Skip to content

GCRI · Pîşesaziya pêşketî û robotîk

Otomasyona pîşesaziyê

Industrial automation uses control pergalan, sensors, actuators and software to run machines and processes with less direct human intervention. It raises productivity and consistency, and it creates new dependencies on software, data, networks and skilled maintenance. This page sets out how automation works and fails, how its adoption and reliability are measured, and what evidence serves the plant operators, engineers and policymakers involved.

01Qeyd

Industrial automation on the record.

02The question

Industrial automation: how the risk develops.

Automation and digitally managed production. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Mekanîzma

Control loops run processes

Programmable controllers and distributed control pergalan read sensors and adjust valves, motors and heaters continuously, keeping processes within set limits.

Mekanîzma

Integration adds dependencies

Connecting machines to plant and business systems improves coordination but means a network, software or data fault can stop production across a site.

Mekanîzma

Legacy systems linger

Control systems often run for decades. Obsolete hardware and unsupported software become hard to maintain, secure and replace without long shutdowns.

Mekanîzma

Skills keep systems running

Automated plants need technicians and engineers who can diagnose faults. Skill shortages lengthen downtime when automation fails.

03Erdnîgarî

Connected activity in Germany.

Night lights, population density and land cover over Germany, from NASA GIBS. Each layer carries its own date.

Nexşeya înteraktîf JavaScript hewce dike; lîsteya qatan û çavkanî li jêr in.

Qat 3

Çalakiya girêdayî, ji bo vê rûpelê

Derbarê vê qatê
Delîl
Çavdêrîkirî
Çavkanî
VIIRS Black Marble (VNP46A2) (NASA LAADS DAAC)
Peydakar
NASA LAADS DAAC
Lîsans
Daneyên vekirî yên NASA
Berhema salê
rojane; Tîrêjiya peykî, ji bo ronahiya heyvê û atmosferê hatiye rastkirin
Nûtirîn di dema avakirinê de
2026-10-12
Çareserî
torê nêzîkî 500 m
Nediyarî
Tîrêja şevê ya peykî ji bo roja tê nîşandan; ronahî nîşanek e ji bo karanîna elektrîkê û qutbûnê, ne pîvandina peydakirin an gihîştinê ye.
Bi vê rêyê tê gihîştin
gibs.earthdata.nasa.gov, tenê piştî ku hûn nexşeya zindî destûr bidin
Derbarê vê qatê
Delîl
Texmînkirî
Çavkanî
Gridded Population of the World v4.11 (NASA SEDAC (CIESIN, Zanîngeha Columbia))
Peydakar
NASA SEDAC (CIESIN, Zanîngeha Columbia)
Lîsans
CC BY 4.0
Berhema salê
null; texmîna li ser bingeha serjimariyê, statîk (2020)
Çareserî
torê nêzîkî 1 km
Nediyarî
Texmîna li ser bingeha serjimêriyê ya mirovan ji bo her kîlometre çargoşeyekê di 2020 de, wekî çarçoveya rûbirûbûnê tê nîşandan; ne jimara mirovên ji hêla tu metirsiyê ve bandor bûne ye.
Bi vê rêyê tê gihîştin
gibs.earthdata.nasa.gov, tenê piştî ku hûn nexşeya zindî destûr bidin
Derbarê vê qatê
Delîl
Çavdêrîkirî (ewr valahiyan dihêlin)
Çavkanî
VIIRS Global Flood Product (NASA LANCE)
Peydakar
NASA LANCE
Lîsans
Daneyên vekirî yên NASA
Berhema salê
rojane; Tesbîtkirina bi peykê; ewr valahiyan dihêlin
Nûtirîn di dema avakirinê de
2026-10-14
Çareserî
tora nêzîkî 250 m
Nediyarî
Tesbîtkirina bi peykê; ewr valahiyan dihêlin. Rasterê peyk an modelê wekî pêşkêşker diweşîne. Ewr, valahiyên şeritê û xeletiya wergirtinê valahî û lerzê dihêlin; nirx nîşander in, ne pîvandinên li cihekî ne.
Bi vê rêyê tê gihîştin
gibs.earthdata.nasa.gov, tenê piştî ku hûn nexşeya zindî destûr bidin
Derbarê vê qatê
Delîl
Çavdêrîkirî
Çavkanî
VIIRS NOAA-20 refleksiyona rastkirî (NASA LANCE)
Peydakar
NASA LANCE
Lîsans
Daneyên vekirî yên NASA
Berhema salê
rojane; Wêneya peykî
Nûtirîn di dema avakirinê de
2026-10-14
Çareserî
tora nêzîkî 250 m
Nediyarî
Wêneyê peykî. Rasterê peykî an modelî wekî peydakar diweşîne. Ewr, valahiyên şeritê û çewtiya wergirtinê valahî û xîrecir dihêlin; nirx nîşander in, ne pîvanên li cihekî ne.
Bi vê rêyê tê gihîştin
gibs.earthdata.nasa.gov, tenê piştî ku hûn nexşeya zindî destûr bidin
Derbarê vê qatê
Delîl
Modelkirî (sala herî dawî ya ku GIBS diweşîne)
Çavkanî
Vegirtina rûyê erdê ya MODIS Terra û Aqua (MCD12Q1) (NASA LP DAAC)
Peydakar
NASA LP DAAC
Lîsans
Daneyên vekirî yên NASA
Berhema salê
salane; Dabeşkirina peykî; dawîn sala ku GIBS weşandiye
Nûtirîn di dema avakirinê de
2024-01-01
Çareserî
torê nêzîkî 500 m
Nediyarî
Çîna vegirtina rûyê erdê ya peykî ji bo salê nîşandayî, bi çandiniyê re; dabeşkirinek bi çewtiyên naskirî, ne qeyda cotkaran e.
Bi vê rêyê tê gihîştin
gibs.earthdata.nasa.gov, tenê piştî ku hûn nexşeya zindî destûr bidin
Derbarê vê qatê
Delîl
Çavdêrîkirî (ewr valahiyan dihêlin)
Çavkanî
MODIS Terra EVI (NASA LANCE)
Peydakar
NASA LANCE
Lîsans
Daneyên vekirî yên NASA
Berhema salê
rojane; Nîşandera peykî; ewr valahiyan dihêlin
Nûtirîn di dema avakirinê de
2026-10-13
Çareserî
tora nêzîkî 250 m
Nediyarî
Îndeksa nebatiyê ya peykî ji bo 8 rojên heta dîroka nîşandayî, nîşanderek ji rewşa jîngehê; ne pîvana cureyan an cûrbecûrbûna jîndaran e.
Bi vê rêyê tê gihîştin
gibs.earthdata.nasa.gov, tenê piştî ku hûn nexşeya zindî destûr bidin

Ya herî dawî ya heyî

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © OpenStreetMap contributors (ODbL) · Natural Earth

Wêneyên herî nû yên NASA tê barkirin.

Bikişîne da ku bilivîne. Ctrl an ⌘ û zivirandin, pincandin an bişkojkan ji bo nêzîkkirinê; ji bo nirxên di bin nîşanderê de li ser bisekine; vegerandin vedigere herêmê.

Connected activity, framed on Germany.Berhemên peyk û modelê wekî NASA diweşîne, her yek bi dîroka xwe. Nîşander in, ne nirxandinên tu cihî ne.

Dane: NASA GIBS · ASTER GDEM · Blue Marble · © beşdarên OpenStreetMap · Natural Earth · NASA EONET · NASA/NOAA VIIRS · NASA JPL OPERA DIST-ALERTÇavkanî û lîsans

  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Daneyên vekirî yên NASA
  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Daneyên vekirî yên NASA
  • Ronahiyên şevê yên VIIRS Black Marble, NASA Goddard Space Flight Center; ji aliyê NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC) ve tê belavkirin; wêne bi riya NASA GIBS. Reng ji nexşeya rengan a weşandî dîsa hatine xêzkirin; nirx li cihên ku têne nîşandan di şaneyên şeşgoşe de hatine navînkirin (guherandî). Daneyên vekirî yên NASA
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Bi lîsansa CC BY 4.0. Reng ji nexşeya rengan a hatî weşandin ji nû ve hatine xêzkirin; nirx li cihê nîşandayî di şaneyên şeşgoşe de hatine navgîn kirin (guhertî). doi:10.7927/H49C6VHW. CC BY 4.0
  • Berhemên VIIRS yên hema hema di dema rast de (lehî, germahiya rûyê erdê, vegirtina berfê, refleksiyona rastkirî), NASA LANCE; wêne bi riya NASA GIBS. Reng ji nexşeya rengan a hatî weşandin ji nû ve hatine xêzkirin; nirx li cihê nîşandayî di şaneyên şeşgoşe de hatine navgîn kirin (guhertî). Daneyên vekirî yên NASA
  • Berhemên rûyê erdê yên MODIS (îndeksên nebatiyê, hilberîna seretayî ya giştî, vegirtina rûyê erdê), NASA LP DAAC û LANCE; wêne bi riya NASA GIBS. Reng ji nexşeya rengan a hatî weşandin ji nû ve hatine xêzkirin; nirx li cihê nîşandayî di şaneyên şeşgoşe de hatine navgîn kirin (guhertî). Daneyên vekirî yên NASA
  • ASTER GDEM berhemek METI û NASA ye (ASTER Global Digital Elevation Model V003, NASA LP DAAC); wêne bi riya NASA GIBS. Reng ji nexşeya rengan a weşandî dîsa hatine xêzkirin; nirx li cihên ku têne nîşandan di şaneyên şeşgoşe de hatine navînkirin (guherandî). Bi vî awayî binivîse: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. Daneyên vekirî yên NASA
  • Bi Natural Earth hatiye çêkirin. Daneyên nexşeyê yên vektor û raster ên belaş @ naturalearthdata.com. Giştî
  • © OpenStreetMap contributors (ODbL), bi riya NASA GIBS (peravên, sînor, rê û navên cihan). Reng ji nexşeya rengan a weşandî dîsa hatine xêzkirin; nirx li cihên ku têne nîşandan di şaneyên şeşgoşe de hatine navînkirin (guherandî). ODbL
  • Blue Marble, NASA Earth Observatory; wêne bi riya NASA GIBS. Reng ji nexşeya rengan a weşandî dîsa hatine xêzkirin; nirx li cihên ku têne nîşandan di şaneyên şeşgoşe de hatine navînkirin (guherandî). Daneyên vekirî yên NASA
  • Çarçove li ser globa û nexşeya daxistî: peravên, sînor, rê û navên cihan ji qatên referansê yên NASA GIBS (daneyên OpenStreetMap, ODbL, © OpenStreetMap contributors); wêneya Blue Marble wekî bingeha bijarte; erdnîgariya 3D û xwendina bilindahiyê ji nîşandera rengê bilindahiyê ya ASTER GDEM (çînên 5 m heta 200 m, ji bo xwendinê hatine mezinkirin). Sînor wekî hatine weşandin têne xêzkirin û li ser tu axê helwestekê nîşan nadin.
  • Bûyerên zindî: NASA Earth Observatory Natural Event Tracker (EONET); bûyer nîşanî ne û girêdanên çavkaniya xwe ya orîjînal diparêzin.
  • Observed (EO): NASA/NOAA VIIRS (Suomi NPP). We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS).
  • Observed (EO): NASA JPL OPERA DIST-ALERT (contains modified Copernicus Sentinel data 2026). We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS).
  • NASA GIBS: We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS).
  • Qatên bijarte (5 çavkanî di lîsteya qatan de: zindî, pêşbînî, çavdêrîkirî û çarçove) dema ku têne vekirin krediya pêşkêşkerê xwe li ser nexşeyê û li vir çap dikin; pêşbînî derketina modelê ne û nîşanderên derivekirî texmîn in.

Qat û dîrok

  • Ronahiya şevê, rojane: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 Cotmeh 2026
  • Qebareya nifûsê, 2020: Nifûs: CIESIN, Zanîngeha Columbia, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · sabît
  • Ava lehiyê, berhevoka 3-rojî: VIIRS Global Flood Product, NASA LANCE · 14 Cotmeh 2026
  • Rengê rastîn: VIIRS NOAA-20 refleksiyona rastkirî, NASA LANCE · 13 Cotmeh 2026
  • Cureyê vegirtina rûyê erdê (IGBP), salane: vegirtina rûyê erdê ya MODIS Terra û Aqua (MCD12Q1), NASA LP DAAC · 2024
  • Nîşandera nebatan a pêşxistî, 8 rojên gerok: MODIS Terra EVI, NASA LANCE · 13 Cotmeh 2026

04Li seranserê qadan

Automation changes how industry draws on energy, water and people.

05Çavdêrî bike

Plant operations and safety.

The screen a team would use to follow this subject: its measures, states and decisions. Names are examples and values are illustrative.

Operasyon û ewlehiya kargehê

Industrial automation · Plant 3 · Shift 2

  • OEE, % ya plankirî
    782Çavdêrî
  • Alarmên ewlehiya krîtîk çalak in
    2Hişyarî
  • Şaneya robotê vê nobetê disekine
    2
  • Enerjî ji bo her yekeyekê
    1.6kWhNormal
Alarmê ewlehiya krîtîk hate rawestandinGCRI · Pîşesaziya pêşketî û robotîk

Asteng

qatên parastinê

Rawestana zexta bilindSISQ3Saxlem
Valfa rehetiyê RV-12MekanîkîQ2Saxlem
Herêma tesbîtkirina gazê 4TesbîtkirinQ2Hat derbaskirin
Perdeya ronahiyê ya şaneya robotêParastinQ3Saxlem

Zexta reaktorê

Plant operations and safety: the screen’s structure, terms and states for Industrial automation.Nav û nirxên nimûneyî; sêwiran e, ne qeyd an pergaleke zindî ye.
06Nîşander

What is measured, and how well.

Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.

IndicatorUnitCadenceSource typeNîşan
Overall equipment effectivenesspercentmonthlyPlant performance recordsÇAVDÊRÎKIRÎ
Unplanned downtimehours per periodmonthlyMaintenance management pergalanÇAVDÊRÎKIRÎ
Control systems past vendor supportpercent of installed baseper assessmentAsset inventoriesDECLARED
Mean time to repair automation faultshoursmonthlyMaintenance recordsÇAVDÊRÎKIRÎ
Firms using advanced automationpercent of manufacturing firmsper surveyBusiness technology surveysREPORTED
Automation technician vacanciescountannualLabour market statisticsREPORTED
07Simulatorê cêwî û kaskade

Model industrial automation as a system. Run the cascade.

Assembled from the Nexus Standards area profile Pîşesazî û çêkerî: the hazards it names, the pergalan and sectors that carry the loss, the controls that dampen it and the data that observe it. Choose the components, pick an initiating hazard and step through the cascade. The Map view places the run on an example geography with open data. Every coupling weight is a stated assumption you can change. A teaching model, not a forecast, an assessment or a certification. To model a place of your own choosing, open the full System Builder.

Metirsî

  • Natech event
  • Dam failure
  • River flood (set off downstream)
  • Flash flood (set off downstream)
  • Koçberiya girseyî (li aliyê jêr çê dibe)
  • Chemical spill or leak (set off downstream)
  • Emergency-response overload (set off downstream)
  • Qutbûna berfireh a elektrîkê (li aliyê jêr çê dibe)
  • Water supply shortfall (set off downstream)
  • Toxic gas release (set off downstream)
  • Industrial fire (set off downstream)

Kontrol

  • NS-0 Destûr û prensîb
  • NS-9 UNI yên çarçoveyî (belavkirin, mînak, mînakên bernameyê)
  • NS-11 Piştrastkirin û çavdêrî (delîl, erêkirin, çavdêriya lihevhatina zero-trust)
  • NS-12 Software, model and AI/ML artefacts (supply chain, model cards, dataset sheets)
  • NRS-H60 Malbata metirsiyê: Qutbûna zincîra dabînkirinê û herikînan (NHS-1 sys.supply-chain)
  • NRS-H50 Malbata metirsiyê: Qezayên pîşesazî û yên pêvajoyê (NHS-1 infra.industrial)
  • NRS-H109 Malbata metirsiyê: Têkçûnên teknolojiyên veguherîna enerjiyê (NHS-1 tech.energy-transition)
  • NRS-X10 Ewlehiya kîmyewî, pîşesazî, nukleerî û radyolojîk
  • NRS-H54 Malbata metirsiyê: Qutbûna îşaret û platformê (NHS-1 cyber.platform)
  • NRS-K14 Profîla pakêta domainê: Hilberîn û pîşesazî (DOMAIN-014)

Çavdêrî

  • eMARS Major Accident Reporting System (listed for reference)
  • World Development Indicators (listed for reference)
  • ILOSTAT (listed for reference)
  • Manufacturing value added as a proportion of GDP and per capita
  • CO2 emission per unit of value added
  • Manufacturing, value added (% of GDP)
  • Direct economic loss to all other damaged or destroyed productive assets attributed to disasters

Erdnîgariya mînakê

  • The Strait of Malacca: 227 hexagonal cells
  • Ronahiyên şevê îşev, qutbûn (VIIRS Day/Night Band), NASA GIBS
  • Ava rûyê erdê di nav ewr re, 30 m (radara OPERA DSWx-S1), NASA GIBS
  • Rêjeya barînê, nîv saeta dawî (IMERG), NASA GIBS
  • Surface soil moisture (SMAP), NASA GIBS
08Çavkanî

Where the evidence comes from.

Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.

ÇavkanîWhat it givesLicence class
Eurostat ICT usage in enterprises and advanced technology modulesAdoption of automation, robotics and data technologiesOpen, Eurostat reuse policy
OECD studies on the diffusion of digital and automation technologiesCross-country adoption evidencePublic, OECD terms
US Census Bureau Annual Business Survey technology modulesFirm adoption of automation and AIPublic domain, US government
ISA and IEC standards for automation (ISA-95, IEC 61131)Architecture and programming standardsLicensed standards, purchase required
Industry association surveys on downtime and maintenanceReliability practicePublic summaries, terms to check
09Rêbaz û delîl

How industrial automation is modelled, measured and tested.

Model, texmînên wî, daneyên wî û nediyariya wî, bi şeweyê ku zanyar an endezyar kontrol bike. Avahî rêbazên weşandî dişopînin. Nirxên hatine xêzkirin nimûneyî ne, ne encam in.

Modela pergalê

The couplings between the systems in industrial automation: signs of influence, a reinforcing and a balancing loop, and cross-links where stress jumps.

++−++PîşesazîKarBazirganîCivakAborîR xurtkerB hevseng
Causal loop diagram from the page’s systems; signs show the direction of influence. Illustrative structure for a system dynamics or network model, not estimated couplings.
Prensîbên rêber ên FAIR · GO FAIR û FORCE11W3C PROV · World Wide Web ConsortiumRêwerzên ji bo birêvebirina hevgirtî ya nediyarîyan · IPCCCEOS Analysis Ready Data · Committee on Earth Observation Satellites
10Biryar

Who decides, and what the evidence serves.

Advanced Industry and Robotics prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

Kî biryarê dideThe questionEvidence this page serves
Plant operators and engineering managersKîjan pergalan to modernise and how to plan downtimeObsolescence reviews; reliability data
Industry ministriesHow to support automation in smaller firmsAdoption profiles
Training bodiesWhich technician skills to trainSkills gap analyses

Outputs this topic produces

  • Automation reliability and obsolescence reviews
  • Adoption profiles by sector and firm size
  • Maintenance and skills gap analyses
  • Evidence notes for industrial policy
11Core questions

What experts ask.

  1. 01

    What does automation change about risk?

    Which hazards it removes, which it shifts and which it creates.

  2. 02

    How do automated systems fail?

    Sensor faults, software errors, unexpected interactions and conditions outside the design envelope.

  3. 03

    What is the human role?

    How operators supervise, intervene and keep the skills to take over.

  4. 04

    How resilient is a highly automated plant?

    Whether it can degrade gracefully or continue safely when pergalan fail.

12Mechanisms

What drives the risk.

Automation holds processes within limits more consistently than people can, and removes workers from repetitive and hazardous tasks. Safety instrumented pergalan shut processes down automatically when conditions become dangerous.

The ironies of automation, first described in human factors research, remain relevant: the more reliable automation becomes, the less practice operators have, yet they are expected to take over in the rare, difficult situations automation cannot handle. Alarm floods during upsets can overwhelm operators.

Complexity creates hidden interactions. Software updates, integration of new systems and data dependencies can change behaviour in ways that testing did not reveal. Common-cause failures, where one fault disables several protective layers, are a particular concern.

Connectivity extends the system boundary. Remote operation, vendor access and cloud analytics improve performance but bring external networks inside the plant, linking automation to cyber resilience.

13Methods and limits

How evidence is gathered, and where it stops.

Method or dataWhat it showsIts limit
Hazard and operability studiesDeviations and their consequencesDepend on team expertise and scope
Reliability analysisFailure rates of components and functionsData for new technologies is sparse
Simulation and digital twinsSystem behaviour under scenariosA model is only as good as its assumptions
Incident databasesPatterns in automation-related eventsUnder-reporting and inconsistent categories
14Rêbaz

How it is studied, and what the methods cannot say.

15Where this page’s references

Where this page’s references lead.

Sazî û belgeyên ku ev rûpel li hember wan tê xwendin. Rewş û çap diguherin; her girêdan diçe ba saziya derxistinê.

16Pirs

Pirs û bersiv.

What is industrial automation?
The use of control systems, sensors and software to operate machines and processes with reduced human intervention, from single machines to whole plants.
What is overall equipment effectiveness?
A measure combining availability, performance and quality to show how much of planned production time is truly productive.
Why do old control systems matter?
Because unsupported hardware and software are harder to repair and secure, and replacing them can require long, costly shutdowns.
Does more automation always mean more safety?
Not always. It removes many hazards but can create new ones, especially when operators lose practice or systems interact unexpectedly.
Does the platform assess automation vendors?
No. It publishes research on automation in general and endorses no product or vendor.
What is a safety instrumented system?
An independent control layer that brings a process to a safe state when it detects dangerous conditions.
rêzeya Pergalên StratejîkTevkarî bike

Ji vê rûpelê delîl bidin.

rêzeya Pergalên Stratejîk is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

GCRIPîşesaziya pêşketî û robotîkTeknolojiya eksponensiyelXetere û berxwedana sektorî ya cîhanî
Pîşesaziya pêşketî û robotîk

Rêbazek, danehevek an pirsek bîne.

Agahî û pirs îro vekirî ne. Pirsek referansekê distîne û gava piştî wê dide nasîn; serlêdan, drav, veqetandina hesabkirinê û tomarkirin tenê dema ku tîm, mercên wê û kapasîteya vekolînê hebin vedibin.