Resilience investment portfolios
Combinations of hardening, redundancy and backup projects are selected to reduce expected service loss across scenarios within a budget.
GCRI · Critical Infrastructure
Optimisation and operations research choose the best use of limited budgets, crews and capacity. In this field they prioritise investments in resilience, schedule restoration and plan network expansion under uncertainty.
Optimisation and operations research develop mathematical methods for allocating resources and making decisions under constraints. They support planning and logistics in complex, interconnected systems. In critical infrastructure and cities and built environment, optimisation supports prepositioning of supplies, network investment and recovery sequencing. Robust formulations help choose options that perform acceptably across many scenarios. The canonical description is on the STEM Commons.
Combinations of hardening, redundancy and backup projects are selected to reduce expected service loss across scenarios within a budget.
Repair crews and sequences are optimised to restore critical services fastest given dependencies and access.
Stochastic and robust optimisation choose network expansions that perform acceptably across many demand and hazard scenarios, not only the expected one.
Night lights, population density and flood water over Western Europe, from NASA GIBS. Each layer carries its own date.
Imephu esebenzisanayo idinga i-JavaScript; uhlu lwezendlalelo nemithombo luphansi.
Izendlalelo 3
Infrastructure exposure, for this page
Ikhibhodi, kugxilwe emephini
Bamba u-Ctrl noma u-⌘ bese uskrola ukuze usondeze
Okutholakala kwakamuva
NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © abanikele ku-OpenStreetMap (ODbL) · Natural Earth
Iyalayisha izithombe zakamuva ze-NASA.
Donsa ukuze unyakazise. U-Ctrl noma u-⌘ bese uskrola, ucindezele ngeminwe emibili noma izinkinobho ukuze usondeze; beka isikhombi ukuze ubone amanani aphansi kwaso; ukusetha kabusha kubuyisela esifundeni.
Infrastructure exposure, framed on Western Europe.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.
Izendlalelo nezinsuku
Datasets and records used by optimisation and operations research on this platform, with the role each plays and the label its values carry. Sources are listed in the source register.
| Idatha | Indima | Label |
|---|---|---|
| Project costs | Options | ESTIMATED |
| Hazard and failure scenarios | Ukungaqiniseki | MODELLED |
| Network models | Constraints | Published statistics |
| Crew and spares inventories | Izinsiza | DECLARED |
The screen a team would use to follow this method: its measures, states and decisions. Names are examples and values are illustrative.
Critical infrastructure · Optimisation for infrastructure · Run R-3239
| Capacity | 0 | 21 | Binding |
| Budget | 0 | 2.8 | Binding |
| Izinga lenkonzo | 1 | 0 | Slack |
Solutions are checked for feasibility, tested through simulation and compared with historical decisions. Sensitivity analysis examines how results change with parameters.
| Check | How it is done |
|---|---|
| Scenario coverage | Solutions are tested on scenarios not used for optimisation |
| Constraint validation | Constraints are confirmed with operators |
| Solution stability | Small changes in inputs are tested for large changes in the chosen portfolio |
Optimal solutions can be fragile when assumptions are wrong. Objectives may omit values that are hard to quantify.
A hazard footprint takes out co-located assets in every layer; fragmentation, dependency between layers and overload of the survivors then spread the failure. The 3D view separates the layers by depth. Teaching model with stated illustrative values, not a prediction. The map on this page shows Western Europe; the model itself is not tied to a place.
Controls
Readouts
| Step | Transport working (%) | Power working (%) | Telecoms working (%) |
|---|---|---|---|
| 0 | 100 | 83 | 83 |
| 1 | 94 | 83 | 83 |
| 2 | 78 | 83 | 83 |
| 3 | 56 | 83 | 78 |
| 4 | 39 | 78 | 67 |
| 5 | 39 | 56 | 61 |
| 6 | 39 | 33 | 61 |
The model runs on the teaching values set by the controls. To calibrate it for a place, read it against these admitted layers and series, which this page’s map can draw:
Across the six pillars, led by Nexus Consortium
Assembled from the Nexus Standards area profile Critical infrastructure and critical entities: the hazards it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Choose the components, pick an initiating hazard and step through the cascade. The Map view places the run on an example geography with open data. Every coupling weight is a stated assumption you can change. A teaching model, not a forecast, an assessment or a certification. To model a place of your own choosing, open the full System Builder.
Izingozi
Systems and couplings
Controls
NS-0 Umthethosisekelo nezimisoNS-3 Ama-UNI amarekhodi obungozi (uhlelo lolimi, ukuqhathanisa nezinhlelo ezindala, igunya lokwabela)NS-9 Ama-UNI omongo (ukufakwa, izibonelo, izibonelo zohlelo)NS-10 Policies and clauses (machine-readable obligations: definition, binding, evaluation and enforcement)NS-11 Ukuqinisekisa nokuqapha (ubufakazi, izifakazelo, ukuqapha ukuhambisana ngaphandle kokwethembana)NRS-H61 Umndeni wezingozi: Ukwehluleka okulandelanayo (NHS-1 sys.cascade)NRS-H94 Umndeni wezingozi: Izehlakalo ze-inthanethi zesistimu (NHS-1 cyber.systemic-cyber)NRS-H107 Umndeni wezingozi: Ukugxila nokufana kwengqalasizinda yedijithali (NHS-1 tech.digital-concentration)NRS-K31 Iphrofayela yephakethe lomkhakha: Ukuqina kwe-inthanethi kazwelonke (DOMAIN-031)NRS-K36 Iphrofayela yephakethe lomkhakha: Ingqalasizinda ebalulekile (DOMAIN-036)NRS-K48 Iphrofayela yephakethe lomkhakha: Ukuqina kwesistimu yezezimali (DOMAIN-048)Observation
Example geography
Systems Science and Modelling stewards optimisation and operations research for the Consortium and reviews how it is applied across platforms.
The model, its assumptions, its data and its uncertainty, in the form a scientist or engineer would check. Structures follow published methods. The values drawn are illustrative, not findings.
The couplings between the systems in optimisation for infrastructure: signs of influence, a reinforcing and a balancing loop, and cross-links where stress jumps.
Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.
Ungalokothi uthumele idatha yomuntu siqu, imininingwane ebucayi yengqalasizinda noma noma yini ongenalo ilungelo lokuyabelana ngayo. Umnikelo ubuyekezwa ngaphambi kokusetshenziswa; ukuwuthumela akunikezi ubuqambi noma amalungelo okuhlela, futhi ukusekela akuthengi muphumela.
Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.
Maps, data and figures on this site are shown for context and general information. They are not advice, forecasts or warnings; the limits of the information are set out in the Disclaimers and Data Notices.
This site uses only strictly necessary cookies to work and to remember your privacy choices. Nothing loads from other companies, and we never sell or share your personal information.
This site uses only strictly necessary cookies to work and to remember your privacy choices. Nothing loads from other companies, and we never sell or share your personal information. We run no advertising. You can review your choices at any time through Privacy choices at the foot of every page.