GCRI · Tentang GCRI
Dewan pengurus dan tata kelola
The Global Centre for Risk and Innovation (GCRI) is one pillar institution with two organisations, GCRI Canada and GCRI US. Each has its own legal identity, governing body and instruments. Neither governs the other. Here: how governance divides between them, which decisions belong to GCRI and what is published about directors. Part of About GCRI.
Board and governance on the record.
- 01InstitutionThe Global Centre for Risk and Innovation (GCRI)
- 02EntitasDua organisasi, masing-masing diatur secara mandiri
- 03Decision rightsWho decides what within the Nexus Consortium
- 04PublicationWhat is published about governance
- 05BoundariesWhat governance does not confer
Dua organisasi, masing-masing memiliki tata kelolanya sendiri.
GCRI Canada
A Canadian not-for-profit organisation with its registered office in Ontario, governed by its own board under its constating instruments. GCRI Canada keeps its corporate and accounting records as Canadian not-for-profit law requires. See GCRI Canada.
GCRI US
The United States institution of GCRI, a separate organisation with its own legal identity, governance and responsibilities. See GCRI US.
How the two cooperate, and which shared services run between them, is set out on Canada and U.S. cooperation.
Who decides what within the Nexus Consortium.
| Keputusan | Akuntabel | Artinya |
|---|---|---|
| Sekretariat konsorsium terpadu | GCRI Canada, dalam mandat utama yang telah disetujui | One coordinated programme with separate institutional responsibilities. |
| Bukti, metode, dan bantuan teknis | Pengelolaan teknis dan bukti GCRI | Pertanyaan nasional menjadi pekerjaan yang dapat diuji dan kapabilitas yang dapat digunakan kembali. |
| Kepemimpinan, penyelenggaraan pertemuan, dan tata kelola Universe | Global Risks Forum (GRF), dalam instrumennya | Year-round participation culminates in structured annual work. |
| Kesiapan keuangan, asuransi, dan pembangunan | The Global Risks Alliance (GRA) | Risk evidence becomes diligence material, not an approval or a transaction. |
| Penerimaan ilmiah dan editorial | Penelaah yang berkualifikasi dengan konflik kepentingan yang dikelola, dan penerbit | Institutional influence cannot decide a scientific conclusion. |
| Keputusan otoritas dan pelaksanaan | Pemerintah, operator, atau lembaga berizin yang terkait | Nexus prepares evidence and supports lawful continuation. |
Bagaimana proses berjalan.
Process explorer · Process
Siapa memutuskan apa
16 steps·5 stages·4 gates
Proses
Siapa memutuskan apa
Every decision has one accountable decider, on the record; the programme informs, and the competent authority decides outside it.
01 Principle
- 01Setiap keputusan memiliki satu pengambil keputusan yang bertanggung jawabStandarSetiap keputusan dalam program memiliki satu pengambil keputusan yang bertanggung jawab, dan pengambil keputusan itu tercatat secara resmi.
02 Who answers for what
- 03Integrated consortium secretariatActor · GCRI CanadaGCRI Canada, within the approved lead mandate, holds the integrated secretariat.
- 04Evidence, methods and technical assistanceActor · GCRIGCRI’s technical and evidence stewardship turns problems into testable questions and reusable capability.
- 05Leadership, convening and Universe governanceActor · The Global Risks ForumGRF, within its instruments, holds leadership, convening and Universe governance.
- 06Finance, insurance and development readinessActor · The Global Risks AllianceGRA answers for readiness. Risk evidence becomes useful diligence material, not an approval or a transaction.
- 07National agenda and local participationActor · Competent National Nexus structuresCompetent National Nexus structures hold the national agenda and local participation. National ownership precedes federation.
- 08Scientific and editorial acceptanceActor · Qualified, conflict-managed reviewers and the publisherQualified, conflict-managed reviewers and the publisher decide scientific and editorial acceptance.
- 09Each institution states its own boundaryStandardGCRI, GRF and GRA each work within stated limits. Readiness is not approval.
03 Gerbang tahun program
- 12G0 · Annual programme authorisedGate · The Global Risks ForumGRF holds four kinds of decision: the mandate (G0), admission (G1), gate decisions and publication (G6). G0 authorises the annual programme.
- 14G1 · Misi diterimaGerbang · The Global Risks ForumGRF menerima misi dengan alasan yang dicatat. GRF tidak dapat menerima misi tanpa pemilik yang bertanggung jawab.
- 15Gate decisions G2 to G5 and G7Gate · The Global Risks ForumEvery gate records a decision, and a gate not passed stops the work it governs. A cycle gate is a programme decision.
- 16G6 · Publikasi diotorisasiGerbang · The Global Risks ForumGRF mengotorisasi publikasi hasil yang telah lolos tinjauan ilmiah dan editorial. GRF tidak dapat menerbitkan data pribadi.
04 Keputusan dan pengaduan terkait standar
- 10Standards decision rights (proposed)StandardCouncils decide, working groups draft, and everything else is open. The model is proposed.
- 11Complaints and appealsStepSomeone not responsible for the contested decision reviews a programme or decision complaint.
- 13Five invariants hold across the matrixStandardEach decision has exactly one decider. Global and national standards bodies never decide for each other.
05 Outside the programme
- 02Competent authorityActor · The competent authorityThe competent authority stands outside the programme. The authority decides and the programme informs.
Decision rights · Governance in operation · The Global Risks ForumDesigned process, not a record of any case: no cycle has run and every programme is at service level R0, information and enquiries. A gate is a programme decision, never a public-authority approval, a certification or a deployment authorisation. The competent authority decides.
Apa yang dipublikasikan tentang tata kelola.
- Directors and accountable officers are named on Leadership only when a current authorisation and biography are on record.
- Keputusan yang didelegasikan diterbitkan sebagai catatan keputusan beserta tanggal, pemegang, dan cakupannya.
- Kepentingan dan konflik yang relevan dengan suatu keputusan dicatat dan, bila memengaruhi pekerjaan publik, diungkapkan.
- Instrumen yang mengatur program ini disebutkan di sini saat telah diadopsi; instrumen berstatus draf tidak disajikan sebagai instrumen yang telah diadopsi.
What governance does not confer.
Merek bersama tidak menjadikan GCRI induk hukum, bendahara, pemberi kerja, agen, atau regulator bagi peserta mana pun. GCRI tidak mengatur, menyertifikasi, melisensikan, atau menyetujui, dan statusnya di badan-badan internasional tidak memberikan kewenangan.
Tanya jawab.
Does GCRI Canada control GCRI US?
Mengapa para direktur tidak dicantumkan di sini?
Siapa yang mengambil keputusan tentang program nasional?
How do I raise a governance concern?
Bawa metode, dataset, atau pertanyaan.
Informasi dan pertanyaan sudah terbuka hari ini. Sebuah pertanyaan menerima nomor referensi dan menyebutkan langkah berikutnya; lamaran, pembayaran, alokasi komputasi, dan pendaftaran hanya dibuka ketika tim, ketentuan, dan kapasitas tinjauannya tersedia.
Dokumen hukum.
Peta, data, dan gambar di situs ini ditampilkan untuk konteks dan informasi umum. Semua itu bukan nasihat, prakiraan, atau peringatan; batasan informasinya dijelaskan dalam Penafian dan Pemberitahuan Data.