Strategic Systems Report 2026: Critical Infrastructure and Lifeline Systems
Strategic Systems
Critical Infrastructure and Lifeline Systems 2026
Imprint
- Editor
- Saeed Valadbaygi, Chief Steward and Managing Editor, the Global Centre for Risk and Innovation (GCRI)
- Publisher of record
- The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium, Toronto
- Report number
- NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE
- Evidence close
- 30 September 2026, cut DC-STRATEGIC-LIFELINES-GLOBAL-2026-B0
- Status
- Draft under stewardship review; not yet released
- DOI and UNI
- Issued at deposit
- Licence
- CC BY 4.0 for Nexus-authored text, tables and figures; third-party material keeps its own licence
- Cite as
- Valadbaygi, S. (Ed.). (2026). Strategic Systems Report 2026: Critical Infrastructure and Lifeline Systems (Baseline Edition 2026, Report No. NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI). https://therisk.global/nexus-reports/editions/sr-02/
Contents
- Critical Infrastructure and Lifeline Systems 2026
- Executive summary
Executive summary
The edition on a few pages: the abstract, the key messages, the headline finding and what each steward reads in it.
S.1Abstract
Lifeline systems are the networks other systems run on: power, water, communications, transport and health services. The 2025 and 2026 evidence shows the same mechanisms at work in very different events. The Iberian blackout of 28 April 2025 came from interacting factors, including voltage control gaps, oscillations and generator disconnections1. A single software update on 18 July 2024 affected an estimated 8.5 million Windows devices4. Government agencies assessed in February 2024 that state-sponsored actors had pre-positioned in the networks of communications, energy, transport and water operators, with some intrusions lasting at least five years2. ENISA analysed 4,875 incidents in a single twelve-month period3. Asset condition and investment are part of the picture: the 2025 US report card grades the country’s infrastructure C with a USD 3.6 trillion ten-year gap6. Around 199 subsea cable faults occur each year, about two thirds from fishing and transport vessels7. War adds direct damage: Ukraine’s recovery needs reached USD 587.7 billion and Gulf power and desalination plants were struck from March 20261213. This baseline reads these events as mechanisms, not as a list. It ranks no country or operator, attributes no attack and recommends no policy.
S.2Key messages
Six readings that frame the lifeline systems baseline, and the eight questions this edition answers, each with its status and source.
Yes: hazards, cyber operations, conflict and software faults recur across sectors.12410
Do lifeline failures have common causes?Reported
Through shared dependence on power, telecoms and software.14
How do failures spread?Reported
Grades are mixed: C overall in the 2025 US report card.6
Is the physical base sound?Reported
About 199 faults a year; most are accidental.7
How exposed are subsea links?Reported
More than USD 250 billion a year to infrastructure from three hazards.10
How large are the losses?Reported
It adds direct damage to power and water systems.1213
Does war change the picture?Reported
Concentrated demand on local grids.89
What does digital load add?Reported
Power loss that overlaps a telecom or cloud failure. SCN-SR02-PWR-01
What will 2027 test first?Expert input
S.3Headline finding
ReportedEQL 4NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-INF-006
Subsea cable faults averaged 199 a year from 2010 to 2023. About two thirds came from fishing and transport vessels, and intent is hard to establish.
| Item | Bar, scaled to the largest value | Value |
|---|---|---|
| Average faults a year | 199 | |
| of which external aggression (about two thirds) | ≈133 |
Source: TeleGeography7. The second bar is a Nexus derivation, method (4), and is approximate.
Most faults are accidents, so route diversity and repair capacity matter more than detecting intent. Governments around the Baltic investigate each fault as potential sabotage, and the analyst notes that severing a few cables is noise rather than a signal7.
S.4At a glance
S.5What each steward reads in it
GCRI · KEY T
Technical Truth
The evidence supports reading lifelines as one dependent network.
GRF · KEY M
Public Meaning
For most people lifeline failure arrives as a dark home, a dry tap or a card that will not work.
GRA · KEY F
Capital Meaning
Readiness implications only. Disruption is costly, resilient options are reported to return several times their cost, and the investment gap is large in places.
NEXUS
Synthesis
Lifeline risk is well described event by event and thinly measured as a system.
S.6What this edition is, and is not
What this edition is
A baseline: the 2026 state of the world’s critical infrastructure and lifeline systems and the couplings through which it carries risk into other systems. It synthesises published evidence and ranks no country, company or asset.
What it is not
Not an infrastructure-security ranking, a threat attribution, a vulnerability disclosure or an assessment of any operator, regulator or government. Operation, protection and recovery of infrastructure rest with owners, operators and competent authorities.
What comes next
National, regional and sector evidence feeds the 2027 lifeline systems edition through the federation. Each edition reports what changed against this baseline: observations, source revisions, method changes, scenario updates and corrections.
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 4Microsoft (ed.), Helping our customers through the CrowdStrike outage (blog post of 20 July 2024; estimate of 8.5 million Windows devices). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 2CISA, NSA, FBI and partner agencies (eds.), PRC State-Sponsored Actors Compromise and Maintain Persistent Access to U.S. Critical Infrastructure (Volt Typhoon), joint cybersecurity advisory AA24-038A, 7 February 2024. CISA, Arlington. Observation year 2024. Accessed 2026-11-03.back
- 3ENISA (ed.), ENISA Threat Landscape 2025 (publication page; period 1 July 2024 to 30 June 2025; published 1 October 2025; version 1.3 of 22 September 2026). European Union Agency for Cybersecurity, Athens. Observation year 2025. Accessed 2026-11-03.back
- 6ASCE (ed.), 2025 Report Card for America’s Infrastructure (overall grade C; ten-year investment gap USD 3.6 trillion; sector grades). American Society of Civil Engineers, Reston. Observation year 2025. Accessed 2026-11-03.back
- 7TeleGeography (ed.), Is it sabotage? Unraveling the mystery of undersea cable breaks (analysis of 199 faults a year, 2010 to 2023). TeleGeography, Washington. Observation year 2024. Accessed 2026-11-03.back
- 12UNVERIFIED, not opened: World Bank, United Nations and European Commission (eds.), Ukraine Fifth Rapid Damage and Needs Assessment (RDNA5), released 23 February 2026 (needs USD 587.7 billion over ten years; energy about USD 91 billion; direct damage to energy and extractives USD 24.8 billion to end 2025), taken from search-result summaries. Observation year 2025. Accessed 2026-11-03.back
- 13UNVERIFIED, not opened: press and think-tank reports on strikes on power and desalination plants in Kuwait, Bahrain and the United Arab Emirates, March to July 2026 (including The National, Arab News and the Arab Center Washington DC), taken from search-result summaries; no official damage assessment was found. Observation year 2026. Accessed 2026-11-03.back
- 10UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays (annual average loss to critical infrastructure above USD 250 billion for floods, tropical cyclones and earthquakes; about USD 2.3 trillion total annual disaster cost), taken from search-result summaries; the report page returned an access error. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-03.back
- 8IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back
- 9IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 11UNVERIFIED, not opened: Hallegatte, S., Rentschler, J. and Rozenberg, J., Lifelines: The Resilient Infrastructure Opportunity (disruptions cost at least USD 390 billion a year in low- and middle-income countries; USD 4.2 trillion net benefit; about USD 4 per USD 1), taken from search-result summaries; the repository returned an access error. World Bank and GFDRR, Washington, 2019. Observation year 2019. Accessed 2026-11-03.back
Lifelines fail together
Part I describes systems and their couplings. It ranks no country or operator and assesses no authority.
1.1The questions this part answers
Key questions
- Where is lifeline systems risk concentrated?
- Which couplings carry lifeline systems shocks into other systems?
- Which lifeline systems capabilities hold under compound stress?
- What must 2027 evidence measure first?
In this part
- Narrative
- Headline finding
- Lead figure
- Five mechanism chapters
- Twelve-domain reading
- Sector screens
- Dependency matrix
- Risk objects
- Capability ladder
- Scenario
- Three lenses
- Portfolio
1.2The argument
Lifeline systems are usually reported by sector: grid operators, water utilities, telecom carriers, hospitals. The 2025 and 2026 evidence reads them as one dependent network. Power runs the water works and the exchanges, the exchanges run the control systems, and software runs all of them142.
The causes repeat. A grid event in 2025 came from interacting technical factors1. A software update in 2024 reached millions of machines in hours4. State-sponsored actors were reported inside operator networks for years2. Fishing and anchoring faults hit subsea links about 199 times a year7. War now adds direct strikes on power and desalination plants13.
The physical base is uneven. The 2025 US report card gives energy D+ and drinking water C−, with a USD 3.6 trillion ten-year gap6. In low- and middle-income countries, disruptions cost at least USD 390 billion a year, and the World Bank finds that resilient options return about USD 4 per USD 111.
The edition therefore asks the same four questions of every event: what was the common cause, how did it spread, what was shared, and what threshold was crossed. It makes no attribution and ranks no operator.
Estimates of need and loss are large and drawn from different sources. The three bars use different periods and methods, so they show scale only and are not added101112.
| Item | Bar, scaled to the largest value | Value |
|---|---|---|
| Ukraine recovery needs, ten years | 587.7 | |
| Disruption cost in LMICs, per year (at least) | 390 | |
| Hazard loss to infrastructure, per year (more than) | 250 |
Source: as cited in the note to this figure. Year 2025.
Figure ID FIG-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-01-003
1.3Twenty couplings between five systems
The lifeline systems-centred matrix types the twenty couplings between the five core systems, read for their lifeline systems content. Strengths are Nexus estimates (ESTIMATED) from the cited evidence and analogue events; they set the graph that 2027 evidence will test.
Each line is one coupling from one system to another, drawn by the strength the edition assigns. Strengths are Nexus estimates from the cited evidence and analogue events.
- Strong
- Moderate
- Weak
Source: this edition’s coupling matrix (Table 1.1); status Estimated.
| From, to | WAT | ENE | FOO | HLT | BIO |
|---|---|---|---|---|---|
| WAT Water | · | STRONG cooling · hydro | MODERATE irrigation · processing | STRONG safe supply · hospitals | WEAK flows |
| ENE Energy | STRONG pumping · treatment · desalination | · | STRONG cold chain · processing | STRONG hospitals · cooling · telecoms | WEAK land use |
| FOO Food | WEAK withdrawals | WEAK bioenergy | · | MODERATE nutrition · food safety | WEAK land conversion |
| HLT Health | WEAK workforce | WEAK workforce | WEAK labour | · | WEAK residues |
| BIO Biodiversity | MODERATE natural infrastructure | WEAK hydrology | WEAK pollination | WEAK zoonoses | · |
| Strength: strong, moderate or weak; a Nexus estimate (status Estimated) from cited evidence and analogue events. The scale is defined in Annex A. | |||||
Transmission paths
- 01
ENE → INF → HLT
A grid failure removes power from exchanges, pumps and hospitals together.
Reported 2025 blackout1
- 02
DAT → INF
A software fault spreads through a shared vendor to many operators.
Reported 2024 outage4
- 03
CON → ENE, WAT
Strikes on co-located power and desalination plants remove two services at once.
Reported 2026 Gulf strikes13
- 04
CLI → INF → FIN
Hazards damage assets and the cost lands on budgets.
Reported GAR 202510
- 05
AIC → ENE
Clustered digital load tightens local grids.
1.4Reinforcing loops
A shock entering either system of a loop can return amplified through the other.
| Loop | First direction | Second direction |
|---|---|---|
| WAT and ENE | Water to energy: cooling · hydro | Energy to water: pumping · treatment · desalination |
| A causal-loop reading of the matrix (Sterman, Business Dynamics, 2000): structural, from estimated strengths, not a measured feedback. | ||
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 4Microsoft (ed.), Helping our customers through the CrowdStrike outage (blog post of 20 July 2024; estimate of 8.5 million Windows devices). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 2CISA, NSA, FBI and partner agencies (eds.), PRC State-Sponsored Actors Compromise and Maintain Persistent Access to U.S. Critical Infrastructure (Volt Typhoon), joint cybersecurity advisory AA24-038A, 7 February 2024. CISA, Arlington. Observation year 2024. Accessed 2026-11-03.back
- 7TeleGeography (ed.), Is it sabotage? Unraveling the mystery of undersea cable breaks (analysis of 199 faults a year, 2010 to 2023). TeleGeography, Washington. Observation year 2024. Accessed 2026-11-03.back
- 13UNVERIFIED, not opened: press and think-tank reports on strikes on power and desalination plants in Kuwait, Bahrain and the United Arab Emirates, March to July 2026 (including The National, Arab News and the Arab Center Washington DC), taken from search-result summaries; no official damage assessment was found. Observation year 2026. Accessed 2026-11-03.back
- 6ASCE (ed.), 2025 Report Card for America’s Infrastructure (overall grade C; ten-year investment gap USD 3.6 trillion; sector grades). American Society of Civil Engineers, Reston. Observation year 2025. Accessed 2026-11-03.back
- 11UNVERIFIED, not opened: Hallegatte, S., Rentschler, J. and Rozenberg, J., Lifelines: The Resilient Infrastructure Opportunity (disruptions cost at least USD 390 billion a year in low- and middle-income countries; USD 4.2 trillion net benefit; about USD 4 per USD 1), taken from search-result summaries; the repository returned an access error. World Bank and GFDRR, Washington, 2019. Observation year 2019. Accessed 2026-11-03.back
- 10UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays (annual average loss to critical infrastructure above USD 250 billion for floods, tropical cyclones and earthquakes; about USD 2.3 trillion total annual disaster cost), taken from search-result summaries; the report page returned an access error. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-03.back
- 12UNVERIFIED, not opened: World Bank, United Nations and European Commission (eds.), Ukraine Fifth Rapid Damage and Needs Assessment (RDNA5), released 23 February 2026 (needs USD 587.7 billion over ten years; energy about USD 91 billion; direct damage to energy and extractives USD 24.8 billion to end 2025), taken from search-result summaries. Observation year 2025. Accessed 2026-11-03.back
- 9IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 8IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back
Key findings
Twelve findings carry the lifeline systems baseline. They are grouped by coupling and never ranked. Each resolves to its source or, where Nexus analysis is involved, to its stated method.
2.1Headline finding
ReportedEQL 4NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-INF-006
Subsea cable faults averaged 199 a year from 2010 to 2023. About two thirds came from fishing and transport vessels, and intent is hard to establish.
| Item | Bar, scaled to the largest value | Value |
|---|---|---|
| Average faults a year | 199 | |
| of which external aggression (about two thirds) | ≈133 |
Source: TeleGeography7. The second bar is a Nexus derivation, method (4), and is approximate.
Implication
Most faults are accidents, so route diversity and repair capacity matter more than detecting intent. Governments around the Baltic investigate each fault as potential sabotage, and the analyst notes that severing a few cables is noise rather than a signal7.
What would move it
Repair-vessel investment, route diversity and the outcome of Baltic investigations would each move this finding.
2.2Infrastructure
ReportedEQL 4NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-INF-001
The Iberian blackout of 28 April 2025 came from interacting factors, including voltage control gaps, oscillations and generator disconnections, according to the ENTSO-E final report of 20 March 2026.1
ReportedEQL 3NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-INF-005
The 2025 US report card grades national infrastructure C, with a USD 3.6 trillion ten-year investment gap and energy at D+.6
ReportedEQL 4NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-INF-006
Subsea cable faults averaged 199 a year from 2010 to 2023; about two thirds came from fishing and transport vessels, and intent is hard to establish.7
2.3CYB
ReportedEQL 4NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-CYB-002
Agencies assessed in February 2024 that state-sponsored actors were pre-positioning on networks in communications, energy, transportation and water sectors, with some intrusions lasting at least five years.2
ReportedEQL 3NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-CYB-003
ENISA analysed 4,875 incidents between 1 July 2024 and 30 June 2025 for the EU threat landscape.3
2.4Data and digital
ReportedEQL 4NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-DAT-004
A single software update affected an estimated 8.5 million Windows devices on 18 July 2024.4
2.5Climate forcing
ReportedEQL 3NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-CLI-007
UNDRR puts the annual average loss to critical infrastructure from floods, tropical cyclones and earthquakes at more than USD 250 billion.10
2.6Development
ReportedEQL 3NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-DEV-008
Disruptions to power, transport, telecommunications and water cost households and firms in low- and middle-income countries at least USD 390 billion a year, and resilient options return about USD 4 per USD 1.11
2.7CON
ReportedEQL 3NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-CON-009
Ukraine’s ten-year recovery and reconstruction needs are USD 587.7 billion, with energy at about USD 91 billion, and direct damage to energy and extractives reached USD 24.8 billion by the end of 2025.12
ReportedEQL 2NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-CON-010
Power and desalination plants in Kuwait, Bahrain and the United Arab Emirates were reported struck from March 2026, in a region where desalination supplies most drinking water.13
2.8AIC
ReportedEQL 4NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-AIC-011
Data centres made up half of US electricity demand growth in 2025, and nearly half of US data-centre capacity sits in five regional clusters.98
2.9Systemic
Expert inputEQL 2NRF-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-SYS-012
The leading compound pathway for 2027 testing is a power loss that overlaps a telecom or cloud failure and limited repair capacity. § scenario
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 7TeleGeography (ed.), Is it sabotage? Unraveling the mystery of undersea cable breaks (analysis of 199 faults a year, 2010 to 2023). TeleGeography, Washington. Observation year 2024. Accessed 2026-11-03.back
- 1ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 6ASCE (ed.), 2025 Report Card for America’s Infrastructure (overall grade C; ten-year investment gap USD 3.6 trillion; sector grades). American Society of Civil Engineers, Reston. Observation year 2025. Accessed 2026-11-03.back
- 2CISA, NSA, FBI and partner agencies (eds.), PRC State-Sponsored Actors Compromise and Maintain Persistent Access to U.S. Critical Infrastructure (Volt Typhoon), joint cybersecurity advisory AA24-038A, 7 February 2024. CISA, Arlington. Observation year 2024. Accessed 2026-11-03.back
- 3ENISA (ed.), ENISA Threat Landscape 2025 (publication page; period 1 July 2024 to 30 June 2025; published 1 October 2025; version 1.3 of 22 September 2026). European Union Agency for Cybersecurity, Athens. Observation year 2025. Accessed 2026-11-03.back
- 4Microsoft (ed.), Helping our customers through the CrowdStrike outage (blog post of 20 July 2024; estimate of 8.5 million Windows devices). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 10UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays (annual average loss to critical infrastructure above USD 250 billion for floods, tropical cyclones and earthquakes; about USD 2.3 trillion total annual disaster cost), taken from search-result summaries; the report page returned an access error. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-03.back
- 11UNVERIFIED, not opened: Hallegatte, S., Rentschler, J. and Rozenberg, J., Lifelines: The Resilient Infrastructure Opportunity (disruptions cost at least USD 390 billion a year in low- and middle-income countries; USD 4.2 trillion net benefit; about USD 4 per USD 1), taken from search-result summaries; the repository returned an access error. World Bank and GFDRR, Washington, 2019. Observation year 2019. Accessed 2026-11-03.back
- 12UNVERIFIED, not opened: World Bank, United Nations and European Commission (eds.), Ukraine Fifth Rapid Damage and Needs Assessment (RDNA5), released 23 February 2026 (needs USD 587.7 billion over ten years; energy about USD 91 billion; direct damage to energy and extractives USD 24.8 billion to end 2025), taken from search-result summaries. Observation year 2025. Accessed 2026-11-03.back
- 13UNVERIFIED, not opened: press and think-tank reports on strikes on power and desalination plants in Kuwait, Bahrain and the United Arab Emirates, March to July 2026 (including The National, Arab News and the Arab Center Washington DC), taken from search-result summaries; no official damage assessment was found. Observation year 2026. Accessed 2026-11-03.back
- 9IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 8IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back
Systems and sectors at baseline
3.1Where each system stood at evidence close
ENE · Power
Iberian blackout, interacting causes
2025final report published 20 March 2026.
Reported2025ENTSO-E1
DAT · Digital
Windows devices hit by one update
8.5millionestimate, 18 July 2024.
Reported2024Microsoft4
INF · Subsea
Cable faults a year, average
199a yearabout two thirds from external aggression.
Reported2010 to 2023TeleGeography7
FIN · Investment
US ten-year infrastructure gap
3.6USD trillionoverall grade C.
Reported2025ASCE6
CLI · Hazard
Annual loss to critical infrastructure, three hazards
>250USD billionfloods, cyclones and earthquakes.
Reported2025UNDRR10
SYS · Cross-system
Ukraine recovery needs, ten years
587.7USD billionenergy about USD 91 billion.
Reported2025RDNA512
3.2Domain posture
Each of the twelve coupled domains is read through lifeline systems, in words, not scored. The coupling column names the dependency that carries lifeline systems risk into each domain.
| Domain | Posture at baseline | Coupling | Status |
|---|---|---|---|
| WAT | Water works depend on power and telecoms; desalination in the Gulf was struck in 2026. | ENE → WAT | Reported EQL 3 |
| ENE | Grid failure from interacting factors in 2025; data-centre load concentrating on local grids. | ENE → all | Reported EQL 4 |
| FOO | Cold chains and logistics depend on power and telecoms; no consolidated series here. | ENE → FOO | Expert input EQL 2 |
| HLT | Hospitals depend on power, water and communications; not consolidated here. | ENE, WAT → HLT | Inferred EQL 2 |
| BIO | Natural infrastructure can buffer hazards; evidence not consolidated here. | BIO → WAT | Expert input EQL 2 |
| CLI | More than USD 250 billion a year of loss to infrastructure from three hazards. | CLI → INF | Reported EQL 3 |
| INF | The core system: US grade C and a USD 3.6 trillion gap; 199 cable faults a year. | the core system | Reported EQL 4 |
| FIN | Resilient options return about USD 4 per USD 1; Ukraine needs USD 587.7 billion. | INF → FIN | Reported EQL 3 |
| DAT | One software update reached 8.5 million devices; incident data are not on a common basis. | DAT ↔ INF | Reported EQL 4 |
| AIC | Data-centre load clusters in a few regions; half of US electricity growth in 2025. | AIC → ENE | Reported EQL 4 |
| MIN | Power equipment and cables depend on refined minerals; the top refiner’s average share rose to 72% in 202540. | MIN → INF | Reported EQL 3 |
| TRD | Shipping lanes and ports carry cable ships and equipment; chokepoint data sit in sibling editions. | INF ↔ TRD | Inferred EQL 2 |
3.3Sector screens
All sixteen sectors are screened for their dependence on lifeline systems, on the same grammar as every national edition. The evidence column describes coverage of the baseline evidence, not the performance of the sector.
| Code | Sector | Baseline evidence | Exposure to watch | Evidence coverage |
|---|---|---|---|---|
| GS-00 | Cross-system | lifelines couple every sector14 | power loss with telecom failure | PARTIAL |
| GS-01 | Water | water works depend on power13 | outage and strikes | THIN |
| GS-02 | Energy | blackout of 28 April 20251 | voltage and frequency events | GOOD |
| GS-03 | Food and agrifood | cold chains depend on power | outage during heat | THIN |
| GS-04 | Health | hospitals depend on lifelines | loss of power and water | THIN |
| GS-05 | Finance and economy | USD 390 billion a year of disruption cost11 | payment and market outages | PARTIAL |
| GS-06 | Development | losses concentrate in lower-income countries11 | weak maintenance | PARTIAL |
| GS-07 | Climate | hazard losses above USD 250 billion a year10 | floods, cyclones, heat | GOOD |
| GS-08 | Disaster | cascading outages after hazards10 | concurrent hazards | PARTIAL |
| GS-09 | Infrastructure | US grade C and USD 3.6 trillion gap6 | ageing assets | GOOD |
| GS-10 | Cities | dense dependence on power and telecoms | multi-sector outage | THIN |
| GS-11 | Biodiversity | natural buffers for infrastructure | loss of buffers | THIN |
| GS-12 | Earth observation | positioning and timing signals underpin networks | signal interference | THIN |
| GS-13 | Cyber and digital | pre-positioning in four sectors2; 4,875 incidents3 | disruptive attacks | GOOD |
| GS-14 | Policy | critical-entity and network security rules1617 | implementation gaps | PARTIAL |
| GS-15 | Science | interdependency science is mature2829 | data at operating scale | PARTIAL |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 4Microsoft (ed.), Helping our customers through the CrowdStrike outage (blog post of 20 July 2024; estimate of 8.5 million Windows devices). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 7TeleGeography (ed.), Is it sabotage? Unraveling the mystery of undersea cable breaks (analysis of 199 faults a year, 2010 to 2023). TeleGeography, Washington. Observation year 2024. Accessed 2026-11-03.back
- 6ASCE (ed.), 2025 Report Card for America’s Infrastructure (overall grade C; ten-year investment gap USD 3.6 trillion; sector grades). American Society of Civil Engineers, Reston. Observation year 2025. Accessed 2026-11-03.back
- 10UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays (annual average loss to critical infrastructure above USD 250 billion for floods, tropical cyclones and earthquakes; about USD 2.3 trillion total annual disaster cost), taken from search-result summaries; the report page returned an access error. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-03.back
- 12UNVERIFIED, not opened: World Bank, United Nations and European Commission (eds.), Ukraine Fifth Rapid Damage and Needs Assessment (RDNA5), released 23 February 2026 (needs USD 587.7 billion over ten years; energy about USD 91 billion; direct damage to energy and extractives USD 24.8 billion to end 2025), taken from search-result summaries. Observation year 2025. Accessed 2026-11-03.back
- 40IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 13UNVERIFIED, not opened: press and think-tank reports on strikes on power and desalination plants in Kuwait, Bahrain and the United Arab Emirates, March to July 2026 (including The National, Arab News and the Arab Center Washington DC), taken from search-result summaries; no official damage assessment was found. Observation year 2026. Accessed 2026-11-03.back
- 11UNVERIFIED, not opened: Hallegatte, S., Rentschler, J. and Rozenberg, J., Lifelines: The Resilient Infrastructure Opportunity (disruptions cost at least USD 390 billion a year in low- and middle-income countries; USD 4.2 trillion net benefit; about USD 4 per USD 1), taken from search-result summaries; the repository returned an access error. World Bank and GFDRR, Washington, 2019. Observation year 2019. Accessed 2026-11-03.back
- 2CISA, NSA, FBI and partner agencies (eds.), PRC State-Sponsored Actors Compromise and Maintain Persistent Access to U.S. Critical Infrastructure (Volt Typhoon), joint cybersecurity advisory AA24-038A, 7 February 2024. CISA, Arlington. Observation year 2024. Accessed 2026-11-03.back
- 3ENISA (ed.), ENISA Threat Landscape 2025 (publication page; period 1 July 2024 to 30 June 2025; published 1 October 2025; version 1.3 of 22 September 2026). European Union Agency for Cybersecurity, Athens. Observation year 2025. Accessed 2026-11-03.back
- 16UNVERIFIED, not opened: Directive (EU) 2022/2557 on the resilience of critical entities, Official Journal of the European Union, 2022, cited from memory; the EUR-Lex request returned no text. Observation year 2022. Accessed 2026-11-03.back
- 17UNVERIFIED, not opened: Directive (EU) 2022/2555 on measures for a high common level of cybersecurity across the Union (NIS2), Official Journal of the European Union, 2022, cited from memory. Observation year 2022. Accessed 2026-11-03.back
- 28UNVERIFIED, not opened: Rinaldi, S.M., Peerenboom, J.P. and Kelly, T.K., Identifying, understanding, and analysing critical infrastructure interdependencies, IEEE Control Systems Magazine 21(6), 11 to 25, 2001, cited from memory. Observation year 2001. Accessed 2026-11-03.back
- 29UNVERIFIED, not opened: Buldyrev, S.V. et al., Catastrophic cascade of failures in interdependent networks, Nature 464, 1025 to 1028, 2010, cited from memory. Springer Nature. Observation year 2010. Accessed 2026-11-03.back
Risks and capability
Four global risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence; loss metrics are added only where they can be modelled.
4.1Risk objects
Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.
ReportedEQL 4RSK-SR02-INF-001
Grid failure with telecom and water knock-on
- Driver
- interacting technical factors in a synchronous grid1
- Exposure
- cities, hospitals, water works, exchanges
- Vulnerability
- uneven stabilisation capability; shared dependence on power
- Capacity
- black-start plans; priority supply; operator coordination
- Cascade
- ENE → INF → WAT, HLT
- Horizon
- 1 to 3 years
InferredEQL 3RSK-SR02-CYB-002
Pre-positioned access in operator networks
ReportedEQL 4RSK-SR02-DAT-003
Common-vendor software failure
- Driver
- one faulty update on a widely deployed platform4
- Exposure
- airlines, hospitals, banks, broadcasters
- Vulnerability
- concentrated vendors; automatic update paths
- Capacity
- staged roll-out; manual fallback; recovery playbooks
- Cascade
- DAT → INF → FIN, HLT
- Horizon
- annual
InferredEQL 3RSK-SR02-INF-004
Subsea link loss with limited repair capacity
4.2Capability ladder
Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence at the global level, from a policy listing to performance in real events.
| Function | Rung | Level | Strongest public evidence at baseline |
|---|---|---|---|
| Prevention and mitigation | EXISTS | security and continuity standards widespread; implementation uneven52022 | |
| Monitoring and observation | ADEQUATE | threat reporting by agencies; operator data uneven23 | |
| Early warning | EXISTS | advisories from agencies; no common cross-sector warning | |
| Preparedness and planning | EXISTS | critical-entity rules in force or being applied1618 | |
| Redundancy and reserves | LISTED | black-start and spare-capacity data not consolidated | |
| Response | DEMONSTRATED | operators restored services after the 2024 and 2025 events14 | |
| Continuity of critical services | EXISTS | priority supply to hospitals and water works in many systems; testing uneven | |
| Recovery | DEMONSTRATED | Iberian grid restored; causes published1 | |
| Adaptation | EXISTS | resilience standards and financing advice published1123 | |
| Social protection | LISTED | support during long outages not consolidated | |
| Finance and insurance | EXISTS | resilience financing guidance; protection gaps in sibling editions1011 | |
| Institutional coordination | EXISTS | EU and national frameworks; cross-border practice uneven161718 | |
| Technical infrastructure | EXISTS | ageing assets in places6 | |
| Workforce | LISTED | skills for operations and cable repair reported thin15 | |
| Research capacity | ADEQUATE | interdependency science mature282933 | |
| A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline. | |||
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 2CISA, NSA, FBI and partner agencies (eds.), PRC State-Sponsored Actors Compromise and Maintain Persistent Access to U.S. Critical Infrastructure (Volt Typhoon), joint cybersecurity advisory AA24-038A, 7 February 2024. CISA, Arlington. Observation year 2024. Accessed 2026-11-03.back
- 5NIST (ed.), The NIST Cybersecurity Framework (CSF) 2.0, NIST CSWP 29, 26 February 2024. National Institute of Standards and Technology, Gaithersburg. Observation year 2024. Accessed 2026-11-03.back
- 4Microsoft (ed.), Helping our customers through the CrowdStrike outage (blog post of 20 July 2024; estimate of 8.5 million Windows devices). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 7TeleGeography (ed.), Is it sabotage? Unraveling the mystery of undersea cable breaks (analysis of 199 faults a year, 2010 to 2023). TeleGeography, Washington. Observation year 2024. Accessed 2026-11-03.back
- 15UNVERIFIED, not opened: TeleGeography (ed.), submarine cable maintenance data (June 2025; about two thirds of repair ships reach end of service life by 2040), taken from search-result summaries. TeleGeography, Washington. Observation year 2025. Accessed 2026-11-03.back
- 20UNVERIFIED, not opened: ISO 22301:2019, Security and resilience: business continuity management systems. International Organization for Standardization, Geneva. Observation year 2019. Accessed 2026-11-03.back
- 22UNVERIFIED, not opened: IEC 62443 series, Security for industrial automation and control systems. International Electrotechnical Commission, Geneva. Observation year 2018. Accessed 2026-11-03.back
- 3ENISA (ed.), ENISA Threat Landscape 2025 (publication page; period 1 July 2024 to 30 June 2025; published 1 October 2025; version 1.3 of 22 September 2026). European Union Agency for Cybersecurity, Athens. Observation year 2025. Accessed 2026-11-03.back
- 16UNVERIFIED, not opened: Directive (EU) 2022/2557 on the resilience of critical entities, Official Journal of the European Union, 2022, cited from memory; the EUR-Lex request returned no text. Observation year 2022. Accessed 2026-11-03.back
- 18UNVERIFIED, not opened: The White House, National Security Memorandum on Critical Infrastructure Security and Resilience (NSM-22), 30 April 2024, cited from memory. Observation year 2024. Accessed 2026-11-03.back
- 11UNVERIFIED, not opened: Hallegatte, S., Rentschler, J. and Rozenberg, J., Lifelines: The Resilient Infrastructure Opportunity (disruptions cost at least USD 390 billion a year in low- and middle-income countries; USD 4.2 trillion net benefit; about USD 4 per USD 1), taken from search-result summaries; the repository returned an access error. World Bank and GFDRR, Washington, 2019. Observation year 2019. Accessed 2026-11-03.back
- 23UNVERIFIED, not opened: OECD (ed.), Good Governance for Critical Infrastructure Resilience. OECD Publishing, Paris, 2019. Observation year 2019. Accessed 2026-11-03.back
- 10UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays (annual average loss to critical infrastructure above USD 250 billion for floods, tropical cyclones and earthquakes; about USD 2.3 trillion total annual disaster cost), taken from search-result summaries; the report page returned an access error. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-03.back
- 17UNVERIFIED, not opened: Directive (EU) 2022/2555 on measures for a high common level of cybersecurity across the Union (NIS2), Official Journal of the European Union, 2022, cited from memory. Observation year 2022. Accessed 2026-11-03.back
- 6ASCE (ed.), 2025 Report Card for America’s Infrastructure (overall grade C; ten-year investment gap USD 3.6 trillion; sector grades). American Society of Civil Engineers, Reston. Observation year 2025. Accessed 2026-11-03.back
- 28UNVERIFIED, not opened: Rinaldi, S.M., Peerenboom, J.P. and Kelly, T.K., Identifying, understanding, and analysing critical infrastructure interdependencies, IEEE Control Systems Magazine 21(6), 11 to 25, 2001, cited from memory. Observation year 2001. Accessed 2026-11-03.back
- 29UNVERIFIED, not opened: Buldyrev, S.V. et al., Catastrophic cascade of failures in interdependent networks, Nature 464, 1025 to 1028, 2010, cited from memory. Springer Nature. Observation year 2010. Accessed 2026-11-03.back
- 33UNVERIFIED, not opened: Helbing, D., Globally networked risks and how to respond, Nature 497, 51 to 59, 2013, cited from memory. Springer Nature. Observation year 2013. Accessed 2026-11-03.back
Power loss that overlaps a telecom or cloud failure
A conditional statement under stated assumptions, never a prediction.
5.1Assumptions
Scenario SCN-SR02-PWR-01: what is assumed, and what is held constant.
- Baseline
- the 2026 reference state in this edition
- Drivers
- a regional power loss during a heat wave, coinciding with a software or cloud outage at a shared vendor
- Analogues
- Iberian blackout, 2025; global software outage, 202414
- Interventions
- none modelled: the specification describes the unmitigated case
- Run state
- narrative specification; quantified run scheduled for 2027
5.2The cascade, step by step
- 1
ENE → INF
voltage and frequency events trip generation; the grid separates
2025
- 2
INF → DAT
exchanges and data centres run on batteries and generators
2025
- 3
DAT → INF
a vendor outage removes remote management and payment services
2024
- 4
INF → WAT
pumping and treatment stop or run on reserves
2026
- 5
INF → HLT
hospitals move to emergency power; dispatch and records degrade
2024 · 2025
- 6
INF → FIN
payments and markets pause; losses accumulate
2024
5.3The scenario as a table of steps
How the shock in scenario SCN-SR02-PWR-01 would travel through Critical Infrastructure and Lifeline Systems‘s coupled systems, step by step, under the assumptions the edition states.
| Step | What happens | Source |
|---|---|---|
| 01 Energy to infrastructure | Voltage and frequency events trip generation; the grid separates. Analogue or source: 2025. | Edition SR-02, scenario SCN-SR02-PWR-01, step 1 |
| 02 Infrastructure to dat | Exchanges and data centres run on batteries and generators. Analogue or source: 2025. | Edition SR-02, scenario SCN-SR02-PWR-01, step 2 |
| 03 DAT to infrastructure | A vendor outage removes remote management and payment services. Analogue or source: 2024. | Edition SR-02, scenario SCN-SR02-PWR-01, step 3 |
| 04 Infrastructure to water | Pumping and treatment stop or run on reserves. Analogue or source: 2026. | Edition SR-02, scenario SCN-SR02-PWR-01, step 4 |
| 05 Infrastructure to health | Hospitals move to emergency power; dispatch and records degrade. Analogue or source: 2024 · 2025. | Edition SR-02, scenario SCN-SR02-PWR-01, step 5 |
| 06 Infrastructure to finance | Payments and markets pause; losses accumulate. Analogue or source: 2024. | Edition SR-02, scenario SCN-SR02-PWR-01, step 6 |
A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Critical Infrastructure and Lifeline Systems 2026, scenario SCN-SR02-PWR-01 (2026); Critical Infrastructure and Lifeline Systems 2026, references (NR-CIT-1) (2026).
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 4Microsoft (ed.), Helping our customers through the CrowdStrike outage (blog post of 20 July 2024; estimate of 8.5 million Windows devices). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
Readings from the other desks
The global baseline is read through each steward’s lens, then once as a whole. Each lens is a projection of reviewed findings, not a separate argument. The other desks’ own editions of this subject are listed first, as cross-references, not copies.
6.1The other desks’ editions of this subject
Federation: each desk writes its own edition for the subjects in its remit. Until a desk releases, its edition shows its frame and the reading this edition printed for it.
| Desk | Edition | State | Identifier |
|---|---|---|---|
| GCRI Systems Evidence | No edition of this subject at this desk in the 2026 Baseline cycle | Not in this cycle | |
| GRF Public Deliberation | Outside this desk’s remit | Not in remit | |
| GRA Capital Readiness | No edition of this subject at this desk in the 2026 Baseline cycle | Not in this cycle | |
| Standards Progress | Outside this desk’s remit | Not in remit | |
| Academy Capability | Outside this desk’s remit | Not in remit | |
| Index Measurement | Outside this desk’s remit | Not in remit |
6.2Three lenses
One edition, read by each steward. The lens of this site comes first.
GCRI · KEY T
Technical Truth
The evidence supports reading lifelines as one dependent network. Common causes recur across sectors, failures spread through shared dependence on power, telecoms and software, and recovery is limited by thresholds such as black-start capability and repair capacity. Evidence is strongest for single events and weakest for cross-sector dependency data.
INF-001 · CYB-002 · DAT-004 · SYS-012
GRF · KEY M
Public Meaning
For most people lifeline failure arrives as a dark home, a dry tap or a card that will not work. The baseline asks that public debate treat infrastructure as shared and interdependent, and keep recovery, not only prevention, in view.
INF-001 · DAT-004 · DEV-008
GRA · KEY F
Capital Meaning
Readiness implications only. Disruption is costly, resilient options are reported to return several times their cost, and the investment gap is large in places116. These show where finance-readiness evidence will matter. Nothing here is advice, a rating or an approval.
INF-005 · DEV-008
NEXUS
Synthesis
Lifeline risk is well described event by event and thinly measured as a system. The 2027 programme should bind dependency data, test the power and telecom compound loss, and map recovery thresholds before the next large event.
SYS-012 · L-01 · L-03
6.3Standards, Academy and steward contributions
How the Nexus Standards drafts, the Risk Academy and the three stewards feed each quarterly edition for lifeline systems. The standards are a preparatory working draft (2026) and are cited as drafts, never as adopted standards.
| Quarter | Edition | Question | Boundary |
|---|---|---|---|
| Q1 | State and Agenda | What matters this year, and what is the starting position? | observed baseline stays distinct from planned work |
| Q2 | Evidence and Build | What new evidence and capability exist? | a configured capability is not a validated result |
| Q3 | Stress Test and Readiness | What do scenarios and tests show? | simulated loss or performance is not observed impact |
| Q4 | Annual Synthesis and Renewal | What changed in the year, and what renews? | release follows review, not event publicity deadlines |
| Steward or body | Role | Contribution route |
|---|---|---|
| GCRI Canada | Lead Institution and Consortium Secretariat; publisher of record; technical truth (key T) | science and practice communities · GCRI gateway |
| The Global Risks Forum (GRF) | leadership, dialogue and the Universe programme; public meaning (key M) | policy, Universe and national adoption · GRF gateway |
| The Global Risks Alliance (GRA) | finance, insurance and development readiness; capital meaning (key F) | finance and insurance · GRA gateway |
| Nexus Standards | preparatory drafts on vocabulary, hazards, indicators and methods | Standards site · working groups HAZ, IND, MTH, FIN, AI |
| Risk Academy | learning pathways tied to the agenda questions | Academy gateway · learning by review |
| Reports strategic desks | lifeline chapter inputs: GCRI evidence and GRA readiness | strategic editorial board |
Standards drafts used in this edition
- Risk vocabulary NRS-C1 (424 terms) for terms in the glossary
- Hazard atlas NHS-1 1.1.0 (905 hazards in 120 families) for risk objects
- Seven risk classes: global, catastrophic, existential, emerging, planetary, exponential, frontier-tech
Standards calendar to watch
- Founding calls from 20 October 2026; working groups meet from 5 November 2026
- Inaugural Global Standards Council session, 12 January 2027
- Quarterly reviews in March, June, September and December, aligned with each edition
6.4GCRI reading: the model card
GCRI’s reading of this edition is its model card: what the national model is, what it computes and where it stops. It is printed in full in Annex A, with the methods it belongs to. Annex A, methodology
6.5Global Risks Forum reading: editorial essays
Four signed essays by the Reports editorial team set out the positions this edition takes. They are interpretation, labelled as such; the evidence they draw on is in the findings register.
Power runs the exchanges, the exchanges run the control systems, and software runs both. Treating each sector alone understates how a fault in one becomes a fault in all. This edition reads the network.
EDITORIAL ESSAY · 01
Lifelines are one network
Prevention fails sometimes. Restoration after the Iberian blackout and the 2024 software outage shows that recovery capability is a distinct and measurable asset.
EDITORIAL ESSAY · 02
Recovery is part of resilience
Agency reporting describes long-lived access to operator networks rather than visible outages. The risk is a capability held in reserve, which is hard to count and easy to underestimate.
EDITORIAL ESSAY · 03
Cyber evidence is mostly about access
The investment gap is large, and resilient options are reported to return several times their cost. Yet maintenance, coordination and data matter at least as much as capital.
EDITORIAL ESSAY · 04
Money is not the whole answer
6.6Global Risks Alliance reading: 2027 lifeline systems readiness pack
The registers that open the 2027 global cycle. At baseline each is initialised from this edition.
| Item | Register | State at baseline | First 2027 entry |
|---|---|---|---|
| E1 | Global risk state delta | baseline set by this edition | changes against the baseline |
| E2 | WEFH+B state delta | five global system readings set | indicator updates and freshness |
| E3 | Agenda and Portfolio movement | eight agenda items · 6 proposed objects | admission decisions |
| E4 | Federation delivery register | national chapters in preparation | national chapters |
| E5 | Consortium capability register | national consortia forming | first contributions |
| E6 | Leadership questions and challenges | none yet | first challenge log |
| E7 | Foundry technical state | national environments prepared | first federation cut |
| E8 | Publication candidates | twelve findings carried forward | PUBLISH · HOLD dispositions |
| E9 | Universe readiness | one candidate mission | admission and role spine |
| E10 | Correction register | none | first federation-wide cycle |
Publication dispositions
- Publish
- Hold
- Needs evidence
- Restricted
- Superseded
6.7Nexus Standards reading: standards and regulatory watch
Instruments and published guidance that shape the systems in this edition, by status on the retrieval date. The edition assesses no one’s compliance.
- IN FORCE
- ADOPTED
- PUBLISHED · GUIDANCE
- PUBLISHED · VOLUNTARY
| Instrument | Body | Scope | Status | Relevance |
|---|---|---|---|---|
| Critical Entities Resilience Directive16 | European Union | EU | IN FORCE | critical entities |
| NIS2 Directive17 | European Union | EU | IN FORCE | network security |
| National Security Memorandum 2218 | United States | US | ISSUED 2024 | infrastructure security |
| Sendai Framework 2015 to 203019 | UNDRR | global | ADOPTED 2015 | infrastructure damage target |
| NIST Cybersecurity Framework 2.05 | NIST | global use | PUBLISHED · VOLUNTARY | cyber risk |
| ISO/IEC 27001 information security21 | ISO | global | PUBLISHED · VOLUNTARY | security management |
| ISO 31000 risk management27 | ISO | global | PUBLISHED · VOLUNTARY | risk process |
| Cross-Sector Cybersecurity Performance Goals26 | CISA | US | PUBLISHED · GUIDANCE | baseline practices |
| ISO 22301 business continuity20 | ISO | global | PUBLISHED · VOLUNTARY | continuity |
| IEC 62443 control-system security22 | IEC | global | PUBLISHED · VOLUNTARY | operational technology |
| UN Convention on the Law of the Sea, articles 112 to 11524 | United Nations | global | IN FORCE | submarine cables |
Changed since 2024
6.8Risk Academy reading: literature and evidence review, science and assessments
The review behind this edition covers lifeline systems assessments, peer-reviewed science and the institutional reports that bind its findings. Systematic reviews for each agenda item begin in 2027.
Review protocol
- Question
- What does the published evidence establish about the world’s critical infrastructure and lifeline systems and its couplings?
- Sources searched
- agency advisories; operator and regulator reports; peer-reviewed interdependency literature; loss statistics
- Window
- releases available at evidence close, 30 September 2026
- Selection
- sources that bind or contextualise a finding in this edition
- Next step
- systematic reviews for agenda items 01 to 05 in 2027
| Reference | Type | Year | Role | Used for |
|---|---|---|---|---|
| Rinaldi, Peerenboom and Kelly28 | journal article | 2001 | framework | interdependencies |
| Buldyrev et al.29 | journal article | 2010 | supports | cascading failure |
| Koks et al.30 | journal article | 2019 | supports | transport hazard risk |
| Helbing33 | journal article | 2013 | framework | networked risk |
| Perrow, Normal Accidents34 | book | 1984 | framework | tight coupling |
| Zscheischler et al.32 | journal article | 2018 | framework | compound events |
| Reference | Issuer | Year | Role | Used for |
|---|---|---|---|---|
| Iberian blackout final report1 | ENTSO-E | 2026 | supports | grid failure |
| Joint cybersecurity advisory AA24-038A2 | CISA and partners | 2024 | supports | pre-positioning |
| ENISA Threat Landscape 20253 | ENISA | 2025 | supports | incident counts |
| GAR 202510 | UNDRR | 2025 | supports | hazard losses |
| GAR 202237 | UNDRR | 2022 | context | systemic risk |
| Lifelines11 | World Bank and GFDRR | 2019 | supports | disruption cost |
| Reference | Issuer | Year | Role | Used for |
|---|---|---|---|---|
| 2025 Report Card6 | ASCE | 2025 | supports | asset condition |
| RDNA512 | World Bank, UN, EU | 2026 | supports | reconstruction needs |
| Building Back Better31 | World Bank | 2018 | context | recovery |
| Energy and AI8 | IEA | 2025 | supports | load clusters |
| Electricity Grids and Secure Energy Transitions35 | IEA | 2023 | context | grid needs |
| Climate Resilience for Energy Security39 | IEA | 2022 | context | resilience |
| Global Critical Minerals Outlook 202640 | IEA | 2026 | supports | mineral concentration |
| Global Energy Review 20269 | IEA | 2026 | supports | electricity growth |
| Reference | Issuer | Year | Role | Used for |
|---|---|---|---|---|
| Microsoft statement on the 2024 outage4 | Microsoft | 2024 | supports | software failure |
| Root cause analysis36 | CrowdStrike | 2024 | context | software failure |
| Cable fault analysis7 | TeleGeography | 2024 | supports | subsea faults |
| Cable maintenance data15 | TeleGeography | 2025 | context | repair ships |
| Annual Outage Analysis 202614 | Uptime Institute | 2026 | context | outage cost |
| EU Action Plan on Cable Security38 | European Commission | 2025 | context | cable policy |
| Gulf desalination reporting13 | press and think tanks | 2026 | context | strikes on plants |
Where the evidence agrees
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 11UNVERIFIED, not opened: Hallegatte, S., Rentschler, J. and Rozenberg, J., Lifelines: The Resilient Infrastructure Opportunity (disruptions cost at least USD 390 billion a year in low- and middle-income countries; USD 4.2 trillion net benefit; about USD 4 per USD 1), taken from search-result summaries; the repository returned an access error. World Bank and GFDRR, Washington, 2019. Observation year 2019. Accessed 2026-11-03.back
- 6ASCE (ed.), 2025 Report Card for America’s Infrastructure (overall grade C; ten-year investment gap USD 3.6 trillion; sector grades). American Society of Civil Engineers, Reston. Observation year 2025. Accessed 2026-11-03.back
- 16UNVERIFIED, not opened: Directive (EU) 2022/2557 on the resilience of critical entities, Official Journal of the European Union, 2022, cited from memory; the EUR-Lex request returned no text. Observation year 2022. Accessed 2026-11-03.back
- 17UNVERIFIED, not opened: Directive (EU) 2022/2555 on measures for a high common level of cybersecurity across the Union (NIS2), Official Journal of the European Union, 2022, cited from memory. Observation year 2022. Accessed 2026-11-03.back
- 18UNVERIFIED, not opened: The White House, National Security Memorandum on Critical Infrastructure Security and Resilience (NSM-22), 30 April 2024, cited from memory. Observation year 2024. Accessed 2026-11-03.back
- 19UNVERIFIED, not opened: UNDRR (ed.), Sendai Framework for Disaster Risk Reduction 2015 to 2030 (target on damage to critical infrastructure), cited from memory. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2015. Accessed 2026-11-03.back
- 5NIST (ed.), The NIST Cybersecurity Framework (CSF) 2.0, NIST CSWP 29, 26 February 2024. National Institute of Standards and Technology, Gaithersburg. Observation year 2024. Accessed 2026-11-03.back
- 21UNVERIFIED, not opened: ISO/IEC 27001:2022, Information security management systems. International Organization for Standardization, Geneva. Observation year 2022. Accessed 2026-11-03.back
- 27UNVERIFIED, not opened: ISO 31000:2018, Risk management: guidelines. International Organization for Standardization, Geneva. Observation year 2018. Accessed 2026-11-03.back
- 26UNVERIFIED, not opened: CISA (ed.), Cross-Sector Cybersecurity Performance Goals. Cybersecurity and Infrastructure Security Agency, Arlington, cited from memory. Observation year 2022. Accessed 2026-11-03.back
- 20UNVERIFIED, not opened: ISO 22301:2019, Security and resilience: business continuity management systems. International Organization for Standardization, Geneva. Observation year 2019. Accessed 2026-11-03.back
- 22UNVERIFIED, not opened: IEC 62443 series, Security for industrial automation and control systems. International Electrotechnical Commission, Geneva. Observation year 2018. Accessed 2026-11-03.back
- 24UNVERIFIED, not opened: United Nations Convention on the Law of the Sea (1982), articles 112 to 115 on submarine cables and pipelines, cited from memory. United Nations, New York. Observation year 1982. Accessed 2026-11-03.back
- 1ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 38UNVERIFIED, not opened: European Commission and High Representative, Joint Communication on an EU Action Plan on Cable Security, February 2025, cited from memory. Observation year 2025. Accessed 2026-11-03.back
- 25UNVERIFIED, not opened: Protocol Additional to the Geneva Conventions of 12 August 1949 relating to the Protection of Victims of International Armed Conflicts (Protocol I), articles 54 and 56 on objects indispensable to survival and works containing dangerous forces, cited from memory. International Committee of the Red Cross, Geneva. Observation year 1977. Accessed 2026-11-03.back
- 28UNVERIFIED, not opened: Rinaldi, S.M., Peerenboom, J.P. and Kelly, T.K., Identifying, understanding, and analysing critical infrastructure interdependencies, IEEE Control Systems Magazine 21(6), 11 to 25, 2001, cited from memory. Observation year 2001. Accessed 2026-11-03.back
- 29UNVERIFIED, not opened: Buldyrev, S.V. et al., Catastrophic cascade of failures in interdependent networks, Nature 464, 1025 to 1028, 2010, cited from memory. Springer Nature. Observation year 2010. Accessed 2026-11-03.back
- 30UNVERIFIED, not opened: Koks, E.E. et al., A global multi-hazard risk analysis of road and railway infrastructure assets, Nature Communications 10, 2677, 2019, cited from memory. Springer Nature. Observation year 2019. Accessed 2026-11-03.back
- 33UNVERIFIED, not opened: Helbing, D., Globally networked risks and how to respond, Nature 497, 51 to 59, 2013, cited from memory. Springer Nature. Observation year 2013. Accessed 2026-11-03.back
- 34UNVERIFIED, not opened: Perrow, C., Normal Accidents: Living with High-Risk Technologies. Basic Books, New York, 1984, cited from memory. Observation year 1984. Accessed 2026-11-03.back
- 32UNVERIFIED, not opened: Zscheischler, J. et al., Future climate risk from compound events, Nature Climate Change 8, 469 to 477, 2018, cited from memory. Springer Nature. Observation year 2018. Accessed 2026-11-03.back
- 2CISA, NSA, FBI and partner agencies (eds.), PRC State-Sponsored Actors Compromise and Maintain Persistent Access to U.S. Critical Infrastructure (Volt Typhoon), joint cybersecurity advisory AA24-038A, 7 February 2024. CISA, Arlington. Observation year 2024. Accessed 2026-11-03.back
- 3ENISA (ed.), ENISA Threat Landscape 2025 (publication page; period 1 July 2024 to 30 June 2025; published 1 October 2025; version 1.3 of 22 September 2026). European Union Agency for Cybersecurity, Athens. Observation year 2025. Accessed 2026-11-03.back
- 10UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays (annual average loss to critical infrastructure above USD 250 billion for floods, tropical cyclones and earthquakes; about USD 2.3 trillion total annual disaster cost), taken from search-result summaries; the report page returned an access error. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-03.back
- 37UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2022: Our World at Risk. United Nations Office for Disaster Risk Reduction, Geneva, cited from memory. Observation year 2022. Accessed 2026-11-03.back
- 12UNVERIFIED, not opened: World Bank, United Nations and European Commission (eds.), Ukraine Fifth Rapid Damage and Needs Assessment (RDNA5), released 23 February 2026 (needs USD 587.7 billion over ten years; energy about USD 91 billion; direct damage to energy and extractives USD 24.8 billion to end 2025), taken from search-result summaries. Observation year 2025. Accessed 2026-11-03.back
- 31UNVERIFIED, not opened: Hallegatte, S., Rentschler, J. and Walsh, B., Building Back Better: Achieving Resilience through Stronger, Faster, and More Inclusive Post-Disaster Reconstruction. World Bank, Washington, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03.back
- 8IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: IEA (ed.), Electricity Grids and Secure Energy Transitions. International Energy Agency, Paris, 2023, cited from memory. Observation year 2023. Accessed 2026-11-03.back
- 39UNVERIFIED, not opened: IEA (ed.), Climate Resilience for Energy Security. International Energy Agency, Paris, 2022, cited from memory. Observation year 2022. Accessed 2026-11-03.back
- 40IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 9IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 4Microsoft (ed.), Helping our customers through the CrowdStrike outage (blog post of 20 July 2024; estimate of 8.5 million Windows devices). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 36UNVERIFIED, not opened: CrowdStrike (ed.), External technical root cause analysis for the Channel File 291 incident, August 2024, cited from memory; no figure used. CrowdStrike, Austin. Observation year 2024. Accessed 2026-11-03.back
- 7TeleGeography (ed.), Is it sabotage? Unraveling the mystery of undersea cable breaks (analysis of 199 faults a year, 2010 to 2023). TeleGeography, Washington. Observation year 2024. Accessed 2026-11-03.back
- 15UNVERIFIED, not opened: TeleGeography (ed.), submarine cable maintenance data (June 2025; about two thirds of repair ships reach end of service life by 2040), taken from search-result summaries. TeleGeography, Washington. Observation year 2025. Accessed 2026-11-03.back
- 14UNVERIFIED, not opened: Uptime Institute (ed.), Annual Outage Analysis 2026 (57% of respondents in the 2025 survey reported a latest major outage above USD 100,000), taken from a press release summary; the report is limited to members. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
- 13UNVERIFIED, not opened: press and think-tank reports on strikes on power and desalination plants in Kuwait, Bahrain and the United Arab Emirates, March to July 2026 (including The National, Arab News and the Arab Center Washington DC), taken from search-result summaries; no official damage assessment was found. Observation year 2026. Accessed 2026-11-03.back
The 2027 agenda
Eight bounded questions open the 2027 lifeline systems agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 lifeline systems edition.
7.1Questions for the operational series
- L-01
How would a regional power loss that overlaps a telecom or cloud failure spread through water, health and transport at the same time?
INI-SR02-PWR-01 · power and telecom compound loss; first output: dependency analysis for six regions.
- L-02
Which shared dependencies (power, telecoms, software, positioning) sit behind the most services?
INI-SR02-DEP-02 · shared dependencies; first output: dependency register.
- L-03
How long do lifeline services take to return after major outages, and what limits recovery?
INI-SR02-RST-03 · restoration times; first output: restoration table.
- L-04
Where are subsea links and repair capacity thinnest?
INI-SR02-CBL-04 · subsea links; first output: link and repair map.
- L-05
How do ageing assets and investment gaps coincide with hazard exposure?
INI-SR02-AST-05 · asset condition and exposure; first output: exposure overlay.
- L-06
Which operators and states publish incident data on a comparable basis?
To be admitted in 2027; first output: coverage note.
- L-07
How do conflict and sabotage threats change protection priorities for water and power?
To be admitted in 2027; first output: scoping note.
- L-08
Which lifeline capabilities have been tested in real outages, and which are only planned?
Lifeline capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for the 2027 lifeline portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-SR02-PWR-01 | Power and telecom compound loss | Initiative | L-01 | PROPOSED |
| INI-SR02-DEP-02 | Shared dependencies | Initiative | L-02 | PROPOSED |
| INI-SR02-RST-03 | Restoration times | Initiative | L-03 | PROPOSED |
| INI-SR02-CBL-04 | Subsea links and repair capacity | Initiative | L-04 | PROPOSED |
| INI-SR02-AST-05 | Asset condition and exposure | Initiative | L-05 | PROPOSED |
| MSN-SR02-2027-01 | Power and telecom loss Universe mission | Mission | L-01 | Candidate |
7.3The pathway
The lifeline systems edition reads national infrastructure chapters, sector editions and the global edition through one governed evidence graph. At baseline the federation is designed and its first editions are drafted. This page states what exists today and what comes next.
- 01
National infrastructure chapters
lifeline reading in each national edition
IN PREPARATION · national baselines
- 02
Sector editions
power, water, cyber, transport
PLANNED · sector Baseline Editions
- 03
Lifeline systems model
the global lifeline system of systems
v0 SPECIFIED · v1 with federation evidence
- 04
Strategic links
SR-01 · SR-03 supply chains · SR-10 digital public infrastructure
PLANNED · strategic baselines
- 05
Universe
annual proving environment
CANDIDATE MISSION · mandate in 2027
- 06
Lifeline Systems Report
this series
BASELINE DRAFT · 2027 annual edition
- 07
Evidence and correction
one graph, many projections
OPEN · first correction cycle in 2027
7.4Universe 2027: evidence pack for the lifeline systems candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | 2027 lifeline systems annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-SR02-2027-01 · Power and telecom loss Universe mission
- Role spine
- Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| INF-001 · grid failure | regional consortia | grid constraint overlay | PUBLIC |
| CYB-002 · pre-positioning | INI-SR02-DEP-02 | shared dependencies | PUBLIC |
| DAT-004 · software failure | INI-SR02-DEP-02 | shared dependencies | PUBLIC |
| INF-005 · asset condition | INI-SR02-AST-05 | asset condition and exposure | PUBLIC |
| INF-006 · subsea links | INI-SR02-CBL-04 | subsea links and repair capacity | PUBLIC |
| DEV-008 · disruption cost | INI-SR02-RST-03 · key F review | restoration times | PUBLIC |
| CON-009 · war damage | sector editions | recovery needs | PUBLIC |
| SYS-012 · compound pathway | MSN-SR02-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the federation | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| Incident and advisory feeds | CISA and partner agencies | per event | CYB-002 |
| EU threat landscape | ENISA | annual | CYB-003 |
| Transparency platform for the continental grid | ENTSO-E | hourly | INF-001 |
| Cable fault and repair data | TeleGeography and industry | per event | INF-006 |
| Disaster loss data | UNDRR and reinsurers | annual | CLI-007 |
| Outage analysis | Uptime Institute | annual | DAT-004 |
| Damage assessments | World Bank, UN and EU | annual | CON-009 |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- annual publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-SR02-001 | Single-vendor software outage in 20244 | CORROBORATED | DAT · INF | risk object RSK-SR02-DAT-003 |
| SIG-SR02-002 | Multi-year pre-positioning reported in four sectors2 | CORROBORATED | INF · DAT | research question L-02 |
| SIG-SR02-003 | Strikes on co-located power and water plants in 202613 | PARTIAL | ENE · WAT | research question L-01 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 4Microsoft (ed.), Helping our customers through the CrowdStrike outage (blog post of 20 July 2024; estimate of 8.5 million Windows devices). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 2CISA, NSA, FBI and partner agencies (eds.), PRC State-Sponsored Actors Compromise and Maintain Persistent Access to U.S. Critical Infrastructure (Volt Typhoon), joint cybersecurity advisory AA24-038A, 7 February 2024. CISA, Arlington. Observation year 2024. Accessed 2026-11-03.back
- 13UNVERIFIED, not opened: press and think-tank reports on strikes on power and desalination plants in Kuwait, Bahrain and the United Arab Emirates, March to July 2026 (including The National, Arab News and the Arab Center Washington DC), taken from search-result summaries; no official damage assessment was found. Observation year 2026. Accessed 2026-11-03.back
Systems in depth
One section per system: its state at evidence close, its exposures and what the operational series will watch.
8.1Common causes
One cause can strike many lifelines at once: a hazard, a cyber campaign, a war or a faulty update. The shared cause matters more than the sector.
| Instance | Mechanism in action | Evidence | Status |
|---|---|---|---|
| Natural hazards | floods, cyclones and earthquakes drive large annual losses to infrastructure | 10 | Reported |
| Cyber operations | pre-positioning reported in four sectors | 23 | Reported |
| Conflict | direct strikes on power and water plants | 1213 | Reported |
| Software faults | one update reached millions of devices | 4 | Reported |
Pathways in this mechanism
- CLI → INF hazards
- DAT → INF software and cyber
- CON → INF strikes
Evidence to bind in 2027
- common cause tagging of incidents
- frequency of concurrent causes
Related editions
- GLB Global Systems
- SR-01 Global Polycrisis and Cascading Systems Risk
- SR-03 Global Supply Chains, Trade and Chokepoints
- SR-10 Digital Public Infrastructure and Systemic Cyber Risk
- GS-02 Energy
- GS-13 Cyber and Digital Systems
8.2Domino effects
A failure in one lifeline removes an input from the next. Power outages reach water works, exchanges and hospitals in sequence.
| Instance | Mechanism in action | Evidence | Status |
|---|---|---|---|
| Power to telecoms | exchanges run on batteries and generators after grid loss | 1 | Inferred |
| Software to services | one vendor update disabled many operators’ machines | 4 | Reported |
| Power to water | co-located plants lose both services when struck | 13 | Reported |
| Water to health | hospital supply depends on water works | 11 | Inferred |
Pathways in this mechanism
- ENE → INF → WAT, HLT
- DAT → INF → FIN
- CON → ENE, WAT
Evidence to bind in 2027
- sequence timing of service loss
- hospital-level dependence data
Related editions
- GLB Global Systems
- SR-01 Global Polycrisis and Cascading Systems Risk
- SR-03 Global Supply Chains, Trade and Chokepoints
- SR-10 Digital Public Infrastructure and Systemic Cyber Risk
- GS-02 Energy
- GS-13 Cyber and Digital Systems
8.3Inter-systemic feedbacks
Lifelines also depend on what they power. Control networks need telecoms, telecoms need power, and digital loads press back on grids.
| Instance | Mechanism in action | Evidence | Status |
|---|---|---|---|
| Digital load to grid | clustered demand tightens local grids | 89 | Reported |
| Grid to digital | data centres need continuous power | 14 | Inferred |
| Remote control | control networks need telecoms and power | 5 | Inferred |
| Financial feedback | losses feed budgets and delay maintenance | 11 | Inferred |
Pathways in this mechanism
- AIC → ENE
- ENE → AIC → INF
- DAT ↔ INF
Evidence to bind in 2027
- control-network dependence data
- cluster-level reliability
Related editions
- GLB Global Systems
- SR-01 Global Polycrisis and Cascading Systems Risk
- SR-03 Global Supply Chains, Trade and Chokepoints
- SR-10 Digital Public Infrastructure and Systemic Cyber Risk
- GS-02 Energy
- GS-13 Cyber and Digital Systems
8.4Shared vulnerabilities
Different lifelines share the same weak points: subsea cables, widely deployed software, ageing assets and a few repair resources.
of faults from fishing and transport vessels7
| Instance | Mechanism in action | Evidence | Status |
|---|---|---|---|
| Subsea cables | frequent, mostly accidental faults; few repair ships | 715 | Reported |
| Common software | a shared platform spreads one fault widely | 4 | Reported |
| Ageing assets | energy D+, wastewater D+, dams D+ in the US | 6 | Reported |
| Positioning and timing | signals underpin networks; no consolidated series here | 8 | Expert input |
Pathways in this mechanism
- INF → DAT cable loss
- DAT → INF software
- INF → FIN deferred maintenance
Evidence to bind in 2027
- repair-vessel capacity by region
- dependence on positioning and timing
Related editions
- GLB Global Systems
- SR-01 Global Polycrisis and Cascading Systems Risk
- SR-03 Global Supply Chains, Trade and Chokepoints
- SR-10 Digital Public Infrastructure and Systemic Cyber Risk
- GS-02 Energy
- GS-13 Cyber and Digital Systems
8.5Thresholds and tipping
A system can absorb stress until a threshold is crossed. Black-start capability, repair capacity and recovery finance are such thresholds for lifelines.
| Instance | Mechanism in action | Evidence | Status |
|---|---|---|---|
| Restoration capacity | service returned after 2024 and 2025 events; times not consolidated | 14 | Reported |
| Repair capacity | ageing repair fleet | 15 | Reported |
| Recovery finance | needs far exceed damage recorded to date | 12 | Reported |
| Tipping in networks | cascades can become abrupt in interdependent networks | 29 | Inferred |
Pathways in this mechanism
- INF → INF cascade thresholds
- FIN → INF recovery finance
- CON → INF repeated damage
Evidence to bind in 2027
- black-start capability data
- cascade thresholds at operating scale
Related editions
- GLB Global Systems
- SR-01 Global Polycrisis and Cascading Systems Risk
- SR-03 Global Supply Chains, Trade and Chokepoints
- SR-10 Digital Public Infrastructure and Systemic Cyber Risk
- GS-02 Energy
- GS-13 Cyber and Digital Systems
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 3ENISA (ed.), ENISA Threat Landscape 2025 (publication page; period 1 July 2024 to 30 June 2025; published 1 October 2025; version 1.3 of 22 September 2026). European Union Agency for Cybersecurity, Athens. Observation year 2025. Accessed 2026-11-03.back
- 2CISA, NSA, FBI and partner agencies (eds.), PRC State-Sponsored Actors Compromise and Maintain Persistent Access to U.S. Critical Infrastructure (Volt Typhoon), joint cybersecurity advisory AA24-038A, 7 February 2024. CISA, Arlington. Observation year 2024. Accessed 2026-11-03.back
- 10UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays (annual average loss to critical infrastructure above USD 250 billion for floods, tropical cyclones and earthquakes; about USD 2.3 trillion total annual disaster cost), taken from search-result summaries; the report page returned an access error. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-03.back
- 12UNVERIFIED, not opened: World Bank, United Nations and European Commission (eds.), Ukraine Fifth Rapid Damage and Needs Assessment (RDNA5), released 23 February 2026 (needs USD 587.7 billion over ten years; energy about USD 91 billion; direct damage to energy and extractives USD 24.8 billion to end 2025), taken from search-result summaries. Observation year 2025. Accessed 2026-11-03.back
- 13UNVERIFIED, not opened: press and think-tank reports on strikes on power and desalination plants in Kuwait, Bahrain and the United Arab Emirates, March to July 2026 (including The National, Arab News and the Arab Center Washington DC), taken from search-result summaries; no official damage assessment was found. Observation year 2026. Accessed 2026-11-03.back
- 4Microsoft (ed.), Helping our customers through the CrowdStrike outage (blog post of 20 July 2024; estimate of 8.5 million Windows devices). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 1ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 11UNVERIFIED, not opened: Hallegatte, S., Rentschler, J. and Rozenberg, J., Lifelines: The Resilient Infrastructure Opportunity (disruptions cost at least USD 390 billion a year in low- and middle-income countries; USD 4.2 trillion net benefit; about USD 4 per USD 1), taken from search-result summaries; the repository returned an access error. World Bank and GFDRR, Washington, 2019. Observation year 2019. Accessed 2026-11-03.back
- 9IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 8IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back
- 14UNVERIFIED, not opened: Uptime Institute (ed.), Annual Outage Analysis 2026 (57% of respondents in the 2025 survey reported a latest major outage above USD 100,000), taken from a press release summary; the report is limited to members. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
- 5NIST (ed.), The NIST Cybersecurity Framework (CSF) 2.0, NIST CSWP 29, 26 February 2024. National Institute of Standards and Technology, Gaithersburg. Observation year 2024. Accessed 2026-11-03.back
- 7TeleGeography (ed.), Is it sabotage? Unraveling the mystery of undersea cable breaks (analysis of 199 faults a year, 2010 to 2023). TeleGeography, Washington. Observation year 2024. Accessed 2026-11-03.back
- 6ASCE (ed.), 2025 Report Card for America’s Infrastructure (overall grade C; ten-year investment gap USD 3.6 trillion; sector grades). American Society of Civil Engineers, Reston. Observation year 2025. Accessed 2026-11-03.back
- 15UNVERIFIED, not opened: TeleGeography (ed.), submarine cable maintenance data (June 2025; about two thirds of repair ships reach end of service life by 2040), taken from search-result summaries. TeleGeography, Washington. Observation year 2025. Accessed 2026-11-03.back
- 29UNVERIFIED, not opened: Buldyrev, S.V. et al., Catastrophic cascade of failures in interdependent networks, Nature 464, 1025 to 1028, 2010, cited from memory. Springer Nature. Observation year 2010. Accessed 2026-11-03.back
Methodology
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
A.1Methods
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | Result |
|---|---|---|---|
| (1) | Factors named in the Iberian blackout page summary | count of listed factors | 5, unweighted |
| (2) | ENISA incidents per month in the period | 4,875 ÷ 12 | ≈ 406 |
| (3) | Subsea faults per week at the average | 199 ÷ 52 | ≈ 3.8 |
| (4) | Faults a year from external aggression (about) | 199 × 2 ÷ 3 | ≈ 133 |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| Label | Rule |
|---|---|
| Reported | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Estimated | Nexus analytical value with stated method |
| Scenario | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, Lifeline Systems Model v0
- Model ID
- MDL-SR02-LIFELINES · v0.1
- Purpose
- represent lifeline systems as a dependent network and the mechanisms by which failures spread between power, water, communications, transport and health
- Family
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- Method
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- Validation
- none yet, first validation against federation evidence in 2027
- Uncertainty
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for asset-, site- or country-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-STRATEGIC-LIFELINES-GLOBAL-2026-B0
- Type
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 40 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 lifeline systems annual cut
Lineage
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | 2027 global annual |
|---|---|---|
| Sources | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | Lifeline Systems Model v0 specification | model runs with receipts |
| Findings | twelve baseline findings | findings re-bound to federation evidence |
| Review | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | Observed | Released | Cadence | Next release |
|---|---|---|---|---|
| Grid failure analysis | 2025 | Mar 2026 | one-off | follow-up reports |
| Cyber advisories | 2024 | Feb 2024 | per event | next joint advisory |
| EU incident counts | Jul 2024 to Jun 2025 | Oct 2025 · v1.3 Sep 2026 | annual | next ENISA report |
| Software outage | 2024 | Jul 2024 | one-off | none scheduled |
| US asset condition | 2025 | Mar 2025 | four-yearly | 2029 |
| Cable fault average | 2010 to 2023 | 2024 | ad hoc | next analysis |
| Hazard losses to infrastructure | 2025 | May 2025 | biennial | 2027 |
| Disruption cost in LMICs | 2019 | 2019 | one-off | no update found |
| Reconstruction needs | to Dec 2025 | Feb 2026 | annual | RDNA6 |
| Gulf strikes | 2026 | Mar to Jul 2026 | per event | not verified |
| System | Coverage | Thinnest dimension |
|---|---|---|
| Power | GOOD | restoration times |
| Communications | PARTIAL | cross-operator dependency |
| Water | THIN | interdependence with power |
| Transport | THIN | cross-modal dependence |
| Health | THIN | facility-level resilience |
| Cyber | PARTIAL | operator-level data |
| Finance of resilience | PARTIAL | recent estimates |
| Conflict damage | THIN | verified 2026 damage |
| Field | Source that would fill it | Blocker |
|---|---|---|
| Cross-sector dependency data at city and national scale | operators, regulators and national statistics offices | security-sensitive and not published on a common basis |
| Restoration times for lifeline services after major outages | operator and regulator reports | not retrieved; no consolidated series |
| Full text of the ENTSO-E final report and its recommendation count | ENTSO-E final report1 | only the publication page was opened; sources disagree on the number of recommendations |
| ENISA sector breakdown and top threats | ENISA Threat Landscape 2025 full report3 | the publication page was read; the PDF was not opened and the page notes corrected figures in version 1.3 |
| Subsea cable repair capacity by region | TeleGeography and ICPC15 | ship counts not retrieved; the 2040 end-of-life figure rests on a search summary |
| Verified damage to Gulf power and desalination plants | national authorities and independent assessments13 | press and think-tank reports only; no official damage assessment found |
| Share of outages caused by power failure at digital facilities | Uptime Institute Annual Outage Analysis14 | report limited to members and subscribers |
| UNDRR GAR 2025 infrastructure loss figures from the report itself | UNDRR GAR 202510 | the report page returned an access error; figures come from search summaries |
| World Bank Lifelines figures from the report itself | World Bank and GFDRR11 | the repository returned an access error; figures come from search summaries |
| Condition of infrastructure outside the United States on one scale | national report cards and statistics | no comparable global series found |
| Status of EU critical entity identification by Member States | European Commission, national authorities16 | not retrieved |
| Capability rungs beyond restoration | operators, regulators, ministries | not reviewed |
A.5Evidence cards, two anchor sources
Issued by the association of European transmission system operators. One-off. Role: binds INF-001. Coverage: Continental Europe. The publication page was read; the full report was not opened.
EVD-SR02-001
ENTSO-E publication page on the Iberian blackout1
Issued by the EU Agency for Cybersecurity. Annual. Role: binds CYB-003. Reporting period 1 July 2024 to 30 June 2025; the page notes corrections in version 1.3.
EVD-SR02-002
ENISA Threat Landscape 20253
| Dimension | EVD-SR02-001 | EVD-SR02-002 |
|---|---|---|
| Completeness | event-specific; some generation data missing | incidents analysed; sector split not read |
| Timeliness | about 11 months after the event | about 3 months after the period |
| Revision | final after interim reports | version 1.3 corrected figures |
| Method transparency | expert panel method published | threat-centric method stated |
| External validation | independent expert panel | agency review |
Evidence cards to follow in 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Group | Area | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- Maps
- plates in Q2 2027
- Waivers
- none
A.7Status words
| Status | What it means |
|---|---|
| Observed | Measured directly and published by the source. |
| Reported | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| Estimated | A Nexus estimate from cited evidence, with its method in Annex A. |
| Modelled | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Scenario | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Step | What happens | Source |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Term | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Coupling | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| ASCE | American Society of Civil Engineers |
| CISA | US Cybersecurity and Infrastructure Security Agency |
| CSF | Cybersecurity Framework |
| ENISA | European Union Agency for Cybersecurity |
| ENTSO-E | European Network of Transmission System Operators for Electricity |
| GAR | Global Assessment Report on Disaster Risk Reduction |
| ICPC | International Cable Protection Committee |
| LMIC | low- and middle-income countries |
| NIS2 | second Network and Information Security Directive |
| OT | operational technology |
| RDNA | Rapid Damage and Needs Assessment |
| UNDRR | United Nations Office for Disaster Risk Reduction |
A.10Technical annex
| Item | Annex | Contents | Status |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-SR02-PWR-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Regional notes | regional lifeline cards | WITH REGIONAL EDITIONS |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: subsea cable fault
- Construct
- a reported break or damage event on a telecommunications submarine cable
- Unit
- faults per year
- Method
- industry fault databases and operator reports
- Source
- TeleGeography analysis7
- Uncertainty
- counts depend on the database; public and private series differ
- Known limits
- does not record intent or repair time
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 3ENISA (ed.), ENISA Threat Landscape 2025 (publication page; period 1 July 2024 to 30 June 2025; published 1 October 2025; version 1.3 of 22 September 2026). European Union Agency for Cybersecurity, Athens. Observation year 2025. Accessed 2026-11-03.back
- 15UNVERIFIED, not opened: TeleGeography (ed.), submarine cable maintenance data (June 2025; about two thirds of repair ships reach end of service life by 2040), taken from search-result summaries. TeleGeography, Washington. Observation year 2025. Accessed 2026-11-03.back
- 13UNVERIFIED, not opened: press and think-tank reports on strikes on power and desalination plants in Kuwait, Bahrain and the United Arab Emirates, March to July 2026 (including The National, Arab News and the Arab Center Washington DC), taken from search-result summaries; no official damage assessment was found. Observation year 2026. Accessed 2026-11-03.back
- 14UNVERIFIED, not opened: Uptime Institute (ed.), Annual Outage Analysis 2026 (57% of respondents in the 2025 survey reported a latest major outage above USD 100,000), taken from a press release summary; the report is limited to members. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
- 10UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays (annual average loss to critical infrastructure above USD 250 billion for floods, tropical cyclones and earthquakes; about USD 2.3 trillion total annual disaster cost), taken from search-result summaries; the report page returned an access error. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-03.back
- 11UNVERIFIED, not opened: Hallegatte, S., Rentschler, J. and Rozenberg, J., Lifelines: The Resilient Infrastructure Opportunity (disruptions cost at least USD 390 billion a year in low- and middle-income countries; USD 4.2 trillion net benefit; about USD 4 per USD 1), taken from search-result summaries; the repository returned an access error. World Bank and GFDRR, Washington, 2019. Observation year 2019. Accessed 2026-11-03.back
- 16UNVERIFIED, not opened: Directive (EU) 2022/2557 on the resilience of critical entities, Official Journal of the European Union, 2022, cited from memory; the EUR-Lex request returned no text. Observation year 2022. Accessed 2026-11-03.back
- 2CISA, NSA, FBI and partner agencies (eds.), PRC State-Sponsored Actors Compromise and Maintain Persistent Access to U.S. Critical Infrastructure (Volt Typhoon), joint cybersecurity advisory AA24-038A, 7 February 2024. CISA, Arlington. Observation year 2024. Accessed 2026-11-03.back
- 6ASCE (ed.), 2025 Report Card for America’s Infrastructure (overall grade C; ten-year investment gap USD 3.6 trillion; sector grades). American Society of Civil Engineers, Reston. Observation year 2025. Accessed 2026-11-03.back
- 7TeleGeography (ed.), Is it sabotage? Unraveling the mystery of undersea cable breaks (analysis of 199 faults a year, 2010 to 2023). TeleGeography, Washington. Observation year 2024. Accessed 2026-11-03.back
Data appendix
The indicator set with its sources, the source registers, the licences of every kind of material and the formats of the edition.
B.1The indicator set
| Indicator | Value | Unit | Year | State | Source |
|---|---|---|---|---|---|
| Subsea cable faults, average | 199 | a year | 2010 to 2023 | Reported | 7 |
| Faults from external aggression | ≈ two thirds | share | 2010 to 2023 | Reported | 7 |
| ENISA incidents analysed | 4,875 | incidents | Jul 2024 to Jun 2025 | Reported | 3 |
| Windows devices affected | 8.5 | million | 2024 | Reported | 4 |
| Longest reported intrusion persistence | ≥ 5 | years | 2024 | Reported | 2 |
| US overall infrastructure grade | C | letter grade | 2025 | Reported | 6 |
| US ten-year investment gap | 3.6 | USD trillion | 2025 | Reported | 6 |
| Annual loss to infrastructure, three hazards | >250 | USD billion | 2025 | Reported | 10 |
| Annual disruption cost, LMICs | ≥ 390 | USD billion | 2019 | Reported | 11 |
| Return on resilient options | ≈ 4 | USD per USD 1 | 2019 | Estimated | 11 |
| Ukraine recovery needs, ten years | 587.7 | USD billion | to Dec 2025 | Reported | 12 |
| Ukraine energy needs, ten years | ≈ 91 | USD billion | to Dec 2025 | Reported | 12 |
| Direct damage, energy and extractives | 24.8 | USD billion | to Dec 2025 | Reported | 12 |
| Share of US electricity growth from data centres | ≈ 50 | % | 2025 | Reported | 9 |
| Operators reporting outage cost above USD 100,000 | 57 | % | 2025 | Reported | 14 |
B.2Global source register
The governed source set behind this edition. Each source keeps its authority, coverage, cadence and role; categories describe origin, not truth.
Domains bound by the register
- INF
- ENE
- DAT
- CLI
- FIN
- WAT
- HLT
- AIC
- MIN
- TRD
| Source | Category | Coverage | Period | Cadence | Role |
|---|---|---|---|---|---|
| ENTSO-E final report1 | operators’ association | Continental Europe | 2025 | one-off | grid failure |
| CISA advisory AA24-038A2 | national agencies | US and partners | 2024 | per event | cyber access |
| ENISA Threat Landscape3 | EU agency | EU | 2024 to 2025 | annual | incidents |
| Microsoft statement4 | vendor | global | 2024 | one-off | software failure |
| NIST CSF 2.05 | national standards body | global use | 2024 | periodic | cyber framework |
| ASCE Report Card6 | professional body | US | 2025 | four-yearly | asset condition |
| TeleGeography7 | market analyst | global | 2010 to 2023 | ad hoc | cable faults |
| UNDRR GAR 202510 | UN agency | global | 2025 | biennial | hazard losses |
| World Bank Lifelines11 | multilateral bank | LMICs | 2019 | one-off | disruption cost |
| RDNA512 | multilateral | Ukraine | 2025 | annual | damage and needs |
B.3Regional reading, ten regional clusters
Map plates follow with the regional Baseline Editions, when boundary sources and public-safe resolutions are bound. This page gives the regional reading in table form and ranks no region.
| Region | Principal hazards | Systems most exposed | Baseline evidence |
|---|---|---|---|
| North America | ageing assets; hurricanes; data-centre load | power, water, telecoms | ASCE report card6; IEA9 |
| South America | hydropower dependence; floods | power, transport | regional statistics (not bound) |
| Europe | grid stability; cable incidents; cyber | power, telecoms | ENTSO-E1; ENISA3 |
| Eurasia | conflict damage; grid attacks | power, heat | RDNA512 |
| Middle East and North Africa | strikes on co-located plants; desalination reliance | water, power | press reports13 |
| Africa | maintenance and financing gaps | power, transport | Lifelines11 |
| South Asia | cyclones and floods | power, ports | GAR 202510 |
| East Asia | earthquake and typhoon exposure; cables | power, telecoms | GAR 202510; cable analysis7 |
| ASEAN | cyclones; subsea links | telecoms, ports | cable analysis7 |
| Oceania-Pacific | island links; cyclones | telecoms, power | cable analysis7 |
B.4Regional card: Continental Europe grid
- region
- grid
- synchronous area
- cross-border
- Systems in view
- power, telecoms, water, hospitals
- Defining events
- blackout in Spain and Portugal on 28 April 20251
- Couplings
- ENE → INF → HLT; ENE → WAT
- Capability evidence
- restoration and a published expert report1
- Gaps
- cross-border flows; data on pre-event generation tripping
- Agenda items
- L-01 · L-03
The final report names oscillations, voltage and reactive power control gaps and generator disconnections as interacting factors [1].
POWER
Interacting factors
Service returned after the event; the time to restore each lifeline is not consolidated here.
RECOVERY
Restoration
The expert panel report is an analysis of causes and recommendations, not an attribution of liability [1].
LEARNING
A public report
B.5How countries appear in the global edition
Countries enter the lifeline systems edition through the infrastructure chapters of their own national editions, on one card grammar. They are read against peer distributions and thresholds, never placed in a league table.
| Card field | What it shows | Source |
|---|---|---|
| WEFH+B state | each core system against peer distribution bands | national edition |
| Couplings | the national dependency matrix | national edition |
| Risk objects | the national risk portfolio | national edition |
| Capability rungs | the national capability ladder | national edition |
| Evidence age | oldest and newest source dates | national source register |
Editions in the 2026 Baseline programme
countries and unions
clusters
flagship and sector
systems reports
technology reports
How to read a country card
- Each system is shown against the distribution of its peers, with thresholds where they exist
- Couplings and risk objects come from the country’s own national edition
- Capability rungs record evidence, not a judgement of institutions
- Evidence age is printed, so older national data are visible as such
| Wave | Countries and unions | State |
|---|---|---|
| W0 | Canada | ISSUED |
| W1 | United States, United Kingdom, France, Germany, Italy, Japan, European Union, Switzerland | PLANNED |
| W2 | Mexico, Brazil, Argentina, Türkiye, Russian Federation, Saudi Arabia, United Arab Emirates, South Africa, Senegal, Kenya, African Union, India, China, Republic of Korea, Indonesia, Singapore, Australia | PLANNED |
B.6Licences
| Material | Licence |
|---|---|
| Text | CC BY 4.0 |
| Data | on the licence of each source; Nexus tables CC BY 4.0 |
| Figures | Nexus figures CC BY 4.0; third-party as credited |
| Maps | boundary source and licence printed on each plate |
| Metadata | CC0 1.0, as Zenodo publishes it |
| Third-party data, figures and text | The source’s own licence, credited where it is used; never relicensed |
| Nexus-authored text, tables and figures: CC BY 4.0 (SPDX CC-BY-4.0). Map plates print their boundary source and licence. | |
B.7Formats and provenance
| Format | Kind | State | What it is | Identifier |
|---|---|---|---|---|
| Web edition | HTML | On this site | Draft in stewardship review; every value resolves to its source. | NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-v1.0.0 |
| Print edition | At release | A4 portrait · screen, print and archival PDF, signed with the web edition at release. | NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-v1.0.0 | |
| Indicator data | CSV · JSON | On this site | 15 indicators with unit, year, status and source; the machine-readable copy ships with the evidence bundle at release. | NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE data release v1 |
| Figures | SVG · PNG | On this site | 4 on the web edition: headline figure, figure 1.3, coupling instrument, capability ladder. | FIG-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-* |
| Slides | Not recorded | No slide deck is recorded for this edition. | ||
| Evidence brief | HTML · PDF | Not recorded | No evidence brief is recorded for this edition. | |
| Dataset with DOI | DataCite | At release | Concept and version DOI are minted at deposit; none is recorded yet. |
Provenance
- Edition pack
- The edition’s content pack (JSON), from which the print and web editions are built
- Evidence cut
- DC-STRATEGIC-LIFELINES-GLOBAL-2026-B0, closed 30 September 2026
- Reproducibility
- sourced values cited; analytical values reproducible from stated parameters
- Self-check
- 14 of 23 at evidence close; a fail on any item blocks release
- Review
- five passes scheduled before release (in Annex C)
- Publisher of record
- GCRI for the Nexus Consortium
- Corrections
- Registry correction pathway; upheld corrections are published as notices with a new version
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 7TeleGeography (ed.), Is it sabotage? Unraveling the mystery of undersea cable breaks (analysis of 199 faults a year, 2010 to 2023). TeleGeography, Washington. Observation year 2024. Accessed 2026-11-03.back
- 3ENISA (ed.), ENISA Threat Landscape 2025 (publication page; period 1 July 2024 to 30 June 2025; published 1 October 2025; version 1.3 of 22 September 2026). European Union Agency for Cybersecurity, Athens. Observation year 2025. Accessed 2026-11-03.back
- 4Microsoft (ed.), Helping our customers through the CrowdStrike outage (blog post of 20 July 2024; estimate of 8.5 million Windows devices). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 2CISA, NSA, FBI and partner agencies (eds.), PRC State-Sponsored Actors Compromise and Maintain Persistent Access to U.S. Critical Infrastructure (Volt Typhoon), joint cybersecurity advisory AA24-038A, 7 February 2024. CISA, Arlington. Observation year 2024. Accessed 2026-11-03.back
- 6ASCE (ed.), 2025 Report Card for America’s Infrastructure (overall grade C; ten-year investment gap USD 3.6 trillion; sector grades). American Society of Civil Engineers, Reston. Observation year 2025. Accessed 2026-11-03.back
- 10UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays (annual average loss to critical infrastructure above USD 250 billion for floods, tropical cyclones and earthquakes; about USD 2.3 trillion total annual disaster cost), taken from search-result summaries; the report page returned an access error. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-03.back
- 11UNVERIFIED, not opened: Hallegatte, S., Rentschler, J. and Rozenberg, J., Lifelines: The Resilient Infrastructure Opportunity (disruptions cost at least USD 390 billion a year in low- and middle-income countries; USD 4.2 trillion net benefit; about USD 4 per USD 1), taken from search-result summaries; the repository returned an access error. World Bank and GFDRR, Washington, 2019. Observation year 2019. Accessed 2026-11-03.back
- 12UNVERIFIED, not opened: World Bank, United Nations and European Commission (eds.), Ukraine Fifth Rapid Damage and Needs Assessment (RDNA5), released 23 February 2026 (needs USD 587.7 billion over ten years; energy about USD 91 billion; direct damage to energy and extractives USD 24.8 billion to end 2025), taken from search-result summaries. Observation year 2025. Accessed 2026-11-03.back
- 9IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 14UNVERIFIED, not opened: Uptime Institute (ed.), Annual Outage Analysis 2026 (57% of respondents in the 2025 survey reported a latest major outage above USD 100,000), taken from a press release summary; the report is limited to members. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
- 1ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 5NIST (ed.), The NIST Cybersecurity Framework (CSF) 2.0, NIST CSWP 29, 26 February 2024. National Institute of Standards and Technology, Gaithersburg. Observation year 2024. Accessed 2026-11-03.back
- 13UNVERIFIED, not opened: press and think-tank reports on strikes on power and desalination plants in Kuwait, Bahrain and the United Arab Emirates, March to July 2026 (including The National, Arab News and the Arab Center Washington DC), taken from search-result summaries; no official damage assessment was found. Observation year 2026. Accessed 2026-11-03.back
References and record
Every source the edition rests on, the publication record, the corrections log and the open record.
C.140 sources
NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).
- 1ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 8
- 2CISA, NSA, FBI and partner agencies (eds.), PRC State-Sponsored Actors Compromise and Maintain Persistent Access to U.S. Critical Infrastructure (Volt Typhoon), joint cybersecurity advisory AA24-038A, 7 February 2024. CISA, Arlington. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 3ENISA (ed.), ENISA Threat Landscape 2025 (publication page; period 1 July 2024 to 30 June 2025; published 1 October 2025; version 1.3 of 22 September 2026). European Union Agency for Cybersecurity, Athens. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 4Microsoft (ed.), Helping our customers through the CrowdStrike outage (blog post of 20 July 2024; estimate of 8.5 million Windows devices). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
- 5NIST (ed.), The NIST Cybersecurity Framework (CSF) 2.0, NIST CSWP 29, 26 February 2024. National Institute of Standards and Technology, Gaithersburg. Observation year 2024. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
- 6ASCE (ed.), 2025 Report Card for America’s Infrastructure (overall grade C; ten-year investment gap USD 3.6 trillion; sector grades). American Society of Civil Engineers, Reston. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 7TeleGeography (ed.), Is it sabotage? Unraveling the mystery of undersea cable breaks (analysis of 199 faults a year, 2010 to 2023). TeleGeography, Washington. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 8IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 6, chapter 8
- 9IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 6, chapter 8
- 10UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays (annual average loss to critical infrastructure above USD 250 billion for floods, tropical cyclones and earthquakes; about USD 2.3 trillion total annual disaster cost), taken from search-result summaries; the report page returned an access error. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 11UNVERIFIED, not opened: Hallegatte, S., Rentschler, J. and Rozenberg, J., Lifelines: The Resilient Infrastructure Opportunity (disruptions cost at least USD 390 billion a year in low- and middle-income countries; USD 4.2 trillion net benefit; about USD 4 per USD 1), taken from search-result summaries; the repository returned an access error. World Bank and GFDRR, Washington, 2019. Observation year 2019. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 12UNVERIFIED, not opened: World Bank, United Nations and European Commission (eds.), Ukraine Fifth Rapid Damage and Needs Assessment (RDNA5), released 23 February 2026 (needs USD 587.7 billion over ten years; energy about USD 91 billion; direct damage to energy and extractives USD 24.8 billion to end 2025), taken from search-result summaries. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 8
- 13UNVERIFIED, not opened: press and think-tank reports on strikes on power and desalination plants in Kuwait, Bahrain and the United Arab Emirates, March to July 2026 (including The National, Arab News and the Arab Center Washington DC), taken from search-result summaries; no official damage assessment was found. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 7, chapter 8
- 14UNVERIFIED, not opened: Uptime Institute (ed.), Annual Outage Analysis 2026 (57% of respondents in the 2025 survey reported a latest major outage above USD 100,000), taken from a press release summary; the report is limited to members. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6, chapter 8
- 15UNVERIFIED, not opened: TeleGeography (ed.), submarine cable maintenance data (June 2025; about two thirds of repair ships reach end of service life by 2040), taken from search-result summaries. TeleGeography, Washington. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
- 16UNVERIFIED, not opened: Directive (EU) 2022/2557 on the resilience of critical entities, Official Journal of the European Union, 2022, cited from memory; the EUR-Lex request returned no text. Observation year 2022. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6
- 17UNVERIFIED, not opened: Directive (EU) 2022/2555 on measures for a high common level of cybersecurity across the Union (NIS2), Official Journal of the European Union, 2022, cited from memory. Observation year 2022. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6
- 18UNVERIFIED, not opened: The White House, National Security Memorandum on Critical Infrastructure Security and Resilience (NSM-22), 30 April 2024, cited from memory. Observation year 2024. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 19UNVERIFIED, not opened: UNDRR (ed.), Sendai Framework for Disaster Risk Reduction 2015 to 2030 (target on damage to critical infrastructure), cited from memory. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2015. Accessed 2026-11-03. Cited in chapter 6
- 20UNVERIFIED, not opened: ISO 22301:2019, Security and resilience: business continuity management systems. International Organization for Standardization, Geneva. Observation year 2019. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 21UNVERIFIED, not opened: ISO/IEC 27001:2022, Information security management systems. International Organization for Standardization, Geneva. Observation year 2022. Accessed 2026-11-03. Cited in chapter 6
- 22UNVERIFIED, not opened: IEC 62443 series, Security for industrial automation and control systems. International Electrotechnical Commission, Geneva. Observation year 2018. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 23UNVERIFIED, not opened: OECD (ed.), Good Governance for Critical Infrastructure Resilience. OECD Publishing, Paris, 2019. Observation year 2019. Accessed 2026-11-03. Cited in chapter 4
- 24UNVERIFIED, not opened: United Nations Convention on the Law of the Sea (1982), articles 112 to 115 on submarine cables and pipelines, cited from memory. United Nations, New York. Observation year 1982. Accessed 2026-11-03. Cited in chapter 6
- 25UNVERIFIED, not opened: Protocol Additional to the Geneva Conventions of 12 August 1949 relating to the Protection of Victims of International Armed Conflicts (Protocol I), articles 54 and 56 on objects indispensable to survival and works containing dangerous forces, cited from memory. International Committee of the Red Cross, Geneva. Observation year 1977. Accessed 2026-11-03. Cited in chapter 6
- 26UNVERIFIED, not opened: CISA (ed.), Cross-Sector Cybersecurity Performance Goals. Cybersecurity and Infrastructure Security Agency, Arlington, cited from memory. Observation year 2022. Accessed 2026-11-03. Cited in chapter 6
- 27UNVERIFIED, not opened: ISO 31000:2018, Risk management: guidelines. International Organization for Standardization, Geneva. Observation year 2018. Accessed 2026-11-03. Cited in chapter 6
- 28UNVERIFIED, not opened: Rinaldi, S.M., Peerenboom, J.P. and Kelly, T.K., Identifying, understanding, and analysing critical infrastructure interdependencies, IEEE Control Systems Magazine 21(6), 11 to 25, 2001, cited from memory. Observation year 2001. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6
- 29UNVERIFIED, not opened: Buldyrev, S.V. et al., Catastrophic cascade of failures in interdependent networks, Nature 464, 1025 to 1028, 2010, cited from memory. Springer Nature. Observation year 2010. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 30UNVERIFIED, not opened: Koks, E.E. et al., A global multi-hazard risk analysis of road and railway infrastructure assets, Nature Communications 10, 2677, 2019, cited from memory. Springer Nature. Observation year 2019. Accessed 2026-11-03. Cited in chapter 6
- 31UNVERIFIED, not opened: Hallegatte, S., Rentschler, J. and Walsh, B., Building Back Better: Achieving Resilience through Stronger, Faster, and More Inclusive Post-Disaster Reconstruction. World Bank, Washington, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03. Cited in chapter 6
- 32UNVERIFIED, not opened: Zscheischler, J. et al., Future climate risk from compound events, Nature Climate Change 8, 469 to 477, 2018, cited from memory. Springer Nature. Observation year 2018. Accessed 2026-11-03. Cited in chapter 6
- 33UNVERIFIED, not opened: Helbing, D., Globally networked risks and how to respond, Nature 497, 51 to 59, 2013, cited from memory. Springer Nature. Observation year 2013. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 34UNVERIFIED, not opened: Perrow, C., Normal Accidents: Living with High-Risk Technologies. Basic Books, New York, 1984, cited from memory. Observation year 1984. Accessed 2026-11-03. Cited in chapter 6
- 35UNVERIFIED, not opened: IEA (ed.), Electricity Grids and Secure Energy Transitions. International Energy Agency, Paris, 2023, cited from memory. Observation year 2023. Accessed 2026-11-03. Cited in chapter 6
- 36UNVERIFIED, not opened: CrowdStrike (ed.), External technical root cause analysis for the Channel File 291 incident, August 2024, cited from memory; no figure used. CrowdStrike, Austin. Observation year 2024. Accessed 2026-11-03. Cited in chapter 6
- 37UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2022: Our World at Risk. United Nations Office for Disaster Risk Reduction, Geneva, cited from memory. Observation year 2022. Accessed 2026-11-03. Cited in chapter 6
- 38UNVERIFIED, not opened: European Commission and High Representative, Joint Communication on an EU Action Plan on Cable Security, February 2025, cited from memory. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
- 39UNVERIFIED, not opened: IEA (ed.), Climate Resilience for Energy Security. International Energy Agency, Paris, 2022, cited from memory. Observation year 2022. Accessed 2026-11-03. Cited in chapter 6
- 40IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03. Cited in chapter 3, chapter 6
C.2Publication record
Publication
- Title
- Strategic Systems Report 2026: Critical Infrastructure and Lifeline Systems, Baseline Edition
- Series
- Reports · Strategic Systems Series SR-02
- Edition
- Baseline Edition 2026 · inaugural annual
- Version
- v1.0.0 · draft for stewardship review
- Publication ID
- NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-v1.0.0
- Evidence close
- 30 September 2026
- Publication date
- October 2026
- DOI
- concept and version DOI at deposit
Publisher
- Publisher of record
- The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
- Place
- Toronto
- Editor
- Saeed Valadbaygi, Chief Steward and Managing Editor
- Stewards
- GCRI · technical truth · GRF · public meaning · GRA · capital meaning
- Licence
- text CC BY 4.0; data on the terms of each source
- Copyright
- © 2026 GCRI · Nexus Consortium
- Language
- English (en-GB) source edition
- Correspondence
- Registry correction pathway · editorial office
Colophon
- Format
- A4 portrait · screen, print and archival PDF
- Typefaces
- Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
- Design standard
- Reports Foundational Edition, Volume I, Part VII
- Accessibility
- tagged PDF and HTML targets; text alternatives for every figure
- Production
- Reports editorial team, GCRI
Release path for this version
| Step | What happens | When |
|---|---|---|
| Draft | editorial self-check complete at evidence close | October 2026 |
| Steward review | five passes on the exact draft (keys T · M · F · N) | Q4 2026 |
| Approval | publication authority approves the exact digest | before release |
| Deposit | concept and version DOI minted; registry pointer set | at release |
| Succession | the 2027 lifeline systems edition reports changes against this baseline | 2027 |
- Current version
- v1.0.0 draft, stewardship review
- Previous edition
- none, first edition of the series
- Next edition
- NR-STRATEGIC-LIFELINES-GLOBAL-2027-v1.0.0
- Latest version
- resolve the concept DOI or the registry record
- Correction route
- Registry correction pathway
- Notice types
- erratum · addendum · supersession · withdrawal
C.3Corrections log
0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.
| Edition | Version | Date | State | Change | Notice |
|---|---|---|---|---|---|
| SR-02 | NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-v1.0.0 | October 2026 | Draft | Baseline Edition 2026, inaugural annual edition, | None |
Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.
C.4Open record
This edition’s open record
- Publication ID
- NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-v1.0.0
- Desk identifier and series alias
- NR-STR-SR-02-2026-BL
- Collection
- None
- DOI
- Concept and version DOI at deposit, on Zenodo with DataCite metadata
- Versions
- Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
- Bundle
- RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
- Licence
- CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0
Credit and identity
- ORCID
- Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
- ROR
- Your organisation by its ROR identifier, never by a typed name alone
- CRediT
- Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
- Account
- None needed to contribute; never a password
Find and follow
Search the open indexes for Critical Infrastructure and Lifeline Systems; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.
Mirrors and harvest
The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.
{
"metadata": {
"resource_type": {
"id": "dataset"
},
"title": "Evidence on Critical Infrastructure and Lifeline Systems for Nexus Reports",
"publication_date": "YYYY-MM-DD",
"creators": [
{
"person_or_org": {
"type": "personal",
"family_name": "Your family name",
"given_name": "Your given name",
"identifiers": [
{
"scheme": "orcid",
"identifier": "0000-0000-0000-0000"
}
]
},
"affiliations": [
{
"id": "ROR identifier of your organisation"
}
]
}
],
"description": "What it is, where its record is kept and how it bears on Strategic Systems Report 2026: Critical Infrastructure and Lifeline Systems.",
"rights": [
{
"id": "cc-by-4.0"
}
],
"subjects": [
{
"subject": "Nexus Reports"
},
{
"subject": "Critical Infrastructure and Lifeline Systems"
},
{
"subject": "Strategic Systems Report · SR-02"
}
],
"related_identifiers": [
{
"identifier": "https://therisk.global/nexus-reports/editions/sr-02/",
"scheme": "url",
"relation_type": {
"id": "issupplementto"
},
"resource_type": {
"id": "publication-report"
}
}
],
"version": "1.0.0"
},
"custom_fields": {},
"access": {
"record": "public",
"files": "public"
},
"files": {
"enabled": true
},
"parent": {
"communities": {
"default": "nexusreports"
}
}
}C.5Where this edition sits among the six pillars
Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.
- F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
- F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
- F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
- Applied in editions Standards Nexus Standards: applied in editions.
- SR-02 edition Reports Critical Infrastructure and Lifeline Systems 2026, published in every format with its sources, citation and corrections.
- F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
- F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
- Taught in the open Academy Risk Academy: taught in the open.
What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; SR-02 is a drafted Baseline Edition, so these handoffs run from its first operational quarter.
| Handoff | Between | What crosses, and when |
|---|---|---|
| F03 | Foundry to Reports | Sealed observations and indicator series behind a profile (closeout). |
| F04 | Universe to Reports | After-action and scenario findings for chapters 10 and 13 (after action review). |
| F05 | Foundry to Reports | National Portfolio movement for chapter 11 (after action review). |
| Ring | Nexus Standards to Reports | Nexus Standards: applied in editions. |
| F06 | Reports to Nexus Standards | Method and correction findings as change proposals (correction). |
| F12 | Reports to Universe | Q4 synthesis informs the next-year mandate (renewal). |
| Ring | Reports to Risk Academy | Risk Academy: taught in the open. |