- Fusion and Frontier Energy 2026
- Chapter 4
Risks and capability
Four fusion risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence.
Contents
- ·Edition home
- ·Executive summary
- 1Fusion is an experiment record and a fuel-cycle question
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5First-plant fuel and licence set the pace
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
4.1Risk objects
Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.
InferredEQL 3RSK-XT14-FUE-001
Tritium start-up supply
InferredEQL 2RSK-XT14-LIT-002
Lithium-6 enrichment and blanket demonstration
InferredEQL 3RSK-XT14-SCH-003
Schedule slippage in large public projects
InferredEQL 3RSK-XT14-GOV-004
Licensing and waste rules not final
4.2Capability ladder
Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence for fusion at the global level.
| Function | Rung | Level | Strongest public evidence at baseline |
|---|---|---|---|
| Prevention and mitigation | LISTED | safety case and licensing rules are proposed or in preparation14 | |
| Monitoring and observation | LISTED | no common tracker of performance claims or fuel inventories | |
| Early warning | LISTED | schedule and supply watching is not consolidated | |
| Preparedness and planning | EXISTS | US roadmap, UK strategy and German plan published121516 | |
| Redundancy and reserves | LISTED | tritium and lithium-6 reserves are not documented21 | |
| Response | LISTED | not applicable at baseline; no plant in operation | |
| Continuity of critical services | LISTED | not applicable at baseline | |
| Recovery | LISTED | not applicable at baseline | |
| Adaptation | LISTED | staged project plans exist7; no tested adaptation | |
| Social protection | LISTED | not applicable at baseline | |
| Finance and insurance | EXISTS | private funding large and public programmes growing1015 | |
| Institutional coordination | EXISTS | ITER, the IAEA group and national strategies7918 | |
| Technical infrastructure | EXISTS | research devices operating at several sites145 | |
| Workforce | LISTED | skills programmes announced15; no figure bound | |
| Research capacity | ADEQUATE | strong laboratory and journal base5353646 | |
| A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline. | |||
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 20Coleman, M. and Kovari, M., Global supply of tritium for fusion R and D from heavy water reactors (conference paper, UK Atomic Energy Authority; abstract and introduction read from the PDF; 0 to 27.7 kg available in 2055 across scenarios; 7.4 kg for a demonstration reactor in 2055 in one case). UK Atomic Energy Authority, Abingdon. Observation year 2018. Accessed 2026-11-03.back
- 22Theiding, T., Tritium: a few kilograms can make or break nuclear fusion (policy blog post of 6 March 2025; about 25 kg of civilian tritium in 2024; a student fellow commentary, weak evidence). Kleinman Center for Energy Policy, University of Pennsylvania, Philadelphia. Observation year 2024. Accessed 2026-11-03.back
- 21Pearson, R.J., The availability and supply of critical natural resources for the realisation of a fusion pilot plant: fuels for fusion (presentation to the US Department of Energy fusion workshop, 1 to 3 June 2022; lithium-6 is 7.4% of natural lithium; blankets need 30 to 90%; supply effectively zero; a company presentation, weak evidence). Kyoto Fusioneering, London. Observation year 2022. Accessed 2026-11-03.back
- 33UNVERIFIED, not opened: Ward, P. and colleagues, Lithium enrichment threatens to curb fusion deployment, arXiv:2605.04707, 2026, taken from search-result summaries. arXiv, Ithaca. Observation year 2026. Accessed 2026-11-03.back
- 7ITER Organization (ed.), ITER in a few lines (project page; baseline reviewed by the ITER Council in November 2024; start of research operation 2034; deuterium-tritium operation 2039; Q of 10, 500 MW from 50 MW). ITER Organization, Saint-Paul-lez-Durance. Observation year 2026. Accessed 2026-11-03.back
- 25Physics Today (ed.), ITER costs are pinned down with caveats (news report on the 2016 baseline review; review committee chaired by A. Wagner; estimate without contingencies). American Institute of Physics, College Park. Observation year 2016. Accessed 2026-11-03.back
- 14US Nuclear Regulatory Commission (ed.), Federal Register notice of 26 February 2026, proposed rule on regulatory framework for fusion machines (10 CFR part 30; comments due 27 May 2026; the first 100,000 of 168,363 characters were read). Office of the Federal Register, Washington. Observation year 2026. Accessed 2026-11-03.back
- 15UK Department for Energy Security and Net Zero (ed.), A new energy revolution: the UK plan for delivering fusion energy (policy paper of 16 March 2026; over GBP 2.5 billion over five years; GBP 1.3 billion for STEP and UK Fusion Energy; the first 100,000 of 127,790 characters were read). UK Government, London. Observation year 2026. Accessed 2026-11-03.back
- 18European Commission (ed.), Commission launches call for evidence to support first-ever EU-wide fusion strategy (news item of 6 June 2025; call open to 1 July 2025; strategy then programmed for the end of 2025). Directorate-General for Energy, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 12US Department of Energy (ed.), Energy Department announces Fusion Science and Technology Roadmap to accelerate commercial fusion power (announcement of 16 October 2025; Build-Innovate-Grow; power on the grid by the mid-2030s; no funding commitment). US Department of Energy, Washington. Observation year 2025. Accessed 2026-11-03.back
- 16Clean Energy Wire (ed.), German government pledges more than EUR 2 bln for nuclear fusion (news report of 2 October 2025; cabinet plan of 1 October 2025). Clean Energy Wire, Berlin. Observation year 2025. Accessed 2026-11-03.back
- 10World Nuclear News (ed.), Fusion industry raised USD4.5 billion in past year, report says (14 July 2026; Fusion Industry Association 2026 survey: USD 4.48 billion in 12 months, USD 14.24 billion cumulative, 56 companies; an industry survey, weak evidence). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 9World Nuclear News (ed.), Fusion entering implementation phase, says Grossi (report on the IAEA World Fusion Outlook 2025; more than 160 devices; private investment above USD 10 billion; October 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 1CEA IRFM (ed.), WEST sets a new plasma duration record (news page; plasma 61299, 12 February 2025, 1,337 seconds, 2 MW lower hybrid heating, 2.6 GJ injected and extracted). Commissariat a l energie atomique et aux energies alternatives, Cadarache. Observation year 2025. Accessed 2026-11-03.back
- 4World Nuclear News (ed.), New world record set in JET final fusion experiments (news report of 9 February 2024; 69 MJ over 5 seconds from 0.2 milligrams of fuel; 59 MJ in 2021). World Nuclear Association, London. Observation year 2024. Accessed 2026-11-03.back
- 5Lawrence Livermore National Laboratory (ed.), National Ignition Facility 2025 (annual report page; 8.6 MJ on 7 April 2025 from 2.08 MJ delivered, target gain 4.13; refurbishment and enhanced yield capability to 2.6 MJ). Lawrence Livermore National Laboratory, Livermore. Observation year 2025. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: Zylstra, A.B. et al., Burning plasma achieved in inertial fusion, Nature 601, 542 to 548, 2022, cited from memory. Observation year 2022. Accessed 2026-11-03.back
- 36UNVERIFIED, not opened: Abu-Shawareb, H. et al., Achievement of target gain larger than unity in an inertial fusion experiment, Physical Review Letters 132, 065102, 2024, cited from memory. Observation year 2024. Accessed 2026-11-03.back
- 46UNVERIFIED, not opened: Maslov, M. et al., JET D-T scientific programme, Nuclear Fusion 63, 112002, 2023, cited from memory. Observation year 2023. Accessed 2026-11-03.back