Skip to content

GCRI · Critical Infrastructure

Methods and uncertainty

The methods Critical Infrastructure relies on: their equations and assumptions, the data they need, how they are validated and the limits of what they can show.

01Sequence

The order things happen in.

  1. 01Draftsources cited, labels attached
  2. 02Evidence checkevery value traced
  3. 03Independent reviewconflicts declared
  4. 04Editionpublished with its limits
  5. 05Correctiona new version, never a silent edit
02Mbinu

The methods in use.

  1. Reliability and resilience engineeringResilience metrics for lifelines · Reliability analysis of networks · Restoration planningApplied here
  2. Systems engineeringResilience requirements · Interface mapping · Verification across the life cycleApplied here
  3. Network science and contagionCritical node and link analysis · Interdependent network models · Redundancy assessmentApplied here
  4. Sensors, IoT and observation networksStructural health monitoring · Leak and pressure monitoring · Grid sensingApplied here
  5. Communications and network technologyMission-critical communications · Backhaul diversity · Communication dependencies of operatorsApplied here
  6. Optimisation and operations researchResilience investment portfolios · Restoration scheduling · Network design under uncertaintyApplied here
  7. Space systems and satellite servicesTiming dependency review · Satellite backup communications · Asset monitoring from spaceApplied here
  8. Energy generation, storage and grid technologyBackup power options · Microgrids for critical services · Fuel supply in emergenciesApplied here
  9. Power systems engineeringContingency analysis · Hardening distribution networks · Black-start and restoration plansApplied here
  10. Structural and earthquake engineeringFragility of infrastructure components · Retrofit of critical structures · Post-event inspectionApplied here
  11. Urban and transport engineeringNetwork criticality · Climate-resilient design · Disruption operationsApplied here
  12. Process and industrial safety engineeringNatech risk assessment · Layers of protection · Learning from incidentsApplied here
03Method register

Each method, its role in this field and how it is checked.

04Mchakato

How the process runs.

Process explorer · Process

Methods and uncertainty: PRISMA 2020 review reporting

10 steps4 stages

Mchakato

Methods and uncertainty: PRISMA 2020 review reporting

PRISMA 2020 is a reporting guideline for systematic reviews; the steps follow its checklist, not a mandated sequence, and no Nexus document adopts it.

  1. 01 Plan

    1. 01Registration and protocolRecord · The review teamThe guideline asks for registration details, access to the protocol and any amendments.
    2. 02Eligibility criteriaRecord · The review teamThe guideline asks for the inclusion and exclusion criteria and how studies were grouped.
  2. 02 Find and select

    1. 03Search: sources and strategiesStep · The review teamThe guideline asks for the information sources and the full search strategies. It does not fix which sources are used.
    2. 04Selection of studiesStep · The review teamThe guideline asks how studies were judged eligible, including how many reviewers screened. It does not fix the number of reviewers.
    3. 05Flow diagramRecordThe flow diagram shows the number of records found, the number of studies included and the reasons for exclusion.
  3. 03 Analyse

    1. 06Data collectionStep · The review teamThe guideline asks how data were collected from reports and which data items were sought.
    2. 07Risk of biasStep · The review teamThe guideline asks for the methods and tools used to assess risk of bias.
    3. 08SynthesisModel · The review teamThe guideline asks for the effect measures and the synthesis methods. It does not prescribe meta-analysis.
    4. 09Certainty of evidenceStep · The review teamThe guideline asks for the methods used to assess certainty, and reports the result per outcome. It does not name a grading scale.
  4. 04 Report

    1. 10Review reportRecordThe guideline helps authors report why the review was done, what they did and what they found.

ReportsOutline of an externally published reporting guideline, not a Nexus process and not a record of operation. PRISMA 2020 mainly covers reviews of intervention effects. No Nexus page names it. Every programme is at service level R0.

05Kutokuwa na uhakika

Where uncertainty in infrastructure analysis comes from, and how it is shown.

ChanzoWhy it matters hereHow it is reported
Network dataOperators rarely share full topologyData coverage stated; synthetic networks labelled
FragilityAsset response to hazards varies by age and designFragility ranges
Restoration timesDepend on crews, spares and accessDistributions from past events
DependenciesOften undocumentedElicited and labelled as expert judgement

Cascade results are reported as scenarios with the dependency assumptions listed.

06How uncertainty is reported

How uncertainty is reported.

  1. 01

    State assumptions

    Each analysis lists its assumptions and the data it depends on.

  2. 02

    Quantify where possible

    Ranges and confidence are reported alongside central estimates.

  3. 03

    Validate and compare

    Models are checked against observations and, where possible, against other models.

  4. 04

    Publish limits

    What an analysis cannot show is stated beside what it can.

07Vyanzo

Where this page’s references lead.

The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.

08Maswali

Questions and answers.

Are the methods open?
Method descriptions are public on the STEM Commons. Code and data follow their own licences and access terms, listed in the source register.
RipotiChangia

Changia ushahidi kutoka ukurasa huu.

Reports ni chapisho la kila robo mwaka la Muungano. Unachojua kuhusu somo hili kinaweza kuwa ushahidi, kisa au sahihisho katika toleo lijalo, kikitajwa kwa jina lako na kuchapishwa chini ya CC BY 4.0 pale ambapo ni kazi yako mwenyewe.

GCRIMiundombinu MuhimuMifumo ya KimkakatiHali Tarajiwa na Jaribio la Shinikizo
Miundombinu Muhimu

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.