnational statistics, industry surveysnot retrieved; capability rung stays LISTED

A.5Evidence cards, two anchor sources

Adopted by the ITU Radiocommunication Assembly in November 2023. One-off. Role: binds INF-001 and the standards tiles. Coverage: terrestrial component of IMT-2030.

EVD-XT09-001

IMT-2030 framework, Recommendation ITU-R M.21601

Published by 3GPP; timetable agreed at the June 2026 plenaries. Continuous. Role: binds INF-002 and the milestone chart. Coverage: global specifications.

EVD-XT09-002

3GPP Release 21 page3

Table A.8Quality dimensions at baseline
DimensionEVD-XT09-001EVD-XT09-002
Completenessresearch targets with examples and rangesfive milestone dates
Timelinessadopted in November 2023agreed in June 2026
Revisionfirst version; no revision seendates can move at plenaries
Method transparencytargets stated with scenario caveatswork plan stated
External validationadopted by member statesagreed by member companies

Evidence cards to follow in 2027

  • ITU2: text of the draft requirements and evaluation reports
  • GSMA22: primary energy report
  • ITU25: final texts on WRC-27 item 1.7
  • 3GPP3: Release 21 description when published

A.6Publication acceptance record

Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.

Table A.9Publication acceptance record
KomQada erdnigarîTiştDerbasN/ALi bendê
D1Identity and scope8800
D2Source and data12912
D3Analysis and models12381
D4Findings and claims9801
D5Figures, tables, maps10622
D6Editorial and citations10802
D7Review and approval130013
D8Artefact and design12705
D9Registry and release9009

Publication gate

Conditions met
14 of 23 at evidence close
Blocking problems
none recorded
Open conditions
reviews, approval of the exact digest, deposit, registry pointer

Not applicable at baseline

Model runs
first runs in Q1 2027
Nexşe
plates in Q2 2027
Waivers
tune

A.7Status words

Table A.10The status every value carries
RewşEv tê çi wateyê
ÇavdêrîkirîMeasured directly and published by the source.
RaportkirîPublished statistics of an official or institutional source.
Hatiye daxuyandinStated by the body concerned; not independently measured.
TexmînkirîA Nexus estimate from cited evidence, with its method in Annex A.
ModelkirîProduced by a stated model from cited inputs.
InferredReasoned from cited evidence; not measured.
PêşbînîA projection by the cited source.
SimulatedA simulation result under stated assumptions.
SenaryoA conditional statement under stated assumptions; never a prediction.
Expert inputExpert judgement, recorded with its basis.
CandidateProposed for a later edition; not yet evidence.
Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject.

A.8How the edition is made, released and corrected

Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.

GavWhat happensÇavkanî
01 Evidence arrives from the pillarsFoundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s.
02 The cut is sealedOn the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on.
03 The edition is assembledThe edition is drafted from its template and content pack. Agents may draft; they never publish and never decide.
04 The keys turnAt the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward.
05 The gate opensA named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit.
06 Signed and depositedThe PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI.
07 Published on its desk’s siteOnly then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part.
08 Corrections go to StandardsMethod and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut.

A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).

Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.

A.9Glossary and abbreviations

Table A.11Series terms
TêgehWate
Baseline Editionthe inaugural annual edition that fixes the reference state for the series
WEFH+Bwater, energy, food, health and biodiversity, the national nexus core
Girêdana typed dependency through which one system transmits to another
Protection gapthe share of losses not covered by insurance
Capability ladderLISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED
EQLevidence-quality level, 1–5
Evidence cuta frozen resolution of exact sources and versions
NNC · NLC · NWGNational Nexus Consortium · National Leadership Council · National Working Groups
Table A.12Abbreviations used in this edition
AbbreviationExpansion
3GPPThird Generation Partnership Project
AI-RANradio access network that combines AI and radio compute
DNADigital Networks Act
FWAfixed wireless access
IMTInternational Mobile Telecommunications
ISACintegrated sensing and communication
ITU-RITU Radiocommunication Sector
NTNnon-terrestrial network
O-RANopen radio access network
RANradio access network
SAstandalone 5G
WRCWorld Radiocommunication Conference

A.10Technical annex

Table A.13Technical annex
BeşAnnexNaverokRewş
A.1Indicator definitionsthe global indicator set, with units and sourcesIN THIS EDITION
A.2Coupling strengthsthe twenty-cell matrix and its rationaleIN THIS EDITION
A.3Scenario specificationSCN-XT09-CMP-01 assumptions and signpostsIN THIS EDITION
A.4Capability placementsrung evidence for fifteen functionsIN THIS EDITION
A.5Model diagnosticsfirst runs and validation2027
A.6Sensitivity analysesinfluence of coupling strengths2027
A.7Cluster notescards for the major radio and compute supply clusters2027
A.8Review statementspass-by-pass review recordAT RELEASE

A.1 · indicator definition: peak data rate

Construct
maximum achievable data rate per device under ideal conditions
Yekîne
Gbit/s
Rêbaz
research-target example set by ITU-R for specific usage scenarios
Çavkanî
Recommendation ITU-R M.2160-0 (2023)1
Nediyarî
examples of 50, 100 and 200 Gbit/s; other values may be considered
Sînorên naskirî
values depend on frequency range, bandwidth and deployment scenario and may not be reached together

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 10NVIDIA and Nokia (eds.), NVIDIA to invest USD 1 billion in Nokia to accelerate AI-RAN innovation (joint company press release of 28 October 2025; USD 6.01 per share; ARC-Pro platform; T-Mobile field evaluations from 2026; company announcement, weak evidence). NVIDIA, Santa Clara, and Nokia, Espoo. Observation year 2025. Accessed 2026-11-03.back
  2. 16Sthankiya, K., Saeed, N., McSorley, G., Jaber, M. and Clegg, R.G., A Survey on AI-driven Energy Optimisation in Terrestrial Next Generation Radio Access Networks, IEEE Access 12, 157540 to 157555, 2024 (arXiv:2411.02164, submitted 4 November 2024; abstract page opened). IEEE, Piscataway. Observation year 2024. Accessed 2026-11-03.back
  3. 22GSMA Intelligence (ed.), Energy and Towers Efficiency Benchmark, presentation by Tim Hatt, March 2026 (PDF slides; Telco Energy Benchmark 2026 covering 19 network operator groups and TowerCos, 118 networks in 76 countries; radio access network 87% of participating operators’ energy use, core and data centres 11%, others 2%; headline efficiency 0.08 kWh per GB; the full report is gated and was not opened). GSMA, London. Observation year 2026. Accessed 2026-11-05.back
  4. 25ITU (ed.), Resolution 256 (WRC-23), Sharing and compatibility studies and development of technical conditions for the use of IMT in the frequency bands 4400 to 4800 MHz, 7125 to 8400 MHz (or parts thereof) and 14.8 to 15.35 GHz for the terrestrial component of IMT, World Radiocommunication Conference, Dubai, 2023 (PDF of the resolution; studies to be completed in time for WRC-27, which is invited to consider identification of the bands; WRC-27 agenda item 1.7). International Telecommunication Union, Geneva. Observation year 2023. Accessed 2026-11-05.back
  5. 33GPP (ed.), Release 21 page (timetable agreed at the June 2026 TSG#112 plenaries; first normative 6G release; Stage-3 freeze December 2028; ASN.1 freeze March 2029). 3rd Generation Partnership Project, Sophia Antipolis. Observation year 2026. Accessed 2026-11-03.back
  6. 283GPP (ed.), TR 22.870 V20.0.0, Study on 6G Use Cases and Service Requirements, Stage 1 (Release 20), March 2026 (report opened from the 3GPP specifications archive). 3rd Generation Partnership Project, Sophia Antipolis. Observation year 2026. Accessed 2026-11-05.back
  7. 293GPP (ed.), TR 38.914 V20.1.0, Study on 6G Scenarios and Requirements (Release 20), September 2026 (report opened from the 3GPP specifications archive). 3rd Generation Partnership Project, Sophia Antipolis. Observation year 2026. Accessed 2026-11-05.back
  8. 2ITU-R (ed.), IMT-2030 process page of Working Party 5D (timeline; candidate proposal window February 2027 to February 2029; draft reports 5/116 and 5/119 completed in 2026 and due for SG 5 approval in December 2026). International Telecommunication Union, Geneva. Observation year 2026. Accessed 2026-11-03.back
  9. 26ITU-R (ed.), Report ITU-R M.2516-0, Future technology trends of terrestrial International Mobile Telecommunications systems towards 2030 and beyond, November 2022 (publication page; in force). International Telecommunication Union, Geneva. Observation year 2022. Accessed 2026-11-05.back
  10. 32GSMA (ed.), The Mobile Economy 2026 (PDF, released March 2026; operator capex USD 1.2 trillion for 2025 to 2030; 50 million jobs supported by the mobile ecosystem in 2025; 6G expected to be deployed from around 2030; no figure taken from it in this edition). GSMA, London. Observation year 2025. Accessed 2026-11-05.back
  11. 9Dell’Oro Group (ed.), RAN market stabilised in 2025 (press release of 17 February 2026; analyst release; stable 2025 revenue; Huawei, Ericsson, Nokia, ZTE and Samsung in unchanged order; concentration at a ten-year high; 1% a year growth forecast 2025 to 2030; about a fifth of value lost 2022 to 2024). Dell’Oro Group, Redwood City. Observation year 2025. Accessed 2026-11-03.back
  12. 23TelecomTV (ed.), RAN market stabilises at $35bn: Omdia (news article of 18 February 2026 by Ray Le Maistre; Omdia fourth quarter and full year 2025 RAN market report: global RAN market, hardware and software excluding services, about USD 35 billion in 2025, essentially flat on 2024; trade press, secondary). TelecomTV, London. Observation year 2025. Accessed 2026-11-05.back
  13. 24NVIDIA (ed.), NVIDIA and Nokia to Pioneer the AI Platform for 6G (company press release of 28 October 2025; the AI-RAN opportunity is expected to exceed a cumulative USD 200 billion by 2030, citing the Omdia RAN Market Tracker 2Q25 forecast for 2025 to 2030; analyst projection in a company announcement, weak evidence). NVIDIA, Santa Clara. Observation year 2025. Accessed 2026-11-05.back
  14. 31ABI Research (ed.), Mavrakis, D., Are GPUs worth considering for 5G RAN?, insight IN-7808, 17 April 2025 (analyst commentary on the NVIDIA and SoftBank GPU-based AI-RAN trial claims; ABI estimates about 1 Gbps per cell and up to 20 cells per server and finds custom silicon ahead for RAN processing alone, attributing the gap to software optimisation). ABI Research, Oyster Bay. Observation year 2025. Accessed 2026-11-05.back
  15. 34IEA (ed.), Global Critical Minerals Outlook 2025 (PDF, May 2025; the 2026 edition returned access errors; average share of the top three mining countries for key energy minerals 77% in 2024; export restrictions on gallium, germanium and antimony, key minerals for semiconductor production, from December 2024; no figure taken from it in this edition). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05.back
  16. 33IEA (ed.), Energy and AI in East Asia, revised version April 2026, prepared with the Korea Energy Economics Institute (PDF; extends the IEA report Energy and AI of April 2025, whose pages returned access errors; restates the base case of data centres at about 415 TWh in 2024 and about 945 TWh by 2030; no figure taken from it in this edition). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05.back
  17. 36US Federal Communications Commission (ed.), Single Network Future: Supplemental Coverage from Space, Report and Order and Further Notice of Proposed Rulemaking, FCC 24-28, GN Docket No. 23-65, adopted 14 March 2024, released 15 March 2024 (PDF; establishes a regulatory framework for supplemental coverage from space). FCC, Washington. Observation year 2024. Accessed 2026-11-05.back
  18. 143GPP (ed.), Non-terrestrial networks overview (first normative requirements in Release 17; Release 19 core completed September 2025 and performance March 2026). 3rd Generation Partnership Project, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03.back
  19. 38Next G Alliance (ed.), Roadmap to 6G, February 2022 (ATIS press release of 3 February 2022 opened; first 6G vision for North America, written by the National 6G Roadmap Working Group with over 600 experts from 80 member organisations; the report PDF was not opened). ATIS, Washington. Observation year 2022. Accessed 2026-11-05.back
  20. 39IMT-2030 (6G) Promotion Group (ed.), 6G Vision and Candidate Technologies, white paper, June 2021 (English PDF hosted by CAICT; the group was established in June 2019 by the Ministry of Industry and Information Technology of China). China Academy of Information and Communications Technology, Beijing. Observation year 2021. Accessed 2026-11-05.back
  21. 40Hexa-X project consortium (eds.), Hexa-X: A flagship for B5G/6G vision and intelligent fabric of technology enablers connecting human, physical, and digital worlds, Horizon 2020 grant agreement 101015956, DOI 10.3030/101015956 (CORDIS fact sheet; 1 January 2021 to 30 June 2023; coordinated by Nokia Solutions and Networks; total cost EUR 11.9 million; project deliverables not opened). Publications Office of the European Union, Luxembourg. Observation year 2023. Accessed 2026-11-05. doi:10.3030/101015956back
  22. 30SoftBank Corp. (ed.), AI-RAN Alliance: leading companies and academic institution in the AI and telecom fields unite (founding member announcement of 26 February 2024; alliance founded with 10 telecom and AI companies and one academic institution; three working groups, AI for RAN, AI and RAN, AI on RAN; the alliance website renders no text and no member count was bound). SoftBank, Tokyo. Observation year 2024. Accessed 2026-11-05.back
  23. 1ITU-R (ed.), Recommendation ITU-R M.2160-0, Framework and overall objectives of the future development of IMT for 2030 and beyond, November 2023 (PDF opened; capability research targets in section 4). International Telecommunication Union, Geneva. Observation year 2023. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Print

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF110 pages1.0 MBTagged, with bookmarks

      SHA-256 ed5e484abe9330d2efe13a909a399668bbfd1db19703d87f2a6db6ac89b61b3b

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF117 pages1.0 MBTagged, with bookmarks

      SHA-256 d953e7bdcd5815dab8cb3e56fb371b3acc808b97d8f7e2633bbce9426f8e8e31

  • Web edition

  • Data bundle

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-6G-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 5a559df298f1d78fa444c5c834ae054cb8e9f9b66abcd752461cff285f1f96c8

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-6G-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 64003267b97e644bfea49c1e19f069f60450615ec55cb0725fccf829bada346c

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-6G-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 d842846869e5039b35c1f26e151ceaf44a5558ce48682d1937394b918bd04ecc

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-6G-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 f618338a44c5f1f95008fbeef100a3cde3d014fd3f7fc267ef7033291649f544

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-6G-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 9728c1012753dced8ef28e9bdf2785ad723556e1f39a6db1dd96f49e6d225046

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-6G-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 231790504577f8faced867f027358055f4911a44eaae882a7b8b7e7bc2386b54

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this annex

Valadbaygi, S. (Ed.). (2026). Annex A: Methodology. In Exponential Technology Report 2026: 6G, AI-RAN and Next-Generation Connectivity (Baseline Edition 2026, Report No. NR-XTECH-6G-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

rêzeya Pergalên StratejîkTevkarî bike

Send evidence or a correction on 6G, AI-RAN and Next-Generation Connectivity.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

Maseya Delîlan a GCRI SystemsTeknolojiya eksponensiyel

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.