Methodology
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
Contents
- ·Edition home
- ·Executive summary
- 1AI compute is physical infrastructure built on a few chips and a few places
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Compute build-out meets local power, water and packaging limits
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- A.1 Methods
- A.2 Model card, Semiconductor and compute System Model v0
- A.3 The baseline evidence cut
- A.4 Evidence age and coverage
- A.5 Evidence cards, two anchor sources
- A.6 Publication acceptance record
- A.7 Status words
- A.8 How the edition is made, released and corrected
- A.9 Glossary and abbreviations
- A.10 Technical annex
- BData appendix
- CReferences and record
- ·Complete edition, for print
A.1Methods
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | Result |
|---|---|---|---|
| (1) | Share of 2025 equipment billings in China, Taiwan and Korea | (49.31 + 31.50 + 25.75) ÷ 135.06 | ≈ 79% |
| (2) | Logic and memory share of 2025 chip sales | (301.9 + 223.1) ÷ 791.7 | ≈ 66% |
| (3) | Site power per chip for the largest 2025 system in the dataset | 300 MW ÷ 200,000 chips | ≈ 1.5 kW per chip, whole-site |
| (4) | Ratio of the 2028 projection to 2023 US data centre use | 325 ÷ 176 and 580 ÷ 176 | 1.8 to 3.3 times |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| Label | Rule |
|---|---|
| Reported | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Estimated | Nexus analytical value with stated method |
| Scenario | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, Semiconductor and compute System Model v0
- Model ID
- MDL-XT06-SEMICONDUCTORS · v0.1
- Purpose
- represent advanced semiconductors and AI compute as infrastructure coupled to electricity, cooling water, materials, finance, workforce and export controls
- Family
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- Method
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- Validation
- none yet, first validation against federation evidence in 2027
- Uncertainty
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for asset-, site- or country-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-XTECH-SEMICONDUCTORS-GLOBAL-2026-B0
- Type
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 44 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 semiconductor and compute annual cut
Lineage
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | 2027 global annual |
|---|---|---|
| Sources | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | Semiconductor and compute System Model v0 specification | model runs with receipts |
| Findings | twelve baseline findings | findings re-bound to federation evidence |
| Review | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | Observed | Released | Cadence | Next release |
|---|---|---|---|---|
| AI supercomputer dataset | 2019 to 2025 | Apr 2025 | one-off | updates |
| Training compute report | 2024 | Aug 2024 | one-off | revisions |
| Semiconductor sales | 2025 | Feb 2026 | annual | next annual release |
| Equipment billings | 2025 | Apr 2026 | annual | next annual release |
| US data centre energy | 2023 and 2028 scenarios | Dec 2024 | periodic | next national update |
| CHIPS awards | not bound at close | post-close, context only: Sep to Oct 202610 | per event | next awards |
| EU Chips Act | 2023 and 2026 | Jun 2026 proposal | periodic | adoption |
| Export-control guidance | 2026 | May 2026 | per event | next notice |
| System | Coverage | Thinnest dimension |
|---|---|---|
| Compute | PARTIAL | counts on a common basis |
| Market | GOOD | primary equipment data |
| Governance | PARTIAL | text of the second Chips Act |
| Investment | PARTIAL | subsidy outlays |
| Energy | PARTIAL | fab and non-US data centre power |
| Water | THIN | fab and data centre water use |
| Skills | THIN | workforce numbers |
| Packaging and memory | THIN | capacity by country |
| Field | Source that would fill it | Blocker |
|---|---|---|
| Power and cooling-water use of fabrication plants on a common basis | company reports, regulators, peer-reviewed footprint studies | single-company figures only; one fab figure read in local news23 |
| Water use of AI data centres | operators, utilities, national statistics | not retrieved; the Berkeley Lab report page gave no water figure16 |
| Global data centre electricity figures from the IEA report itself | IEA Energy and AI24 | the IEA page returned an access error; figures come from search summaries |
| Foundry market share from a primary market-research source | TrendForce report27 and the TSMC annual report17 | press coverage only; the annual report was listed but not read; sources differ in scope |
| Advanced packaging and high-bandwidth memory capacity by country | industry and trade statistics | not retrieved |
| Equipment dependence by country and tool type | SEMI data, company filings, trade statistics | regional billings read only through a trade report9 |
| Gallium and germanium production and supply from the primary source | USGS Mineral Commodity Summaries 20262526 | the USGS pages returned an access error; no figure used |
| Delivered outlays against announced subsidy awards | NIST, European Commission, national ministries | award outlays not bound at the close; outlays not published in one series4412 |
| Text of the EU second Chips Act proposal | European Commission legal text | the page states the proposal; the text was not opened12 |
| Rapidus and other national programme totals from ministry sources | METI and national ministries | trade press only; totals differ by source2143 |
| Chip and AI accelerator volumes by type | company filings, market research | not retrieved; vendor claims are not used19 |
| Semiconductor workforce size and skills gaps | national statistics, OECD, industry surveys | not retrieved; capability rung stays LISTED |
| WSTS forecast values for 2026 and 2027 | WSTS forecast releases18 | the home page was read; it carries no forecast text |
| Capability rungs beyond monitoring and planning | agencies, operators, laboratories | not reviewed |
A.5Evidence cards, two anchor sources
Preprint arXiv 2504.16026 by Pilz, Sanders, Rahman and Heim, April 2025. One-off dataset of 500 systems. Role: binds AIC-001 and the lead figure. Coverage: systems from 2019 to 2025.
EVD-XT06-001
Trends in AI Supercomputers1
Issued by the Semiconductor Industry Association in 2026 from WSTS data. Annual. Role: binds FIN-004 and the market tiles. Coverage: world sales by product category and region.
EVD-XT06-002
SIA release on 2025 sales8
| Dimension | EVD-XT06-001 | EVD-XT06-002 |
|---|---|---|
| Completeness | systems visible in public sources only | all WSTS members; world total |
| Timeliness | about one year of lag in the dataset | issued within weeks of year end |
| Revision | preprint versions | later forecasts may revise totals |
| Method transparency | dataset method described | compiled by WSTS from member reports |
| External validation | preprint, not yet peer reviewed here | industry statistics, no peer review |
Evidence cards to follow in 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Group | Area | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- Maps
- plates in Q2 2027
- Waivers
- none
A.7Status words
| Status | What it means |
|---|---|
| Observed | Measured directly and published by the source. |
| Reported | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| Estimated | A Nexus estimate from cited evidence, with its method in Annex A. |
| Modelled | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Scenario | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Step | What happens | Source |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Term | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Coupling | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| BIS | Bureau of Industry and Security |
| CHIPS | Creating Helpful Incentives to Produce Semiconductors |
| D:5 | Country Group D:5 of the US export regulations |
| DOE | US Department of Energy |
| FLOP | floating-point operations |
| HBM | high-bandwidth memory |
| IRDS | International Roadmap for Devices and Systems |
| SEMI | semiconductor equipment and materials association |
| SIA | Semiconductor Industry Association |
| TWh | terawatt-hour |
| WSTS | World Semiconductor Trade Statistics |
| EUV | extreme ultraviolet lithography |
A.10Technical annex
| Item | Annex | Contents | Status |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-XT06-PWR-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Cluster notes | cards for the major fabrication and compute clusters | 2027 |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: doubling time
- Construct
- time for a measured quantity to double under a fitted exponential trend
- Unit
- months
- Method
- regression of the quantity on date across systems or models
- Source
- preprint arXiv 2504.160261; preprint arXiv 2202.059242
- Uncertainty
- depends on dataset coverage and period; not stated as one value in the abstracts read
- Known limits
- a historical fit, not a forecast; data come from public disclosures
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 10POST-CLOSE, context only: NIST (ed.), CHIPS for America program page (USD 50 billion; USD 39 billion manufacturing incentives; USD 11 billion research; award notices of 8 September, 16 September, 14 October and 22 October 2026). National Institute of Standards and Technology, Gaithersburg. Observation year 2026. Accessed 2026-11-03.back
- 23AZFamily (ed.), TSMC Arizona expansion could make it Phoenix’s largest water customer, 22 July 2026 (total planned investment USD 265 billion; about 5,300 acre-feet a year for the first fab; 65% reclaimed; goal 90%); local news reporting company figures, weak evidence. Gray Media, Phoenix. Observation year 2026. Accessed 2026-11-03.back
- 16Shehabi, A. and others, 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, December 2024 (publication page abstract only; no figures on the page; the report PDF was not read). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03.back
- 24UNVERIFIED, not opened: IEA (ed.), Energy and AI, April 2025 (about 415 TWh of global data centre electricity in 2024, about 1.5% of the total; about 945 TWh in 2030 in the base case; range of 700 to 1,700 TWh in 2035), taken from search-result summaries; the IEA pages returned an access error. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
- 27UNVERIFIED, not opened: TrendForce (ed.), 2025 foundry ranking (largest foundry sales about USD 122.5 billion and a share of about 69.9%), taken from press coverage in search results. TrendForce, Taipei. Observation year 2025. Accessed 2026-11-03.back
- 17TSMC (ed.), Annual reports page of investor relations (2025 Annual Report and Form 20-F filed 17 April 2026 listed; the reports themselves were not read). Taiwan Semiconductor Manufacturing Company, Hsinchu. Observation year 2025. Accessed 2026-11-03.back
- 9Evertiq (ed.), Semiconductor equipment billings reached $135B in 2025, 9 April 2026, a trade report of a SEMI release (USD 135.06 billion in 2025 against USD 117.14 billion in 2024; regional table); the SEMI page itself returned an access error, so this is a secondary report and weak evidence. Evertiq, Munich. Observation year 2025. Accessed 2026-11-03.back
- 25UNVERIFIED, not opened: USGS (ed.), Mineral Commodity Summaries 2026, gallium chapter (reported in summaries as about 99% of primary low-purity gallium produced in China in 2025), taken from search-result summaries; the page returned an access error and no figure is used in the findings. US Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
- 26UNVERIFIED, not opened: USGS (ed.), Mineral Commodity Summaries 2026, germanium chapter, the page returned an access error; summaries differ on China shares and no figure is used. US Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
- 44United States Congress, CHIPS and Science Act, Public Law 117-167, enacted 9 August 2022 (text of section 102 on Congress.gov, first 100,000 characters read: the funding lines for sections 9902 and 9906 of Public Law 116-283 by fiscal year 2022 to 2026 sum to USD 39 billion for manufacturing incentives and USD 11 billion for research, USD 50 billion in all; the totals are sums of the listed amounts, not stated in the text). Observation year 2022. Accessed 2026-11-03.back
- 12European Commission (ed.), European Chips Act policy page (entered into force 21 September 2023; three pillars; more than EUR 33 billion across 19 State aid decisions; second Chips Act proposed June 2026). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2026. Accessed 2026-11-03.back
- 21The Register (ed.), Japan’s Rapidus lands $1.7B to chase 2nm chip production by 2027, 27 February 2026 (JPY 267.6 billion round; JPY 100 billion from a METI agency; JPY 167.6 billion from 32 companies); trade press, weak evidence. Situation Publishing, London. Observation year 2026. Accessed 2026-11-03.back
- 43UNVERIFIED, not opened: METI and press coverage of the April 2026 addition of JPY 631.5 billion to Rapidus support, bringing research and development support to about JPY 2.354 trillion, taken from search-result summaries; totals differ by source. Observation year 2026. Accessed 2026-11-03.back
- 19Nvidia (ed.), Blackwell architecture product page (208 billion transistors per GPU; custom TSMC 4NP process; performance multiples are vendor claims and weak evidence). Nvidia, Santa Clara. Observation year 2026. Accessed 2026-11-03.back
- 18POST-CLOSE, context only: WSTS (ed.), World Semiconductor Trade Statistics home page (73rd forecast conference planned for 16 to 19 November 2026; billings data through August 2026; no forecast values in the text of the page). WSTS, Geneva. Observation year 2026. Accessed 2026-11-03.back
- 1Pilz, K.F., Sanders, J., Rahman, R. and Heim, L., Trends in AI Supercomputers, arXiv:2504.16026, submitted 22 April 2025 (abstract page: 500 systems from 2019 to 2025; performance doubling about every nine months; cost and power doubling about every year; one March 2025 system with about 200,000 chips, USD 7 billion and 300 MW; about 75% of performance in the United States). arXiv, Ithaca. Observation year 2025. Accessed 2026-11-03.back
- 8Semiconductor Industry Association (ed.), Global Annual Semiconductor Sales Increase 25.6% to $791.7 Billion in 2025 (release; WSTS data; logic USD 301.9 billion; memory USD 223.1 billion; regional growth; about USD 1 trillion projected for 2026). Semiconductor Industry Association, Washington. Observation year 2025. Accessed 2026-11-03.back
- 13US Department of Commerce, Bureau of Industry and Security (ed.), home page and news items (May 2026 guidance on licences for advanced computing items to Country Group D:5 entities; 7 April 2026 extension of the authorised IC designer timeline to 31 December 2026; Section 232 investigation of semiconductor imports listed). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
- 2Sevilla, J., Heim, L., Ho, A., Besiroglu, T., Hobbhahn, M. and Villalobos, P., Compute Trends Across Three Eras of Machine Learning, arXiv:2202.05924, 2022 (abstract page: doubling about every 20 months before 2010 and about every 6 months in the deep learning era). arXiv, Ithaca. Observation year 2022. Accessed 2026-11-03.back