Skip to content

GCRI · GCRI ile çalışın

Altyapı ve sanayi

Utilities, infrastructure and essential-service operators, manufacturers and industry associations can work with The Global Centre for Risk and Innovation (GCRI) on dependency and resilience evidence, research and development, and safe trials. Work starts from an operational mission and ends with a handoff. The operator keeps its assets and decisions. No membership grants access to production systems. Part of Work with GCRI.

02What the work produces

Evidence, R&D and safe trials.

Each piece of work is scoped to an operational question the operator owns.

Kanıt

Dependency studies

Which services depend on which assets and suppliers, linked to infrastructure dependencies.

R&D

Applied research

İşletmeciyle birlikte geliştirilen, hakları baştan kararlaştırılmış yöntemler ve araçlar.

Trials

Controlled tests

Durdurma kurallarıyla test tasarımları; hiçbir şey canlı operasyonlara dokunmadan önce kontrollü ortamlarda yürütülür.

03Yollar

Two starting points.

Kimİlk adımİlk sonuç
Utilities, infrastructure and essential-service operatorsİşletme gerçekliğine dayanan bir misyon sununA dependency study, a controlled test design, options and limitations and a handoff to the operator
İşletmeler, imalatçılar ve sanayi dernekleriExplore a sector programmeA work scope, permitted data exchange, evaluation terms and an operational output
04Süreç

Sürecin nasıl işlediği.

Process explorer · Process

Infrastructure and industry: Working group, charter to sunset

9 steps4 stages1 gate

Süreç

Infrastructure and industry: Working group, charter to sunset

Bir çalışma grubu, belirli bir süre için kayıtla tüzük alır, sınırları belirli görevleri yerine getirir, taslak hazırlar ve tavsiyede bulunur, ardından yenilenmedikçe feshedilir; benimseme kararı vermez.

  1. 01 Form

    1. 01NLC grubu önerirKarar · Ulusal Liderlik KonseyiNLC çalışma grupları önerir ve liderlik havuzlarından başkanları, editörleri ve uzmanları aday gösterir. Tüzük vermez.
    2. 02Kayıtla tüzükKarar · Ulusal Standartlar KonseyiBir çalışma grubu, en fazla yirmi dört aylık bir süre için kayıtla tüzük alır. Tüzük, kapsamını, rollerini ve karar kuralını belirler.
    3. 03Üyeler yetkinlikleriyle katılırAdım · ÜyelerUzmanlar, uygulayıcılar, öğrenciler ve gönüllüler yetkinlikleriyle katılır. Üyeler çıkarlarını beyan eder ve çatışma durumunda çekilir.
  2. 02 Work

    1. 04Workplan from the national agendaStepAssignments come from the national agenda and the year’s missions. Each states the competence it needs and how the work will be reviewed.
    2. 05Aylık olarak teslim edilen taslaklar ve çıktılarKayıtGruplar aylık teslimat yapar. Standartlar için ulusal profili ve sapma kaydını taslak olarak hazırlar, ulusal kamuoyu görüşünü ve pilot uygulamaları yürütür.
  3. 03 İnceleme

    1. 06Katkı kaydı ve incelemesiGeçitHer katkı kaydedilir ve incelenir. Bir çalışma grubu taslak hazırlar ve tavsiyede bulunur; benimseme kararı vermez.
    2. 07Tanınma kaydı izlerKayıtKatkı kayıtları tutulur; böylece tanınma kaydı izler.
    3. 08Ulusal benimseme başka bir yerde kararlaştırılırKarar · Ulusal Standartlar KonseyiUlusal Standartlar Konseyi benimseme biçimine ve ulusal profile karar verir. Çalışma grubu önerir ve asla karar vermez.
  4. 04 Kapanış

    1. 09Dissolved by default, or renewed by recordDecision · National Standards CouncilA group is dissolved by default at the end of the timebox. The National Standards Council renews or closes it, on the NLC’s proposal.

National Working Groups · National Standards Council · Decision rightsDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. No working group is constituted. The charter rules belong to the proposed Nexus Standards working model.

05Koşullar

Neler alırsınız, neye katkıda bulunursunuz ve neler bekleyebilirsiniz.

SoruYanıt
AldıklarınızA dependency study, a controlled test design, options with their limits and a handoff
KatkınızAn operational question, permitted data under agreed terms and operator time
MaliyetDetermined in the written terms for each scope, stated with issuer, currency, effective date and scope before any commitment
Kim hesap verirŞartlarda adı geçen GCRI kuruluşu, GCRI Canada veya GCRI US
Nasıl ayrılınır veya endişe iletilirKararlaştırılan koşullar çerçevesinde istediğiniz zaman çekilebilirsiniz; endişeler bütünlük endişesi formuna
06Role limits

What GCRI does not do.

  • GCRI does not operate, inspect or certify infrastructure
  • Üyelik hiçbir zaman üretim erişimi vermez ve kamuya açık önizlemeler kısıtlı topolojiyi asla ifşa etmez
  • Precompetitive work is designed so that competitors’ confidential information is not exchanged
  • A tested option is not authorisation to deploy it; that decision belongs to the operator

Altyapıya ilişkin finansman soruları, The Global Risks Alliance (GRA) tarafından altyapı hazırlığıkapsamında incelenir. Bilgi ve sorular bugün açıktır: her soruya bir referans verilir ve alındı bildirimi bir sonraki adımı belirtir.

07Sorular

Sorular ve yanıtlar.

Do we have to share sensitive operational data?
Only what the agreed scope needs, under data terms you approve. Restricted detail never appears in public outputs.
Sonuçların sahibi kimdir?
Rights are agreed at the start, separating background intellectual property, joint results and third-party material. Public publication requires agreement.
Üyelik ücreti var mı?
No fee schedule is published. No one is asked to pay a fee that has not been stated with its issuer, currency, effective date and scope.
Nasıl başlarız?
Write to the contact form with the operational question and the scope you have in mind.
Global Centre for Risk and Innovation

Bir yöntem, bir veri seti ya da bir soru getirin.

Bilgi ve başvurular bugün açıktır. Bir başvuru bir referans numarası alır ve bir sonraki adımı belirtir; başvurular, ödemeler, işlem kapasitesi tahsisleri ve kayıtlar yalnızca ekipleri, koşulları ve inceleme kapasiteleri mevcut olduğunda açılır.