Skip to content

GCRI · STEM Commons

Science

Every science method in the STEM Commons, its steward platform and how widely it is applied.

01Workspace

The workspace for science.

Econometric model

The Global Centre for Risk and Innovation (GCRI) · Science · Run R-6516 · Example interface, not a record

Estimates stableGCRI · GCRI

Estimates

robust standard errors

Country programmes active0.100.05[0.0, 0.5]No
Evidence records with labels0.140.13[−0.4, 0.3]No
Methods applied0.120.18[−0.1, 0.8]No
Reports released−0.190.15[0.0, 0.4]Yes

Method card

Method
science
Sample
2345 obs
Design
panel, fixed effects
Label
MODELLED

Residuals by group

Econometric model.Illustrative interface; not live data.

GCRI · Econometric model. Econometric model: example names and illustrative values, not a record.

03The science strand

Disciplines that explain how coupled systems behave.

The science strand covers the Earth and life sciences that describe hazards and ecosystems, and the social and economic sciences that describe exposure, vulnerability and response. Systemic analysis needs both: the physical chain from rainfall to river flow, and the social chain from river flow to income, health and migration.

  • Physical systems: climate, hydrology, geoscience, oceans.
  • Living systems: ecology, agriculture, epidemiology, life sciences.
  • Human systems: social science, economics, financial economics, policy science.
04Process

How the process runs.

Process

Science: Programme through eight gates

The Global Risks Forum (GRF) records eight yearly gates, each a programme decision; a gate not passed stops its work, and the competent authority decides outside.

  1. 01 Q1 · Planning

    1. 01G0 · Annual programme authorisedGate · The Global Risks ForumGRF authorises the annual mandate. It never sets a national agenda.
    2. 03Route the candidate mission to standardsStep · Nexus StandardsNexus Standards routes each candidate mission to the standards and profiles that apply.
  2. 02 Q2 · Readiness and build

    1. 04G1 · Missions admittedGate · The Global Risks ForumGRF admits missions with reasons recorded. It cannot admit a mission without an accountable owner.
    2. 05G2 · Data and resources qualifiedGate · The Global Risks ForumReadiness preparation closes when data, people and resources are qualified.
    3. 06G3 · Build accepted for exerciseGate · The Global Risks ForumGRF records whether the build is accepted for exercise. A gate not passed stops the work it governs.
  3. 03 Q3 · Action Week

    1. 07G4 · Controlled live operation authorisedGate · The Global Risks ForumGRF authorises controlled live operation for Action Week.
    2. 08G5 · Evidence sealed and stand-down recordedGate · The Global Risks ForumThe evidence is sealed with its provenance and the stand-down is recorded.
  4. 04 Q4 · Reporting and renewal

    1. 02Competent authority decides and actsActor · The competent authorityThe competent authority decides and acts under its own rules. The programme informs it and never decides for it.
    2. 09Scientific and editorial reviewStep · Reviewers and the publisherQualified, conflict-managed reviewers and the publisher decide what is accepted. Institutions cannot decide a scientific conclusion.
    3. 10G6 · Publication authorisedGate · The Global Risks ForumGRF authorises publication of results that have passed scientific and editorial review. It cannot publish personal data.
    4. 11G7 · Renewal reviewedGate · The Global Risks ForumGRF reviews renewal and sets the next cycle’s mandate.

The programme year · The Global Risks Forum · Decision rightsDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation.

05Sources

Where this page’s references lead.

The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.

ReportsContribute

Contribute evidence from this page.

Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

GCRI
The Global Centre for Risk and Innovation

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.