GCRI · Foundry
Venti sistemi tecnici
A technical environment of many systems fails at its seams: two systems each believe they own the same record, an interface changes without notice, or a downstream tool computes its own version of a figure that already exists upstream. The canonical inventory gives each Foundry system one contribution, one boundary and one owner per record type. This page sets out how interface and ownership failures develop and spread, how they are measured, and what system owners and reviewers need to keep the inventory true.
Twenty technical systems on the record.
Venti sistemi tecnici: come si sviluppa il rischio.
Canonical Foundry system inventory. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.
Duplicate ownership
Quando due sistemi scrivono lo stesso tipo di registrazione, divergono in modo silenzioso. Ciascuno appare corretto preso da solo; il conflitto emerge soltanto quando una decisione attinge a entrambi e trova due risposte a una stessa domanda.
Deriva dell'interfaccia
Un campo cambia significato, un'unità cambia, un valore facoltativo diventa obbligatorio. I consumatori costruiti sul vecchio contratto continuano a funzionare e producono risultati plausibili ma errati. La difesa abituale sono contratti versionati con verifiche di compatibilità a ogni build.
Dipendenze condivise
Many systems depend on one identity service, one message bus, one library or one cloud region. A fault or vulnerability there reaches every dependant at once, which is why dependency maps and software bills of materials matter.
Authority creep
Un sistema costruito per supportare una decisione comincia a prenderla: una soglia di un cruscotto diventa un'azione automatica, una bozza diventa un rilascio. I limiti scritti nella definizione di ogni sistema e applicati ai gate di policy impediscono che il supporto diventi autorità.
Console dell'area di lavoro e dei job.
La schermata che un gruppo utilizzerebbe per seguire questo tema: misure, stati e decisioni. I nomi sono esempi e i valori sono illustrativi.
Area di lavoro e console dei job
Venti sistemi tecnici · Spazio di progetto 12 · Cluster est
- Job in esecuzione20Attivo
- Attesa in coda, p508minNormal
- Esecuzioni oggi5327
- Quota utilizzata, % questo mese85Attenzione
Lavori
| J-77261 | Ensemble di modelli di inondazione | Responsabile del progetto | 00:10:12 | In esecuzione |
| J-22526 | Rendering delle tile, zoom da 0 a 12 | Spazio di lavoro GIS | 00:01:40 | In esecuzione |
| J-65648 | Esportazione delle evidenze | Custode del modello | 00:00:55 | Fatto |
| J-53084 | Batch di chiamate agli strumenti dell'agente | Sandbox degli agenti | 00:01:51 | Blocco da policy |
Eventi politici
- 10:28SogliaLa chiamata dell'agente richiede l'approvazione umana
- 10:33InfoRun record sealed
- 11:58AvvisareQuota all'80% per il progetto
I venti sistemi sono concepiti per servire tutti e cinque i domini.
- WaterIn practiceEarth observation and early warning systems serve water work.What a reader can checkSystem purpose
- EnergiaIn praticaIl supporto alle decisioni e la simulazione servono il lavoro sull'energia.Che cosa può verificare un lettoreStato della capacità
- HealthIn practiceSignal and evidence systems serve health work.What a reader can checkVerification state
System readiness is designed for the Foundry Build and Readiness series. Systems are recorded as declared until verification evidence exists under NS-11 of the proposed Nexus Standards.
- Revisioni tecniche.
- Requirements from users.
How twenty technical systems is modelled, measured and tested.
Il modello, le sue ipotesi, i suoi dati e la sua incertezza, nella forma in cui uno scienziato o un ingegnere li verificherebbe. Le strutture seguono metodi pubblicati. I valori rappresentati sono illustrativi, non risultati.
Modello, equazioni e ipotesi
The model structure used for twenty technical systems, the assumptions it makes and how each is tested.
Ri = f(Hi, Ei, Vi, Ci)pericolo, esposizione, vulnerabilità e capacità di rispostaEAL = ∑k pk · Lkover events k with annual probability pkxt+1 = A xt + B ut + εtA carries the couplings, u the shock, ε the error| Ipotesi | Perché è realizzato | Come viene testato |
|---|---|---|
| Pericolo ed esposizione sono indipendenti all'interno di un evento | Mantiene trattabile l'integrale delle perdite | Confrontare con un adattamento di copula su registrazioni congiunte |
| Gli accoppiamenti sono lineari vicino al punto di funzionamento | Consente agli shock di propagarsi attraverso A | Perturbare oltre l'intervallo lineare e confrontare |
| Le curve di vulnerabilità si trasferiscono da un luogo all'altro | Le curve locali sono raramente disponibili | Validare rispetto alle perdite osservate, dove esistono |
- Input
- set di dati versionati con provenienza
- Risultati
- distribuzioni, mai valori singoli
- Codice
- pubblicato con la scheda del modello e i test
- Riproduzione
- stessi dati, codice, ambiente e seed
Cosa viene misurato e con quale accuratezza.
Ogni indicatore riporta la sua unità, la sua cadenza, il tipo di fonte su cui si basa e l'etichetta di evidenza che un valore riporterebbe. Non sono mostrati valori: un programma li fornisce sotto la propria autorità.
| Indicatore | Unità | Cadenza | Tipo di fonte | Etichetta |
|---|---|---|---|---|
| Record types with more than one declared owner | conteggio | per rilascio | System registry | DICHIARATO |
| Breaking interface changes detected | conteggio per rilascio | per build | Verifiche di compatibilità dei contratti | OSSERVATO |
| Componenti con una distinta base del software aggiornata | proportion of deployed components | per build | Registri di generazione degli SBOM | OSSERVATO |
| Known exploited vulnerabilities in dependencies | numero di casi aperti | giornaliero | Scansioni rispetto agli avvisi pubblici | OSSERVATO |
| Tempo di correzione delle vulnerabilità critiche delle dipendenze | giorni | per advisory | Registri delle modifiche e dei rilasci | OSSERVATO |
| Release artefacts with build provenance attestations | proportion of artefacts | per rilascio | Signed build attestations | OSSERVATO |
| Systems with a documented boundary and owner | quota delle scorte | trimestrale | System registry | DICHIARATO |
Da dove provengono le evidenze.
Set di dati pubblici e registri istituzionali specifici, ciascuno con la sua classe di licenza. Le fonti soggette ad accordo sono utilizzate solo alle relative condizioni e mai ripubblicate.
| Fonte | Cosa fornisce | Classe di licenza |
|---|---|---|
| Specifica OpenAPI | Machine-readable HTTP interface contracts that can be compared for breaking change | Apache 2.0 |
| Specifica del linguaggio Protocol Buffers | Contratti canonici di servizio e di messaggio con regole di compatibilità definite | Open source, BSD-style |
| Specifiche CycloneDX e SPDX | Formati per distinte base del software, licenze e provenienza dei componenti | Open specifications |
| Database delle vulnerabilità OSV | Avvisi di vulnerabilità open source associati alle versioni dei pacchetti | CC BY 4.0 |
| National Vulnerability Database (NIST) | Vulnerability records with severity scoring | Pubblico dominio |
| Catalogo CISA delle vulnerabilità note sfruttate | Vulnerabilità con evidenze di sfruttamento attivo | Pubblico dominio |
| Risultati di OpenSSF Scorecard | Controlli automatizzati delle pratiche di sicurezza nelle dipendenze open source | Libero e aperto |
Chi decide, e a cosa servono le evidenze.
Foundry prepara le evidenze. Le decisioni riportate di seguito sono prese dalle autorità indicate, secondo le rispettive norme, e mai dalla piattaforma.
| Chi decide | La domanda | Evidenze fornite da questa pagina |
|---|---|---|
| System owners | Whether a change to their system’s contract or record ownership may proceed | Risultati della verifica di compatibilità; i consumatori del contratto interessato |
| Security officers | Which dependency vulnerabilities must be fixed before release, and which are accepted with a recorded rationale | Bills of materials matched against advisories; exploitation status |
| Architecture reviewers | Whether a new capability belongs in an existing system or needs a new boundary | Inventario, mappa della titolarità dei registri e contratto proposto |
| Contracting institutions | Which systems their agreement covers and what each may do with their data | System boundaries and the record types each one reads and writes |
Output prodotti da questo argomento
- Inventory of systems with contribution, boundary and record ownership
- Interface contracts with version and compatibility history
- Dependency maps and software bills of materials per release
- Boundary statements of what each system must never do
A che cosa deve rispondere un inventario dei sistemi.
- Which system is the authoritative owner of each kind of record?
- Where does each system’s authority stop, and who decides beyond that point?
- Come si combinano l' sistemi a scambiarsi record senza copiarli e senza divergere?
- Which shared controls apply to every system, so that trust does not depend on each one’s configuration?
Twenty systems, one line each.
- NXS-CMD (integrated posture and executive synthesis)ContributionCommand home for posture, authority and coordinated response
- NXS-NST (civilian common operating picture)ContributionCommon operating picture for civilian operations
- NXS-DSS (casi decisionali e deliberazione)ContributoNote decisionali, compromessi tra opzioni e supporto alle decisioni spaziali
- NXS-COR (calcolo, nodi e ambienti di esecuzione)ContributoPiano di controllo del calcolo su cloud, infrastruttura privata ed edge
- NXS-NXQ (software, modelli e ciclo di vita delle capacità)ContributoAcquisizione, tracciabilità, convalida degli schemi e instradamento degli eventi
- NXS-GRX (dati canonici, provenienza e rischio)ContributoOntologia dei rischi, indici e pacchetti di evidenze
- NXS-EOP (osservazione della Terra e gemelli digitali)ContributoCatalogo delle osservazioni, analisi spettrali e gemelli di scenario
- NXS-EWS (monitoraggio e allerta multi-pericolo)ContributoSupporto alle allerte, dal segnale di pericolo al pacchetto pronto per l'autorità
- NXS-AAP (azione anticipatoria e soglie di attivazione)ContributoProcedure operative attivate dalle evidenze, prontezza e registri delle azioni
- NXS-NET (topologia e continuità delle reti)ContributoTopologia della rete, integrità dei percorsi e prontezza delle comunicazioni
- NXS-OPS (strumenti, sensori e calibrazione)ContributoNodi dell'osservatorio, telemetria dei sensori e prova di osservazione
- NXS-SIG (segnale, spettro, sincronizzazione e PNT)ContributoMonitoraggio autorizzato dello spettro e integrità del segnale
- NXS-NSF (fiducia, autorizzazione e garanzia)ContributoIdentità, mandato, controlli delle politiche e ricevute di prova
- NXS-HUB (conoscenza, registri e apprendimento)ContributoCollaborazione, conoscenza, elenco e servizio di supporto
- NXS-STU (composizione, dashboard e flussi di lavoro)ContributoDashboard, mappe, flussi di lavoro e configurazioni di agenti componibili
- NXS-FAC (progetti, build e firma)ContributoDai progetti a versioni delle applicazioni testate e firmate
- NXS-APP (catalogo e ciclo di vita delle applicazioni)ContributoCatalogo delle applicazioni, installazione e ciclo di vita in esecuzione
- NXS-RLS (partecipanti, accordi e passaggi di consegne)ContributoProtocolli, obblighi, passaggi di consegne e ricevute tra istituzioni
- NXS-POR (erogazione a pubblico, clienti e partner)ContributoPubblicazione sicura per il pubblico e distribuzione ai destinatari
- NXS-LAB (ricerca, esperimenti e simulazioni)ContributoEsperimenti governati, calcolo riproducibile e passaggi di consegne della ricerca
Le descrizioni riguardano la progettazione. Una pagina di sistema non attesta che il sistema sia in funzione per alcun tenant.
Un'unica dorsale di fiducia, registri composti.
The systems share one trust spine, the NXS-NSF Sovereignty Framework, so identity, policy and receipts work the same way everywhere. Records are composed rather than duplicated: NXS-NST, NXS-DSS and NXS-EWS use The Global Risks Index (NXS-GRX) products instead of inventing their own risk figures, and NXS-POR publishes only what has passed a public-safe release decision. This is ordinary systems-engineering discipline, a single source of truth per record type and explicit interfaces between subsystems, applied to risk work.
I confini fanno parte di ciascuna definizione. DSS supporta l'analisi, ma l'analisi non è la decisione. EWS supporta la verifica delle previsioni e i pacchetti di allerta, ma l'emissione delle allerte resta in capo alle parti autorizzate. AAP valuta le soglie di attivazione e la prontezza, ma non eroga mai fondi né invia risorse in modo automatico. Rails registra istruzioni e ricevute tra istituzioni, e una ricevuta non è regolamento né accettazione esterna. Laboratori esegue esperimenti riproducibili, e i risultati degli esperimenti non sono certificazione.
Come viene studiato, e cosa i metodi non possono dire.
- 01Ingegneria dei sistemiInventario canonico dei sistemi · Interfacce definite dal contratto · Requisiti ricondotti alle evidenzeApplicato qui
- 02Ingegneria del software e dei sistemi critici per la sicurezzaControlli delle politiche a sicurezza intrinseca · Provenienza delle build e distinte dei materiali · Casi di garanziaApplicato qui
- 03Calcolo ad alte prestazioni, cloud ed edgePianificazione degli insiemi di simulazioni tra livelli · Esecuzione federata accanto ai datiApplicato qui
- 04Ingegneria, interoperabilità e gestione responsabile dei datiConvalida al confine di acquisizione · Estrazioni di dati congelate per prodotti riproducibiliApplicato qui
Where this page’s references lead.
Gli organismi e i documenti alla luce dei quali si legge questa pagina. Stato ed edizioni cambiano; ogni link porta all'organismo emittente.
Domande e risposte.
Perché ogni tipo di registro ha un solo responsabile?
Che cos'è una distinta base del software (software bill of materials)?
Why are the systems written in several languages?
Does a system page mean the system is running?
Perché esattamente venti sistemi?
Posso usare un sistema da solo?
Is the Labs system the same as Labs?
Contribuisci con evidenze da questa pagina.
Reports è la pubblicazione trimestrale del consorzio. Ciò che sai su questo tema può diventare un'evidenza, un caso o una correzione nella prossima edizione, attribuita a te e pubblicata con licenza CC BY 4.0 se si tratta di un tuo lavoro.
- E-mailPortale GW-GCRIInvialo da questa paginaUn'evidenza, una correzione, un caso, un metodo, una revisione, una traduzione o un contributo a un profilo. Arriva etichettata con questa pagina, così la riceve la persona redattrice che ne è responsabile.
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- RapportiGCRIVedi tutti i modi per contribuireI tipi di contributo, come viene revisionato ciascuno, il riconoscimento che ricevi, la licenza e ciò che non è mai accettato.
Non inviare mai dati personali, dettagli su infrastrutture sensibili o qualsiasi cosa che tu non abbia il diritto di condividere. Un contributo viene sottoposto a revisione prima dell'uso; inviarlo non conferisce diritti di paternità né editoriali, e la sponsorizzazione non compra mai un risultato.
Porta un metodo, un set di dati o una domanda.
Informazioni e richieste sono aperte oggi. Una richiesta riceve un riferimento e indica il passo successivo; candidature, pagamenti, assegnazioni di calcolo e registrazioni si aprono solo quando esistono il team, le condizioni e la capacità di revisione.
Documenti legali.
Le mappe, i dati e le cifre di questo sito sono mostrati a titolo di contesto e di informazione generale. Non costituiscono consigli, previsioni né allerte; i limiti dell'informazione sono esposti nelle Dichiarazioni di esclusione di responsabilità e nelle Note sui dati.