G01 · PROCESS · foundryGCRI dossier · service level R0
GCRIWater NexusEstablished
Build in Nexus Foundry

Build in Nexus Foundry

The Nexus Foundry systems that serve Water Nexus, what an authorized project can do with them, and how access is requested.

Publisher
The Global Centre for Risk and Innovation
Field
Water, Climate and hazards, Critical infrastructure
Status
Established
Service level
R0: information and enquiries
Nexus Core build, illustrative interfaceAn illustrative Core build console: contributed capacity moving through offered, qualified, reserved, allocated, accessible, measured and accepted states, a temporary backbone topology with compute, network, data, identity and observability nodes, readiness meters and a build report with open defects and a pending go or no-go decision. Values are placeholders.NEXUS CORE · BUILD MONTHWEEK 3 OF 4 · ILLUSTRATIVEGO / NO-GO · OPENCONTRIBUTED CAPACITYOfferedQualifiedReservedAllocatedAccessibleMeasuredAcceptedNONE IMPLIES THE NEXTTEMPORARY BACKBONEEDITION ONLYCORECompute ANetworkData lakeIdentityObservabilityCompute BBUILT FOR THE EDITION · STOOD DOWN AFTER ITREADINESSSecurity testInteroperabilityRehearsalTrainingBUILD REPORTDefects open3Known limits7Rights verifiedYESSite safetyPENDING

Water NexusWireframe of the working environment, not a live screen. Names and values are placeholders.

STEM methods
9
Canonical methods this field applies
Topics
8
Subject pages in the field
Counterparts
10
Platforms in shared fields at GCRI, GRF and GRA
Report series
3
Nexus Reports series it contributes to
01Systems

Foundry systems for this field.

02Canvas

Scoping to review.

Canvas · scoping to reviewDesign, not a record
A programme on Water Nexus, from scoping to reviewA scoping dialogue produces a note and an authority map; qualification gates the inputs; the build, the community and a controlled test follow; publication and the owner’s decision close the cycle. Design of a programme, not a record of one.runs / water-nexus / programmeDESIGN RUN+−FITPLAYLAYOUT · LRPROGRAMME OWNERWATER NEXUS · GCRIFOUNDRY · UNIVERSEREPORTSScoping dialogueTASKR0 · no feeowner keeps authorityDONEScoping noteDATASETquestion · boundarylabel: OFFICIALDONEAuthority mapDATASETwho decides whatdata rightsDONEQualificationGATEdata · methods · resourcesoffered is not allocatedRUNNINGBuildMODELNexus Foundryversioned recordQUEUEDControlled testEXERCISEexercise controlstand-down plannedQUEUEDPublicationDATASETNexus Reportslimits attachedQUEUEDOwner’s decisionDECISIONministry · agency · utilityunder its own rulesAUTHORITYRUN TIMELINE · ONE PROGRAMMEScopeQualifyBuildTestPublishScoping dialogueScoping noteAuthority mapQualificationBuildControlled testPublicationNOWINSPECTOR · SELECTED NODEQualification · gateOWNERGCRI technical officeINPUTSscoping note, authority mapOUTPUTSqualified inputs, reasons on recordEVIDENCEdata rights confirmedUNLOCKSbuild and test

Fig.A programme as a run graph: scoping, qualification, build, test, publication and the owner’s decision, with the gates between them. Design of a programme, not a record of one.

03Field

Water Nexus on the map.

Where this page’s subject sits in the world: boundaries and context now, the field layers when the interactive map loads.

Field · world viewDesign figure until live
World map, Equal Earth projectionLand and country boundaries from Natural Earth at 1:110 million, drawn in the Equal Earth projection with a fifteen degree graticule. The interactive map with its layers loads through the Nexus Foundry plugin.
GCRI · Water Nexus · fieldDESIGN FIGURE

MapWorld map in the Equal Earth projection, land and boundaries from Natural Earth (public domain). The interactive map loads through the Nexus Foundry plugin (globe or flat view).

04Access

How a project gets access.

  1. 01

    Enquiry

    Describe the project and its owner to contact@therisk.global.

  2. 02

    Authorization

    Access requires an authorized project with an accountable owner, data terms and a review plan.

  3. 03

    Allocation

    Compute and data allocations open when their terms and review capacity exist.

The current service level is R0: information and enquiries. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.

05Connected

Where this page leads across the Consortium.

LinkRelationshipWhy
EOPFoundry systemEOP serves this field.
GRIxFoundry systemGRIx serves this field.
EWSFoundry systemEWS serves this field.
DSSFoundry systemDSS serves this field.
OPFoundry systemOP serves this field.
06Questions

Questions and answers.

Is Foundry access free?
Terms are set per project when allocations open.
Water Nexus

Bring your expertise to this field.

The current service level is R0: information and enquiries. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.

Have questions?