GCRI · Nexus Ekosistemi
Ağ ve Çekirdek
Two layers of shared computing serve Nexus Consortiums. The Nexus Network is a durable federation of retained national and regional sites. edition Core is the temporary backbone assembled each year from contributed, authorised computing, networks and teams, then stood down. The Global Centre for Risk and Innovation (GCRI) coordinates both through GCRI Canada. Part of Nexus ecosystem.
The workspace for Network and Core.
Ülke programı konsolu
Network and Core · Country programme A · Month 4 · Example interface, not a record
Program
- Oluşumdosya
- Ulusal Masapersonel görevlendirilmiş
- Ulusal Modelyapım
- Portföyseçenekler
- Annual missiontest
- Raporsürüm
Sistem bağlantısı
bağımlılık gücü, 0 ila 100
Bir Ulusal Modelin tahminlerle değiştirdiği örnek güçlü yönler.
Kanıt kayıt defteri
| Rezervuar depolaması | GÖZLENEN | Ulusal Masa |
| Hidroelektrik üretimi | MODELLENMİŞ | Teknik ofis |
| Şebeke baskısı | SENARYO | Teknik ofis |
| Hastane sürekliliği | TAHMİNİ | Sağlık bakanlığı |
GCRI · Ülke programı konsolu. Ülke programı konsolu: örnek adlar ve örnekleyici değerler, kayıt değildir.
Persistent, temporary and durable.
| Katman | Neleri barındırır |
|---|---|
| Persistent coordination | Authorised institutions and projects; resource catalogues and qualification; identity, rights and methods; retained evidence and publication records |
| Temporary technical environment | Qualified networking and high-performance computing; accelerators, cloud and edge capacity; secure data spaces and cyber ranges; simulation environments and technical support |
| Durable outputs | Trained teams and tested configurations; reproducible workloads and software; datasets where permitted and evaluation results; improvements to institutional practice |
The Network is not a permanent global supercomputer, and the Core is not installed, standing capacity.
Seven states, none of which implies the next.
A contributed resource moves through offered, qualified, reserved, allocated, accessible, measured and accepted. An offer is never counted as reserved, consumed or funded, and neither membership nor sponsorship secures an allocation.
- Owner and operating contact
- Legal and use constraints, location and availability window
- Hardware, software, interconnect, memory and storage profile
- Güvenlik durumu, desteklenen iş yükleri ve ölçülen sınırlar
- Return and sanitisation requirements
Rules for describing capacity.
- 01
State the conditions
Publish measured capability with workload, data size, hardware, topology, precision, concurrency, software version and interval.
- 02
Separate the numbers
Keep peak, sustained, available and allocated capacity apart, and never sum hardware specifications into a performance claim.
- 03
Federation is not one machine
Describe local low-latency computing and wide-area federation separately.
- 04
Count the footprint
Track energy, cooling, water, transfers and logistics, keeping measurements apart from estimates.
How the temporary Core is closed.
The proposed one-day stand-down closes new submissions, checkpoints authorised jobs, freezes the evidence manifest, revokes temporary credentials, reconciles equipment and records open exceptions. It becomes a commitment only when the annual programme records it. Review, reconciliation and corrections continue afterwards. Contributors start at Technology and infrastructure providers. The Global Risks Forum (GRF) governs the annual programme: see its Annual operating cycle.
Sorular ve yanıtlar.
Is any Core capacity available now?
Does offering capacity give us a role in the programme?
Is data deleted within a day of stand-down?
Bir yöntem, bir veri seti ya da bir soru getirin.
Bilgi ve başvurular bugün açıktır. Bir başvuru bir referans numarası alır ve bir sonraki adımı belirtir; başvurular, ödemeler, işlem kapasitesi tahsisleri ve kayıtlar yalnızca ekipleri, koşulları ve inceleme kapasiteleri mevcut olduğunda açılır.
Hukuki belgeler.
Bu sitedeki haritalar, veriler ve şekiller bağlam ve genel bilgi amacıyla gösterilir. Tavsiye, tahmin ya da uyarı değildir; bilgilerin sınırları Sorumluluk Reddi ve Veri Bildirimleri'nde açıklanmıştır.