Draft, not yet released. In stewardship review. Not indexed until the first approved release.

Methodology

How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.

14 min read0 figures13 tables19 notesNR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE

Contents
  1. ·Edition home
  2. ·Executive summary
  3. 1AI compute is physical infrastructure built on a few chips and a few places
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Compute build-out meets local power, water and packaging limits
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. AMethodology
    1. A.1 Methods
    2. A.2 Model card, Semiconductor and compute System Model v0
    3. A.3 The baseline evidence cut
    4. A.4 Evidence age and coverage
    5. A.5 Evidence cards, two anchor sources
    6. A.6 Publication acceptance record
    7. A.7 Status words
    8. A.8 How the edition is made, released and corrected
    9. A.9 Glossary and abbreviations
    10. A.10 Technical annex
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

A.1Methods

The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.

Table A.1Methods
No.DerivationCalculationResult
(1)Share of 2025 equipment billings in China, Taiwan and Korea(49.31 + 31.50 + 25.75) ÷ 135.06≈ 79%
(2)Logic and memory share of 2025 chip sales(301.9 + 223.1) ÷ 791.7≈ 66%
(3)Site power per chip for the largest 2025 system in the dataset300 MW ÷ 200,000 chips≈ 1.5 kW per chip, whole-site
(4)Ratio of the 2028 projection to 2023 US data centre use325 ÷ 176 and 580 ÷ 1761.8 to 3.3 times
Table A.2Coupling strength scale (matrix and model card)
StrengthDefinition
STRONGa disruption in the source system has historically changed the target system’s service or output within one season, in more than one region
MODERATEan effect is documented but buffered or slower
WEAKan effect is plausible but not documented at global scale
Table A.3Status grammar
LabelRule
Reportedvalue as issued by its source, with year
Inferredreasoned from cited evidence; never a measurement
EstimatedNexus analytical value with stated method
Scenarioconditional on stated assumptions
Expert inputstructured editorial judgement awaiting evidence

A.2Model card, Semiconductor and compute System Model v0

Model ID
MDL-XT06-SEMICONDUCTORS · v0.1
Purpose
represent advanced semiconductors and AI compute as infrastructure coupled to electricity, cooling water, materials, finance, workforce and export controls
Family
graph-based system of systems
Inputs
the cited sources of this edition; no proprietary data
Method
expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
Validation
none yet, first validation against federation evidence in 2027
Uncertainty
qualitative; strengths are hypotheses, not measurements
Domain of validity
global scale; not for asset-, site- or country-level use
Reproducibility
strength table and sources published in this edition
20couplings

typed in v0

0strong

documented within one season

2moderate

documented, buffered

18weak

plausible, undocumented

A.3The baseline evidence cut

Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.

Cut ID
DC-XTECH-SEMICONDUCTORS-GLOBAL-2026-B0
Type
baseline documentary cut
Resolution policy
pinned · as of 30 September 2026
Sources pinned
44 cited sources, each at the edition and access date in the references
Model runs
none at baseline, analytical values are stated with their method
Digest
computed at freeze and recorded in the publication record
Supersedes
nothing, first cut of the series
Superseded by
the 2027 semiconductor and compute annual cut

Lineage

  1. 01

    source edition

  2. 02

    pinned citation

  3. 03

    finding

  4. 04

    page

  5. 05

    publication record

Table A.4From the baseline cut to the federation cut
ElementBaseline 20262027 global annual
Sourcescited global publications, pinned by editionnational, regional and sector cuts through one graph
Analysisstated methods and editorial estimatestyped analysis specifications
ModelsSemiconductor and compute System Model v0 specificationmodel runs with receipts
Findingstwelve baseline findingsfindings re-bound to federation evidence
Reviewfive passes scheduledfive passes on the exact digest

A.4Evidence age and coverage

A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.

Table A.5Evidence age and coverage
IndicatorObservedReleasedCadenceNext release
AI supercomputer dataset2019 to 2025Apr 2025one-offupdates
Training compute report2024Aug 2024one-offrevisions
Semiconductor sales2025Feb 2026annualnext annual release
Equipment billings2025Apr 2026annualnext annual release
US data centre energy2023 and 2028 scenariosDec 2024periodicnext national update
CHIPS awardsnot bound at closepost-close, context only: Sep to Oct 202610per eventnext awards
EU Chips Act2023 and 2026Jun 2026 proposalperiodicadoption
Export-control guidance2026May 2026per eventnext notice
Table A.6Coverage by system at baseline
SystemCoverageThinnest dimension
ComputePARTIALcounts on a common basis
MarketGOODprimary equipment data
GovernancePARTIALtext of the second Chips Act
InvestmentPARTIALsubsidy outlays
EnergyPARTIALfab and non-US data centre power
WaterTHINfab and data centre water use
SkillsTHINworkforce numbers
Packaging and memoryTHINcapacity by country
Table A.7Designed empty states: what is not bound, what would fill it and why
FieldSource that would fill itBlocker
Power and cooling-water use of fabrication plants on a common basiscompany reports, regulators, peer-reviewed footprint studiessingle-company figures only; one fab figure read in local news23
Water use of AI data centresoperators, utilities, national statisticsnot retrieved; the Berkeley Lab report page gave no water figure16
Global data centre electricity figures from the IEA report itselfIEA Energy and AI24the IEA page returned an access error; figures come from search summaries
Foundry market share from a primary market-research sourceTrendForce report27 and the TSMC annual report17press coverage only; the annual report was listed but not read; sources differ in scope
Advanced packaging and high-bandwidth memory capacity by countryindustry and trade statisticsnot retrieved
Equipment dependence by country and tool typeSEMI data, company filings, trade statisticsregional billings read only through a trade report9
Gallium and germanium production and supply from the primary sourceUSGS Mineral Commodity Summaries 20262526the USGS pages returned an access error; no figure used
Delivered outlays against announced subsidy awardsNIST, European Commission, national ministriesaward outlays not bound at the close; outlays not published in one series4412
Text of the EU second Chips Act proposalEuropean Commission legal textthe page states the proposal; the text was not opened12
Rapidus and other national programme totals from ministry sourcesMETI and national ministriestrade press only; totals differ by source2143
Chip and AI accelerator volumes by typecompany filings, market researchnot retrieved; vendor claims are not used19
Semiconductor workforce size and skills gapsnational statistics, OECD, industry surveysnot retrieved; capability rung stays LISTED
WSTS forecast values for 2026 and 2027WSTS forecast releases18the home page was read; it carries no forecast text
Capability rungs beyond monitoring and planningagencies, operators, laboratoriesnot reviewed

A.5Evidence cards, two anchor sources

Preprint arXiv 2504.16026 by Pilz, Sanders, Rahman and Heim, April 2025. One-off dataset of 500 systems. Role: binds AIC-001 and the lead figure. Coverage: systems from 2019 to 2025.

EVD-XT06-001

Trends in AI Supercomputers1

Issued by the Semiconductor Industry Association in 2026 from WSTS data. Annual. Role: binds FIN-004 and the market tiles. Coverage: world sales by product category and region.

EVD-XT06-002

SIA release on 2025 sales8

Table A.8Quality dimensions at baseline
DimensionEVD-XT06-001EVD-XT06-002
Completenesssystems visible in public sources onlyall WSTS members; world total
Timelinessabout one year of lag in the datasetissued within weeks of year end
Revisionpreprint versionslater forecasts may revise totals
Method transparencydataset method describedcompiled by WSTS from member reports
External validationpreprint, not yet peer reviewed hereindustry statistics, no peer review

Evidence cards to follow in 2027

  • Pilz and others1: publication status and dataset updates
  • US Department of Commerce13: rule texts behind the May 2026 guidance
  • European Commission12: second Chips Act proposal text
  • IEA24: global data centre figures from the report

A.6Publication acceptance record

Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.

Table A.9Publication acceptance record
GroupAreaItemsPassN/APending
D1Identity and scope8800
D2Source and data12912
D3Analysis and models12381
D4Findings and claims9801
D5Figures, tables, maps10622
D6Editorial and citations10802
D7Review and approval130013
D8Artefact and design12705
D9Registry and release9009

Publication gate

Conditions met
14 of 23 at evidence close
Blocking problems
none recorded
Open conditions
reviews, approval of the exact digest, deposit, registry pointer

Not applicable at baseline

Model runs
first runs in Q1 2027
Maps
plates in Q2 2027
Waivers
none

A.7Status words

Table A.10The status every value carries
StatusWhat it means
ObservedMeasured directly and published by the source.
ReportedPublished statistics of an official or institutional source.
DeclaredStated by the body concerned; not independently measured.
EstimatedA Nexus estimate from cited evidence, with its method in Annex A.
ModelledProduced by a stated model from cited inputs.
InferredReasoned from cited evidence; not measured.
ForecastA projection by the cited source.
SimulatedA simulation result under stated assumptions.
ScenarioA conditional statement under stated assumptions; never a prediction.
Expert inputExpert judgement, recorded with its basis.
CandidateProposed for a later edition; not yet evidence.
Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject.

A.8How the edition is made, released and corrected

Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.

StepWhat happensSource
01 Evidence arrives from the pillarsFoundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s.
02 The cut is sealedOn the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on.
03 The edition is assembledThe edition is drafted from its template and content pack. Agents may draft; they never publish and never decide.
04 The keys turnAt the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward.
05 The gate opensA named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit.
06 Signed and depositedThe PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI.
07 Published on its desk’s siteOnly then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part.
08 Corrections go to StandardsMethod and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut.

A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).

Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.

A.9Glossary and abbreviations

Table A.11Series terms
TermMeaning
Baseline Editionthe inaugural annual edition that fixes the reference state for the series
WEFH+Bwater, energy, food, health and biodiversity, the national nexus core
Couplinga typed dependency through which one system transmits to another
Protection gapthe share of losses not covered by insurance
Capability ladderLISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED
EQLevidence-quality level, 1–5
Evidence cuta frozen resolution of exact sources and versions
NNC · NLC · NWGNational Nexus Consortium · National Leadership Council · National Working Groups
Table A.12Abbreviations used in this edition
AbbreviationExpansion
BISBureau of Industry and Security
CHIPSCreating Helpful Incentives to Produce Semiconductors
D:5Country Group D:5 of the US export regulations
DOEUS Department of Energy
FLOPfloating-point operations
HBMhigh-bandwidth memory
IRDSInternational Roadmap for Devices and Systems
SEMIsemiconductor equipment and materials association
SIASemiconductor Industry Association
TWhterawatt-hour
WSTSWorld Semiconductor Trade Statistics
EUVextreme ultraviolet lithography

A.10Technical annex

Table A.13Technical annex
ItemAnnexContentsStatus
A.1Indicator definitionsthe global indicator set, with units and sourcesIN THIS EDITION
A.2Coupling strengthsthe twenty-cell matrix and its rationaleIN THIS EDITION
A.3Scenario specificationSCN-XT06-PWR-01 assumptions and signpostsIN THIS EDITION
A.4Capability placementsrung evidence for fifteen functionsIN THIS EDITION
A.5Model diagnosticsfirst runs and validation2027
A.6Sensitivity analysesinfluence of coupling strengths2027
A.7Cluster notescards for the major fabrication and compute clusters2027
A.8Review statementspass-by-pass review recordAT RELEASE

A.1 · indicator definition: doubling time

Construct
time for a measured quantity to double under a fitted exponential trend
Unit
months
Method
regression of the quantity on date across systems or models
Source
preprint arXiv 2504.160261; preprint arXiv 2202.059242
Uncertainty
depends on dataset coverage and period; not stated as one value in the abstracts read
Known limits
a historical fit, not a forecast; data come from public disclosures

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 10POST-CLOSE, context only: NIST (ed.), CHIPS for America program page (USD 50 billion; USD 39 billion manufacturing incentives; USD 11 billion research; award notices of 8 September, 16 September, 14 October and 22 October 2026). National Institute of Standards and Technology, Gaithersburg. Observation year 2026. Accessed 2026-11-03.back
  2. 23AZFamily (ed.), TSMC Arizona expansion could make it Phoenix’s largest water customer, 22 July 2026 (total planned investment USD 265 billion; about 5,300 acre-feet a year for the first fab; 65% reclaimed; goal 90%); local news reporting company figures, weak evidence. Gray Media, Phoenix. Observation year 2026. Accessed 2026-11-03.back
  3. 16Shehabi, A. and others, 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, December 2024 (publication page abstract only; no figures on the page; the report PDF was not read). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03.back
  4. 24UNVERIFIED, not opened: IEA (ed.), Energy and AI, April 2025 (about 415 TWh of global data centre electricity in 2024, about 1.5% of the total; about 945 TWh in 2030 in the base case; range of 700 to 1,700 TWh in 2035), taken from search-result summaries; the IEA pages returned an access error. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  5. 27UNVERIFIED, not opened: TrendForce (ed.), 2025 foundry ranking (largest foundry sales about USD 122.5 billion and a share of about 69.9%), taken from press coverage in search results. TrendForce, Taipei. Observation year 2025. Accessed 2026-11-03.back
  6. 17TSMC (ed.), Annual reports page of investor relations (2025 Annual Report and Form 20-F filed 17 April 2026 listed; the reports themselves were not read). Taiwan Semiconductor Manufacturing Company, Hsinchu. Observation year 2025. Accessed 2026-11-03.back
  7. 9Evertiq (ed.), Semiconductor equipment billings reached $135B in 2025, 9 April 2026, a trade report of a SEMI release (USD 135.06 billion in 2025 against USD 117.14 billion in 2024; regional table); the SEMI page itself returned an access error, so this is a secondary report and weak evidence. Evertiq, Munich. Observation year 2025. Accessed 2026-11-03.back
  8. 25UNVERIFIED, not opened: USGS (ed.), Mineral Commodity Summaries 2026, gallium chapter (reported in summaries as about 99% of primary low-purity gallium produced in China in 2025), taken from search-result summaries; the page returned an access error and no figure is used in the findings. US Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
  9. 26UNVERIFIED, not opened: USGS (ed.), Mineral Commodity Summaries 2026, germanium chapter, the page returned an access error; summaries differ on China shares and no figure is used. US Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
  10. 44United States Congress, CHIPS and Science Act, Public Law 117-167, enacted 9 August 2022 (text of section 102 on Congress.gov, first 100,000 characters read: the funding lines for sections 9902 and 9906 of Public Law 116-283 by fiscal year 2022 to 2026 sum to USD 39 billion for manufacturing incentives and USD 11 billion for research, USD 50 billion in all; the totals are sums of the listed amounts, not stated in the text). Observation year 2022. Accessed 2026-11-03.back
  11. 12European Commission (ed.), European Chips Act policy page (entered into force 21 September 2023; three pillars; more than EUR 33 billion across 19 State aid decisions; second Chips Act proposed June 2026). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2026. Accessed 2026-11-03.back
  12. 21The Register (ed.), Japan’s Rapidus lands $1.7B to chase 2nm chip production by 2027, 27 February 2026 (JPY 267.6 billion round; JPY 100 billion from a METI agency; JPY 167.6 billion from 32 companies); trade press, weak evidence. Situation Publishing, London. Observation year 2026. Accessed 2026-11-03.back
  13. 43UNVERIFIED, not opened: METI and press coverage of the April 2026 addition of JPY 631.5 billion to Rapidus support, bringing research and development support to about JPY 2.354 trillion, taken from search-result summaries; totals differ by source. Observation year 2026. Accessed 2026-11-03.back
  14. 19Nvidia (ed.), Blackwell architecture product page (208 billion transistors per GPU; custom TSMC 4NP process; performance multiples are vendor claims and weak evidence). Nvidia, Santa Clara. Observation year 2026. Accessed 2026-11-03.back
  15. 18POST-CLOSE, context only: WSTS (ed.), World Semiconductor Trade Statistics home page (73rd forecast conference planned for 16 to 19 November 2026; billings data through August 2026; no forecast values in the text of the page). WSTS, Geneva. Observation year 2026. Accessed 2026-11-03.back
  16. 1Pilz, K.F., Sanders, J., Rahman, R. and Heim, L., Trends in AI Supercomputers, arXiv:2504.16026, submitted 22 April 2025 (abstract page: 500 systems from 2019 to 2025; performance doubling about every nine months; cost and power doubling about every year; one March 2025 system with about 200,000 chips, USD 7 billion and 300 MW; about 75% of performance in the United States). arXiv, Ithaca. Observation year 2025. Accessed 2026-11-03.back
  17. 8Semiconductor Industry Association (ed.), Global Annual Semiconductor Sales Increase 25.6% to $791.7 Billion in 2025 (release; WSTS data; logic USD 301.9 billion; memory USD 223.1 billion; regional growth; about USD 1 trillion projected for 2026). Semiconductor Industry Association, Washington. Observation year 2025. Accessed 2026-11-03.back
  18. 13US Department of Commerce, Bureau of Industry and Security (ed.), home page and news items (May 2026 guidance on licences for advanced computing items to Country Group D:5 entities; 7 April 2026 extension of the authorised IC designer timeline to 31 December 2026; Section 232 investigation of semiconductor imports listed). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
  19. 2Sevilla, J., Heim, L., Ho, A., Besiroglu, T., Hobbhahn, M. and Villalobos, P., Compute Trends Across Three Eras of Machine Learning, arXiv:2202.05924, 2022 (abstract page: doubling about every 20 months before 2010 and about every 6 months in the deep learning era). arXiv, Ithaca. Observation year 2022. Accessed 2026-11-03.back

Cite this annex

Valadbaygi, S. (Ed.). (2026). Annex A: Methodology. In Exponential Technology Report 2026: Advanced Semiconductors and AI Compute (Baseline Edition 2026, Report No. NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

ReportsContribute

Send evidence or a correction on Advanced Semiconductors and AI Compute.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems Evidence deskExponential Technology

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

The Global Centre for Risk and Innovation

Science · evidence · measurement

Not for profit

Our articles, maps and twins are free to read and free to republish. Readers and partners keep it that way.

Partner with us

Who funds us

GCRI is a not-for-profit institution. To ask who funds a piece of work, use the funding questions form.

Independence

Editors and the expert reviewers named on each article decide what we publish. Funders and partners do not review or approve articles before publication.

Licence

Articles: CC BY 4.0. Figures, maps, twins and data: CC BY 4.0. Other uses: ask through the permissions form.