Methodology
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
Contents
- ·Edition home
- ·Executive summary
- 1Orbit is shared infrastructure under growing load
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Severe storm in a crowded low orbit
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
A.1Methods
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | Result |
|---|---|---|---|
| (1) | Share of active satellites in one constellation | 11,148 ÷ 17,099 | about 65% |
| (2) | Share of catalogued objects that are spacecraft | 19,154 ÷ 34,054 | about 56% |
| (3) | Fall in CRASH Clock, 2018 to June 2025 | 164 ÷ 5.5 | about 30 times |
| (4) | Active satellites outside the largest constellation | 17,099 − 11,148 | 5,951 |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| Label | Rule |
|---|---|
| Reported | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Estimated | Nexus analytical value with stated method |
| Scenario | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, Space System Model v0
- Model ID
- MDL-XT18-SPACE · v0.1
- Purpose
- represent orbital infrastructure as shared infrastructure coupled to space weather, navigation and timing, communications, cyber security, atmosphere and governance
- Family
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- Method
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- Validation
- none yet, first validation against federation evidence in 2027
- Uncertainty
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for asset-, site- or country-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-XTECH-SPACE-GLOBAL-2026-B0
- Type
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 43 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 space annual cut
Lineage
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | 2027 global annual |
|---|---|---|
| Sources | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | Space System Model v0 specification | model runs with receipts |
| Findings | twelve baseline findings | findings re-bound to federation evidence |
| Review | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | Observed | Released | Cadence | Next release |
|---|---|---|---|---|
| Catalogued objects | 2026 | as of 4 Aug 2026 | quarterly | next quarterly issue |
| Active satellites | 2026 | 26 Oct 2026 | continuous | next update |
| ESA debris estimates | 2024 | report of Apr 2025 | annual | next report |
| ESA launch and reentry data | 2025 | report of 14 Sep 2026 | annual | next report |
| May 2024 storm | 2024 | May 2024 · article May 2025 | per event | next severe storm |
| CRASH Clock | 2025 | Dec 2025 · revised Jun 2026 | one-off | peer review |
| GPS benefit study | 2019 | Oct 2019 | one-off | new studies |
| Satellite network attack | 2022 | Feb 2022 · May 2022 | per event | incident reports |
| Reentry emissions model | 2024 | Jun 2024 | one-off | measurement campaigns |
| EU Space Act | 2025 | Jun 2025 · Nov 2025 | per meeting | compromise text |
| System | Coverage | Thinnest dimension |
|---|---|---|
| Orbital population | GOOD | common basis across catalogues |
| Space weather | PARTIAL | forecast skill and exposure |
| Navigation | PARTIAL | non-US outage costs |
| Cyber | PARTIAL | ground-segment incident data |
| Atmosphere | THIN | measured emissions by species |
| Governance | PARTIAL | text and adoption of rules |
| Economy | THIN | industry size from the report itself |
| Supply and workforce | THIN | materials, launch capacity, people |
| Field | Source that would fill it | Blocker |
|---|---|---|
| Object and debris counts on a common basis across catalogues | national catalogues, ESA, public trackers145 | counts of 34,054 catalogued, about 40,000 tracked and about 50,000 large trackable use different bases and are not reconciled |
| Conjunction and maneuver counts by operator | operator reports, national catalogues | not retrieved; ESA gives conjunction counts only in a figure1 |
| Debris and satellite counts from the ESA 2026 report itself | ESA Space Environment Report 20262 | only the summary page was read; tracked object and fragmentation counts were not on it |
| Peer review of the CRASH Clock estimate | journal publication of the preprint9 | not located; earlier versions and press reports gave other values |
| Launch and reentry emissions by species, measured | atmospheric measurement campaigns, peer-reviewed studies102930 | only a modelling study was read10 |
| Industry size and investment from the report itself | Space Foundation report and SIA 2026 report2223 | the Space Foundation page returned an access error; the SIA page gave no figures; the 2024 value rests on search summaries |
| Text and current status of the EU Space Act | Commission proposal and Parliament records24 | proposal not opened; Council note read for November 2025 only14 |
| Date the FCC five-year rule applies to each licence | FCC order appendix11 | the order was read; the applicability date was not confirmed |
| Outage costs of navigation outside the United States | EU and national studies2135 | not retrieved; the study read covers US private-sector use15 |
| Backup navigation and timing capacity of critical sectors | national agencies, operators | not retrieved; rung stays LISTED |
| Supply chains and materials for satellites and ground segments | industry and trade statistics | not retrieved |
| Space workforce and launch capacity by country | national statistics, industry surveys | not retrieved; capability rung stays LISTED |
| Loss and insurance data for orbital assets | insurers, operators | not retrieved; no figure used |
| Capability rungs beyond tracking, rules and research | agencies, operators, laboratories | not reviewed |
A.5Evidence cards, two anchor sources
Issued by the NASA Orbital Debris Program Office in September 2026. Periodic, quarterly. Role: binds ORB-001 and the lead figure. Coverage: objects catalogued by one national network as of 4 August 2026.
EVD-XT18-001
NASA Orbital Debris Quarterly News, September 20264
Issued by ESA on 14 September 2026, with data through 2025. Annual. Role: binds ORB-004. Coverage: world launches and reentries; summary page read.
EVD-XT18-002
Satellite launch and reentry data in the ESA Space Environment Report 20262
| Dimension | EVD-XT18-001 | EVD-XT18-002 |
|---|---|---|
| Completeness | one national catalogue; objects large enough to track | summary page of the full report |
| Timeliness | box score dated 4 August 2026 | data through the end of 2025 |
| Revision | quarterly issues | annual reports |
| Method transparency | catalogue definitions stated in the issue | report and methods published |
| External validation | agency catalogue; no peer review | agency report; no peer review |
Evidence cards to follow in 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Group | Area | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- Maps
- plates in Q2 2027
- Waivers
- none
A.7Status words
| Status | What it means |
|---|---|
| Observed | Measured directly and published by the source. |
| Reported | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| Estimated | A Nexus estimate from cited evidence, with its method in Annex A. |
| Modelled | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Scenario | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Step | What happens | Source |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Term | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Coupling | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| ESA | European Space Agency |
| EU | European Union |
| FCC | US Federal Communications Commission |
| GEO | geostationary orbit |
| GNSS | global navigation satellite system |
| GPS | Global Positioning System |
| ITU | International Telecommunication Union |
| LEO | low Earth orbit |
| MEO | medium Earth orbit |
| NOAA | US National Oceanic and Atmospheric Administration |
| SSN | US Space Surveillance Network |
| TLE | two-line element set |
A.10Technical annex
| Item | Annex | Contents | Status |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-XT18-STM-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Cluster notes | cards for the major orbital shells and ground-segment clusters | 2027 |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: CRASH Clock
- Construct
- time to a possible catastrophic collision if satellites stopped maneuvering or situational awareness were severely lost
- Unit
- days
- Method
- computed from catalogued orbits and conjunction frequency under stated assumptions
- Source
- arXiv preprint, revised June 20269
- Uncertainty
- earlier versions and press reports gave other values; assumptions drive the result
- Known limits
- a model metric, not a forecast; peer review not located
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1ESA (ed.), ESA Space Environment Report 2025 (summary page dated 1 April 2025; data through the end of 2024). European Space Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
- 4NASA Orbital Debris Program Office (ed.), Orbital Debris Quarterly News, Volume 30, Issue 3, September 2026 (satellite box score as of 4 August 2026; launch table May to July 2026). National Aeronautics and Space Administration, Houston. Observation year 2026. Accessed 2026-11-03.back
- 5NASA Orbital Debris Program Office (ed.), Orbital debris frequently asked questions (more than 34,000 objects catalogued as of August 2026; about 100 million millimeter-sized pieces; 41 ISS avoidance maneuvers since 1999). National Aeronautics and Space Administration, Houston. Observation year 2026. Accessed 2026-11-03.back
- 2ESA (ed.), ESA Space Environment Report 2026 (summary page dated 14 September 2026; data through the end of 2025; the full report PDF was not opened). European Space Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 9Thiele, S., Heiland, S.R., Boley, A.C. and Lawler, S.M., An Orbital House of Cards: Frequent Satellite Close Conjunctions, arXiv:2512.09643, submitted 10 December 2025, version 3 of 29 June 2026 (abstract page read; preprint, peer review not located; the abstract of this version gives 5.5 days and 164 days). arXiv, Ithaca. Observation year 2025. Accessed 2026-11-03.back
- 10Ferreira, J.P., Huang, Z., Nomura, K. and Wang, J., Potential Ozone Depletion From Satellite Demise During Atmospheric Reentry in the Era of Mega-Constellations, Geophysical Research Letters 51, 2024, DOI 10.1029/2024GL109280 (full text read; modelling study). American Geophysical Union, Washington. Observation year 2022. Accessed 2026-11-03. doi:10.1029/2024GL109280back
- 29UNVERIFIED, not opened: Ryan, R.G. and others, Impact of Rocket Launch and Space Debris Air Pollution on Stratospheric Ozone and Global Climate, Earth’s Future 10, e2021EF002612, 2022, cited from memory. Observation year 2022. Accessed 2026-11-03.back
- 30UNVERIFIED, not opened: Maloney, C. and others, study of satellite reentry aluminum in the atmosphere, Journal of Geophysical Research: Atmospheres, April 2025, taken from a search-result summary that says its modelling did not include interactive ozone chemistry. Observation year 2025. Accessed 2026-11-03.back
- 22SIA (ed.), State of the Satellite Industry Report, 2026 edition covering fiscal year 2025 (web page read; the executive summary was not read and no figure is used). Satellite Industry Association, Washington. Observation year 2025. Accessed 2026-11-03.back
- 23UNVERIFIED, not opened: Space Foundation (ed.), The Space Report 2025 Q2 (global space economy USD 613 billion in 2024, about 7.8% growth, about 78% commercial), taken from search-result summaries; the page returned an access error. Space Foundation, Colorado Springs. Observation year 2024. Accessed 2026-11-03.back
- 24UNVERIFIED, not opened: European Commission (ed.), Proposal for a Regulation on the safety, resilience and sustainability of space activities in the Union (EU Space Act), COM(2025) 335, published 25 June 2025, taken from search-result summaries; the Council note gives 26 June 2025 as the transmission date. European Commission, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 14General Secretariat of the Council (ed.), Note 15830/25, Regulation on the safety, resilience and sustainability of space activities in the Union (EU Space Act), progress report for the Competitiveness Council of 8 and 9 December 2025, interinstitutional file 2025/0335 (COD), 26 November 2025. Council of the European Union, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 11FCC (ed.), Second Report and Order, FCC 22-74, Mitigation of Orbital Debris in the New Space Age, IB Docket Nos. 22-271 and 18-313, adopted 29 September 2022, released 30 September 2022. Federal Communications Commission, Washington. Observation year 2022. Accessed 2026-11-03.back
- 21EUSPA (ed.), Galileo (web page last modified 25 September 2026; no satellite count on the page). European Union Agency for the Space Programme, Prague. Observation year 2026. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: Royal Academy of Engineering (ed.), Global Navigation Space Systems: reliance and vulnerabilities, March 2011, cited from memory; the page returned an error. Royal Academy of Engineering, London. Observation year 2011. Accessed 2026-11-03.back
- 15NIST (ed.), Economic Benefits of the Global Positioning System to the US Private Sector (news page dated 2 October 2019, updated 3 February 2025; study by RTI International sponsored by NIST; about USD 1.4 trillion in 2017 dollars, 1984 to 2017). National Institute of Standards and Technology, Gaithersburg. Observation year 2019. Accessed 2026-11-03.back
- 6Parker, W.E. and Linares, R., Satellite Drag Analysis During the May 2024 Gannon Geomagnetic Storm, arXiv:2406.08617, 2024 (abstract page read; preprint). arXiv, Ithaca. Observation year 2024. Accessed 2026-11-03.back
