GCRI · National Nexus
Formation pathway
A National programme forms in stages, and each stage is a different thing. Exploration is interest and research coverage. Constitution is accountable structures and instruments on record. An active programme is scoped work under them. The Global Centre for Risk and Innovation (GCRI) supports formation and keeps these apart: interest is never shown as a programme, a plan never as a commitment. Part of National Nexus.
Formation pathway on the record.
- 01InstitutionThe Global Centre for Risk and Innovation (GCRI)
- 02StagesFour stages, each with its own evidence
- 03DossierWhat the formation dossier contains
- 04First outcomeWhat a country receives from a scoping dialogue
- 05SafeguardsConditions that apply from the first step
- 06StatusWhere formation stands
Four stages, each with its own evidence.
| Stage | What it means | Evidence required |
|---|---|---|
| Exploration | Questions, interest and research coverage | An enquiry with a reference; a country research profile |
| In formation | A formation dossier is being prepared | Named counterparts and a dossier in progress |
| Constituted | Accountable structures and instruments exist | Recorded instruments and a named accountable organisation |
| Active programme | Scoped work is under way | Agreements, a mandate and records of delivery |
What the formation dossier contains.
- The local ownership model and host options
- The first risk questions, drawn from national demand
- Safeguards, including rights-holder involvement and conflict rules
- Domestic resources and any support sought
- Exit conditions, so the programme can stop cleanly
How the process runs.
Process
Formation pathway: Build, sign and accept
An admitted mission becomes a cycle project; the build is pinned, verified and signed, and the Global Risks Forum (GRF) records acceptance for exercise, not permission to deploy.
01 Request and sources
- 01Admitted mission becomes a cycle projectRecord · Universe to FoundryAn admitted mission becomes a cycle project with a decision case.
- 02Qualify data sources and resourcesStep · GCRIGCRI qualifies data sources and resource offers and builds the scenario models. An offer is not an allocation.
02 Build and verify
- 03Source snapshotRecord · NXS-FAC (blueprints, builds and signing)The snapshot pins the commit, dependencies and generator versions.
- 04Build contractRecord · NXS-FAC (blueprints, builds and signing)The build contract declares the artefact kind, environment and reproducibility envelope.
- 05Integrate and buildModel · GCRIGCRI integrates software and data, signs builds, and tests security and interoperability.
- 06Verification suiteGate · NXS-FAC (blueprints, builds and signing)Required and advisory checks stay separate. Reproducibility needs pinned inputs, declared nondeterminism and independent rebuilds.
03 Sign and admit
- 07Sign the exact artefactStep · NXS-FAC (blueprints, builds and signing)NXS-FAC builds, attests and requests a signature via a scoped signer identity. It holds no key material.
- 08Package admissionStep · NXS-NXQ (software, models and capability lifecycle)NXS-NXQ receives the signed package and keeps admission evidence that binds the task, data class, evaluation suite and expiration.
04 Accept
- 09Core Build ReportRecord · GCRIThe Core Build Report is the go or no-go record. Universe assembles the Core and holds the decision for the exercise.
- 10G3 · Build accepted for exerciseGate · The Global Risks ForumGRF records whether the build is accepted for exercise. A signed build or release candidate is not permission to deploy to production.
The programme year · NXS-FAC · UniverseDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The record order follows the Builds and Releases room lists of NXS-FAC.
What a country receives from a scoping dialogue.
Scoping note
The question, the counterparts and the authority for each step.
Authority map
Which institutions decide what, so that no step is taken without its holder.
Baseline plan
A first-quarter baseline plan and a decision on whether to proceed.
Conditions that apply from the first step.
Formation brings people and data together before any programme exists, so safeguards start early. Rights-holders take part on their own terms, with a knowledge-use schedule and withdrawal conditions. Participants declare interests. Enquiries are used to answer them and keep a record, under this site’s privacy notice. Engagement follows the Foundry sanctions and eligibility policy.
Where formation stands.
No national programme is recorded as constituted or active. Information and enquiries are open today. A research profile or an enquiry is not a constituted programme. National adoption is a separate decision of the competent authority. Begin with a country programme enquiry. Programme status defines each state. The parallel route at The Global Risks Forum (GRF): National and regional participation.
Questions and answers.
How long does formation take?
Must a government lead formation?
Who pays for formation?
Can a country stop after exploration?
Bring a method, a dataset or a question.
Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.
Legal documents.
Maps, data and figures on this site are shown for context and general information. They are not advice, forecasts or warnings; the limits of the information are set out in the Disclaimers and Data Notices.