The 2027 agenda
Eight bounded questions open the 2027 lifeline systems agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 lifeline systems edition.
Contents
- ·Edition home
- ·Executive summary
- 1Lifelines fail together
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Power loss that overlaps a telecom or cloud failure
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
7.1Questions for the operational series
- L-01
How would a regional power loss that overlaps a telecom or cloud failure spread through water, health and transport at the same time?
INI-SR02-PWR-01 · power and telecom compound loss; first output: dependency analysis for six regions.
- L-02
Which shared dependencies (power, telecoms, software, positioning) sit behind the most services?
INI-SR02-DEP-02 · shared dependencies; first output: dependency register.
- L-03
How long do lifeline services take to return after major outages, and what limits recovery?
INI-SR02-RST-03 · restoration times; first output: restoration table.
- L-04
Where are subsea links and repair capacity thinnest?
INI-SR02-CBL-04 · subsea links; first output: link and repair map.
- L-05
How do ageing assets and investment gaps coincide with hazard exposure?
INI-SR02-AST-05 · asset condition and exposure; first output: exposure overlay.
- L-06
Which operators and states publish incident data on a comparable basis?
To be admitted in 2027; first output: coverage note.
- L-07
How do conflict and sabotage threats change protection priorities for water and power?
To be admitted in 2027; first output: scoping note.
- L-08
Which lifeline capabilities have been tested in real outages, and which are only planned?
Lifeline capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for the 2027 lifeline portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-SR02-PWR-01 | Power and telecom compound loss | Initiative | L-01 | PROPOSED |
| INI-SR02-DEP-02 | Shared dependencies | Initiative | L-02 | PROPOSED |
| INI-SR02-RST-03 | Restoration times | Initiative | L-03 | PROPOSED |
| INI-SR02-CBL-04 | Subsea links and repair capacity | Initiative | L-04 | PROPOSED |
| INI-SR02-AST-05 | Asset condition and exposure | Initiative | L-05 | PROPOSED |
| MSN-SR02-2027-01 | Power and telecom loss Universe mission | Mission | L-01 | Candidate |
7.3The pathway
The lifeline systems edition reads national infrastructure chapters, sector editions and the global edition through one governed evidence graph. At baseline the federation is designed and its first editions are drafted. This page states what exists today and what comes next.
- 01
National infrastructure chapters
lifeline reading in each national edition
IN PREPARATION · national baselines
- 02
Sector editions
power, water, cyber, transport
PLANNED · sector Baseline Editions
- 03
Lifeline systems model
the global lifeline system of systems
v0 SPECIFIED · v1 with federation evidence
- 04
Strategic links
SR-01 · SR-03 supply chains · SR-10 digital public infrastructure
PLANNED · strategic baselines
- 05
Universe
annual proving environment
CANDIDATE MISSION · mandate in 2027
- 06
Lifeline Systems Report
this series
BASELINE DRAFT · 2027 annual edition
- 07
Evidence and correction
one graph, many projections
OPEN · first correction cycle in 2027
7.4Universe 2027: evidence pack for the lifeline systems candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | 2027 lifeline systems annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-SR02-2027-01 · Power and telecom loss Universe mission
- Role spine
- Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| INF-001 · grid failure | regional consortia | grid constraint overlay | PUBLIC |
| CYB-002 · pre-positioning | INI-SR02-DEP-02 | shared dependencies | PUBLIC |
| DAT-004 · software failure | INI-SR02-DEP-02 | shared dependencies | PUBLIC |
| INF-005 · asset condition | INI-SR02-AST-05 | asset condition and exposure | PUBLIC |
| INF-006 · subsea links | INI-SR02-CBL-04 | subsea links and repair capacity | PUBLIC |
| DEV-008 · disruption cost | INI-SR02-RST-03 · key F review | restoration times | PUBLIC |
| CON-009 · war damage | sector editions | recovery needs | PUBLIC |
| SYS-012 · compound pathway | MSN-SR02-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the federation | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| Incident and advisory feeds | CISA and partner agencies | per event | CYB-002 |
| EU threat landscape | ENISA | annual | CYB-003 |
| Transparency platform for the continental grid | ENTSO-E | hourly | INF-001 |
| Cable fault and repair data | TeleGeography and industry | per event | INF-006 |
| Disaster loss data | UNDRR and reinsurers | annual | CLI-007 |
| Outage analysis | Uptime Institute | annual | DAT-004 |
| Damage assessments | World Bank, UN and EU | annual | CON-009 |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- annual publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-SR02-001 | Single-vendor software outage in 20244 | CORROBORATED | DAT · INF | risk object RSK-SR02-DAT-003 |
| SIG-SR02-002 | Multi-year pre-positioning reported in four sectors2 | CORROBORATED | INF · DAT | research question L-02 |
| SIG-SR02-003 | Strikes on co-located power and water plants in 202613 | PARTIAL | ENE · WAT | research question L-01 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 4Microsoft (ed.), Helping our customers through the CrowdStrike outage (blog post of 20 July 2024; estimate of 8.5 million Windows devices). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 2CISA, NSA, FBI and partner agencies (eds.), PRC State-Sponsored Actors Compromise and Maintain Persistent Access to U.S. Critical Infrastructure (Volt Typhoon), joint cybersecurity advisory AA24-038A, 7 February 2024. CISA, Arlington. Observation year 2024. Accessed 2026-11-03.back
- 13UNVERIFIED, not opened: press and think-tank reports on strikes on power and desalination plants in Kuwait, Bahrain and the United Arab Emirates, March to July 2026 (including The National, Arab News and the Arab Center Washington DC), taken from search-result summaries; no official damage assessment was found. Observation year 2026. Accessed 2026-11-03.back
