Resilience investment portfolios
Combinations of hardening, redundancy and backup projects are selected to reduce expected service loss across scenarios within a budget.
GCRI · Critical Infrastructure
Optimisation and operations research choose the best use of limited budgets, crews and capacity. In this field they prioritise investments in resilience, schedule restoration and plan network expansion under uncertainty.
Optimisation and operations research develop mathematical methods for allocating resources and making decisions under constraints. They support planning and logistics in complex, interconnected systems. In critical infrastructure and cities and built environment, optimisation supports prepositioning of supplies, network investment and recovery sequencing. Robust formulations help choose options that perform acceptably across many scenarios. The canonical description is on the STEM Commons.
Combinations of hardening, redundancy and backup projects are selected to reduce expected service loss across scenarios within a budget.
Repair crews and sequences are optimised to restore critical services fastest given dependencies and access.
Stochastic and robust optimisation choose network expansions that perform acceptably across many demand and hazard scenarios, not only the expected one.
Night lights, population density and flood water over Western Europe, from NASA GIBS. Each layer carries its own date.
Ramani shirikishi inahitaji JavaScript. Orodha ya tabaka na vyanzo imetolewa hapa chini.
Tabaka 3
Infrastructure exposure, for this page
Kibodi, ramani ikiwa imelengwa
Shikilia Ctrl au ⌘ na usogeze ili kukuza
Ya karibuni zaidi inayopatikana
NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © wachangiaji wa OpenStreetMap (ODbL) · Natural Earth
Inapakia picha za hivi karibuni za NASA.
Buruta ili kusogeza. Ctrl au ⌘ na usogeze, bana au tumia vitufe ili kukuza; elea juu ili kuona thamani zilizo chini ya kiashiria; weka upya hurudisha kwenye eneo.
Infrastructure exposure, framed on Western Europe.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.
Tabaka na tarehe
Datasets and records used by optimisation and operations research on this platform, with the role each plays and the label its values carry. Sources are listed in the source register.
| Data | Jukumu | Label |
|---|---|---|
| Project costs | Options | IMEKADIRIWA |
| Hazard and failure scenarios | Kutokuwa na uhakika | IMEUNDWA KIMUUNDO |
| Network models | Constraints | Published statistics |
| Crew and spares inventories | Rasilimali | DECLARED |
The screen a team would use to follow this method: its measures, states and decisions. Names are examples and values are illustrative.
Critical infrastructure · Optimisation for infrastructure · Run R-3239
| Capacity | 0 | 21 | Binding |
| Budget | 0 | 2.8 | Binding |
| Kiwango cha huduma | 1 | 0 | Slack |
Solutions are checked for feasibility, tested through simulation and compared with historical decisions. Sensitivity analysis examines how results change with parameters.
| Check | How it is done |
|---|---|
| Scenario coverage | Solutions are tested on scenarios not used for optimisation |
| Constraint validation | Constraints are confirmed with operators |
| Solution stability | Small changes in inputs are tested for large changes in the chosen portfolio |
Optimal solutions can be fragile when assumptions are wrong. Objectives may omit values that are hard to quantify.
A hazard footprint takes out co-located assets in every layer; fragmentation, dependency between layers and overload of the survivors then spread the failure. The 3D view separates the layers by depth. Teaching model with stated illustrative values, not a prediction. The map on this page shows Western Europe; the model itself is not tied to a place.
Controls
Readouts
| Step | Transport working (%) | Power working (%) | Telecoms working (%) |
|---|---|---|---|
| 0 | 100 | 83 | 83 |
| 1 | 94 | 83 | 83 |
| 2 | 78 | 83 | 83 |
| 3 | 56 | 83 | 78 |
| 4 | 39 | 78 | 67 |
| 5 | 39 | 56 | 61 |
| 6 | 39 | 33 | 61 |
The model runs on the teaching values set by the controls. To calibrate it for a place, read it against these admitted layers and series, which this page’s map can draw:
Across the six pillars, led by Nexus Consortium
Assembled from the Nexus Standards area profile Critical infrastructure and critical entities: the hazards it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Choose the components, pick an initiating hazard and step through the cascade. The Map view places the run on an example geography with open data. Every coupling weight is a stated assumption you can change. A teaching model, not a forecast, an assessment or a certification. To model a place of your own choosing, open the full System Builder.
Majanga
Systems and couplings
Controls
NS-0 Katiba na kanuniNS-3 UNI za rekodi za hatari (sarufi, ulinganishi wa urithi, mamlaka ya ugawaji)NS-9 UNI za kimuktadha (utekelezaji, matukio, matukio ya programu)NS-10 Sera na vifungu (wajibu unaosomeka na mashine: ufafanuzi, ufungamanishaji, tathmini na utekelezaji)NS-11 Uthibitishaji na ufuatiliaji (ushahidi, uthibitisho, uchunguzi wa ulinganifu usio na imani)NRS-H61 Familia ya majanga: Kushindwa kwa mfululizo (NHS-1 sys.cascade)NRS-H94 Familia ya majanga: Matukio ya kimtandao ya kimfumo (NHS-1 cyber.systemic-cyber)NRS-H107 Familia ya majanga: Mkusanyiko na ufanano wa miundombinu ya kidijitali (NHS-1 tech.digital-concentration)NRS-K31 Wasifu wa kifurushi cha nyanja: Ustahimilivu wa kitaifa wa kimtandao (DOMAIN-031)NRS-K36 Wasifu wa kifurushi cha nyanja: Miundombinu muhimu (DOMAIN-036)NRS-K48 Wasifu wa kifurushi cha nyanja: Ustahimilivu wa mfumo wa fedha (DOMAIN-048)Observation
Example geography
Systems Science and Modelling stewards optimisation and operations research for the Consortium and reviews how it is applied across platforms.
The model, its assumptions, its data and its uncertainty, in the form a scientist or engineer would check. Structures follow published methods. The values drawn are illustrative, not findings.
The couplings between the systems in optimisation for infrastructure: signs of influence, a reinforcing and a balancing loop, and cross-links where stress jumps.
Reports ni chapisho la kila robo mwaka la Muungano. Unachojua kuhusu somo hili kinaweza kuwa ushahidi, kisa au sahihisho katika toleo lijalo, kikitajwa kwa jina lako na kuchapishwa chini ya CC BY 4.0 pale ambapo ni kazi yako mwenyewe.
Usitume kamwe data binafsi, maelezo nyeti ya miundombinu wala chochote ambacho huna haki ya kukishiriki. Mchango hupitiwa kabla ya kutumika; kuutuma hakutoi haki za uandishi wala za uhariri, na udhamini haununui matokeo.
Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.
Maps, data and figures on this site are shown for context and general information. They are not advice, forecasts or warnings; the limits of the information are set out in the Disclaimers and Data Notices.
Tovuti hii inatumia vidakuzi vya lazima kabisa pekee ili kufanya kazi na kukumbuka chaguo zako za faragha. Hakuna kinachopakiwa kutoka kampuni nyingine, na kamwe hatuuzi wala kushiriki taarifa zako binafsi.
Tovuti hii inatumia vidakuzi vya lazima kabisa pekee ili kufanya kazi na kukumbuka chaguo zako za faragha. Hakuna kinachopakiwa kutoka kampuni nyingine, na kamwe hatuuzi wala kushiriki taarifa zako binafsi. Hatuendeshi matangazo. Unaweza kukagua chaguo zako wakati wowote kupitia Chaguo za faragha chini ya kila ukurasa.