Redundancy and diversity design
Critical functions are given independent backup paths, with diversity in supplier, technology and location so that one common cause cannot disable both.
GCRI · Systemic Risk Management
Reliability and resilience engineering supply the design methods that keep systems working through failure: redundancy, diversity, graceful degradation and recovery planning. In systemic risk management they connect the analysis of risk to the engineering and organisational choices that reduce it.
Reliability and resilience engineering studies how systems fail, how failures can be prevented and how systems absorb, adapt and recover from disruption. It addresses both technical components and the organisations that operate them. In risk management and systemic risk and methods and modelling, resilience engineering identifies critical components and recovery bottlenecks across connected systems. It informs redundancy, spares and restoration priorities. The canonical description is on the STEM Commons.
Critical functions are given independent backup paths, with diversity in supplier, technology and location so that one common cause cannot disable both.
Services are designed to shed lower-priority functions under stress and keep essential ones, with the order of shedding agreed before an event.
Recovery objectives are set for each service and tested in exercises, and the dependencies that lengthen recovery are identified and addressed.
Flood water, population density and active fires over Asia, from NASA GIBS. Each layer carries its own date.
Ramani shirikishi inahitaji JavaScript. Orodha ya tabaka na vyanzo imetolewa hapa chini.
Tabaka 3
Hazards and exposure, for this page
Kibodi, ramani ikiwa imelengwa
Shikilia Ctrl au ⌘ na usogeze ili kukuza
Ya karibuni zaidi inayopatikana
NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © wachangiaji wa OpenStreetMap (ODbL) · Natural Earth
Inapakia picha za hivi karibuni za NASA.
Buruta ili kusogeza. Ctrl au ⌘ na usogeze, bana au tumia vitufe ili kukuza; elea juu ili kuona thamani zilizo chini ya kiashiria; weka upya hurudisha kwenye eneo.
Hazards and exposure, framed on Asia.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.
Tabaka na tarehe
Datasets and records used by reliability and resilience engineering on this platform, with the role each plays and the label its values carry. Sources are listed in the source register.
| Data | Jukumu | Label |
|---|---|---|
| Asset and component failure records | Reliability inputs | IMEONEKANA |
| Continuity test results | Recovery performance | IMEONEKANA |
| Design documentation | Redundancy and diversity structure | DECLARED |
| Incident and near-miss reports | Failure modes in practice | IMERIPOTIWA |
The screen a team would use to follow this method: its measures, states and decisions. Names are examples and values are illustrative.
Systemic risk · Reliability and resilience · Run R-9568
nodes: assets · edges: dependencies
| N3 | 1470 | 35 | Critical |
| N4 | 6600 | 5 | Normal |
| N5 | 2499 | 15 | Normal |
| N6 | 6395 | 2 | Normal |
Reliability predictions are compared with field failure data. Exercises and post-event reviews check whether recovery performed as planned.
| Check | How it is done |
|---|---|
| Common-cause analysis | Redundant paths are checked for shared dependencies that could fail together |
| Exercise verification | Recovery objectives are verified in tests, not assumed from design |
| Failure mode review | Failure modes and effects are reviewed with operators who know the system |
Common-cause failures and rare events are hard to estimate from limited data. Human and organisational factors resist quantification.
Two stocks, pressure and adaptive capacity, joined by a reinforcing growth loop, a delayed balancing response and damage when pressure outruns capacity; past the threshold the system can tip. Teaching model with stated illustrative values, not a prediction. The map on this page shows Asia; the model itself is not tied to a place.
Controls
Readouts
| Year | Pressure | Capacity | Perceived |
|---|---|---|---|
| 0 | 20.0 | 50.0 | 20.0 |
| 4 | 23.3 | 44.9 | 21.2 |
| 8 | 27.2 | 42.2 | 24.0 |
| 12 | 31.7 | 42.3 | 27.7 |
| 16 | 36.8 | 45.5 | 32.2 |
| 20 | 42.3 | 51.5 | 37.2 |
| 24 | 47.9 | 60.3 | 42.6 |
| 28 | 53.2 | 71.3 | 48.0 |
| 32 | 57.8 | 84.3 | 53.1 |
| 36 | 66.4 | 98.4 | 58.4 |
| 40 | 82.7 | 115.9 | 69.7 |
| 44 | 97.8 | 139.7 | 83.8 |
| 48 | 109.1 | 169.4 | 97.3 |
No observed data enters this model: it runs on the teaching values set by the controls, to be replaced with a programme’s own evidence.
Across the six pillars, led by Nexus Consortium
Assembled from the Nexus Standards area profile Global and systemic risk: the hazards it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Choose the components, pick an initiating hazard and step through the cascade. The Map view places the run on an example geography with open data. Every coupling weight is a stated assumption you can change. A teaching model, not a forecast, an assessment or a certification. To model a place of your own choosing, open the full System Builder.
Majanga
Systems and couplings
Controls
NS-0 Katiba na kanuniNS-3 UNI za rekodi za hatari (sarufi, ulinganishi wa urithi, mamlaka ya ugawaji)NS-9 UNI za kimuktadha (utekelezaji, matukio, matukio ya programu)NS-10 Sera na vifungu (wajibu unaosomeka na mashine: ufafanuzi, ufungamanishaji, tathmini na utekelezaji)NS-11 Uthibitishaji na ufuatiliaji (ushahidi, uthibitisho, uchunguzi wa ulinganifu usio na imani)NS-14 Ulinganifu na upatanisho na viwango vya njeNRS-H120 Familia ya majanga: Udhaifu wa kimuundo wa mifumo iliyounganishwa (NHS-1 sys.fragility)NRS-C6 Hatari za kimfumo na za mfululizoNRS-H61 Familia ya majanga: Kushindwa kwa mfululizo (NHS-1 sys.cascade)NRS-H62 Familia ya majanga: Matukio mchanganyiko na ya majanga mengi (NHS-1 sys.compound)NRS-H94 Familia ya majanga: Matukio ya kimtandao ya kimfumo (NHS-1 cyber.systemic-cyber)NRS-H60 Familia ya majanga: Kukatizwa kwa mnyororo wa ugavi na mitiririko (NHS-1 sys.supply-chain)Observation
Example geography
Critical Infrastructure stewards reliability and resilience engineering for the Consortium and reviews how it is applied across platforms.
The model, its assumptions, its data and its uncertainty, in the form a scientist or engineer would check. Structures follow published methods. The values drawn are illustrative, not findings.
The model structure used for reliability and resilience engineering, the assumptions it makes and how each is tested.
Ri = f(Hi, Ei, Vi, Ci)hazard, exposure, vulnerability and coping capacityEAL = ∑k pk · Lkover events k with annual probability pkxt+1 = A xt + B ut + εtA carries the couplings, u the shock, ε the error| Assumption | Why it is made | How it is tested |
|---|---|---|
| Hazard and exposure are independent within an event | Keeps the loss integral tractable | Compare with a copula fit on joint records |
| Couplings are linear near the operating point | Lets shocks propagate through A | Perturb beyond the linear range and compare |
| Vulnerability curves transfer between places | Local curves are rarely available | Validate against observed losses where they exist |
Reports ni chapisho la kila robo mwaka la Muungano. Unachojua kuhusu somo hili kinaweza kuwa ushahidi, kisa au sahihisho katika toleo lijalo, kikitajwa kwa jina lako na kuchapishwa chini ya CC BY 4.0 pale ambapo ni kazi yako mwenyewe.
Usitume kamwe data binafsi, maelezo nyeti ya miundombinu wala chochote ambacho huna haki ya kukishiriki. Mchango hupitiwa kabla ya kutumika; kuutuma hakutoi haki za uandishi wala za uhariri, na udhamini haununui matokeo.
Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.
Maps, data and figures on this site are shown for context and general information. They are not advice, forecasts or warnings; the limits of the information are set out in the Disclaimers and Data Notices.
Tovuti hii inatumia vidakuzi vya lazima kabisa pekee ili kufanya kazi na kukumbuka chaguo zako za faragha. Hakuna kinachopakiwa kutoka kampuni nyingine, na kamwe hatuuzi wala kushiriki taarifa zako binafsi.
Tovuti hii inatumia vidakuzi vya lazima kabisa pekee ili kufanya kazi na kukumbuka chaguo zako za faragha. Hakuna kinachopakiwa kutoka kampuni nyingine, na kamwe hatuuzi wala kushiriki taarifa zako binafsi. Hatuendeshi matangazo. Unaweza kukagua chaguo zako wakati wowote kupitia Chaguo za faragha chini ya kila ukurasa.