Skip to content

GCRI · زیرساخت‌های حیاتی

برنامه‌ها و پروژه‌ها

How زیرساخت‌های حیاتی organises work into programmes: global priorities, regional applications and country work, each shown with its actual status.

01فضای کار

The workspace for programmes and projects.

Workstream tracker

Programmes and projects · Programme year 1 · Example interface, not a record

Two milestones at riskGCRI · زیرساخت‌های حیاتی

Workstreams

owner · stage · status

Restoration priorities protocolEmergency servicesآزمونM5 · week 10On track
Dependency mapping, lifelinesمالک داراییساختنM3 · week 26مسدود
Backup power auditPlanning authorityساختنM2 · week 13On track
Flood hardening programmeمالک داراییتعیین دامنهM7 · week 3On track
Asset criticality assessmentEmergency servicesتعیین دامنهM4 · week 40At risk

Effort against plan

person-weeks

Restoration priorities30 pw of 22 pw requiredDependency mapping41 pw of 31 pw requiredBackup power audit47 pw of 23 pw requiredFlood hardening48 pw of 36 pw required

Milestones

  1. W6M1Restoration priorities protocol: scoping note signed
  2. W16M2Inputs qualified at the gate
  3. W23M3Dependency mapping, lifelines: build review
  4. W27M4Controlled test with observers
  5. W44M5Publication and decision record
Workstream tracker.رابط تصویری؛ داده‌های زنده نیست.

Critical Infrastructure · Workstream tracker. Workstream tracker: example names and illustrative values, not a record.

02سطوح

Three levels of work.

03Three levels

How infrastructure work is organised globally, regionally and nationally.

Infrastructure resilience is shaped by global principles, regional networks that cross borders and national regulation of critical entities.

  • جهانی: principles for resilient infrastructure and shared methods.
  • منطقه‌ای: cross-border grids, corridors, cables and pipelines.
  • ملی: critical entity designation, resilience duties and asset standards.
04فرایند

نحوهٔ اجرای فرایند.

Process explorer · Process

Programmes and projects: Policy question to decision

9 steps5 مرحله1 gate

فرایند

Programmes and projects: Policy question to decision

A priority becomes a question, evidence, a decision case and a limited publication; the competent authority decides, never the programme.

  1. 01 Question

    1. 01A priority becomes a questionگام · جهان; national counterpartsA priority becomes a researchable question with stated criteria. National counterparts own the agenda, data and decisions.
    2. 03Scientific and stakeholder challengeStep · the Global Centre for Risk and Innovation (GCRI); the Global Risks Forum (GRF)چالش علمی و چالش ذی‌نفعان آسیب‌دیده انتخاب مأموریت و روش‌ها را آگاه می‌کند.
  2. 02 Evidence and options

    1. 04Assemble the evidenceگام · GCRIMethods, labelled data and uncertainty are assembled. Every finding carries one of nine evidence labels.
    2. 06Decision case with optionsRecord · The decision owner named in the caseA decision case binds owner, alternatives, evidence and deadline. It needs sensitivity and robustness.
  3. 03 Review and publication

    1. 07G6 · انتشار مجاز شددروازه · The Global Risks ForumGRF authorises publication of results that have passed scientific and editorial review. It cannot publish personal data.
    2. 08Publish with method, uncertainty and limitsسابقه · گزارش‌هاFindings are published with their method, uncertainty and limits. An edition is published after review, not to a calendar.
  4. 04 Outside the programme

    1. 02Competent authority decidesDecision · The competent authorityThe authority or institution decides under its own rules. The authority decides; the programme informs.
    2. 05Action and implementation stay with the ownersActor · The relevant government, operator or licensed institutionDecisions and execution stay with the relevant government, operator or licensed institution. The programme records one only if shared.
  5. 05 Learning

    1. 09Corrections and lessons feed the next agendaگام · ⁨Universe⁩Corrections and lessons feed the next annual agenda. The findings of one year set the mandate of the next.

چرخهٔ Nexus · Decision rights · The programme yearDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation.

05وضعیت

Every programme shows where it stands.

A programme is shown as exploring, forming, constituted, active, paused or archived, according to its record. A plan is never presented as an activity.

06منابع

Where this page’s references lead.

نهادها و اسنادی که این صفحه بر پایهٔ آن‌ها خوانده می‌شود. وضعیت و ویراست‌ها تغییر می‌کنند؛ هر پیوند به نهاد صادرکننده می‌رود.

08پرسش‌ها

پرسش و پاسخ.

How does a country take part?
Through its national programme. Country enquiries go to the Consortium Secretariat at فرم تماس or a regional desk.
زیرساخت‌های حیاتی

یک روش، یک مجموعه‌داده یا یک پرسش بیاورید.

اطلاعات و درخواست‌ها امروز باز است. هر درخواست یک شمارهٔ پیگیری می‌گیرد و گام بعدی را مشخص می‌کند؛ درخواست‌های عضویت، پرداخت‌ها، تخصیص رایانش و ثبت‌نام‌ها تنها زمانی باز می‌شوند که تیم، شرایط و ظرفیت داوری آن‌ها فراهم باشد.