Putuskan

The decision belongs to the competent authority or institution, under its own rules. GCRI’s part ends at handing over evidence, options and their limits in a form the decision-holder can use and others can audit.

01Enam pilar

Langkah ini berada di luar program.

The decision is taken by the competent authority under its own rules; the six pillars, led by the Nexus Consortium, supply evidence and options and do not decide.

Pilih pilar · arahkan kursor ke garis18 / 18 serah terima

Rute

Seluruh program

Every pillar hands its work to another; together they close the year’s feedback loops.

L · F · U · S · R · A

Pilar
6 dari 6
Serah terima
18 dari 18
Putaran
17 ditutup

Serah terima yang berjalan

  • F01Universe → Foundry · Admitted mission becomes a cycle project with a decision caseReadiness preparation
  • F02Foundry → Universe · Core Build Report and go or no-go evidenceControlled build
  • F03Foundry → Reports · Sealed observations and indicator series behind a profileCloseout
  • F04Universe → Reports · After-action and scenario findings for chapters 10 and 13After-action review

dan 14 lainnya

F01 hingga F14 adalah serah terima yang tercatat dalam tahun program, masing-masing dengan artefak yang berpindah dan fasenya; R1, R2, R3, dan R4 membawa pekerjaan mengelilingi cincin. Sebuah lingkaran dihitung jika setiap pilar di dalamnya dipilih. Setiap pilar dipimpin oleh Nexus Consortium.
  1. LaboratoriumTempat pertanyaan menjadi eksperimen dan prototipe: metode, data, dan alat baru dicoba secara terbuka, dengan batasannya tercatat, sebelum Foundry membangunnya, di bawah Nexus Consortium.Labs di GCRI: Labs
  2. FoundryWhere methods, data and models become reproducible builds, each run with its inputs, version and limits on record.Foundry at GCRI: Foundry
  3. UniverseWhere a build is tested under controlled conditions with independent evaluators, so a method’s skill is measured, not assumed.Universe at GCRI: Universe technical officeuniverse.nexus
  4. Nexus StandardsWhere methods, identifiers and data schemas are codified in the open and corrected when a test finds a fault.Nexus Standards
  5. LaporanTempat temuan diterbitkan dengan metode, ketidakpastian, dan kelas buktinya, dan dikoreksi sebagai versi baru.Reports di GCRI: TerbitkanLaporan
  6. Akademi RisikoTempat metode dan sistem diajarkan pada data dan tempat nyata, dengan mengerjakan kasusnya, di Risk Academy.Akademi Risiko
02Serah terima

Apa yang diterima pemegang keputusan.

ButirMengapa ini penting
The question as framed, with its criteriaSo the decision-holder can see whether it was the right question
Options with consequences and uncertaintyAnalisis keputusan membandingkan opsi, tidak memilih di antaranya
Evidence labels and limitsAgar hasil yang dimodelkan tidak dijadikan dasar tindakan seolah-olah merupakan data teramati
What would change the answerTriggers for revisiting the decision as monitoring data arrive

Under the Sendai Framework, disaster risk governance is a national responsibility shared with local government and other stakeholders. Evidence from the cycle feeds that governance; it does not substitute for it.

03Ruang kerja

The workspace for the decide step.

Pekan tindakan

Universe · the Global Centre for Risk and Innovation (GCRI) · Minggu 27 · Contoh antarmuka, bukan catatan resmi

Week plannedGCRI · GCRI

Jalur

sesi terkendali

MonTueWedThuFri0910111213141516Programme formation clinicAnnual mission planningEvidence label auditNational Model reviewStand-down and hot washObserver briefing

Catatan pengamat

  1. O-1Jalur eskalasi antarsel tidak jelasJalur 14 j
  2. O-2Serah terima data berjalan sesuai rancanganJalur 21 j
  3. O-3Pesan publik dirancang sebelum verifikasiJalur 34 j
Pekan aksi.Antarmuka ilustratif; bukan data langsung.

GCRI · Action week. Action week: example names and illustrative values, not a record.

04Keputusan yang tercatat

NXS-RLS records who decided what.

Where a competent body chooses to record a decision taken on cycle evidence, the record names the body, the mandate, the date and the evidence version it relied on. That record is what makes the renew step possible: when the evidence is corrected, the decisions that relied on it can be found. Authenticated is not authorised, and an analyst’s access to a build gives no decision right.

05Proses

Bagaimana proses berjalan.

Process explorer · Process

Putuskan: Dari deliberasi ke keputusan

9 steps4 stages

Proses

Putuskan: Dari deliberasi ke keputusan

Pertanyaan dialog memperoleh pemilik yang akuntabel, bukti, dan pembacaan keuangan; deliberasi dicatat beserta perbedaan pendapat, dan pengambil keputusan yang akuntabel yang memutuskan.

  1. 01 Pertanyaan dan bukti

    1. 01Rumuskan pertanyaan dengan pemilik yang bertanggung jawabCatatan · The Global Risks ForumGRF menyusun pertanyaan dialog, dengan berkonsultasi dengan GCRI dan Global Risks Alliance (GRA) apabila menyangkut keuangan. Catatan pertanyaan menyebutkan penanggung jawab yang akuntabel.
    2. 02Ringkasan buktiCatatan · GCRIGCRI menyusun ringkasan bukti dengan label, sumber, dan batasan. GRF dan GRA diberi tahu.
    3. 03Pembacaan keuangan, bila pembiayaan terlibatCatatan · The Global Risks AllianceJika suatu catatan memiliki implikasi keuangan, GRA menyediakan pembacaan keuangan berupa catatan opsi. Hal itu tidak pernah merupakan transaksi atau persetujuan.
  2. 02 Dialog

    1. 04Siapa yang terlibat, dan dengan kewenangan apaKomponenDesain forum menanyakan siapa audiensnya, siapa yang harus berpartisipasi, siapa yang tidak, dan otoritas apa, jika ada, yang dimiliki para pembicara.
    2. 05Dialogue and deliberationExercise · The Global Risks Forum; councilsCouncils decide by consensus on the record, with dissent recorded. Evidence producers, deliberators and funders stay distinguishable.
    3. 06Opsi dan rekomendasiCatatan · Pemilik keputusanRuang Keputusan menyimpan kasus keputusan, opsi, kriteria, proses penilaian, dan rekomendasi sebagai catatan.
  3. 03 Catatan

    1. 07Deliberasi dicatat sebelum temuan dilanjutkanCatatan · DewanDeliberasi Dewan atas temuan latihan dicatat sebelum temuan diteruskan ke Reports. Risalah yang disetujui dipublikasikan, beserta perbedaan pendapat.
  4. 04 Keputusan

    1. 08Pengambil keputusan yang bertanggung jawab memutuskanKeputusan · Pengambil keputusan yang akuntabelDewan memberikan rekomendasi dalam cakupan yang dipublikasikan dan tidak mengambil keputusan otoritas publik. Setiap keputusan memiliki satu pengambil keputusan yang bertanggung jawab.
    2. 09Jalur tindak lanjut dan catatanCatatanSetiap forum memiliki jalur tindak lanjut. Catatan menyatakan apa yang disimpulkan, jika ada, dan apa yang masih belum terselesaikan.

Councils · The Global Risks Forum · The global levelDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. No council is constituted.

08Sumber

Where this page’s references lead.

Badan dan dokumen yang menjadi acuan halaman ini. Status dan edisi berubah; setiap tautan menuju badan penerbitnya.

Global Centre for Risk and Innovation

Bawa metode, dataset, atau pertanyaan.

Informasi dan pertanyaan sudah terbuka hari ini. Sebuah pertanyaan menerima nomor referensi dan menyebutkan langkah berikutnya; lamaran, pembayaran, alokasi komputasi, dan pendaftaran hanya dibuka ketika tim, ketentuan, dan kapasitas tinjauannya tersedia.