The 2027 agenda
Eight bounded questions open the 2027 additive manufacturing agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 additive manufacturing edition.
Contents
- ·Edition home
- ·Executive summary
- 1Additive manufacturing is production infrastructure that is still being qualified
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Defence demand outruns part acceptance and supply
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
7.1Questions for the operational series
- M-01
How fast can defence and aerospace qualify materials and processes, and what limits the rate?
INI-XT13-QAL-01 · part acceptance; first output: part acceptance register by sector.
- M-02
What do metal machines need in energy and inert gas per kilogram of part, on a common basis?
INI-XT13-ENE-02 · process footprint; first output: footprint estimates by process.
- M-03
How large is the supply of qualified metal powder, and where are the chokepoints?
INI-XT13-PWD-03 · powder supply; first output: supply map.
- M-04
Which machines, materials and software are single points of failure for production lines?
INI-XT13-DEP-04 · dependence; first output: dependence map.
- M-05
How can production claims, yield and scrap be compared on a common basis?
INI-XT13-BMK-05 · claims on a common basis; first output: benchmark table.
- M-06
Which national controls and strategies set rules for machines, feedstock and files, and how do they differ?
To be admitted in 2027; first output: controls overlay.
- M-07
What workforce exists for operating, qualifying and finishing additive parts?
To be admitted in 2027; first output: scoping note.
- M-08
Which readiness capabilities have been tested in real production, and which are only planned?
Readiness capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for the 2027 additive manufacturing portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-XT13-QAL-01 | Part acceptance | Initiative | M-01 | PROPOSED |
| INI-XT13-ENE-02 | Process footprint | Initiative | M-02 | PROPOSED |
| INI-XT13-PWD-03 | Powder supply | Initiative | M-03 | PROPOSED |
| INI-XT13-DEP-04 | Dependence | Initiative | M-04 | PROPOSED |
| INI-XT13-BMK-05 | Claims on a common basis | Initiative | M-05 | PROPOSED |
| MSN-XT13-2027-01 | Defence demand Universe mission | Mission | M-01 | Candidate |
7.3The pathway
The additive manufacturing edition reads national industrial readiness chapters, the coupled sector reports on infrastructure, minerals and supply chains, and the global edition through one governed evidence graph. At baseline the federation is designed; the global energy and lifeline editions are drafted. This page states what exists today and what comes next.
- 01
National readiness chapters
industrial and defence production readiness in each national edition
IN PREPARATION · national baselines
- 02
Sector couplings
GS-02 energy · GS-09 infrastructure · SR-04 minerals
GS-02 DRAFTED · sector baselines
- 03
Technology system model
machines, feedstock, energy, part acceptance, workforce, governance
v0 SPECIFIED · v1 with federation evidence
- 04
Strategic links
SR-03 supply chains and chokepoints · SR-13 strategic technology
PLANNED · strategic baselines
- 05
Universe
annual proving environment
CANDIDATE MISSION · mandate in 2027
- 06
XT-13 report
this series
BASELINE DRAFT · 2027 annual edition
- 07
Evidence and correction
one graph, many projections
OPEN · first correction cycle in 2027
7.4Universe 2027: evidence pack for the additive manufacturing candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | 2027 global annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-XT13-2027-01 · Defence demand Universe mission
- Role spine
- Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| FIN-002 · market size | INI-XT13-BMK-05 | claims on a common basis | PUBLIC |
| FIN-003 · machine-maker results | INI-XT13-DEP-04 | dependence | PUBLIC |
| GOV-007 · Navy parts | INI-XT13-QAL-01 | part acceptance | PUBLIC |
| ENE-008 · process energy | INI-XT13-ENE-02 · key F review | process footprint | PUBLIC |
| HLT-009 · powder exposure | INI-XT13-ENE-02 | process footprint | PUBLIC |
| GOV-010 · export controls | regional consortia | controls overlay | PUBLIC |
| INF-011 · benchmarks | INI-XT13-BMK-05 | claims on a common basis | PUBLIC |
| SYS-012 · compound pathway | MSN-XT13-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the federation | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| Wohlers Report and trade press | commercial survey | annual | FIN-002 |
| Listed company results | companies | quarterly | FIN-003 |
| Navy and DoD releases | US government | per event | GOV-007 |
| NIST additive manufacturing pages | NIST | per release | INF-011 |
| NIOSH evaluations | NIOSH | per release | HLT-009 |
| Federal Register export-control rules | BIS | per rule | GOV-010 |
| Critical minerals outlook | IEA | annual | MIN-010 |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- annual publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-XT13-001 | Revenue growth of 10.9% in 20252 | PARTIAL | FIN | research question M-05 |
| SIG-XT13-002 | Machine-maker Chapter 11 filing in 20255 | CORROBORATED | FIN · INF | initiative M-04 |
| SIG-XT13-003 | Navy parts installed in 20267 | PARTIAL | GOV · INF | research question M-01 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 2Voulpiotis, F. (3Dnatives), Wohlers Report 2026: growth continues, but caution defines the AM market (trade article, 17 February 2026; weak evidence: a trade summary of a commercial report; reports 2025 revenue USD 24.231 billion, up 10.9%, services up 15.5% with 48% share, machine sales up 3.6%, Asia-Pacific up 19.8%, Europe and the Americas up 9%). 3Dnatives, Paris. Observation year 2025. Accessed 2026-11-03.back
- 5Nano Dimension Ltd. (ed.), Annual report on Form 10-K for the year ended 31 December 2025 (first 100,000 characters read; Desktop Metal Chapter 11 filing on 28 July 2025; Markforged acquisition closed 25 April 2025; revenue tables not read). Nano Dimension, Waltham. Observation year 2025. Accessed 2026-11-03.back
- 7Jones, M. (NAVSUP Weapon Systems Support), Shattering bottlenecks: NAVSUP WSS partners with DLA and NAVSEA on submarine advanced manufacturing (official release via the Defense Visual Information Distribution Service, 30 June 2026; nearly 120 additive parts in development, 20 installed, more than 1,400 cumulative days of delay removed, lead times cut by up to 70% for some components; not independently audited). US Navy, Mechanicsburg. Observation year 2026. Accessed 2026-11-03.back
