- Fusion and Frontier Energy 2026
- Chapter 7
The 2027 agenda
Eight bounded questions open the 2027 fusion agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 fusion edition.
Contents
- ·Edition home
- ·Executive summary
- 1Fusion is an experiment record and a fuel-cycle question
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5First-plant fuel and licence set the pace
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
7.1Questions for the operational series
- F-01
How much tritium is available to start a first plant, and how does stated demand compare with supply by year?
INI-XT14-FUE-01 · tritium supply and start-up; first output: supply and demand table.
- F-02
What lithium-6 enrichment capacity exists, and what do blanket designs need?
INI-XT14-LIT-02 · lithium-6 and blankets; first output: capacity map.
- F-03
What licensing, waste and siting rules apply to first plants in each jurisdiction?
INI-XT14-LIC-03 · licensing and waste; first output: rule overlay.
- F-04
How can gain, duration and power claims be compared on a common basis, including facility electricity?
INI-XT14-BMK-04 · performance on a common basis; first output: benchmark table.
- F-05
How do stated plant dates, public funding and private funding move together?
INI-XT14-FIN-05 · funding and schedule tracker; first output: tracker.
- F-06
Which materials and components limit first-wall and magnet lifetimes?
To be admitted in 2027; first output: dependence map.
- F-07
What workforce exists for fusion engineering, tritium handling and licensing?
To be admitted in 2027; first output: scoping note.
- F-08
Which readiness capabilities have been tested in a real licence or fuel transfer, and which are only planned?
Readiness capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for the 2027 fusion portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-XT14-FUE-01 | Tritium supply and start-up | Initiative | F-01 | PROPOSED |
| INI-XT14-LIT-02 | Lithium-6 and blankets | Initiative | F-02 | PROPOSED |
| INI-XT14-LIC-03 | Licensing and waste | Initiative | F-03 | PROPOSED |
| INI-XT14-BMK-04 | Performance on a common basis | Initiative | F-04 | PROPOSED |
| INI-XT14-FIN-05 | Funding and schedule tracker | Initiative | F-05 | PROPOSED |
| MSN-XT14-2027-01 | First-plant fuel Universe mission | Mission | F-01 | Candidate |
7.3The pathway
The fusion edition reads national readiness chapters, the coupled sector reports on energy, minerals and materials, and the global edition through one governed evidence graph. At baseline the federation is designed; the global energy and lifeline editions are drafted. This page states what exists today and what comes next.
- 01
National readiness chapters
fusion programme and regulatory readiness in each national edition
IN PREPARATION · national baselines
- 02
Sector couplings
GS-02 energy · SR-04 minerals · XT-12 materials
DRAFTED · sector baselines
- 03
Technology system model
devices, fuel cycle, materials, workforce, governance
v0 SPECIFIED · v1 with federation evidence
- 04
Strategic links
SR-02 lifeline systems · SR-13 strategic technology
PLANNED · strategic baselines
- 05
Universe
annual proving environment
CANDIDATE MISSION · mandate in 2027
- 06
XT-14 report
this series
BASELINE DRAFT · 2027 annual edition
- 07
Evidence and correction
one graph, many projections
OPEN · first correction cycle in 2027
7.4Universe 2027: evidence pack for the fusion candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | 2027 global annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-XT14-2027-01 · First-plant fuel Universe mission
- Role spine
- Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| INF-001 · inertial result | INI-XT14-BMK-04 | performance on a common basis | PUBLIC |
| INF-003 · plasma duration | INI-XT14-BMK-04 | performance on a common basis | PUBLIC |
| INF-005 · ITER plan | INI-XT14-FIN-05 | funding and schedule tracker | PUBLIC |
| MIN-006 · tritium | INI-XT14-FUE-01 | tritium supply and start-up | PUBLIC |
| MIN-007 · lithium-6 | INI-XT14-LIT-02 | lithium-6 and blankets | PUBLIC |
| FIN-008 · investment | INI-XT14-FIN-05 | funding and schedule tracker | PUBLIC |
| GOV-010 · licensing | INI-XT14-LIC-03 | licensing and waste | PUBLIC |
| SYS-012 · compound pathway | MSN-XT14-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the federation | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| Laboratory and institute news on records | laboratories and institutes | per event | INF-001 |
| ITER project updates | ITER Organization | per release | INF-005 |
| Federal Register and NRC fusion pages | US regulator | per release | GOV-010 |
| Fusion Industry Association report | trade association | annual | FIN-008 |
| IAEA World Fusion Outlook | IAEA | annual | INF-005 |
| Company announcements | companies | per event | FIN-011 |
| Tritium and lithium supply notices | producers and agencies | per event | MIN-006 |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- annual publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-XT14-001 | NIF reached a target gain of 4.135 | CORROBORATED | INF | research question F-04 |
| SIG-XT14-002 | Private funding rose to USD 4.48 billion in 12 months10 | PARTIAL | FIN | initiative F-05 |
| SIG-XT14-003 | US rule proposed for fusion machines14 | CORROBORATED | GOV | initiative F-03 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 5Lawrence Livermore National Laboratory (ed.), National Ignition Facility 2025 (annual report page; 8.6 MJ on 7 April 2025 from 2.08 MJ delivered, target gain 4.13; refurbishment and enhanced yield capability to 2.6 MJ). Lawrence Livermore National Laboratory, Livermore. Observation year 2025. Accessed 2026-11-03.back
- 10World Nuclear News (ed.), Fusion industry raised USD4.5 billion in past year, report says (14 July 2026; Fusion Industry Association 2026 survey: USD 4.48 billion in 12 months, USD 14.24 billion cumulative, 56 companies; an industry survey, weak evidence). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 14US Nuclear Regulatory Commission (ed.), Federal Register notice of 26 February 2026, proposed rule on regulatory framework for fusion machines (10 CFR part 30; comments due 27 May 2026; the first 100,000 of 168,363 characters were read). Office of the Federal Register, Washington. Observation year 2026. Accessed 2026-11-03.back