Skip to content

GCRI · National Nexus

Oluşum yolu

A National programme forms in stages, and each stage is a different thing. Exploration is interest and research coverage. Constitution is accountable structures and instruments on record. An active programme is scoped work under them. The Global Centre for Risk and Innovation (GCRI) supports formation and keeps these apart: interest is never shown as a programme, a plan never as a commitment. Part of National Nexus.

02Aşamalar

Her biri kendi kanıtına sahip dört aşama.

AşamaNe anlama gelirEvidence required
KeşifQuestions, interest and research coverageAn enquiry with a reference; a country research profile
Oluşum aşamasındaA formation dossier is being preparedNamed counterparts and a dossier in progress
ConstitutedAccountable structures and instruments existRecorded instruments and a named accountable organisation
Active programmeScoped work is under wayAnlaşmalar, bir yetki ve teslimat kayıtları
03Dosya

What the formation dossier contains.

  • The local ownership model and host options
  • The first risk questions, drawn from national demand
  • Safeguards, including rights-holder involvement and conflict rules
  • Yurt içi kaynaklar ve talep edilen destekler
  • Programın düzgün biçimde sona erebilmesi için çıkış koşulları
04Süreç

Sürecin nasıl işlediği.

Process explorer · Process

Formation pathway: Build, sign and accept

10 steps4 stages2 gates

Süreç

Formation pathway: Build, sign and accept

Kabul edilen bir görev bir döngü projesine dönüşür; derleme sabitlenir, doğrulanır ve imzalanır ve Global Risks Forum (GRF) kullanıma alma izni olarak değil, tatbikat için kabul olarak kaydeder.

  1. 01 Talep ve kaynaklar

    1. 01Kabul edilen görev bir döngü projesine dönüşürKayıt · Evren 'ten Foundry'yeKabul edilen bir görev, bir karar vakasıyla birlikte bir döngü projesine dönüşür.
    2. 02Veri kaynaklarını ve kaynakları nitelendirinAdım · GCRIGCRI veri kaynaklarını ve kaynak tekliflerini nitelendirir ve senaryo modellerini oluşturur. Bir teklif bir tahsis değildir.
  2. 02 Oluşturun ve doğrulayın

    1. 03Kaynak anlık görüntüsüKayıt · NXS-FAC (taslaklar, yapılar ve imzalama)Anlık görüntü; commit'i, bağımlılıkları ve üreteç sürümlerini sabitler.
    2. 04Derleme sözleşmesiKayıt · NXS-FAC (taslaklar, yapılar ve imzalama)Derleme sözleşmesi, çıktı türünü, ortamı ve tekrarlanabilirlik kapsamını beyan eder.
    3. 05Integrate and buildModel · GCRIGCRI integrates software and data, signs builds, and tests security and interoperability.
    4. 06Doğrulama paketiGeçit · NXS-FAC (taslaklar, yapılar ve imzalama)Zorunlu ve tavsiye niteliğindeki kontroller ayrı tutulur. Tekrarlanabilirlik, sabitlenmiş girdiler, beyan edilmiş belirlenimsizlik ve bağımsız yeniden derlemeler gerektirir.
  3. 03 İmzalayın ve kabul edin

    1. 07Tam olarak o çıktıyı imzalayınAdım · NXS-FAC (taslaklar, yapılar ve imzalama)NXS-FAC derler, onaylar ve kapsamı sınırlı bir imzacı kimliği aracılığıyla imza ister. Anahtar materyali tutmaz.
    2. 08Paket kabulüAdım · NXS-NXQ (yazılım, modeller ve yetenek yaşam döngüsü)NXS-NXQ imzalı paketi alır ve görevi, veri sınıfını, değerlendirme paketini ve sona erme tarihini bağlayan kabul kanıtını saklar.
  4. 04 Kabul edin

    1. 09Temel Geliştirme RaporuKayıt · GCRIÇekirdek Oluşturma Raporu, devam veya durdurma kaydıdır. Universe Çekirdeği bir araya getirir ve tatbikat kararını elinde tutar.
    2. 10G3 · Yapım tatbikat için kabul edildiGeçit · The Global Risks ForumGRF derlemenin tatbikat için kabul edilip edilmediğini kaydeder. İmzalı bir derleme veya sürüm adayı, üretime alma izni değildir.

The programme year · NXS-FAC · UniverseDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The record order follows the Builds and Releases room lists of NXS-FAC.

05İlk sonuç

What a country receives from a scoping dialogue.

Not

Kapsam notu

The question, the counterparts and the authority for each step.

Harita

Yetki haritası

Which institutions decide what, so that no step is taken without its holder.

Plan

Baseline plan

A first-quarter baseline plan and a decision on whether to proceed.

06Güvenceler

Conditions that apply from the first step.

Formation brings people and data together before any programme exists, so safeguards start early. Rights-holders take part on their own terms, with a knowledge-use schedule and withdrawal conditions. Participants declare interests. Enquiries are used to answer them and keep a record, under this site’s privacy notice. Engagement follows the Foundry sanctions and eligibility policy.

07Durum

Oluşumun geldiği aşama.

No national programme is recorded as constituted or active. Information and enquiries are open today. A research profile or an enquiry is not a constituted programme. National adoption is a separate decision of the competent authority. Begin with a country programme enquiry. Programme status defines each state. The parallel route at The Global Risks Forum (GRF): National and regional participation.

08Sorular

Sorular ve yanıtlar.

How long does formation take?
No duration is promised. Formation moves as counterparts, safeguards and resources are confirmed, and each step is recorded.
Must a government lead formation?
Bir program, ulusal düzeyde hesap verebilir karşı taraflar gerektirir. Otoriteler arası iş birliği bir yoldur; hiçbir zaman bir üyelik kademesi satın almaya bağlı değildir.
Who pays for formation?
Oluşum, yurt içi kaynaklarla ve yazılı şartlarda belirtilen her türlü destekle gerçekleşir. Herhangi bir ücret tarifesi yayımlanmaz ve kamu kurumlarıyla iş birliği hiçbir zaman bir üyelik kademesi satın almaya bağlı değildir.
Can a country stop after exploration?
Yes. A decision not to proceed is recorded with its reasons, and nothing obliges a country to continue.
Global Centre for Risk and Innovation

Bir yöntem, bir veri seti ya da bir soru getirin.

Bilgi ve başvurular bugün açıktır. Bir başvuru bir referans numarası alır ve bir sonraki adımı belirtir; başvurular, ödemeler, işlem kapasitesi tahsisleri ve kayıtlar yalnızca ekipleri, koşulları ve inceleme kapasiteleri mevcut olduğunda açılır.