Governance of systemic risk is the problem of assigning responsibility for risks that no single institution owns, and of deciding with incomplete evidence without either paralysis or overreach.

02Three mandates

The field, seen three ways.

GCRI

Zanist û delîl

Registry, Agency.

GRF

Governance and dialogue

Research Nexus, Policy Nexus, Governance Nexus.

03Simulator

Stok, herik, dereng û sînorê guherînê.

Du stok, zext û kapasîteya adaptasyonê, bi xelekeyeke mezinbûnê ya xurtker, bersiveke hevsengiyê ya dereng û zirarê dema ku zext ji kapasîteyê derbas dibe têne girêdan; li derveyî sînor pergal dikare biguhere. Modela fêrkirinê bi nirxên nimûneyî yên diyarkirî, ne pêşbînî.

Kontrol

Zêdebûna zextê
6.0% salê
Bandora kapasîteyê di kêmkirina zextê de
4.0% salê
Bersiva veberhênanê li hember zextê ya hatî dîtin
20%
Derengiya têgihîştinê
4.0 sal
Sînorê guherînê yê zextê
60 indeks
Zêdebûn li derveyî sînor
2.0 carî
Salên simulekirî
50 sal

Xwendin

Zexta herî bilind
113 nîşander
Kapasîte di dawiyê de
186 indeks
Salên li ser sînor
15.8 sal
Jimar, rêbaz û çavkanî
SalZextêKapasîteHatî dîtin
020.050.020.0
423.344.921.2
827.242.224.0
1231.742.327.7
1636.845.532.2
2042.351.537.2
2447.960.342.6
2853.271.348.0
3257.884.353.1
3666.498.458.4
4082.7115.969.7
4497.8139.783.8
48109.1169.497.3

Rêbaz

  1. System dynamics Forrester (1961), Industrial Dynamics, MIT Press; Sterman (2000), Business Dynamics
  2. Critical transitions and tipping points Scheffer and others (2009), Early-warning signals for critical transitions, Nature 461
  3. Causal loop diagram Sterman (2000), Business Dynamics, McGraw-Hill
  4. Uncertainty fan (parameter Monte Carlo) Spiegelhalter, Pearson and Short (2011), Visualising uncertainty about the future, Science 333
  5. One-at-a-time sensitivity (tornado) Saltelli and others (2008), Global Sensitivity Analysis: The Primer, Wiley

Dane

No observed data enters this model: it runs on the teaching values set by the controls, to be replaced with a programme’s own evidence.

Stok, herik, derengî û sînorekî tipping. Modeleke hînkirinê ya ronîker: li gorî nirxên ku kontrol destnîşan dikin dixebite, ne li ser daneyên pîvandî. Rêbaz: Dînamîkên pergalê (Forrester (1961), Industrial Dynamics, MIT Press; Sterman (2000), Business Dynamics); Veguherînên krîtîk û xalên tipping (Scheffer û yên din (2009), Early-warning signals for critical transitions, Nature 461); Dîagrama xelekên sedemî (Sterman (2000), Business Dynamics, McGraw-Hill).

Li seranserê şeş stûnan, bi pêşengiya Nexus Consortium

04The systemic question

Ownerless risks and coordination.

The IRGC risk governance framework distinguishes simple, complex, uncertain and ambiguous risks and matches each with a style of governance: routine regulation, expert deliberation, precaution, or broad stakeholder discourse. Systemic risks tend to be all four at once, which is why mandates, coordination bodies and records of who decided what matter.

  • Mandate mapping: which authority can act on which part of a risk.
  • Coordination mechanisms across ministries and levels of government.
  • Accountability records that survive staff and government turnover.
05Pêvajo

Pêvajo çawa dimeşe.

Process explorer · Process

Governance and institutions: Risk management process

8 gav5 qonax

Pêvajo

Governance and institutions: Risk management process

ISO 31000:2018 sets out an iterative risk management process, from scope, context and criteria through assessment and treatment to monitoring, review and reporting.

  1. 01 Frame

    1. 01Scope, context and criteriaDataset · National DeskThe frame for the process: the scope, the external and internal context, and the risk criteria. Later steps are read against this frame.
  2. 02 Risk assessment

    1. 04Risk identificationStep · National DeskThe first part of risk assessment. Risk is usually expressed by risk sources, potential events, their consequences and likelihood.
    2. 05Risk analysisModel · National DeskThe second part of risk assessment. It considers consequences and likelihood of the identified risks, with guidelines, not a formula.
    3. 06Risk evaluationStep · National DeskThe last part of risk assessment. Results of the analysis are compared with the risk criteria to see where more action is needed.
  3. 03 Treatment

    1. 07Risk treatmentStep · National DeskTreatment options are selected, then plans are prepared and implemented. Residual risk is documented and goes to monitoring and review.
  4. 04 Across the process

    1. 02Communication and consultationStep · National DeskCommunication and consultation with stakeholders is its own process element. The standard draws it alongside the others, not in sequence.
    2. 03Monitoring and reviewStep · National DeskMonitoring and review take place at every stage. New experience, knowledge and analysis can revise elements, actions and controls.
  5. 05 Record and report

    1. 08Recording and reportingRecord · National DeskThe process and its outcomes are documented and reported. The standard does not name who receives the report in the clauses read.

Outline of an external standard or method, from its public sources. It describes what the framework says, not a record of any run. It does not show that Nexus or any partner performs, certifies or approves a step. A gate is a step of the method, never a Nexus approval.

06Çarçove

Governance references.

Framework or bodyWhat it governs or supplies
Pêşniyara OECD li ser Rêveberiya Xetereyên KrîtîkWhole-of-government risk governance
IRGC risk governance frameworkPre-assessment, appraisal, characterisation, management and communication
Sendai Framework priority twoStrengthening disaster risk governance
07Couplings

Governance across the Consortium.

  • Records and identifiers on Registry.
  • Technical assistance through Agency.
  • Governance dialogue at the Global Risks Forum (GRF); this gateway lists its platforms below.
09Çavkanî

Where this page’s references lead.

Sazî û belgeyên ku ev rûpel li hember wan tê xwendin. Rewş û çap diguherin; her girêdan diçe ba saziya derxistinê.

10Pirs

Pirs û bersiv.

Why does GCRI host field gateways?
GCRI hosts the shared references of the Consortium, including the STEM Commons and the field gateways, so each field has one place that links all three institutions’ work.
rêzeya Pergalên StratejîkTevkarî bike

Ji vê rûpelê delîl bidin.

Reports weşana sê mehane ya Konsorsiyûmê ye. Tiştê ku tu li ser vê mijarê dizanî dikare di çapa pêş de bibe delîl, dosya an rastkirin, bi navê te û di bin CC BY 4.0 de weşandî li cihê ku karê te bi xwe be.

GCRI
Global Centre for Risk and Innovation

Rêbazek, danehevek an pirsek bîne.

Agahî û pirs îro vekirî ne. Pirsek referansekê distîne û gava piştî wê dide nasîn; serlêdan, drav, veqetandina hesabkirinê û tomarkirin tenê dema ku tîm, mercên wê û kapasîteya vekolînê hebin vedibin.