Severe storm in a crowded low orbit
A conditional statement under stated assumptions, never a prediction.
Contents
- ·Edition home
- ·Executive summary
- 1Orbit is shared infrastructure under growing load
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Severe storm in a crowded low orbit
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
5.1Assumptions
Scenario SCN-XT18-STM-01: what is assumed, and what is held constant.
- Baseline
- the 2026 reference state in this edition
- Drivers
- a storm of the 2024 class, or larger, arrives while low orbits hold more satellites than in 2024
- Analogues
- the May 2024 storm and the CRASH Clock estimate79
- Interventions
- none modelled: the specification describes the unmitigated case
- Run state
- narrative specification; quantified run scheduled for 2027
5.2The cascade, step by step
- 1
SPW → INF
storm heating raises drag on thousands of satellites
2024
- 2
INF → INF
many satellites maneuver at once and some lose control
2025
- 3
INF → DAT
navigation and communications degrade for hours to days
2024
- 4
DAT → FOO
GPS-guided farming and logistics stall
2024
- 5
SPW → ENE
power lines and transformers are stressed on the ground
2024
- 6
GOV → INF
licensing and disposal rules are tested against the event
2022
5.3The scenario as a table of steps
How the shock in scenario SCN-XT18-STM-01 would travel through Space and Orbital Infrastructure’s coupled systems, step by step, under the assumptions the edition states.
| Step | What happens | Source |
|---|---|---|
| 01 SPW to infrastructure | Storm heating raises drag on thousands of satellites. Analogue or source: 2024. | Edition XT-18, scenario SCN-XT18-STM-01, step 1 |
| 02 Infrastructure to infrastructure | Many satellites maneuver at once and some lose control. Analogue or source: 2025. | Edition XT-18, scenario SCN-XT18-STM-01, step 2 |
| 03 Infrastructure to dat | Navigation and communications degrade for hours to days. Analogue or source: 2024. | Edition XT-18, scenario SCN-XT18-STM-01, step 3 |
| 04 DAT to food | GPS-guided farming and logistics stall. Analogue or source: 2024. | Edition XT-18, scenario SCN-XT18-STM-01, step 4 |
| 05 SPW to energy | Power lines and transformers are stressed on the ground. Analogue or source: 2024. | Edition XT-18, scenario SCN-XT18-STM-01, step 5 |
| 06 Governance to infrastructure | Licensing and disposal rules are tested against the event. Analogue or source: 2022. | Edition XT-18, scenario SCN-XT18-STM-01, step 6 |
A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Space and Orbital Infrastructure 2026, scenario SCN-XT18-STM-01 (2026); Space and Orbital Infrastructure 2026, references (NR-CIT-1) (2026).
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 7NASA (ed.), What NASA is learning from the biggest geomagnetic storm in 20 years (article dated 9 May 2025; page updated 25 September 2026). National Aeronautics and Space Administration, Washington. Observation year 2024. Accessed 2026-11-03.back
- 9Thiele, S., Heiland, S.R., Boley, A.C. and Lawler, S.M., An Orbital House of Cards: Frequent Satellite Close Conjunctions, arXiv:2512.09643, submitted 10 December 2025, version 3 of 29 June 2026 (abstract page read; preprint, peer review not located; the abstract of this version gives 5.5 days and 164 days). arXiv, Ithaca. Observation year 2025. Accessed 2026-11-03.back
