Draft, not yet released. In stewardship review. Not indexed until the first approved release.

Methodology

How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.

13 min read0 figures13 tables17 notesNR-XTECH-SPACE-GLOBAL-2026-BASELINE

Contents
  1. ·Edition home
  2. ·Executive summary
  3. 1Orbit is shared infrastructure under growing load
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Severe storm in a crowded low orbit
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. AMethodology
    1. A.1 Methods
    2. A.2 Model card, Space System Model v0
    3. A.3 The baseline evidence cut
    4. A.4 Evidence age and coverage
    5. A.5 Evidence cards, two anchor sources
    6. A.6 Publication acceptance record
    7. A.7 Status words
    8. A.8 How the edition is made, released and corrected
    9. A.9 Glossary and abbreviations
    10. A.10 Technical annex
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

A.1Methods

The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.

Table A.1Methods
No.DerivationCalculationResult
(1)Share of active satellites in one constellation11,148 ÷ 17,099about 65%
(2)Share of catalogued objects that are spacecraft19,154 ÷ 34,054about 56%
(3)Fall in CRASH Clock, 2018 to June 2025164 ÷ 5.5about 30 times
(4)Active satellites outside the largest constellation17,099 − 11,1485,951
Table A.2Coupling strength scale (matrix and model card)
StrengthDefinition
STRONGa disruption in the source system has historically changed the target system’s service or output within one season, in more than one region
MODERATEan effect is documented but buffered or slower
WEAKan effect is plausible but not documented at global scale
Table A.3Status grammar
LabelRule
Reportedvalue as issued by its source, with year
Inferredreasoned from cited evidence; never a measurement
EstimatedNexus analytical value with stated method
Scenarioconditional on stated assumptions
Expert inputstructured editorial judgement awaiting evidence

A.2Model card, Space System Model v0

Model ID
MDL-XT18-SPACE · v0.1
Purpose
represent orbital infrastructure as shared infrastructure coupled to space weather, navigation and timing, communications, cyber security, atmosphere and governance
Family
graph-based system of systems
Inputs
the cited sources of this edition; no proprietary data
Method
expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
Validation
none yet, first validation against federation evidence in 2027
Uncertainty
qualitative; strengths are hypotheses, not measurements
Domain of validity
global scale; not for asset-, site- or country-level use
Reproducibility
strength table and sources published in this edition
20couplings

typed in v0

0strong

documented within one season

0moderate

documented, buffered

20weak

plausible, undocumented

A.3The baseline evidence cut

Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.

Cut ID
DC-XTECH-SPACE-GLOBAL-2026-B0
Type
baseline documentary cut
Resolution policy
pinned · as of 30 September 2026
Sources pinned
43 cited sources, each at the edition and access date in the references
Model runs
none at baseline, analytical values are stated with their method
Digest
computed at freeze and recorded in the publication record
Supersedes
nothing, first cut of the series
Superseded by
the 2027 space annual cut

Lineage

  1. 01

    source edition

  2. 02

    pinned citation

  3. 03

    finding

  4. 04

    page

  5. 05

    publication record

Table A.4From the baseline cut to the federation cut
ElementBaseline 20262027 global annual
Sourcescited global publications, pinned by editionnational, regional and sector cuts through one graph
Analysisstated methods and editorial estimatestyped analysis specifications
ModelsSpace System Model v0 specificationmodel runs with receipts
Findingstwelve baseline findingsfindings re-bound to federation evidence
Reviewfive passes scheduledfive passes on the exact digest

A.4Evidence age and coverage

A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.

Table A.5Evidence age and coverage
IndicatorObservedReleasedCadenceNext release
Catalogued objects2026as of 4 Aug 2026quarterlynext quarterly issue
Active satellites202626 Oct 2026continuousnext update
ESA debris estimates2024report of Apr 2025annualnext report
ESA launch and reentry data2025report of 14 Sep 2026annualnext report
May 2024 storm2024May 2024 · article May 2025per eventnext severe storm
CRASH Clock2025Dec 2025 · revised Jun 2026one-offpeer review
GPS benefit study2019Oct 2019one-offnew studies
Satellite network attack2022Feb 2022 · May 2022per eventincident reports
Reentry emissions model2024Jun 2024one-offmeasurement campaigns
EU Space Act2025Jun 2025 · Nov 2025per meetingcompromise text
Table A.6Coverage by system at baseline
SystemCoverageThinnest dimension
Orbital populationGOODcommon basis across catalogues
Space weatherPARTIALforecast skill and exposure
NavigationPARTIALnon-US outage costs
CyberPARTIALground-segment incident data
AtmosphereTHINmeasured emissions by species
GovernancePARTIALtext and adoption of rules
EconomyTHINindustry size from the report itself
Supply and workforceTHINmaterials, launch capacity, people
Table A.7Designed empty states: what is not bound, what would fill it and why
FieldSource that would fill itBlocker
Object and debris counts on a common basis across cataloguesnational catalogues, ESA, public trackers145counts of 34,054 catalogued, about 40,000 tracked and about 50,000 large trackable use different bases and are not reconciled
Conjunction and maneuver counts by operatoroperator reports, national cataloguesnot retrieved; ESA gives conjunction counts only in a figure1
Debris and satellite counts from the ESA 2026 report itselfESA Space Environment Report 20262only the summary page was read; tracked object and fragmentation counts were not on it
Peer review of the CRASH Clock estimatejournal publication of the preprint9not located; earlier versions and press reports gave other values
Launch and reentry emissions by species, measuredatmospheric measurement campaigns, peer-reviewed studies102930only a modelling study was read10
Industry size and investment from the report itselfSpace Foundation report and SIA 2026 report2223the Space Foundation page returned an access error; the SIA page gave no figures; the 2024 value rests on search summaries
Text and current status of the EU Space ActCommission proposal and Parliament records24proposal not opened; Council note read for November 2025 only14
Date the FCC five-year rule applies to each licenceFCC order appendix11the order was read; the applicability date was not confirmed
Outage costs of navigation outside the United StatesEU and national studies2135not retrieved; the study read covers US private-sector use15
Backup navigation and timing capacity of critical sectorsnational agencies, operatorsnot retrieved; rung stays LISTED
Supply chains and materials for satellites and ground segmentsindustry and trade statisticsnot retrieved
Space workforce and launch capacity by countrynational statistics, industry surveysnot retrieved; capability rung stays LISTED
Loss and insurance data for orbital assetsinsurers, operatorsnot retrieved; no figure used
Capability rungs beyond tracking, rules and researchagencies, operators, laboratoriesnot reviewed

A.5Evidence cards, two anchor sources

Issued by the NASA Orbital Debris Program Office in September 2026. Periodic, quarterly. Role: binds ORB-001 and the lead figure. Coverage: objects catalogued by one national network as of 4 August 2026.

EVD-XT18-001

NASA Orbital Debris Quarterly News, September 20264

Issued by ESA on 14 September 2026, with data through 2025. Annual. Role: binds ORB-004. Coverage: world launches and reentries; summary page read.

EVD-XT18-002

Satellite launch and reentry data in the ESA Space Environment Report 20262

Table A.8Quality dimensions at baseline
DimensionEVD-XT18-001EVD-XT18-002
Completenessone national catalogue; objects large enough to tracksummary page of the full report
Timelinessbox score dated 4 August 2026data through the end of 2025
Revisionquarterly issuesannual reports
Method transparencycatalogue definitions stated in the issuereport and methods published
External validationagency catalogue; no peer reviewagency report; no peer review

Evidence cards to follow in 2027

  • ESA2: tracked object and fragmentation counts in the full report
  • Parker and Linares6: forecast assessment details
  • Thiele and others9: peer review and assumptions of the CRASH Clock
  • European Commission24: proposal text

A.6Publication acceptance record

Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.

Table A.9Publication acceptance record
GroupAreaItemsPassN/APending
D1Identity and scope8800
D2Source and data12912
D3Analysis and models12381
D4Findings and claims9801
D5Figures, tables, maps10622
D6Editorial and citations10802
D7Review and approval130013
D8Artefact and design12705
D9Registry and release9009

Publication gate

Conditions met
14 of 23 at evidence close
Blocking problems
none recorded
Open conditions
reviews, approval of the exact digest, deposit, registry pointer

Not applicable at baseline

Model runs
first runs in Q1 2027
Maps
plates in Q2 2027
Waivers
none

A.7Status words

Table A.10The status every value carries
StatusWhat it means
ObservedMeasured directly and published by the source.
ReportedPublished statistics of an official or institutional source.
DeclaredStated by the body concerned; not independently measured.
EstimatedA Nexus estimate from cited evidence, with its method in Annex A.
ModelledProduced by a stated model from cited inputs.
InferredReasoned from cited evidence; not measured.
ForecastA projection by the cited source.
SimulatedA simulation result under stated assumptions.
ScenarioA conditional statement under stated assumptions; never a prediction.
Expert inputExpert judgement, recorded with its basis.
CandidateProposed for a later edition; not yet evidence.
Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject.

A.8How the edition is made, released and corrected

Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.

StepWhat happensSource
01 Evidence arrives from the pillarsFoundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s.
02 The cut is sealedOn the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on.
03 The edition is assembledThe edition is drafted from its template and content pack. Agents may draft; they never publish and never decide.
04 The keys turnAt the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward.
05 The gate opensA named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit.
06 Signed and depositedThe PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI.
07 Published on its desk’s siteOnly then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part.
08 Corrections go to StandardsMethod and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut.

A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).

Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.

A.9Glossary and abbreviations

Table A.11Series terms
TermMeaning
Baseline Editionthe inaugural annual edition that fixes the reference state for the series
WEFH+Bwater, energy, food, health and biodiversity, the national nexus core
Couplinga typed dependency through which one system transmits to another
Protection gapthe share of losses not covered by insurance
Capability ladderLISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED
EQLevidence-quality level, 1–5
Evidence cuta frozen resolution of exact sources and versions
NNC · NLC · NWGNational Nexus Consortium · National Leadership Council · National Working Groups
Table A.12Abbreviations used in this edition
AbbreviationExpansion
ESAEuropean Space Agency
EUEuropean Union
FCCUS Federal Communications Commission
GEOgeostationary orbit
GNSSglobal navigation satellite system
GPSGlobal Positioning System
ITUInternational Telecommunication Union
LEOlow Earth orbit
MEOmedium Earth orbit
NOAAUS National Oceanic and Atmospheric Administration
SSNUS Space Surveillance Network
TLEtwo-line element set

A.10Technical annex

Table A.13Technical annex
ItemAnnexContentsStatus
A.1Indicator definitionsthe global indicator set, with units and sourcesIN THIS EDITION
A.2Coupling strengthsthe twenty-cell matrix and its rationaleIN THIS EDITION
A.3Scenario specificationSCN-XT18-STM-01 assumptions and signpostsIN THIS EDITION
A.4Capability placementsrung evidence for fifteen functionsIN THIS EDITION
A.5Model diagnosticsfirst runs and validation2027
A.6Sensitivity analysesinfluence of coupling strengths2027
A.7Cluster notescards for the major orbital shells and ground-segment clusters2027
A.8Review statementspass-by-pass review recordAT RELEASE

A.1 · indicator definition: CRASH Clock

Construct
time to a possible catastrophic collision if satellites stopped maneuvering or situational awareness were severely lost
Unit
days
Method
computed from catalogued orbits and conjunction frequency under stated assumptions
Source
arXiv preprint, revised June 20269
Uncertainty
earlier versions and press reports gave other values; assumptions drive the result
Known limits
a model metric, not a forecast; peer review not located

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1ESA (ed.), ESA Space Environment Report 2025 (summary page dated 1 April 2025; data through the end of 2024). European Space Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  2. 4NASA Orbital Debris Program Office (ed.), Orbital Debris Quarterly News, Volume 30, Issue 3, September 2026 (satellite box score as of 4 August 2026; launch table May to July 2026). National Aeronautics and Space Administration, Houston. Observation year 2026. Accessed 2026-11-03.back
  3. 5NASA Orbital Debris Program Office (ed.), Orbital debris frequently asked questions (more than 34,000 objects catalogued as of August 2026; about 100 million millimeter-sized pieces; 41 ISS avoidance maneuvers since 1999). National Aeronautics and Space Administration, Houston. Observation year 2026. Accessed 2026-11-03.back
  4. 2ESA (ed.), ESA Space Environment Report 2026 (summary page dated 14 September 2026; data through the end of 2025; the full report PDF was not opened). European Space Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  5. 9Thiele, S., Heiland, S.R., Boley, A.C. and Lawler, S.M., An Orbital House of Cards: Frequent Satellite Close Conjunctions, arXiv:2512.09643, submitted 10 December 2025, version 3 of 29 June 2026 (abstract page read; preprint, peer review not located; the abstract of this version gives 5.5 days and 164 days). arXiv, Ithaca. Observation year 2025. Accessed 2026-11-03.back
  6. 10Ferreira, J.P., Huang, Z., Nomura, K. and Wang, J., Potential Ozone Depletion From Satellite Demise During Atmospheric Reentry in the Era of Mega-Constellations, Geophysical Research Letters 51, 2024, DOI 10.1029/2024GL109280 (full text read; modelling study). American Geophysical Union, Washington. Observation year 2022. Accessed 2026-11-03. doi:10.1029/2024GL109280back
  7. 29UNVERIFIED, not opened: Ryan, R.G. and others, Impact of Rocket Launch and Space Debris Air Pollution on Stratospheric Ozone and Global Climate, Earth’s Future 10, e2021EF002612, 2022, cited from memory. Observation year 2022. Accessed 2026-11-03.back
  8. 30UNVERIFIED, not opened: Maloney, C. and others, study of satellite reentry aluminum in the atmosphere, Journal of Geophysical Research: Atmospheres, April 2025, taken from a search-result summary that says its modelling did not include interactive ozone chemistry. Observation year 2025. Accessed 2026-11-03.back
  9. 22SIA (ed.), State of the Satellite Industry Report, 2026 edition covering fiscal year 2025 (web page read; the executive summary was not read and no figure is used). Satellite Industry Association, Washington. Observation year 2025. Accessed 2026-11-03.back
  10. 23UNVERIFIED, not opened: Space Foundation (ed.), The Space Report 2025 Q2 (global space economy USD 613 billion in 2024, about 7.8% growth, about 78% commercial), taken from search-result summaries; the page returned an access error. Space Foundation, Colorado Springs. Observation year 2024. Accessed 2026-11-03.back
  11. 24UNVERIFIED, not opened: European Commission (ed.), Proposal for a Regulation on the safety, resilience and sustainability of space activities in the Union (EU Space Act), COM(2025) 335, published 25 June 2025, taken from search-result summaries; the Council note gives 26 June 2025 as the transmission date. European Commission, Brussels. Observation year 2025. Accessed 2026-11-03.back
  12. 14General Secretariat of the Council (ed.), Note 15830/25, Regulation on the safety, resilience and sustainability of space activities in the Union (EU Space Act), progress report for the Competitiveness Council of 8 and 9 December 2025, interinstitutional file 2025/0335 (COD), 26 November 2025. Council of the European Union, Brussels. Observation year 2025. Accessed 2026-11-03.back
  13. 11FCC (ed.), Second Report and Order, FCC 22-74, Mitigation of Orbital Debris in the New Space Age, IB Docket Nos. 22-271 and 18-313, adopted 29 September 2022, released 30 September 2022. Federal Communications Commission, Washington. Observation year 2022. Accessed 2026-11-03.back
  14. 21EUSPA (ed.), Galileo (web page last modified 25 September 2026; no satellite count on the page). European Union Agency for the Space Programme, Prague. Observation year 2026. Accessed 2026-11-03.back
  15. 35UNVERIFIED, not opened: Royal Academy of Engineering (ed.), Global Navigation Space Systems: reliance and vulnerabilities, March 2011, cited from memory; the page returned an error. Royal Academy of Engineering, London. Observation year 2011. Accessed 2026-11-03.back
  16. 15NIST (ed.), Economic Benefits of the Global Positioning System to the US Private Sector (news page dated 2 October 2019, updated 3 February 2025; study by RTI International sponsored by NIST; about USD 1.4 trillion in 2017 dollars, 1984 to 2017). National Institute of Standards and Technology, Gaithersburg. Observation year 2019. Accessed 2026-11-03.back
  17. 6Parker, W.E. and Linares, R., Satellite Drag Analysis During the May 2024 Gannon Geomagnetic Storm, arXiv:2406.08617, 2024 (abstract page read; preprint). arXiv, Ithaca. Observation year 2024. Accessed 2026-11-03.back

Cite this annex

Valadbaygi, S. (Ed.). (2026). Annex A: Methodology. In Exponential Technology Report 2026: Space and Orbital Infrastructure (Baseline Edition 2026, Report No. NR-XTECH-SPACE-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

ReportsContribute

Send evidence or a correction on Space and Orbital Infrastructure.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems Evidence deskExponential Technology

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

The Global Centre for Risk and Innovation

Science · evidence · measurement

Not for profit

Our articles, maps and twins are free to read and free to republish. Readers and partners keep it that way.

Partner with us

Who funds us

GCRI is a not-for-profit institution. To ask who funds a piece of work, use the funding questions form.

Independence

Editors and the expert reviewers named on each article decide what we publish. Funders and partners do not review or approve articles before publication.

Licence

Articles: CC BY 4.0. Figures, maps, twins and data: CC BY 4.0. Other uses: ask through the permissions form.