Draft, not yet released. In stewardship review. Not indexed until the first approved release.

Methodology

How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.

12 min read0 figures13 tables11 notesNR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE

Contents
  1. ·Edition home
  2. ·Executive summary
  3. 1Lifelines fail together
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Power loss that overlaps a telecom or cloud failure
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. AMethodology
    1. A.1 Methods
    2. A.2 Model card, Lifeline Systems Model v0
    3. A.3 The baseline evidence cut
    4. A.4 Evidence age and coverage
    5. A.5 Evidence cards, two anchor sources
    6. A.6 Publication acceptance record
    7. A.7 Status words
    8. A.8 How the edition is made, released and corrected
    9. A.9 Glossary and abbreviations
    10. A.10 Technical annex
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

A.1Methods

The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.

Table A.1Methods
No.DerivationCalculationResult
(1)Factors named in the Iberian blackout page summarycount of listed factors5, unweighted
(2)ENISA incidents per month in the period4,875 ÷ 12≈ 406
(3)Subsea faults per week at the average199 ÷ 52≈ 3.8
(4)Faults a year from external aggression (about)199 × 2 ÷ 3≈ 133
Table A.2Coupling strength scale (matrix and model card)
StrengthDefinition
STRONGa disruption in the source system has historically changed the target system’s service or output within one season, in more than one region
MODERATEan effect is documented but buffered or slower
WEAKan effect is plausible but not documented at global scale
Table A.3Status grammar
LabelRule
Reportedvalue as issued by its source, with year
Inferredreasoned from cited evidence; never a measurement
EstimatedNexus analytical value with stated method
Scenarioconditional on stated assumptions
Expert inputstructured editorial judgement awaiting evidence

A.2Model card, Lifeline Systems Model v0

Model ID
MDL-SR02-LIFELINES · v0.1
Purpose
represent lifeline systems as a dependent network and the mechanisms by which failures spread between power, water, communications, transport and health
Family
graph-based system of systems
Inputs
the cited sources of this edition; no proprietary data
Method
expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
Validation
none yet, first validation against federation evidence in 2027
Uncertainty
qualitative; strengths are hypotheses, not measurements
Domain of validity
global scale; not for asset-, site- or country-level use
Reproducibility
strength table and sources published in this edition
20couplings

typed in v0

5strong

documented within one season

3moderate

documented, buffered

12weak

plausible, undocumented

A.3The baseline evidence cut

Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.

Cut ID
DC-STRATEGIC-LIFELINES-GLOBAL-2026-B0
Type
baseline documentary cut
Resolution policy
pinned · as of 30 September 2026
Sources pinned
40 cited sources, each at the edition and access date in the references
Model runs
none at baseline, analytical values are stated with their method
Digest
computed at freeze and recorded in the publication record
Supersedes
nothing, first cut of the series
Superseded by
the 2027 lifeline systems annual cut

Lineage

  1. 01

    source edition

  2. 02

    pinned citation

  3. 03

    finding

  4. 04

    page

  5. 05

    publication record

Table A.4From the baseline cut to the federation cut
ElementBaseline 20262027 global annual
Sourcescited global publications, pinned by editionnational, regional and sector cuts through one graph
Analysisstated methods and editorial estimatestyped analysis specifications
ModelsLifeline Systems Model v0 specificationmodel runs with receipts
Findingstwelve baseline findingsfindings re-bound to federation evidence
Reviewfive passes scheduledfive passes on the exact digest

A.4Evidence age and coverage

A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.

Table A.5Evidence age and coverage
IndicatorObservedReleasedCadenceNext release
Grid failure analysis2025Mar 2026one-offfollow-up reports
Cyber advisories2024Feb 2024per eventnext joint advisory
EU incident countsJul 2024 to Jun 2025Oct 2025 · v1.3 Sep 2026annualnext ENISA report
Software outage2024Jul 2024one-offnone scheduled
US asset condition2025Mar 2025four-yearly2029
Cable fault average2010 to 20232024ad hocnext analysis
Hazard losses to infrastructure2025May 2025biennial2027
Disruption cost in LMICs20192019one-offno update found
Reconstruction needsto Dec 2025Feb 2026annualRDNA6
Gulf strikes2026Mar to Jul 2026per eventnot verified
Table A.6Coverage by system at baseline
SystemCoverageThinnest dimension
PowerGOODrestoration times
CommunicationsPARTIALcross-operator dependency
WaterTHINinterdependence with power
TransportTHINcross-modal dependence
HealthTHINfacility-level resilience
CyberPARTIALoperator-level data
Finance of resiliencePARTIALrecent estimates
Conflict damageTHINverified 2026 damage
Table A.7Designed empty states: what is not bound, what would fill it and why
FieldSource that would fill itBlocker
Cross-sector dependency data at city and national scaleoperators, regulators and national statistics officessecurity-sensitive and not published on a common basis
Restoration times for lifeline services after major outagesoperator and regulator reportsnot retrieved; no consolidated series
Full text of the ENTSO-E final report and its recommendation countENTSO-E final report1only the publication page was opened; sources disagree on the number of recommendations
ENISA sector breakdown and top threatsENISA Threat Landscape 2025 full report3the publication page was read; the PDF was not opened and the page notes corrected figures in version 1.3
Subsea cable repair capacity by regionTeleGeography and ICPC15ship counts not retrieved; the 2040 end-of-life figure rests on a search summary
Verified damage to Gulf power and desalination plantsnational authorities and independent assessments13press and think-tank reports only; no official damage assessment found
Share of outages caused by power failure at digital facilitiesUptime Institute Annual Outage Analysis14report limited to members and subscribers
UNDRR GAR 2025 infrastructure loss figures from the report itselfUNDRR GAR 202510the report page returned an access error; figures come from search summaries
World Bank Lifelines figures from the report itselfWorld Bank and GFDRR11the repository returned an access error; figures come from search summaries
Condition of infrastructure outside the United States on one scalenational report cards and statisticsno comparable global series found
Status of EU critical entity identification by Member StatesEuropean Commission, national authorities16not retrieved
Capability rungs beyond restorationoperators, regulators, ministriesnot reviewed

A.5Evidence cards, two anchor sources

Issued by the association of European transmission system operators. One-off. Role: binds INF-001. Coverage: Continental Europe. The publication page was read; the full report was not opened.

EVD-SR02-001

ENTSO-E publication page on the Iberian blackout1

Issued by the EU Agency for Cybersecurity. Annual. Role: binds CYB-003. Reporting period 1 July 2024 to 30 June 2025; the page notes corrections in version 1.3.

EVD-SR02-002

ENISA Threat Landscape 20253

Table A.8Quality dimensions at baseline
DimensionEVD-SR02-001EVD-SR02-002
Completenessevent-specific; some generation data missingincidents analysed; sector split not read
Timelinessabout 11 months after the eventabout 3 months after the period
Revisionfinal after interim reportsversion 1.3 corrected figures
Method transparencyexpert panel method publishedthreat-centric method stated
External validationindependent expert panelagency review

Evidence cards to follow in 2027

  • ENTSO-E1: recommendation tables in the final report
  • ENISA3: sector breakdown of incidents
  • CISA2: follow-up advisories
  • ASCE6: sector pages for energy and water

A.6Publication acceptance record

Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.

Table A.9Publication acceptance record
GroupAreaItemsPassN/APending
D1Identity and scope8800
D2Source and data12912
D3Analysis and models12381
D4Findings and claims9801
D5Figures, tables, maps10622
D6Editorial and citations10802
D7Review and approval130013
D8Artefact and design12705
D9Registry and release9009

Publication gate

Conditions met
14 of 23 at evidence close
Blocking problems
none recorded
Open conditions
reviews, approval of the exact digest, deposit, registry pointer

Not applicable at baseline

Model runs
first runs in Q1 2027
Maps
plates in Q2 2027
Waivers
none

A.7Status words

Table A.10The status every value carries
StatusWhat it means
ObservedMeasured directly and published by the source.
ReportedPublished statistics of an official or institutional source.
DeclaredStated by the body concerned; not independently measured.
EstimatedA Nexus estimate from cited evidence, with its method in Annex A.
ModelledProduced by a stated model from cited inputs.
InferredReasoned from cited evidence; not measured.
ForecastA projection by the cited source.
SimulatedA simulation result under stated assumptions.
ScenarioA conditional statement under stated assumptions; never a prediction.
Expert inputExpert judgement, recorded with its basis.
CandidateProposed for a later edition; not yet evidence.
Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject.

A.8How the edition is made, released and corrected

Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.

StepWhat happensSource
01 Evidence arrives from the pillarsFoundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s.
02 The cut is sealedOn the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on.
03 The edition is assembledThe edition is drafted from its template and content pack. Agents may draft; they never publish and never decide.
04 The keys turnAt the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward.
05 The gate opensA named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit.
06 Signed and depositedThe PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI.
07 Published on its desk’s siteOnly then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part.
08 Corrections go to StandardsMethod and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut.

A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).

Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.

A.9Glossary and abbreviations

Table A.11Series terms
TermMeaning
Baseline Editionthe inaugural annual edition that fixes the reference state for the series
WEFH+Bwater, energy, food, health and biodiversity, the national nexus core
Couplinga typed dependency through which one system transmits to another
Protection gapthe share of losses not covered by insurance
Capability ladderLISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED
EQLevidence-quality level, 1–5
Evidence cuta frozen resolution of exact sources and versions
NNC · NLC · NWGNational Nexus Consortium · National Leadership Council · National Working Groups
Table A.12Abbreviations used in this edition
AbbreviationExpansion
ASCEAmerican Society of Civil Engineers
CISAUS Cybersecurity and Infrastructure Security Agency
CSFCybersecurity Framework
ENISAEuropean Union Agency for Cybersecurity
ENTSO-EEuropean Network of Transmission System Operators for Electricity
GARGlobal Assessment Report on Disaster Risk Reduction
ICPCInternational Cable Protection Committee
LMIClow- and middle-income countries
NIS2second Network and Information Security Directive
OToperational technology
RDNARapid Damage and Needs Assessment
UNDRRUnited Nations Office for Disaster Risk Reduction

A.10Technical annex

Table A.13Technical annex
ItemAnnexContentsStatus
A.1Indicator definitionsthe global indicator set, with units and sourcesIN THIS EDITION
A.2Coupling strengthsthe twenty-cell matrix and its rationaleIN THIS EDITION
A.3Scenario specificationSCN-SR02-PWR-01 assumptions and signpostsIN THIS EDITION
A.4Capability placementsrung evidence for fifteen functionsIN THIS EDITION
A.5Model diagnosticsfirst runs and validation2027
A.6Sensitivity analysesinfluence of coupling strengths2027
A.7Regional notesregional lifeline cardsWITH REGIONAL EDITIONS
A.8Review statementspass-by-pass review recordAT RELEASE

A.1 · indicator definition: subsea cable fault

Construct
a reported break or damage event on a telecommunications submarine cable
Unit
faults per year
Method
industry fault databases and operator reports
Source
TeleGeography analysis7
Uncertainty
counts depend on the database; public and private series differ
Known limits
does not record intent or repair time

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
  2. 3ENISA (ed.), ENISA Threat Landscape 2025 (publication page; period 1 July 2024 to 30 June 2025; published 1 October 2025; version 1.3 of 22 September 2026). European Union Agency for Cybersecurity, Athens. Observation year 2025. Accessed 2026-11-03.back
  3. 15UNVERIFIED, not opened: TeleGeography (ed.), submarine cable maintenance data (June 2025; about two thirds of repair ships reach end of service life by 2040), taken from search-result summaries. TeleGeography, Washington. Observation year 2025. Accessed 2026-11-03.back
  4. 13UNVERIFIED, not opened: press and think-tank reports on strikes on power and desalination plants in Kuwait, Bahrain and the United Arab Emirates, March to July 2026 (including The National, Arab News and the Arab Center Washington DC), taken from search-result summaries; no official damage assessment was found. Observation year 2026. Accessed 2026-11-03.back
  5. 14UNVERIFIED, not opened: Uptime Institute (ed.), Annual Outage Analysis 2026 (57% of respondents in the 2025 survey reported a latest major outage above USD 100,000), taken from a press release summary; the report is limited to members. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
  6. 10UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays (annual average loss to critical infrastructure above USD 250 billion for floods, tropical cyclones and earthquakes; about USD 2.3 trillion total annual disaster cost), taken from search-result summaries; the report page returned an access error. United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-03.back
  7. 11UNVERIFIED, not opened: Hallegatte, S., Rentschler, J. and Rozenberg, J., Lifelines: The Resilient Infrastructure Opportunity (disruptions cost at least USD 390 billion a year in low- and middle-income countries; USD 4.2 trillion net benefit; about USD 4 per USD 1), taken from search-result summaries; the repository returned an access error. World Bank and GFDRR, Washington, 2019. Observation year 2019. Accessed 2026-11-03.back
  8. 16UNVERIFIED, not opened: Directive (EU) 2022/2557 on the resilience of critical entities, Official Journal of the European Union, 2022, cited from memory; the EUR-Lex request returned no text. Observation year 2022. Accessed 2026-11-03.back
  9. 2CISA, NSA, FBI and partner agencies (eds.), PRC State-Sponsored Actors Compromise and Maintain Persistent Access to U.S. Critical Infrastructure (Volt Typhoon), joint cybersecurity advisory AA24-038A, 7 February 2024. CISA, Arlington. Observation year 2024. Accessed 2026-11-03.back
  10. 6ASCE (ed.), 2025 Report Card for America’s Infrastructure (overall grade C; ten-year investment gap USD 3.6 trillion; sector grades). American Society of Civil Engineers, Reston. Observation year 2025. Accessed 2026-11-03.back
  11. 7TeleGeography (ed.), Is it sabotage? Unraveling the mystery of undersea cable breaks (analysis of 199 faults a year, 2010 to 2023). TeleGeography, Washington. Observation year 2024. Accessed 2026-11-03.back

Cite this annex

Valadbaygi, S. (Ed.). (2026). Annex A: Methodology. In Strategic Systems Report 2026: Critical Infrastructure and Lifeline Systems (Baseline Edition 2026, Report No. NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

ReportsContribute

Send evidence or a correction on Critical Infrastructure and Lifeline Systems.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems Evidence deskStrategic Systems

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Sector signature

The sectors behind Critical Infrastructure and Lifeline Systems.

A reading aid: the sectors the findings run through and how strongly they depend on each other.

Select corners · hover lines6 / 15 relations

Context

Infrastructure and its partners

Infrastructure gives pipes, dams and treatment works to water (0.6), transmission and fuel logistics to energy (0.6) and access to care to health (0.5).

W · E · I · F · H · B

Sectors
4 of 6
Relations
6 of 15
Coupling
0.46 share of total

Strongest relations in play

  • Energy → Infrastructure · power for transport and telecoms0.8
  • Water → Energy · cooling water and hydropower0.6
  • Infrastructure → Water · pipes, dams and treatment works0.6
  • Water → Health · drinking water and sanitation0.7
Teaching values for a typical city-region, not measurements for any place. Coupling is the summed strength of the relations in play, as a share of all fifteen.
The Global Centre for Risk and Innovation

Science · evidence · measurement

Not for profit

Our articles, maps and twins are free to read and free to republish. Readers and partners keep it that way.

Partner with us

Who funds us

GCRI is a not-for-profit institution. To ask who funds a piece of work, use the funding questions form.

Independence

Editors and the expert reviewers named on each article decide what we publish. Funders and partners do not review or approve articles before publication.

Licence

Articles: CC BY 4.0. Figures, maps, twins and data: CC BY 4.0. Other uses: ask through the permissions form.