GCRI · PAGE · network-and-coreGCRI dossier · service level R0
GCRINexus Ecosystem
Ecosystem · Network and Core

Network and Core

Two layers of shared computing serve Nexus Consortiums. The Nexus Network is a durable federation of retained national and regional sites. Nexus Core is the temporary technical backbone assembled each year for the annual programme from contributed, authorized computing, networks and teams, then stood down. The Global Centre for Risk and Innovation (GCRI) coordinates both through GCRI Canada. This page explains the difference, the states a resource offer passes through and the rules for describing capacity honestly. Return to Nexus Ecosystem.

Institution
The Global Centre for Risk and Innovation (GCRI)
Service level
R0: information and enquiries

Country programme console

Network and Core · Country programme A · Month 4

National Model in buildGCRI · GCRI

Programme

  1. Formationdossier
  2. National Deskstaffed
  3. National Modelbuild
  4. Portfoliooptions
  5. Annual missiontest
  6. Reportedition

System coupling

dependency strength, 0 to 100

Placeholder strengths a National Model replaces with estimates.

Evidence ledger

Reservoir storageOBSERVEDNational Desk
Hydropower outputMODELLEDTechnical office
Grid stressSCENARIOTechnical office
Hospital continuityESTIMATEDHealth ministry

GCRI · Country programme consoleCountry programme console, in outline: domain structure with placeholder names and illustrative values, not a record.

01In brief

The short answer.

The Nexus Network and Nexus Core are the two layers of shared computing for Nexus Consortiums: the Network is a durable federation of retained national and regional sites, and the Core is a temporary backbone assembled each year from contributed, authorized resources, then stood down. A contributed resource moves through seven states, and an offer is never counted as capacity.

02Geography

Landscapes and remoteness in Central America.

Mountain ranges, deserts, wetlands, glaciers and reefs, and how remote each division is from large cities, shown for Central America as an example geography for this subject.

Mountain ranges, deserts, wetlands, glaciers and reefs, and how remote each division is from large cities.Indicator derived from Natural Earth at map scale; a screening view, not an assessment.
GCRI · institution · fieldDESIGN FIGURE
03Layers

Persistent, temporary and durable.

LayerWhat it holds
Persistent coordinationAuthorized institutions and projects; resource catalogues and qualification; identity, rights and methods; retained evidence and publication records
Temporary technical environmentQualified networking and high-performance computing; accelerators, cloud and edge capacity; secure data spaces and cyber ranges; simulation environments and technical support
Durable outputsTrained teams and tested configurations; reproducible workloads and software; datasets where permitted and evaluation results; improvements to institutional practice

The Network is not a permanent global supercomputer, and the Core is not installed, standing capacity.

04Resource states

Seven states, none of which implies the next.

A contributed resource moves through offered, qualified, reserved, allocated, accessible, measured and accepted. An offer is never counted as reserved, consumed or funded, and neither membership nor sponsorship secures an allocation.

  • Owner and operating contact
  • Legal and use constraints, location and availability window
  • Hardware, software, interconnect, memory and storage profile
  • Security state, supported workloads and measured limits
  • Return and sanitisation requirements
05Measurement

Rules for describing capacity.

  1. 01

    State the conditions

    Publish measured capability with workload, data size, hardware, topology, precision, concurrency, software version and interval.

  2. 02

    Separate the numbers

    Keep peak, sustained, available and allocated capacity apart, and never sum hardware specifications into a performance claim.

  3. 03

    Federation is not one machine

    Describe local low-latency computing and wide-area federation separately.

  4. 04

    Count the footprint

    Track energy, cooling, water, transfers and logistics, keeping measurements apart from estimates.

06Key terms

Terms used on this page.

Each term as this page uses it. Where a standard-setting body defines the term, the wording follows that body.

TermDefinition
Edge computingProcessing data close to where it is produced or used rather than in a central data centre.
Data residencyA requirement that data be stored and processed within a stated jurisdiction.
Research and education networkA network that connects universities and research institutions at high capacity.
Capability computingUsing a large share of a supercomputer for a single, very large job.
07Stand-down

How the temporary Core is closed.

The proposed one-day stand-down closes new submissions, checkpoints authorized jobs, freezes the evidence manifest, revokes temporary credentials, reconciles equipment and records unresolved exceptions. It becomes a programme commitment only when the annual programme records it, and review, reconciliation and corrections continue afterwards. Contributors can start from Technology and infrastructure providers; the annual programme itself is governed by The Global Risks Forum (GRF), described on Annual operating cycle.

08Questions

Questions and answers.

Is any Core capacity available now?
No allocation is open. The current service level is information and enquiries.
Does offering capacity give us a role in the programme?
An offer receives a disposition and, if suitable, a qualification record. Allocation is a separate, approved step, and an offer confers no governance role.
Is data deleted within a day of stand-down?
No such promise is made. Media are purged or retained under approved, validated rules, and review continues after stand-down.
The Global Centre for Risk and Innovation

Start with an enquiry.

The current service level is R0: information and enquiries. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.

Have questions?