- South Africa 2026
- Chapter 7
The 2027 agenda
Eight bounded questions open the 2027 National Agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due at the Q1 2027 cut.
Contents
- ·Edition home
- ·Executive summary
- 1South Africa’s risk runs through its pipes and its grid
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Power shortfall and wastewater stress in a dense province
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
7.1Questions for the operational series
- A-01
How would a power shortfall interrupt pumping and treatment in a dense province, and how long would services take to recover?
INI-ZAF-ENE-01 · grid and water continuity; first output: dependency graph for two provinces.
- A-02
Where are wastewater systems in a critical state, and which rivers and settlements sit downstream?
INI-ZAF-WAT-02 · wastewater and river risk; first output: system-by-system register.
- A-03
How much of urban supply is lost, and what does it cost in energy?
INI-ZAF-WAT-03 · non-revenue water; first output: loss-and-energy table for five metros.
- A-04
How exposed are food and fertiliser supply to concurrent drought, price and logistics shocks?
INI-ZAF-FOO-04 · food supply exposure; first output: commodity dependence table.
- A-05
Where do flood losses fall on households, municipalities and the national budget?
INI-ZAF-FIN-05 · flood protection gap; first output: peril-by-province loss table.
- A-06
How do river basins and dams perform under multi-year drought?
INI-ZAF-WAT-01 · workstream; first output: basin performance note.
- A-07
What is the condition of ecosystems that supply water, and how is it changing?
To be admitted in Q1 2027; first output: scoping note against the 2025 assessment.
- A-08
Which capabilities have been tested in real disasters, and which are only planned?
National capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for admission at the Q1 2027 alignment. They are programme objects, no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-ZAF-ENE-01 | Grid and water continuity | Initiative | A-01 | PROPOSED |
| INI-ZAF-WAT-02 | Wastewater and river risk | Initiative | A-02 | PROPOSED |
| INI-ZAF-WAT-03 | Non-revenue water and energy | Initiative | A-03 | PROPOSED |
| INI-ZAF-FOO-04 | Food supply exposure | Initiative | A-04 | PROPOSED |
| INI-ZAF-FIN-05 | Flood protection gap | Initiative | A-05 | PROPOSED |
| PRJ-ZAF-ENE-01a | Two-province grid and water dependency graph | Project | A-01 | PROPOSED |
| MSN-ZAF-2027-01 | Power, wastewater and flood Universe mission | Mission | A-01 | Candidate |
7.3The pathway
South Africa is the national pathway through which the Nexus operating system will run in South Africa from 2027. At baseline the pathway is designed and its records are prepared; its councils and working groups are constituted from Q1 2027. This page states what exists today and what comes next, nothing more.
- 01
One National Agenda
bounded national questions for the year
DRAFT 2027 · agenda review at the Q1 alignment
- 02
National Desk
coordination, records, routing and continuity
DESIGNED · constituted in Q1 2027
- 03
National Model
the country as a system of systems
v0 SPECIFIED · v1 with the first Foundry cut
- 04
National Portfolio
risks, capabilities, initiatives, projects, missions
7 PROPOSED · admission at the Q1 alignment
- 05
Foundry
continuous computational environment
PREPARED · first sealed cut NQ-ZAF-2027-Q1
- 06
quarterly and annual publication
BASELINE ISSUED · Q1 2027 · State & Agenda
- 07
Universe
annual proving environment
CANDIDATE MISSION · mandate set in 2027
- 08
Evidence and correction
after-action, correction and renewal
OPEN · first correction cycle in Q2 2027
7.4Universe 2027, evidence pack for the candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | Q4 2027 annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-ZAF-2027-01 · Power, wastewater and flood Universe mission
- Role spine
- Leadership sponsor (NLC) · Institutional anchor (NNC) · Mission lead (NWG)
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| CLI-001 · emissions | public record | reference for the 2027 series | PUBLIC |
| ENE-003 · load-shedding | INI-ZAF-ENE-01 | grid and water continuity | PUBLIC |
| WAT-005 · Green Drop | INI-ZAF-WAT-02 | wastewater and river risk | PUBLIC |
| WAT-006 · water loss | INI-ZAF-WAT-03 | loss and energy | PUBLIC |
| FOO-007 · food | INI-ZAF-FOO-04 | food supply exposure | PUBLIC |
| CLI-011 · floods | INI-ZAF-FIN-05 · key F review | flood protection gap | PUBLIC |
| HLT-008 · health | research question A-01 | service continuity | PUBLIC |
| SYS-012 · compound pathway | MSN-ZAF-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the national pathway | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| Weather warnings and rainfall | South African Weather Service | real time | CLI findings |
| Grid status and load-shedding | Eskom | daily | ENE findings |
| Dam levels | Department of Water and Sanitation | weekly | RSK-ZAF-CLI-004 |
| Green, Blue and No Drop reports | Department of Water and Sanitation | periodic | WAT-005 |
| Crop estimates | Crop Estimates Committee | monthly in season | FOO-007 |
| Crop monitoring brief | FAO GIEWS | periodic | FOO-007 |
| Population and labour statistics | Statistics South Africa | per release | profile |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- quarterly publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-ZAF-001 | Load-shedding energy down 82% in a year5 | CORROBORATED | ENE · FIN | risk object RSK-ZAF-ENE-003 |
| SIG-ZAF-002 | Critical wastewater systems up to 47%9 | CORROBORATED | WAT · HLT | initiative A-02 |
| SIG-ZAF-003 | Provincial flood tolls in 2022 and 20251415 | CORROBORATED | CLI · INF | research question A-01 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 5Council for Scientific and Industrial Research (ed.), “Loadshedding down 82% in H1 2025 as demand eases and EAF edges up, but tariffs still exceed inflation.” CSIR, Pretoria, 2025.back
- 9Parliamentary Monitoring Group (ed.), “Green, Blue and No Drop Reports 2025: Ministry briefing,” Portfolio Committee on Water and Sanitation, 9 June 2026. PMG, Cape Town, 2026.back
- 14Bloomberg (ed.), “Death toll from flooding in South Africa’s KZN rises to 459.” Bloomberg News, 29 May 2022.back
- 15Eastern Cape Provincial Government (ed.), flood recovery update reporting 102 flood-related deaths. Reported by Pondoland Times, Eastern Cape, 2025.back
