Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

Systems and sectors at baseline

5 min read0 figures2 tables12 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

Содержание
  1. ·Edition home
  2. ·Executive summary
  3. 1HPC is power, cooling and policy before it is speed
  4. 2Key findings
  5. 3Systems and sectors at baseline
    1. 3.1 Where each system stood at evidence close
    2. 3.2 Domain posture
    3. 3.3 Sector screens
  6. 4Risks and capability
  7. 5Power and siting limits meet fast-growing demand
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. AМетодология
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

3.1Where each system stood at evidence close

INF · Systems

LineShine Linpack result, new first place

2.198exaflops

CPU-only; about 42.2 MW.

Сообщённые данные2026TOP5004

INF · Systems

Combined performance of the TOP500 list

18.73exaflops

up from 14.99 six months before.

Сообщённые данные2026TOP5005

ENE · Efficiency

Green500 leader, KAIROS

73.282GFlops per watt

3.05 petaflops at 46 kW.

Reported2026Green50035

ENE · Energy

US data centre electricity use

176TWh

4.4% of US electricity.

Сообщённые данные2023DOE12

FIN · Finance

Exascale Computing Project budget

1.8USD billion

from 2016 to 2024.

Сообщённые данные2024ECP17

GOV · Policy

EuroHPC budget, 2021 to 2027

8.2EUR billion

at least; page gives the amended figure.

Reported2026EuroHPC11

3.2Domain posture

Each of the twelve coupled domains is read through HPC, in words, not scored. The coupling column names the dependency that carries HPC risk into each domain.

Table 3.1Each domain read in words, not scored
ДоменPosture at baselineВзаимосвязиСтатус
WATCooling-water use of large facilities is not bound in this edition.ENE → WATExpert input EQL 1
ENEThe five largest systems draw 15.8 to 42.2 megawatts; US data centres used 4.4% of electricity in 2023.ENE ↔ INFReported EQL 4
FOONo documented coupling at baseline; weather and crop applications are not evidenced here.none documentedExpert input EQL 1
HLTNo documented coupling at baseline; drug discovery and genomics workloads are not evidenced here.none documentedExpert input EQL 1
BIONo documented coupling at baseline.none documentedExpert input EQL 1
CLIElectricity and cooling demand matter for emissions; the footprint of large systems is not bound.INF → CLIExpert input EQL 1
INFThe core system: five systems at or above one exaflop; list performance 18.73 exaflops.the core systemReported EQL 4
FINUSD 1.8 billion for the US exascale project; USD 50 billion for CHIPS programmes; EUR 8.2 billion for EuroHPC.FIN → INFReported EQL 4
DATLarge systems hold sensitive scientific data; no figure is bound.INF ↔ DATExpert input EQL 1
AICAccelerators are in 276 of 500 listed systems; the AI and scientific demand split is not bound.INF ↔ AICReported EQL 3
MINNo supply figure for chips, memory or minerals is bound for HPC.MIN → INFExpert input EQL 1
TRDUS licence rules and guidance shape access to advanced computing items.INF ↔ TRDReported EQL 3

3.3Sector screens

All sixteen sectors are screened for their dependence on HPC, on the same grammar as every national edition. The evidence column describes coverage of the baseline evidence, not the performance of the sector.

Table 3.2Sectors: baseline evidence and the exposure to watch
КодСекторBaseline evidenceExposure to watchEvidence coverage
GS-00Cross-systemHPC couples to energy, chips and policypower and siting limitsTHIN
GS-01Водаcooling-water use not boundfacility sitingTHIN
GS-02Энергетикаfive largest systems draw 15.8 to 42.2 MW1load from large facilitiesPARTIAL
GS-03Продовольствиеno documented couplingnone documentedTHIN
GS-04Здравоохранениеno documented couplingnone documentedTHIN
GS-05Финансыpublic programmes of USD 1.8 billion and EUR 8.2 billion1711dependence on a few programmesPARTIAL
GS-06Разработкаaccess to compute and skillswidening gapsTHIN
GS-07Климатfootprint at scale not boundelectricity demandTHIN
GS-08Бедствиеno documented couplingnone documentedTHIN
GS-09Инфраструктураwarm-water cooling and heat reuse at JUPITER9single-site dependenceTHIN
GS-10Городаheat reuse into a campus network9none documentedTHIN
GS-11Биоразнообразиеno documented couplingnone documentedTHIN
GS-12«Наблюдение Земли»weather and climate workloads not evidenced herenone documentedTHIN
GS-13Кибербезопасность и цифровые технологииsecurity of large systems not boundaccess control and export rulesTHIN
GS-14ПолитикаBIS notices, EuroHPC and UK plan131123fragmented rulesPARTIAL
GS-15Наукаpublic lists and standards forums11516common benchmarksGOOD

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  2. 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  3. 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  4. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  5. 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
  6. 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  7. 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  8. 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
  9. 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
  10. 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
  11. 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03.back
  12. 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03.back

Загрузки

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Печать

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF107 pages1020 KBTagged, with bookmarks

      SHA-256 c3c3e9d1277a616f4f8d597106a1c14752fc2e3fe68cacef0a05c65138510173

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF117 pages1.0 MBTagged, with bookmarks

      SHA-256 b1930c71db45cbcc42cecf8004ee9926a2476dd67c398f74e84a6649284e29b7

  • Web edition

  • Data bundle

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-HPC-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 2a89de21e69539d371d4fc87f1b6a46b8a8bd3ac8ec6f180005df9e20b461bcc

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-HPC-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 d7e1295f96aeff4d56015c654b1df24f835a8b689f65d5f432fab2ced10b8080

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-HPC-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 8fd5b0c4a509399a99a223dc468e03ac9eb73b4b26f18175f22c10129595b681

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-HPC-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 11175e84c9d4cb16ea1d2a4a3c566cc18b4922e2dd14d06cddb0f1c8437a040a

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-HPC-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 b6b328b31dc77b492f46a3e68222342a943ad922f15fb3d0806eae36667aca5d

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-HPC-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 6f312e18246515b489207b2877fb66a3e5b0c3abbe3e78400b57b865c30c1731

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 3: Systems and sectors at baseline. In Exponential Technology Report 2026: HPC and Advanced Computing (Baseline Edition 2026, Report No. NR-XTECH-HPC-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

ОтчётыВнести вклад

Send evidence or a correction on HPC and Advanced Computing.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

Служба GCRI «Системы и доказательная база»Экспоненциальные технологии
Contribution form · reports.contribution.gcri

Никогда не отправляйте персональные данные, сведения о чувствительной инфраструктуре или то, чем вы не вправе делиться. Материал проходит рассмотрение перед использованием; его отправка не дает авторских или редакционных прав, а спонсорство никогда не покупает выводы.

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace